Third Inservice Inspection Interval - Ten-Year Inservice Inspection Plan and Schedule
ML18018B053
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 10/15/1999
From:
Niagara Mohawk Power Corp
To:
Office of Nuclear Reactor Regulation
References
Download: ML18018B053 (576)


Text

V NIAGARA U MOHAWK Niagara Mohawk Power Corporation 300 Erie Boulevard West Syracuse, New York 13202 Nine Mile Point Nuclear Power Station THIRD INSERVICE INSPECTION INTERVAL TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Prepared For Nine Mile Point Nuclear Power Station P.O. Box 63 Lycoming, New York 13093 Commercial Service Date: December 26, 1969 NRC Docket Number: 50-220 Document Number: NMP1-ISI-003-1 0 Revision Number: 0 Date: October 15, 1999 Prepared by: /O l~

NMP1 - ISI Program Manager Approved by':

Glenn R. erkins -Supervisor ASME Sectio XI Programs Approved by:

WIJ iam Yae er - Bra ch Manager, Engineerin r/

Services OCR <<~woigl

~g Ilgwu

'is 5 <iHi)i~Z

I NINE MILE POINT NMP1-ISI-003-1 0 Y NIAGARA NUCLEAR POWER STATION N 4 MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE TABLE OF CONTENTS Table of Contents Record of Revision .

Abstract .

1.0 Introduction . 7 1.1 Inspection Interval .. 7 1.2 Inspection Periods . .. 7 1.3 Applicable Documents .. 7 1.4 Applicable Code Edition and Addenda 10 2.0 Development of Inspection Plan ...... ~....... ~...........

2.1 Class 1 Systems/Components 12 2.2 Class 2 Systems/Components . 12 2.3 Class 3 Systems/Components . 12 2.4 Class 1, 2, 3 Component Supports 12 2.5 Substitute Examinations 12 2.6 Nondestructive Examinations 12 2.7 Weld/Support Location Maps 13 2.8 Ultrasonic Calibration Blocks .. 13 2.9 Weld Identification 13 3..0 Records ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 1 6 3.1 General 16 3.1.1 Scheduled Examination Tables........ 16 3.1.1 Inspection Zones . 16 3.1.3 Code Item Classification 16 3.1.4 Inspection/Examination Table Contents .. 16 3.2 Final Reports 17 3.3 ISI Summary Report . 17 File: NMP1ISIPL.wpd

0 NINE MILE POINT NMP1-ISI-003-1 0 hl V NIAGARA NUCLEAR POWER STATION H U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE TABLE OF CONTENTS - Continued 4.0 Class 1 Tables . ~ .. ~ 19 00.0 Reactor Pressure Vessel ........... 1thru 83 01.0 Main Steam . .......... 84thru90 31.0 Feedwater System . ........ 91 thru 97 32.0 Reactor Recirculation System .. . 98thru130 33.0 Reactor Clean Up ....... 131 thru 135 36.0 Reactor Instrumentation ....... 136 thru 137 37.0 Reactor Drain 8 Vent .. ........ 138 thru 143 38.0 Reactor Shutdown Cooling ........ 144 thru 147 39.0 Emergency Condenser System ........ 148 thru156 40.0 Reactor Core Spray System . ....... 157thru171 42.1 Liquid Poison System ..... .. 172 thru 173

~

44.1 Control Rod Drive System ........ 174 thru 177 5.0 Class 2 Tables ~ .. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 20 02.0 Main Steam System . ...... 177thru179 03.0 Main Steam System . ..... 180 thru 181 39.0 Emergency Condenser System . ...... 182 thru 196 44.2 Control Rod Drive System .. ...... 197 thru 198 80.0 Reactor Containment Spray System . ...... 199 thru 210 81.0 Reactor Core Spray System 211 thru 222 93.0 Reactor Containment Spray System . 223 thru 225 6.0 Class 3 Tables 21 38.0 Shutdown Cooling Water System 226 thru 226 39.0 Emergency Condenser System . 227 thru 223 54.0 Spent Fuel Pool Cooling System 228 thru 235 57.0 Spent Fuel Pool Cooling System 236 thru 236 70.0 'eactor Building Closed Loop Cooling System 237 thru 242 72.0 Emergency Service Water System 243 thru 244 93.0 Reactor Containment Spray System 245 thru 248 APPENDICES A Acceptance Criteria 22 B Nondestructive Examination Procedure Listing 24 C Ultrasonic Calibration Blocks 26 D Class 1, 2, and 3 Weld/Support Location Maps 33 E ASME Code Cases .. 38 File: NMP1ISIPL.wpd

0 NINE MILE POINT NMP1-ISI-003-10 El 1 N1AGARA NUCLEAR POWER STATION H U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE TABLE OF CONTENTS - Continued LIST OF FIGURES 2-1 Tee Weld ID 14 2-2 Elbow weld ID 14 2-3 Reducer weld ID 15 3-1 Inservice Inspection Schedule . 18 LIST OF TABLES 1-2 NMP1 Inservice Inspection Periods 7 A-1 Class 1 Acceptance Standards 22 A-2 A-3 Class 2 Acceptance Standards ............ .... 23 Class 3 Acceptance Standards 23 A-4 Component Support Acceptance Standards . 23 File: NMP1ISIPL.wpd

I NINE MILE POINT NMP1-ISI-003-1 0 V NIAGARA NUCLEAR POWER STATION N 4 MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE RECORD OF REVISION', ": ;

REVISION DATE , 'FFECTED No. 'PAGES 0 October 15, 1999 Entire Ten-Year Inservice Inspection Plan and Document Schedule for the 3" Ten Year Inservice Inspection Interval e

File: NMP1ISIPL.wpd

NINE MILE POINT N MP1-ISI-003-10 Y NIAGARA NUCLEAR POWER STATION N Lf MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE ABSTRACT This document provides the Third Interval Ten-Year Inservice Inspection Plan and Schedule for Nine Mile Point Nuclear Power Station, Unit 1.

The Schedule identifies those components and/or systems (including supports) which are classified Quality Group A, B and C (ASME Code Class 1, 2, and 3, and have been selected for nondestructive examination, as set forth in the ASME Boiler and Pressure Vessel Code,Section XI, 1989 Edition, no Addenda, to the extent practical within the limitations of design, geometry and materials of construction of the components as stated in 10 CFR 50.55a (b)(2).

Where an examination required by Section XI is determined to be impractical, the basis for this determination is included in the Nine Mile Point Insetvice Inspection Program, in the form of a Request for Relief.

