Issue date | Title | Topic | |
---|---|---|---|
NMP1L3544, Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations | 14 July 2023 | Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations | Weld Overlay Moisture barrier Through-Wall Leak |
NMP1L3517, Proposed Alternative Associated with a Weld Overlay Repair to the Torus | 29 March 2023 | Proposed Alternative Associated with a Weld Overlay Repair to the Torus | Weld Overlay |
NMP2L2811, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2022 Owner'S Activity Report for RFO-18 Inservice Examinations | 13 May 2022 | Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2022 Owner'S Activity Report for RFO-18 Inservice Examinations | |
ML21189A026 | 28 June 2021 | Fifth Inservice Inspection Interval, First Inservice Inspection Period 2021 Owner'S Activity Report for RFO-26 Inservice Examinations | |
NMP1L3356, Relief Requests Associated with Pump Periodic Verification Tests for the Fifth Ten-Year Inservice Test Interval | 8 October 2020 | Relief Requests Associated with Pump Periodic Verification Tests for the Fifth Ten-Year Inservice Test Interval | Fuel cladding |
NMP2L2755, Fourth Inservice Inspection Interval, First Inservice Inspection Period, 2020 Owner'S Activity Report for RFO17 Inservice Examinations | 8 January 2020 | Fourth Inservice Inspection Interval, First Inservice Inspection Period, 2020 Owner'S Activity Report for RFO17 Inservice Examinations | Coatings VT-2 Through-Wall Leak |
NMP2L2711, Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-879 | 16 October 2019 | Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-879 | Boric Acid Nondestructive Examination |
ML19267A024 | 24 September 2019 | End of Interval Relief Associated with the Third Ten-Year Inservice Inspection (ISI) Interval | |
NMP1L3309, Submittal of the Snubber IST Program Plan for the Unit 1 Fifth 10-Year Interval and the Unit 2 Fourth 10-Year Interval | 6 September 2019 | Submittal of the Snubber IST Program Plan for the Unit 1 Fifth 10-Year Interval and the Unit 2 Fourth 10-Year Interval | |
NMP2L2700, Co. - Submittal of Proposed Alternative to Utilize Code Case N-879 for Plants | 30 April 2019 | Co. - Submittal of Proposed Alternative to Utilize Code Case N-879 for Plants | Boric Acid Loop seal Nondestructive Examination |
ML18207A406 | 17 July 2018 | Third Inservice Inspection Interval, Third Iservice Inspection Period 2018 Owner'S Activity Report for RF0-16 Lnservice Examinations | |
ML18018A962 | 18 January 2018 | Preservice Inspection Plan - Preservice Testing - Component Supports | |
ML18018A961 | 18 January 2018 | Preservice Inspection Plan | Stroke time Hydrostatic Squib VT-2 Cold shutdown justification Liquid penetrant |
ML17164A181 | 6 June 2017 | Fourth Inservice Inspection Interval, Third Inservice Inspection Period 2017 Owner'S Activity Report for RF0-24 Inservice Examinations | EVT-1 |
NMP2L2620, Submittal of Post Extended Power Uprate Steam Dryer Inspection Results and Long-term Steam Dryer Inspection Plan in Accordance with Operating License Conditions 2.C.(20)(f), 2.C.(20)(g) and 2.C.(20)(h) | 1 August 2016 | Submittal of Post Extended Power Uprate Steam Dryer Inspection Results and Long-term Steam Dryer Inspection Plan in Accordance with Operating License Conditions 2.C.(20)(f), 2.C.(20)(g) and 2.C.(20)(h) | EVT-1 |
ML16216A149 | 25 July 2016 | Third Inservice Inspection Interval, Second Inservice Inspection Period 2016 Owner'S Activity Report for RFO-15 Inservice Examinations | |
ML15191A385 | 9 July 2015 | Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2015 Owner'S Activity Report for RFO-23 Inservice Examinations | EVT-1 |
ML15155A591 | 3 June 2015 | End of Interval Relief Request Associated with the Second 10- Year Risk Informed ISI Inspections | |
ML14203A008 | 16 July 2014 | Third Inservice Inspection Interval, Second Inservice Inspection Period 2014 Owner'S Activity Report for RFO14 Inservice Examinations | |
ML13261A288 | 6 September 2013 | Request to Utilize an Alternative to the Requirements of 10 CFR 50.55a(g) for Implementation of a Risk-Informed, Safety-Based Inservice Inspection Program Based on ASME Code Case N-716 - Response to Nrc. | |
ML13231A186 | 9 August 2013 | Fourth Inservice Inspection Interval, Second Inservice Inspection Period, 2013 Owner'S Activity Report for RFO-22 Inservice Examinations | EVT-1 |
ML12335A288 | 20 November 2012 | Corrected Copy of 2012 Owner'S Activity Report for Refueling Outage 13 Inservice Examinations | |
ML12242A236 | 16 August 2012 | Owner'S Activity Report for Refueling Outage 13 Inservice Examinations | |
ML101270023 | 29 April 2010 | American Society of Mechanical Engineers Code, Section XI, Inservice Inspection Program for Third Ten-Year Inservice Inspection Interval - 10 CFR 50.55a Request Number ISI-25, Response to NRC Request for Additional Information | Weld Overlay Dissimilar Metal Weld |
