 Issue dateTitleTopic
NMP1L3544, Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations14 July 2023Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice ExaminationsWeld Overlay
Moisture barrier
Through-Wall Leak
NMP1L3517, Proposed Alternative Associated with a Weld Overlay Repair to the Torus29 March 2023Proposed Alternative Associated with a Weld Overlay Repair to the TorusWeld Overlay
NMP2L2811, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2022 Owner'S Activity Report for RFO-18 Inservice Examinations13 May 2022Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2022 Owner'S Activity Report for RFO-18 Inservice Examinations
ML21189A02628 June 2021Fifth Inservice Inspection Interval, First Inservice Inspection Period 2021 Owner'S Activity Report for RFO-26 Inservice Examinations
NMP1L3356, Relief Requests Associated with Pump Periodic Verification Tests for the Fifth Ten-Year Inservice Test Interval8 October 2020Relief Requests Associated with Pump Periodic Verification Tests for the Fifth Ten-Year Inservice Test IntervalFuel cladding
NMP2L2755, Fourth Inservice Inspection Interval, First Inservice Inspection Period, 2020 Owner'S Activity Report for RFO17 Inservice Examinations8 January 2020Fourth Inservice Inspection Interval, First Inservice Inspection Period, 2020 Owner'S Activity Report for RFO17 Inservice ExaminationsCoatings
VT-2
Through-Wall Leak
NMP2L2711, Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-87916 October 2019Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-879Boric Acid
Nondestructive Examination
ML19267A02424 September 2019End of Interval Relief Associated with the Third Ten-Year Inservice Inspection (ISI) Interval
NMP1L3309, Submittal of the Snubber IST Program Plan for the Unit 1 Fifth 10-Year Interval and the Unit 2 Fourth 10-Year Interval6 September 2019Submittal of the Snubber IST Program Plan for the Unit 1 Fifth 10-Year Interval and the Unit 2 Fourth 10-Year Interval
NMP2L2700, Co. - Submittal of Proposed Alternative to Utilize Code Case N-879 for Plants30 April 2019Co. - Submittal of Proposed Alternative to Utilize Code Case N-879 for PlantsBoric Acid
Loop seal
Nondestructive Examination
ML18207A40617 July 2018Third Inservice Inspection Interval, Third Iservice Inspection Period 2018 Owner'S Activity Report for RF0-16 Lnservice Examinations
ML18018A96218 January 2018Preservice Inspection Plan - Preservice Testing - Component Supports
ML18018A96118 January 2018Preservice Inspection PlanStroke time
Hydrostatic
Squib
VT-2
Cold shutdown justification
Liquid penetrant
ML17164A1816 June 2017Fourth Inservice Inspection Interval, Third Inservice Inspection Period 2017 Owner'S Activity Report for RF0-24 Inservice ExaminationsEVT-1
NMP2L2620, Submittal of Post Extended Power Uprate Steam Dryer Inspection Results and Long-term Steam Dryer Inspection Plan in Accordance with Operating License Conditions 2.C.(20)(f), 2.C.(20)(g) and 2.C.(20)(h)1 August 2016Submittal of Post Extended Power Uprate Steam Dryer Inspection Results and Long-term Steam Dryer Inspection Plan in Accordance with Operating License Conditions 2.C.(20)(f), 2.C.(20)(g) and 2.C.(20)(h)EVT-1
ML16216A14925 July 2016Third Inservice Inspection Interval, Second Inservice Inspection Period 2016 Owner'S Activity Report for RFO-15 Inservice Examinations
ML15191A3859 July 2015Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2015 Owner'S Activity Report for RFO-23 Inservice ExaminationsEVT-1
ML15155A5913 June 2015End of Interval Relief Request Associated with the Second 10- Year Risk Informed ISI Inspections
ML14203A00816 July 2014Third Inservice Inspection Interval, Second Inservice Inspection Period 2014 Owner'S Activity Report for RFO14 Inservice Examinations
ML13261A2886 September 2013Request to Utilize an Alternative to the Requirements of 10 CFR 50.55a(g) for Implementation of a Risk-Informed, Safety-Based Inservice Inspection Program Based on ASME Code Case N-716 - Response to Nrc.