Tables for each system subject to examination are included within this document, and provides Code classification, Code examination category, Code item number, component identification and description, examination method, and where within the Third Ten-Year Inspection Interval and period the component is scheduled to be performed.

File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-10 El Y NlAGARA NUCLEAR POWER STATION H U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN>>YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE

1.0 INTRODUCTION

This document details the Third Interval, Ten-Year Inservice Inspection Plan and schedule for selected components, welds, supports, bolting, pump casings, valve bodies, and reactor pressure vessel internals for the Nine Mile Point Nuclear Power Station, Unit 1.

Niagara Mohawk Power Corporation (NMPC), is the Owner of Record.

The Commercial Service Date for the Nine Mile Point Nuclear Power Station, Unit 1 is December 26, 1969.

1.1 Inspection Interval The Third Inservice Inspection Interval becomes effective on December 26, 1999 and is scheduled to end on December 25, 2009.

1.2 Inspection Periods The Third lnservice Inspection Interval is divided into three successive inspection periods as determined by calendar years of plant service within the inspection interval. Identified below are the period dates for the third inspection interval as defined by Inspection Program NBN In accordance with IWB-2412(b) the inspection period specified below may be decreased or extended by as much as 1 year to enable inspection to coincide with NMP1's plant outages.

TABLE 1-2 NMP1 INSERVICE INSPECTION PERIODS INSPECTION PERIOD START PERIOD END REFUEL REFUEL PERIODS DATES 'DATES OUTAGE OUTAGE YEAR December 26, 1999 December 25, 2002 RFO-16 2001 December 25, 2002 December 26, 2006 RFO-17 2003 RFO-18 2005 December 26, 2006 December 25, 2009 RFO-19 2007 The plant operating license is currently scheduled to expire on August 22, 2009.

1.3 Applicable Documents The Third Inservice Inspection Program for Quality Group A, B, and C (ASME Code Class 1, 2 and 3), systems and components (including their supports) was developed after giving due consideration to the following documents and subject to the limitations and modifications listed File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-10 H V NIAGARA NUCLEAR POWER STATION H V MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE in 10 CFR 50.55a(b), and to the extent practical within the limitations of design, geometry and materials of construction. Specific areas within this document where these document are used in the preparation of this program are addressed within the area affected.

Code of Federal Regulations 10 CFR 50.55(a) Code of Federal Regulations; Federal Register, Volume 64, Number 183, dated September 22, 1999, amendment to the regulation.

ASME Code Editions and Addenda ASME Boiler and Pressure Vessel Code, Sections V, 1989 Edition, "Nondestructive Examination" ASME Boiler and Pressure Vessel Code,Section XI, 1989 Edition, "Rules for Inservice Inspection of Nuclear Power Plant Components" ASME Boiler and Pressure Vessel Code,Section XI, 1992 Edition through the 1992 Addenda, "Rules for Inservice Inspection of Nuclear Power Plant Components",

Subsections IWE and IWL.

USNRC Regulatory Guides The following list of Regulatory Guides are applicable to the Nine Mile Point Nuclear Power Station Third Inservice Inspection Program:

1.26 Quality Group Classifications and Standards for Water-Steam, and Radioactive-Waste-Containing Components of Nuclear Power Plants, Revision 2, June 1975.

1.65 Materials and Inspections for Reactor Vessel Closure Studs, dated October 1973, Regulatory Position C.4.b.

1.84 Design and Fabrication Code Case Acceptability ASME Section III, Division 1, Latest Revision.

1.85 Material Code Case Acceptability ASME Section III, Division 1, Latest Revision.

1.147 Inservice Inspection Code Case Acceptability ASME Section XI, Division 1, Revision 12..

NMP1 Specific Documents Nine Mile Point Unit 1 Updated Final Safety Analysis Report, Sections 1, 5, 7, 9, 12 File: NMP1ISIPL.wpd

0 NINE MILE POINT NMP1-ISI-003-10 Y NIAGARA NUCLEAR POWER STATION N U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE and 16.

Nine Mile Point Unit 1 Technical Specifications, USNRC Docket number 50-220, Sections 3.6 and 4.6.

USNRC NUREGS/SRP's USNRC NUREG 0313, Technical Report on Material Selection and Processing Guidelines for BWR Coolant Pressure Boundary Piping, Revision 2.

USNRC NUREG 0619, BWR Feedwater Nozzle and CRD Return Lines.

USNRC Bulletins 82-03 Stress Corrosion Cracking in Thick-Wall, Large-Diameter, Stainless Steel, Recirculation System Piping at BWR Plants, Revision 1, October 28, 1982.

USNRC Generic Letters 88-01 USNRC Position on IGSCC in BWR Austenitic Stainless Steel Piping, January 25, 1988.

88-01 NRC Position on Intergranular Stress Corrosion Cracking (IGSCC) in BWR Austenitic Stainless Steel Piping, Supplement 1, February 4, 1992.

81-11 Feedwater and Control Rod Drive Nozzle Cracking, 90-05 Guidance for Performing Temporary Non-Code Repairs to ASME (ISI) Code Class 1, 2 and 3 Piping and Components, June 15, 1990.

90-09 Alternative Requirements for Snubber Visual Inspection Intervals and Corrective Actions, December 11, 1990.

94-03 Intergranular Stress Corrosion Cracking (IGSCC) of Core Shroud in Boiling Water Reactors, February 1, 1995.

98-05 Boiling Water Reactor Licensees Use of the BWRVIP 05 Report to Request Relief rom Augmented Examination Requirements on Reactor Pressure Vessel Circumferential Shell Welds, December 10, 1998.

Additional References or Commitments Requirements of the complete BWRVIP implementation criteria for the Third Ten Year Inservice Inspection Interval is currently under development. Upon completion of this process the applicable information will be incorporated within ISI Program. General Information pertaining to BWRVIPs implementation is contained in the ISI Program NMP1-ISI-003, Section 6.0 Titled Augmented Examinations.

File: NMP1ISIPL.wpd

0 NINE MILE POINT NMP1-ISI-003-10 Y NIAGARA NUCLEAR POWER STATION N U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE USNRC Informational Notices 89-79 Degraded Coatings and Corrosion of Steel Containment Vessels, December 1, 1989.

ASME Code Cases Code Cases approved through Regulatory Guide 1.147 may be proposed for revision to the inspection plan. Specific Code Cases used in the preparation of this document are identified below.