ML100320052 | 28 January 2010 | American Society of Mechanical Engineers Code, Section XI, Inservice Inspection Program for Fourth Ten-Year Inservice Inspection Interval & Associated 10 CFR 50.55a Requests - Additional Supplemental Information Relating to Relief Request 1 | Internal Flooding Probabilistic Risk Assessment |
ML093350523 | 24 November 2009 | American Society of Mechanical Engineers Code, Section XI, Inservice Inspection Program for the Third Ten-Year Inservice Inspection Interval - 10 CFR 50.55a Request Number ISI-25 | Dissimilar Metal Weld |
ML092400149 | 25 August 2009 | Third 10-Year Inservice Testing Program - Request for Alternative Number MSS-VR-02 Regarding Testing of Main Steam Safety Relief Valves | Time of Discovery High Radiation Area Stroke time Scaffolding |
ML091950307 | 6 July 2009 | Third Inservice Inspection Interval Third Inservice Inspection Period 2009 Owner'S Activity Report for RFO-20 Inservice Examinations | |
ML091830049 | 25 June 2009 | Request to Utilize an Alternative to the Requirements of 10 CFR 50.55a(g) for the Repair & Inservice Inspection of Control Rod Drive Stub Tubes for the License Renewal Period of Extended Operation - Response. | |
ML090860860 | 16 March 2009 | Submittal of American Society of Mechanical Engineers (ASME) Code, Section XI, Inservice Inspection Program for the Fourth Ten-Year Inservice Inspection Interval and Associated 10 CFR 50.55a Requests | Non-Destructive Examination Weld Overlay Internal Flooding Hydrostatic Probabilistic Risk Assessment Nondestructive Examination VT-2 Incorporated by reference Aging Management Scram Discharge Volume Large early release frequency Liquid penetrant Through-Wall Leak Through Wall Leak Dissimilar Metal Weld |
ML083230512 | 13 November 2008 | Transmittal of Inservice Testing (IST) Program Update and Associated 10 CFR 50.55a Requests - Response to NRC Request for Additional Information | Stroke time Scram Discharge Volume Grace period |
ML082671120 | 16 September 2008 | Extension of Permanent Relief from Inservice Inspection Requirements of 10 CFR 50.55a(g) for the Volumetric Examination of Reactor Pressure Vessel Shell Circumferential Welds for the License Renewal Period of Extended Operation | |
ML081930965 | 11 July 2008 | Second Inservice Inspection Interval 2008 Owners' Activity Report for Inservice Examinations | |
ML081840022 | 30 June 2008 | American Society of Mechanical Engineers Code, Section XI, Inservice Inspection Program for Third Ten-Year Inservice Inspection Interval & Associated 10 CFR 50.55a Requests - Response to NRC Requests for Additional Information | Probabilistic Risk Assessment Nondestructive Examination Large early release frequency |
ML081900568 | 30 June 2008 | Inservice Testing Program Update and Associated 10 CFR 50.55a Requests for the Next Ten-Year IST Intervals | Safe Shutdown Loop seal Stroke time Hydrostatic Squib Incorporated by reference Scram Discharge Volume Excess Flow Check Valve Cold shutdown justification Exemption Request Power-Operated Valves Power Operated Valves |
ML080250410 | 25 January 2008 | American Society of Mechanical Engineers (ASME) Code, Section XI, Inservice Inspection Program for the Third Ten-Year Inservice Inspection Interval and Associated 10 CFR 50.55a Requests - Replacement of Appendix H, Relief Requests / Alterna | Nondestructive Examination VT-2 Large early release frequency |
ML071370230 | 10 May 2007 | Request for Use of Later Edition to ASME Code, Section XI for Inservice Inspection Program | Nondestructive Examination Dissimilar Metal Weld |
ML062010139 | 13 July 2006 | Owner'S Activity Report for Inservice Examinations | |
ML052210436 | 26 July 2005 | Owner'S Activity Report for Inservice Examinations | |
ML032310438 | 8 August 2003 | Relief, Request for Relief from Qualification Requirements for Dissimilar Metal Piping Welds | Dissimilar Metal Weld |
ML032110132 | 23 July 2003 | Submittal of Inservice Inspection Owners Activity Reports | |
ML030770448 | 6 March 2003 | Inservice Inspection Relief Requests Regarding Inner Radius Examination of Class I Reactor Pressure Vessel Nozzles | EVT-1 |
ML003734960 | 18 July 2000 | Inservice Inspection (ISI) Summary Report | Weld Overlay Hydrostatic Anchor Darling Nondestructive Examination VT-2 EVT-1 Liquid penetrant |
ML18018B053 | 15 October 1999 | Third Inservice Inspection Interval - Ten-Year Inservice Inspection Plan and Schedule | Weld Overlay Hydrostatic Coatings Nondestructive Examination VT-2 Incorporated by reference |
ML18018B052 | 27 September 1999 | Third Inservice Inspection Interval | Reactor Vessel Water Level Non-Destructive Examination Weld Overlay Hydrostatic Coatings Nondestructive Examination VT-2 Incorporated by reference Scram Discharge Volume Moisture barrier Earthquake EVT-1 Liquid penetrant Through Wall Leak Dissimilar Metal Weld |
ML18018B013 | 29 July 1986 | Preservice Inspection Plan for Nuclear Piping Systems and the Reactor Pressure Vessel Vol. 2 | VT-2 |