ML13231A1869 August 2013Fourth Inservice Inspection Interval, Second Inservice Inspection Period, 2013 Owner'S Activity Report for RFO-22 Inservice ExaminationsEVT-1
ML12335A28820 November 2012Corrected Copy of 2012 Owner'S Activity Report for Refueling Outage 13 Inservice Examinations
ML12242A23616 August 2012Owner'S Activity Report for Refueling Outage 13 Inservice Examinations
ML10127002329 April 2010American Society of Mechanical Engineers Code, Section XI, Inservice Inspection Program for Third Ten-Year Inservice Inspection Interval - 10 CFR 50.55a Request Number ISI-25, Response to NRC Request for Additional InformationWeld Overlay
Dissimilar Metal Weld
ML10032005228 January 2010American Society of Mechanical Engineers Code, Section XI, Inservice Inspection Program for Fourth Ten-Year Inservice Inspection Interval & Associated 10 CFR 50.55a Requests - Additional Supplemental Information Relating to Relief Request 1Internal Flooding
Probabilistic Risk Assessment
ML09335052324 November 2009American Society of Mechanical Engineers Code, Section XI, Inservice Inspection Program for the Third Ten-Year Inservice Inspection Interval - 10 CFR 50.55a Request Number ISI-25Dissimilar Metal Weld
ML09240014925 August 2009Third 10-Year Inservice Testing Program - Request for Alternative Number MSS-VR-02 Regarding Testing of Main Steam Safety Relief ValvesTime of Discovery
High Radiation Area
Stroke time
Scaffolding
ML0919503076 July 2009Third Inservice Inspection Interval Third Inservice Inspection Period 2009 Owner'S Activity Report for RFO-20 Inservice Examinations
ML09183004925 June 2009Request to Utilize an Alternative to the Requirements of 10 CFR 50.55a(g) for the Repair & Inservice Inspection of Control Rod Drive Stub Tubes for the License Renewal Period of Extended Operation - Response.
ML09086086016 March 2009Submittal of American Society of Mechanical Engineers (ASME) Code, Section XI, Inservice Inspection Program for the Fourth Ten-Year Inservice Inspection Interval and Associated 10 CFR 50.55a RequestsNon-Destructive Examination
Weld Overlay
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Nondestructive Examination
VT-2
Incorporated by reference
Aging Management
Scram Discharge Volume
Large early release frequency
Liquid penetrant
Through-Wall Leak
Through Wall Leak
Dissimilar Metal Weld
ML08323051213 November 2008Transmittal of Inservice Testing (IST) Program Update and Associated 10 CFR 50.55a Requests - Response to NRC Request for Additional InformationStroke time
Scram Discharge Volume
Grace period
ML08267112016 September 2008Extension of Permanent Relief from Inservice Inspection Requirements of 10 CFR 50.55a(g) for the Volumetric Examination of Reactor Pressure Vessel Shell Circumferential Welds for the License Renewal Period of Extended Operation
ML08193096511 July 2008Second Inservice Inspection Interval 2008 Owners' Activity Report for Inservice Examinations
ML08184002230 June 2008American Society of Mechanical Engineers Code, Section XI, Inservice Inspection Program for Third Ten-Year Inservice Inspection Interval & Associated 10 CFR 50.55a Requests - Response to NRC Requests for Additional InformationProbabilistic Risk Assessment
Nondestructive Examination
Large early release frequency
ML08190056830 June 2008Inservice Testing Program Update and Associated 10 CFR 50.55a Requests for the Next Ten-Year IST IntervalsSafe Shutdown
Loop seal
Stroke time
Hydrostatic
Squib
Incorporated by reference
Scram Discharge Volume
Excess Flow Check Valve
Cold shutdown justification
Exemption Request
Power-Operated Valves
Power Operated Valves
ML08025041025 January 2008American Society of Mechanical Engineers (ASME) Code, Section XI, Inservice Inspection Program for the Third Ten-Year Inservice Inspection Interval and Associated 10 CFR 50.55a Requests - Replacement of Appendix H, Relief Requests / AlternaNondestructive Examination
VT-2
Large early release frequency
ML07137023010 May 2007Request for Use of Later Edition to ASME Code, Section XI for Inservice Inspection ProgramNondestructive Examination
Dissimilar Metal Weld
ML06201013913 July 2006Owner'S Activity Report for Inservice Examinations
ML05221043626 July 2005Owner'S Activity Report for Inservice Examinations
ML0323104388 August 2003Relief, Request for Relief from Qualification Requirements for Dissimilar Metal Piping WeldsDissimilar Metal Weld
ML03211013223 July 2003Submittal of Inservice Inspection Owners Activity Reports
ML0307704486 March 2003Inservice Inspection Relief Requests Regarding Inner Radius Examination of Class I Reactor Pressure Vessel NozzlesEVT-1
ML00373496018 July 2000Inservice Inspection (ISI) Summary ReportWeld Overlay
Hydrostatic
Anchor Darling
Nondestructive Examination
VT-2
EVT-1
Liquid penetrant
ML18018B05315 October 1999Third Inservice Inspection Interval - Ten-Year Inservice Inspection Plan and ScheduleWeld Overlay
Hydrostatic
Coatings
Nondestructive Examination
VT-2
Incorporated by reference
ML18018B05227 September 1999Third Inservice Inspection IntervalReactor Vessel Water Level
Non-Destructive Examination
Weld Overlay
Hydrostatic
Coatings
Nondestructive Examination
VT-2
Incorporated by reference
Scram Discharge Volume
Moisture barrier
Earthquake
EVT-1
Liquid penetrant
Through Wall Leak
Dissimilar Metal Weld
ML18018B01329 July 1986Preservice Inspection Plan for Nuclear Piping Systems and the Reactor Pressure Vessel Vol. 2VT-2