N-460 Alternative Examination Coverage for Class 1 and Class 2 Welds,Section XI, Division 1. RG 1.147, Rev. 12 N-491-1 Alternative Rules for Examination of Class 1, 2, 3 and MC Component Supports of Light Water Cooled Power Plants,Section XI, Division 1.

RG 1.147, Rev. 12.

N-509 Alternative Rules for the Selection and Examination of Class 1, 2 and 3 Integrally Welded Attachments,Section XI, Division 1. RG 1.147, Rev. 12.

N-524 Alternative Examination Requirements for Longitudinal Welds in Class 1 and 2 Piping Section XI, Division 1. RG 1.147, Rev. 12.

Note: See Appendix E "Code Cases" of the 10 Year Inspection Plan for a complete listing applicable Code Cases.

1.4 Applicable Code Editions and Addenda 1.4.1 Third Inspection Interval Pursuant to Title 10, Part 50, Section 55a(g)(4), of the Code of Federal Regulations, the Inservice Inspection requirements applicable to nondestructive examination and system pressure testing for the Third Inservice Inspection Interval are based on the rules set forth in the 1989 Edition, no Addenda of Section XI, that was endorsed twelve months prior to the start of the Third Inspection Interval.

1.4.2 Subsequent Code Editions and Addenda As permitted by 10 CFR 50.55a(g)(4)(iv), the NMPC may elect to meet the requirements set forth in subsequent Editions and Addenda of Section XI that are incorporated by reference into 10 CFR 50.55a(b)(2), subject to the applicable limitations and modification and subject to USNRC approval.

File: NMP1ISIPL.wpd

Ol NINE MILE POINT N MP1-ISI-003-10 El V NIAGARA NUCLEAR POWER STATION IlU MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE Portions of Editions and Addenda may also be used provided that all related requirements to the respective Editions and Addenda are met. NMPC intends to continually evaluate and apply, as appropriate, changes in adopted Code Editions and Addenda which provide the continuing assurance of the quality and safety of pressure retaining components and systems.

File: NMP1ISIPL.wpd

0 NINE MILE POINT NMP1-Isl-003-1 0 El Y NIAGARA NUCLEAR POWER STATION a U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE 2.0 ~ DEVELOPMENT OF INSPECTION PLAN This document provides the component schedule for inservice nondestructive examinations to be performed over the Third Ten-Year Inservice Inspection Interval on Class 1, 2 and 3 components and their supports of the Niagara Mohawk Power Corporation (NMPC), Nine Mile Point Nuclear Power Station (NMP1). Component and/or system selected for nondestructive examination are scheduled in accordance with the requirements of Section XI, to the extent practical.

2.1 CLASS 1 SYSTEMS/COMPONENTS The Class 1 system boundaries subject to examination were developed based upon the requirements of 10 CFR 50.2(v) and NMPC NMP1-FSAR. The Class 1 components and systems (including supports) selected for examination are identified in Section 4.0 of this document.

2.2 CLASS 2 SYSTEMS/COMPONENTS The Class 2 system boundaries subject to examination were developed based upon the requirements of Regulatory Guide 1.26 and the NMPC NMP1-FSAR. The Class 2 components and systems (including supports) selected for examination are identified in Section 5.0 of this document.

2.3 CLASS 3 SYSTEMS/COMPONENTS The Class 3 system boundaries subject to examination were developed based upon the requirements of Regulatory Guide 1.26, and the NMPC NMP1-FSAR. The Class 3 components and systems (including supports) selected for examination are identified in Section 6.0 of this document.

2.4 CLASS 1, CLASS 2 AND CLASS 3 COMPONENT SUPPORTS - IWF Component supports selected for examination shall be the supports of those components that are required to be examined under IWB, IWC and IWD, and are included within Sections 4.0, 5.0 and 6.0 as applicable.

2.5 SUBSTITUTE EXAMINATIONS NMPC may substitute components scheduled in this Document for others not previously scheduled when the original selection was part of the additional piping weld selection. This substitution may be done due to such conditions as limited physical access, high radiation levels, inaccessibility etc. Such changes will be noted in the Summary Report Submittal.

Specific examinations that are required, and can not be completed within the periodfinterval will be identified within the Summary Report Submittal, and may be the subject of a request for relief.

2.6 NONDESTRUCTIVE EXAMINATIONS Nondestructive examinations will be performed in accordance with established Niagara File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-1 0 Y NIAGARA NUCLEAR POWER STATION N kJ MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE Mohawk Power Corporation (NMPC) nondestructive examination procedures and/or NMPC approved vendor procedures which conform to the requirements of the NMPC Quality Assurance Program and the applicable sections of the ASME Boiler and Pressure Vessel Code. NMPC approved vendor NDE Procedures will be identified as required, (example, Automated UT of RPV).

2.7 WELD/SUPPORT LOCATION MAPS Weld/Support location maps Listing indicating components, areas, weld locations, and other information pertinent to the performance of the inservice Nondestructive examinations are contained in Appendix C.

2.8 ULTRASONIC CALIBRATIONBLOCKS Ultrasonic calibration blocks for each component subject to volumetric examination are maintained at the plant site. A listing of applicable ultrasonic calibration blocks is included in Appendix B.

2.9 WELD IDENTIFICATION Longitudinal welds in Class 2 piping and pipe fittings do not receive unique identification numbers from the spool fabricators. All longitudinal pipe welds intersecting any of the selected circumferential welds will also be examined. As an alternate to Table IWB-2500-1, ASME Code Case N-524, "Alternative Examination Requirements for Longitudinal Welds in Class 1 Piping Section XI, Division 1", shall be used as defined below:

(A) When only a surface examination is required, examination of longitudinal piping welds is not required beyond those portions of the welds within the examination boundaries of intersecting circumferential welds.

(B) When both surface and volumetric examinations are required, examination of longitudinal piping welds is not required beyond those portions of the welds within the examination boundaries of intersecting circumferential welds providing the following requirements are met.

(1) Where longitudinal welds are specified and locations are known, examination requirements shall be met for both transverse and parallel flaws at the intersection of the welds and for that length of longitudinal weld within the circumferential weld examination volume; (2) Where longitudinal welds are specified but locations are unknown, or the existence of longitudinal welds is uncertain, the examination requirements shall be met for both transverse and parallel flaws within the entire examination volume of intersecting circumferential welds.

File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-1 0 El Y NIAGARA NUCLEAR POWER STATION H U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE Since Class 2 longitudinal welds are required to be examined from the intersecting circumferential weld, they were given unique identification numbers as denoted below.

Fittings: Longitudinal welds in fittings are identified by adding letter A, B, or C, (1, 2, or 3), as applicable, to the I.D. for the reference weld. The reference weld is defined as the first circumferential weld encountered when entering the fitting on the direction of the flow.

The following figure shows the convention for identifying which weld in a welded fitting receives a particular letter designation.

Tee Case 1: Three welds located as shown in Figure 2-1.

Tee Case 2: If only one weld Figure 2-1 TEE weld ID exists it is identified by the letter A or 1.

Figure 2-1 Tee Weld ID Elbow Case 1: Two welds located as shown in Figure 2-2, one located on the inside radius and the other on the outside radius.

Elbow Case 2: If only one weld exists it is identified by the letter A or 1.

Figure 2-2 Elbow weld ID File: NMP1ISIPL.wpd

0 NINE MILE POINT NMP1-ISI-003-1 0 V NlAGARA NUCLEAR POWER STATION N U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE Elbow Case 3: If two welds exist in locations other than Case 1, Weld A or 1 is the first weld encountered when moving clockwise from the reference weld datum while looking in the direction of flow. The other weld is identified by B or 2.

Reducer Case 1: If only one weld exists it is identified by the letter A or 1.

Reducer Case 2: If two welds exist, weld A or 1 is the first weld encountered when moving clockwise from the reference weld datum while looking in the direction of flow. The other weld is identified by B or 2. See Figure 2-3.

Figure 2-3 Reducer weld ID Piping: Longitudinal piping welds are not assigned a specific weld identification number. They are identified by reference to the intersecting circumferential weld first encountered when entering the seamed pipe in the direction of flow.

File: NIVIP1ISIPL.wpd

0 NINE MILE POINT NMP1-ISI-003-1 0 Y NlAGARA NUCLEAR POWER STATION N U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE 3.0 RECORDS 3.1 General Records and Reports of Inservice Inspection activities (such as Programs, Plans, Schedules, calibration, examination procedures, examination results, reports, equipment and personnel certifications, corrective actions taken or recommended will be developed and maintained in accordance with IWA-6000 of the ASME Boiler and Pressure Vessel Code,Section XI.

3.1.1 SCHEDULED EXAMINATIONTABLES The Scheduled Examination Tables for Inservice examinations of major components of Niagara Mohawk Power Corporation, Nine Mile Point Nuclear Power Station will be in a format similar to Figure 3-1.

3.1.2 INSPECTION ZONES Areas subject to examination have been divided into systems. Each system is defined by a weld/support location map which identifies and locates all welds, supports, and other examination areas subject to and/or selected for examination within each system.

3.1.3 CODE ITEM CLASSIFICATION For the sake of continuity and clarity, all items to which a Code Category and Code Item Number can be applied are identified.

3.1.4 INSPECTION/EXAMINATIONTABLE CONTENTS The Inservice Inspection/Examination Tables provide the following information:

ASME SECTION XI ITEM NUMBER - Listed in this column is the appropriate item number from Table IWB-2500-1, IWC-2500-1, IWD-2500-1 or IWF-2500-1, as applicable, of the ASME Boiler 8. Pressure Vessel Code,Section XI.

COMPONENT IDENTIFICATION- The examination area identification is the unique component or weld identification number. This number also appears on the applicable ISI Weld/Support Location Map.

COMPONENT DESCRIPTION - The examination area description is a brief description of the component or, in the case of a weld, the parts being joined.

CODE EXAMINATION CATEGORY - Listed in this column are the appropriate examination categories from Tables IWB-2500-1, IWC-2500-1, IWD-2500-1 or IWF-2500-1, as applicable, of the ASME Boiler 8 Pressure Vessel Code,Section XI.

CODE EXAMINATION METHODS - Listed in this column are the appropriate nondestructive examination method(s) to be used for each component or item subject File: NMP1ISIPL.wpd

0 NINE MILE POINT NMP1-ISI-003-10 El Y NIAGARA NUCLEAR POWER STATION H U MOHAlhlK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE to examination, if applicable.

ISI INTERVAL - Identified in this column are numbers 1, 2, and 3. Each number signitying an inspection period. The current inspection interval relating to this Table is number 3. Within each column a system of codes are entered to define the status of each component or item. For the purpose of providing Tables of components or areas selected for examination during the interval an (X) will be placed on the applicable row. Each row is defined by period, depending on where the (X) is placed, will determine when that item is scheduled to be examined within the interval and period. Additional codes are used to provide a status of examinations conducted during a given period in time. Additional codes such as those identified in Figure 3-1 may also be used.

REMARKS - This column identifies examination note(s) and/or instruction applicable to a particular item.

3.2 FINAL REPORTS Following the completion of the Inservice Inspection Activity, NMPC shall prepare a Inservice Inspection Final Report. The Final Report will be tiled at the Nine Mile Point site Document Control Center. Final Examination Report Tables are included as part of the Final Report along with any additional records and reports in order to provide a documentation of the complete examination activity.

This report shall be made available for review by the Enforcement and Regulatory Authority having jurisdiction at the plant side.

3.3 INSERVICE INSPECTION

SUMMARY

REPORT Following the units return to service, NMPC shall prepare a Summary Report of the ISI activity.

The Summary Report shall be filed with the Nuclear Regulatory Commission as required by Section XI and/or Code Case N-532.

File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-10 hl Y NlAGARA NUCLEAR POWER STATION H U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE DATE: (A) Nine Mlle Point Nuclear Plant unit 1 Page (C)

Inservlce Inspection Long Term Plan Rev. (8) Class X Section XI Scheduled Components System (D)

INSPECTION INTERVAI PLAN STATUS Summary Examination Area ASME Number Identiiicatlon Sec. XI Categy Item No NDE Meth First Period Second Period OUTAGE Third Period Instructions

" Calibration Blocks-1234 1234 1234 DRAWING NUM8ER: (E), LINE NO. (F)

(G) (I) (J) (H) (K) (L)--. - - - - - - - (K)(M)

(A) Denotes the date of the inspection plan table (B) Denotes the current revision number of the plan (C) Identifies the page number of the table (D) Identifies the System applicable to this table

) Denotes the applicable Drawing number for this table

) Identifies the applicable Line for this table

6) Denotes the Summary Number (I) Denotes the component or weld identification number (J) Denotes the ASME Code Category (H) Denotes the ASME Code Item Number (K) Denotes the NDE Method to be used for the examination (L) Shows when an item was examined or is scheduled to be examined. Any interval can be shown separately.

X - Scheduled P - Partial C Completed E - Expanded Scope A - Augmented B - Baseline (M) Denotes specific instruction applicable to the item FIGURE 3-1 lnservice Inspection Plan (also known as Long Term Plan)

File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-1 0 Y NIAGARA NUCLEAR POWER STATION N kJ MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE 4.0 CLASS 1 INSERVICE INSPECTION PLAN TABLES This section contains the Long Term Ten-Year Inservice Inspection Examination Tables for nondestructive examinations of selected systems and components for the Second Inservice Inspection Interval.

00.0 Reactor Pressure Vessel 1 thru 83 01.0 Main Steam 84 thM 90 31.0 Feedwater System . 91 thru97 32.0 Reactor Recirculation System .... 98thru130 33.0 Reactor Clean Up 131 thru 135 36.0 Reactor Instrumentation . 136 thru 137 37.0 Reactor Drain 8 Vent . 138 thru 143 38.0 Reactor Shutdown Cooling . 144 thru 147 39.0 Emergency Condenser System 148 thru 156 40.0 Reactor Core Spray System .. 157 thru 171 42.1 Liquid Poison System . 172 thru 173 44.1 Control Rod Drive System . 174 thru 177 File: NMP1 ISIPL.wpd

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 1 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS J Welds NUMBER: 00.0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR AS ME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTZFZCATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 + +CALIBRATION BLOCK*+

Control Rod Drive Housings (REF. DWG. NO. 28A) 002610 DRV-44-XXXX(NC02) NCTS UT Prior to and after each CRDH Upper- J Weld & 503783

- - - Roll Repair Drives to Roll 3 X X X - - X Area be determined later

+*LATER**

002620 DRV 44-XXXX(NC02) NCTS UT Examine (2) previously CRDH to Upper-J Weld 503783 roll-repaired CRDH, only X X X X if made availablc thru norm drive maint., 1" above s below upper-J veld, Drives to bc dctermincd during each outage ~+LATER*w 630 DRV-44-XXXX(NC02) NCTS UT Examine (2) previously CRDH Roll Repair 503783 rolled areas to include X - - - X X - - X Region volume of base material of 1" above C beld roll band, only if made availablc thru norm drive maint., Drives to bc determined during 1

  • LATER* 4

0 DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 2 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS ure Head Nuts NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERZOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK**

00. 0 RPV (REF. DWG. NO. 28A) 002700 CH-01-N B-G-1 VT-1 +AN/A**

Closure Head Flange B6.10 Nuts X 002800 CH-02-N B-G-1 VT-1 *~N/A+*

Closure Head Flange B6.10 3 X Nuts 002900 CH-03-N B-G-1 *AN/A%1 Closure Head Flange B6.10 3 X Nuts 003000 CH-04-N B-G-1 a 1N/Aa a Closure Head Flange B6.10 3 X Nuts 003100 CH-05-N B-G-1 VT-1 Closure Head Flange B6.10 3 X Nuts 003200 CH-06-N B-G-1 VT-1 ~~N/A~~

Closure Head Flange B6.10 3 X Nuts 003300 CH-07-N B-G-1 VT-1 aaN/Aaa Closure Head Flange B6.10 3 X Nuts 003400 CH-08-N B-G-1 VT-1 ~+N/A**

Closure Head Flange B6.10 Nuts 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 3 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS ura Head Nuts NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERZOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE - OUTAGE INSTRUCTIONS NUMBER IDENTZFZCATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +*CALIBRATION BLOCK**

003500 CH-09-N B-G-1 ++N/A++

Closure Head Flange B6. 10 3 X Nuts 003600 CH-10-N BG1 **N/A~~

Closure Head Flange B6. 10 3 X Nuts 003700 CH-11-N B-G-1 **N/A**

Closure Head Flange B6.10 3 X Nuts 003800 CH-12-N B G 1 **N/A*~

Closuro Head Flange B6.10 3 X Nuts 003900 CH-13-N B-G-1 *AN/A1*

Closure Head Flange B6. 10 Nuts X 004000 CH-14-N B"G-1 ffN/A*%

Closure Head Flange B6. 10 3 X Nuts 004100 CH-15-N B"G-1 *aN/Aas Closure Head Flange B6.10

'uts 3 X 004200 CH-16 N B-0"1 VT 1 **N/A++

Closure Head Flange B6 10

~

3 X Nuts

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 4 REVZSZON: 0 ZNSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Nuts NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 e iCALIBRATION BLOCK**

004300 CH-17-N B-G-1 VT-1 Closure Head Flange B6.10 3 X Nuts 004400 CH 18-N B G 1 VT 1 aeN/As*

Closure Head Flange B6. 10 3 X Nuts 004500 CH-19-N B-G-1 tkN/At1 I

Closure Head Flange B6. 10 3 X Nuts 004600 CH-20-N B-G-1 VT-1 e*N/A*a Closure Head Flange B6. 10 3 X Nuts 004700 CH-21-N B-G-1 eaN/A+a Closure Head Flange B6.10 Nuts 3 X 004800 CH-22-N B-G-1 VT-1 **N/A*%

Closure Head Flange B6.10 3 X Nuts 004900 CH 23-N B G-1 *~N/A~~

Closure Head Flange B6.10 Nuts 3 X 005000 CH-24-N B-G-1 VT-1 **N/A~~

Closure Head Flange B6 10 F

Nuts 3 X

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PLANT UNIT 1 PAGE: 5 REVISZON: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS ure Head Nuts NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 y yCALIBRATION BLOCKt a 005100 CH-25-N B-G-1 VT-1 **N/A4*

Closure Head Flange B6. 10 3 X Nuts 005200 CH-26-N B-G-1 VT 1 4 4N/Af

  • Closure Head Flange B6. 10 3 X Nuts 005300 CH-27-N B G 1 asN/AP+

Closure Head Flange B6. 10 3 X Nuts 005400 CH-28-N B-G-1 VT 1 **N/A**

Closure Head Flange B6. 10 3 X Nuts 005500 CH-29-N B-G-1 VT-1 aaN/Ass Closure Head Flange B6. 10 3 X Nuts 005600 CH-30-N B-G-1 **N/As*

Closure Head Flange B6.10 3 X Nuts 005700 CH-31-N B G-1 VT-1 1 *'N/A*0 Closure Head Flange B6. 10

'uts 3 X 005800 CH-32-N B-G-1 Closure Head Flange B6.10 3 X Nuts

DATE: 10/15/99 NINE MZLE POINT NUCLEAR PLANT UNIT 1 PAGE: 6 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XI SCHEDULED COMPONENTS urc Head Nuts NUMBER: 00.0 INSPECTION INTERVAZ PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTIFZCATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +~CALIBRATION BLOCK**

005900 CH-33-N B-G-1 VT-1 **N/A~~

Closure Head Flange B6. 10 3 X Nuts 006000 CH-34 N B-G-1 *~N/A~+

Closure Head Flange B6.10 3 X Nuts 006100 CH-35-N B-G"1 **N/A*I Closure Head Flange B6. 10 3 X Nuts 006200 CH 36"N B-G-1 ~~N/A~*

Closure Head Flange B6. 10 3 X Nuts 006300 CH-37-N B-G-1 a*N/Aa*

Closure Head Flange B6. 10 3 X Nuts 006400 CH-38-N B-G-1 VT-1 ~~N/A~~

Closure Head Flange B6.10 Nuts X 006500 CH-39-N B-G"1 *~N/A++

Closure Head Flange B6. 10 3 X Nuts 006600 CH-40 N B G 1 VT-1 **N/A*+

Closure Head Flange B6.10 3 X Nuts

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 7 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Nuts NUMBER: l~ 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATZON AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK~*

006700 CH-41 "N B-G-1 ttN/Af*

Closure Head Flange B6. 10 3 X Nuts 006800 CH-42-N B G-1 *iN/Af4 Closure Head Flange B6.10 3 X Nuts 006900 CH-43-N B G 1 +sN/A@a Closure Head Flange B6. 10 3 X Nuts 007000 CH-44-N B-G 1 **N/A*+

Closure Head Flange B6. 10 3 X Nuts 007100 CH 45-N B-G-1 **N/A*%

Closure Head Flange B6. 10 3 X Nu ts 007200 CH-46-N B-G-1 **N/A~*

Closure Head Flange B6.10 3 X Nuts 007300 CH-47-'N B-G-1 VT 1 j*N/A1*

Closure Head Flange B6.10

'uts 3 X 007400 CH-48-N B-G-l %AN/A*1 Closure Head Flange B6. 10 3 X Nuts

DATE: 10/15/99 NZNE MILE POZNT NUCLEAR PIANT UNIT 1 PAGE: 8 I

REVISION: 0 INSERVZCE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS urc Head Nuts NUMBER: 00.0 INSPECTION ZNTERVAI PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1-2 3 4 <<*CALIBRATION BLOCK**

007500 CH"49-N B-G"1 VT-1 ~~N/A~+

Closure Head Flange B6. 10 3 X Nuts 007600 CH-50-N B-G-1 +*N/A+*

Closure Head Flango B6. 10 3 X Nuts 007700 CH-51-N B-G-1 f iN/A*1 Closure Head Flange B6. 10 3 X Nuts 007800 CH-52-N B G-1 VT 1 *+N/A~~

Closure Head Flange B6. 10 3 X Nuts 007900 CH-53-N B-G-1 f4N/A4*

Closure Head Flange B6. 10 3 X Nuts 008000 CH-54-N B-G-1 VT-1 **N/A~~

Closure Head Flange B6. 10 3 X Nuts 008100 CH-55-N B"G-1 VT-1 t*N/A**

Closure Head Flange B6. 10 3 X Nuts 008200 CH-56-N B-G-1 VT 1 ++N/A~+

Closure Head Flange B6. 10 3 X Nuts

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PLANT UNIT 1 PAGE: 9 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Nuts NUMBER: 00.0 INSPECTION INTERVAL PIAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK*~

008300 CH-57-N B-G-1 VT 1 ++N/A++

Closure Head Flange B6. 10 3 X Nuts 008400 CH-58-N B-G 1 4*N/At1 Closure Head Flange B6.10 3 X Nuts 008500 CH-59-N B-G-1 VT-1 ~1N/Al*

Closure Head Flange B6. 10 3 X Nuts 008600 CH-60"N B-G-1 **N/A**

Closure Head Flange B6. 10 3 X Nuts 008700 CH-61-N B-G-1 ~*N/A**

Closure Head Flange B6. 10 3 X Nuts 008800 CH-62 N B-G-1 4 %N/At 1 Closure Head Flange B6. 10 3 X Nuts 008900 CH-63-N B-G-1 +*N/A~~

Closure Head Flange B6. 10

'uts 3 X 009000 CH 64 N B-G-1 VT 1 *IN/A**

Closuro Head Flange B6. 10 3 X Nuts

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNZT 1 V

PAGE: 10 REVZSZON: 0 INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS urc Head Studs NUMBER: 00.0 INSPECTZON ZNTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ +CALIBRATION BLOCK**

00. 0 RPV (REF. DWG. NO. 28A) 009100 CH" 01-B B-G-1 UT Rcg. Guide 1.65, Surface Closure Head Flange B6.20 MT exam when removed 3 X Studs ~ + 6. 25-RPV-STUD+*

009200 CH 02 B B-G 1 UT Rcg. Guide 1.65, Surface Closure Head Flange B6.20 MT exam when removed 3 X Studs **6.25-RPV-STUD**

009300 CH-03-B B-G-1 UT Rcg. Guide 1.65, MT exam Closure Head Flange B6.20 when removed 3 X Studs ~~6.25-RPV-STUD**

009400 CH-04 B B-G-1 Rcg. Guide 1.65,Surface Closure Head Flange B6. 20 MT exam when removed 3 X Studs *+6.25-RPV-STUD*+

009500 CH-05-B B-G-1 UT Rcg. Guide 1.65,Surface Closure Head Flange B6.20 MT exam when removed 3 X Studs ~~6.25-RPV-STUD**

009600 CH 06 B B-G-1 UT Reg. Guide 1.65,Surface Closure Head Flange B6 20 MT exam when removed 3 X Studs ~~6.25-RPV-STUD**

009700 CH"07-B B-G-1 UT Rcg. Guide 1.65; Surface Closure Head Flange B6.20 MT exam when removed 3 X Studs **6.25 RPV-STUD+~

009800 CH-08-B B-G-1 Rcg. Guide 1.65, MT when Closure Head Flango B6.20 removed 3 X Studs ++6.25-RPV STUD++

DATE: 10/15/99 NINE MZLE POINT NUCLEAR PLAIiT UNIT 1 PAGE: 11 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Studs NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~*

009900 CH-09"B B-G-1 UT Rcg. Guide 1.65, MT when Closure Head Flange B6 20

~ MT removed 3 X ~~6.25 RPV-STUD++

Studs 010000 CH-10-B B G-1 Rcg. Guide 1.65,MT when Closure Head Flange B6. 20 MT removed 3 X Studs ~ +NMP-6. 25-RPV-STUD**

010100 CH-11-B B-G-1 UT Rcg. Guide 1.65, MT when Closure Head Flange B6.20 MT removed 3 X Studs *~6.25 RPV-STUD+*

010200 CH-12-B B-G-1 UT Reg. Guide 1.65,MT exam Closure Head Flange B6.20 MT when removed 3 X Studs **6.25 RPV STUD++

010300 CH-13 "B B-G-1 UT Rcg. Guide 1.65,MT exam Closure Head Flange B6.20 MT when rcmovcd 3 X Studs *~6.25"RPV-STUD**

010400 CH-14-B BG1 Rcg. Guide 1.65, MT exam Closure Head Flange B6. 20 MT when removed 3 X Studs ~~6.25 RPV-STUD**

010500 CH-15-B B "G-l UT Rcg. Guide 1.65, MTexam Closure Head Flange B6.20 when rcmovcd 3 X Studs ++6.25"RPV-STUD*~

010600 CH-16-B B-G"1 Rcg. Guido 1.65, MT exam Closure Head Flange B6.20 MT when removed 3 X Studs *+6.25-RPV STUD*~

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PLANT UNIT 1 PAGE: 12 REVISION: 0 ZNSERVZCE INSPECTZON TEN-YEAR PLAN CZASS 1 SECTION XI SCHEDULED COMPONENTS urc Head Studs NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMZNATZON AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ +CALIBRATION BLOCX>> ~

010700 CH-17-B B-G-1 UT Rcg. Guide 1.65, MT eaxm Closure Head Flange B6.20 MT when removed 3 X Studs +*6.25-RPV STUD~~

010800 CH-18-B B-G-1 UT Rcg. Guide 1.65, MT exam Closure Head Flange B6.20 MT when removed 3 X Studs ~~6.25-RPV-STUD~~

010900 CH-19-B B-G-1 UT Reg. Guide 1.65,MT exam Closure Head Flango B6. 20 MT when removed Studs **NMP-6.25-RPV-STUD**

011000 CH-20-B B-G 1 Rcg. Guido 1.65,MT exam Closure Head Flange B6.20 MT when removed 3 X Studs **NMP 6. 25 RPV-STUD++

011100 CH-21-B B-G-1 UT Rcg. Guide 1.65, MT exam Closure Head Flange B6.20 when removed 3 X Studs ~ ~NMP-6. 25-RPV-STUD~*

011200 CH-22-B B-G-1 UT Rcg. Guide 1.65, MT exam Closure Head Flange B6. 20 when removed 3 X Studs +~6.25-RPV"STUD**

011300 CH-23-B B-G-1 UT Rcg. Guide 1.65,MT exam Closure Head Flange B6.20 when removed 3 X

'tuds

    • NMP 6. 25-RPV-STUD+ +

011400 CH-24-B B-G-1 UT Reg. Guide 1.65, MT exam Closuro Hoad Flange B6. 20 MT when removed 3 X Studs +*NMP-6. 25-RPV-STUD**

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 13 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XI SCHEDULED COMPONENTS ure Head Studs NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCX**

011500 CH-25-B Closure Head Flange Studs B-G-1 B6.20 UT MT 3 X when r~

Reg. Guide 1.65,MT exam

~ ~NMP-6 . 25-RPV-STVD**

011600 CH-26-B B-G 1 VT Rcg. Guide 1.65, MT when Closure Head Flange B6.20 MT removed 3 X Studs ~ +NMP-6. 25-RPV-STUD~ +

'I 011700 CH-27-B B-G-1 UT Rcg. Guide 1.65, MT exam Closure Head Flange B6.20 MT when rcmovcd 3

Studs ~~NMP"6.25-RPV-STVD**

011800 CH" 28-B B-G-1 Rcg. Guide 1.65, MT exam Closure Head Flango B6.20 MT when rcmovcd 3 X Studs ~ ~NMP-6. 25-RPV-STUD~~

011900 CH-29-B BG1 VT Reg. Guide 1.65, MT exam Closuro Head Flange B6.20 MT when rcmovcd 3

Studs ~+6.25-RPV-STUD~~

012000 CH-30-B B-G-1 UT Rcg. Guido 1.65, MT exam Closure Head Flange B6. 20 MT when removed 3 X Studs ++6.25-RPV STUD~+

012100 CH-31-B B-G-1 UT Rcg. Guide 1.65, MT exam Closure Head Flange B6.20 MT when removed 3 X Studs ~+6.25-RPV STUD~~

012200 CH-32-B B-G 1 VT Rcg. Guido 1.65, MT exam Closure Head Flange B6.20 MT when rcmovcd 3 X Studs **6.25 RPV-STUD++

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 14 REVISION: 0 INSERVICE INSPECTION TEN"YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS urc Head Studs NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~*

012300 CH-33-B B-G 1 UT Reg. Guide 1.65, MT exam Closure Head Flange B6.20 when rcmovcd 3 X Studs ~~6.25"RPV-STUD*~

012400 CH-34-B B-G-1 UT Reg. Guide 1.65, MT exam Closure Head Flange B6 20

~ MT when removed 3 X Studs **6'5-RPV-STUD**

012500 CH-35-B B-G-l UT Reg. Guide 1.65, MT exam Closure Head Flange B6. 20 MT when removed 3 X Studs ~+6.25-RPV-STUD++

012600 CH 36-B B-G-1 Rcg. Guide 1.65,MT exam Closure Head Flange B6.20 when rcmovcd 3 X Studs +*6.25 RPV STUD++

012700 CH-37-B B-G-1 Reg. Guide 1.65,MT exam Closure Head Flange B6.20 when removed Studs X *~6.25 RPV-STUD~~

012800 CH-38-B B-G-1 UT Reg. Guide 1.65,MT exam Closure Head Flange B6.20 MT when rcmovcd 3 X Studs ~~6.25-RPV-STUD~~

012900 CH-39-B B"G-1 UT Reg. Guide 1.65, MT exam Closure Head Flange B6. 20 MT when removed Studs 3 X ~*6.25-RPV-STUD**

013000 CH 40 B B-G-1 Rcg. Guide 1.65,MT exam Closure Head Flange B6. 20 when rcmovcd 3 X Studs ~+6.25-RPV STUD**

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 15 REVISION: 0 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS ure Head Studs NUMBER: 00. 0 INSPECTION ZNTERVAI PIAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK**

013100 CH-41-B B-G-1 UT Reg. Guide 1.65, MT exam Closure Head Flange B6.20 when removed 3 X Studs a+6.25 RPV STUD*a 013200 CH-42-B B-G 1 UT Rcg. Guide 1.65, MT exam Closure Head Flange B6.20 MT when removed 3 X Studs ~~6.25-RPV-STUD+~

013300 CH-43-B B-G-1 Reg. Guide 1.65, MT exam Closure Head Flange B6. 20 when removed 3 X Studs **6.25-RPV-STUD+*

013400 CH-44-B B-G-1 UT Reg. Guide 1.65,MT exam Closure Head Flange B6 20

~ MT when removed Studs X *+6 25-RPV-STUD*+

~

013500 CH-45-B B-G-1 UT Reg. Guide 1.65, MT exam Closure Head Flange B6.20 MT when removed 3 X Studs ~~6.25-RPV-STUD**

013600 CH-46"B B-G-1 UT Reg. Guide 1.65, MT exam Closure Head Flange B6.20 MT when removed 3 X Studs ~*6.25-RPV-STUD**

013700 CH-47-B B-G-1 Reg. Guide 1.65,MT exam Closure Head Flange B6.20 when removed 3 X Studs ~~6.25-RPV-STUD**

013800 CH-48-B B-G-1 UT Reg. Guide 1. 65, MT Closure Head Flange B6.20 MT exam when removed 3 X Studs ~~6.25-RPV-STUD**

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 16 REVISION: 0 ZNSERVZCE ZNSPECTZON TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Studs NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY METH'IRST NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~~

013900 CH 49 B B-G-1 UT Reg. Guide 1.65, MT exam Closure Head Flange B6. 20 MT when removed 3 X ++6.25 RPV-STUD++

Studs 014000 CH-50-B B"G"1 UT Rcg. Guide 1.65, MT exam Closure Head Flange B6 ~ 20 MT when removed 3 X Studs ++6.25 RPV-STUD++

014100 CH-51-B B-G-1 UT Rcg. Guide 1.65, MT exam Closure Head Flange B6.20 MT when removed 3

Studs ~~6.25-RPV-STUD*~

014200 CH-52-B B-G-1 Reg. Guide 1.65, MT Closure Head Flange B6.20 MT exam when removed 3

Studs ~ ~NMP-6. 25-RPV-STUD~ ~

014300 CH-53-B B-G 1 Reg. Guide 1.65, MT exam Closure Head Flange B6.20 MT when removed 3 X Studs ++NMP-6.25 RPV STUD*t 014400 CH-54-B B-G-1 UT Rcg. Guide 1.65, MT exam Closure Head Flange B6.20 MT when removed 3 X Studs ~~6.25 RPV-STUD~~

014500 CH-55-B Closure Head Flange Studs

'6 B-G-1

~ 20 UT 3 X Rcg. Guide 1.65, MT exam when removed

~~NMP" 6. 25-RPV-STUD+~

014600 CH"56-B B-G-1 UT Rcg. Guide 1.65, MT exam Closure Head Flange B6 20

~ MT when rcmovcd 3

Studs ~~NMP-6.25-RPV-STUD*>>

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNZT 1 PAGE: 17 REVZSZON: 0 INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS urc Head Studs NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERZOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTIFZCATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~~

014700 CH-57-B BG1 UT Reg. Guide 1.65, MT exam Closure Head Flange B6 20 when removed 3

Studs ~~NMP-6.25-RPV-STUD~*

014800 CH-58-B B G 1 UT Rcg. Guide 1.65, MT Closure Head Flange B6.20 MT exam when removed 3 X Studs ~ ~NMP-6. 25-RPV-STUD~ ~

014900 CH-59-B B-G-1 UT Reg. Guide 1.65, MT exam Closure Head Flange B6.20 MT when removed 3 +*6 25-RPV-STUD+*

Studs ~

015000 CH-60-B B-G-l Rcg. Guide 1.65, MT exam Closure Head Flange B6.20 when removed 3

Studs ~~NMP-6.25-RPV-STUD~*

015100 CH-61-B BG1 Rcg. Guide 1.65, MT exam Closure Head Flange B6.20 when removed 3 X Studs aaNMP-6.25-RPV STUDa ~

015200 CH-62-B B-G-1 UT Rcg. Guide 1.65, MT Closure Head Flange B6.20 MT exam when removed 3

Studs **NMP-6.25-RPV STUDY' 015300 CH-63-B B-G-1 Rcg. Guide 1.65, MT exam Closure Head Flange B6.20 when removed 3

'tuds

~~NMP-6.25-RPV-STUD**

015400 CH-64-B B-G-1 UT Rcg. Guide 1.65, MT exam Closure Head Flange B6.20 MT when removed 3 X Studs ~*6. 25-RPV-STUD~~

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 18 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XI SCHEDULED COMPONENTS ure Head Studs NUMBER: 00. 0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTZPZCATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +'~CALIBRATION BLOCK++

015500 CH-XX-B B-G-1 MT Per RG 1.65, a minimum Closure Head Plangc B6.30 of 4 studs vill be Studs 3 X - - - X X examLncd each period for a total of 12. **N/A*~

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 19 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washcrs NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK**

00. 0 RPV (REF. DWG. NO. 28) 015600 RV-01-TA B-G 1 VT-1 Reactor Vessel Flange B6.50 3 X Washer 015700 RV-01-TB BG-1VT1 Reactor Vcsscl Flange B6 50~

3 X Washer 015800 RV-02"TA B-G 1 VT 1 Reactor Vessel Flange B6 50 F

3 X Washer 015900 RV-02"TB B-G-1 VT-1 Reactor Vessel Flange B6.50 3 X Washer 016000 RV-03-TA B-G-1 VT-1 Reactor Vcsscl Flange B6 50 F

3 X Washer 016100 RV TB B-G"1 Reactor Vcsscl Flange B6 50

~

3 X Washer 016200 RV-04 TA B-G-1 VT-1 Reactor Vcsscl Flange B6 50

~

3 X Washer 016300 RV-04 TB B-G-1 Reactor Vcsscl Flange B6.50 3 X Washer

DATE: 10/15/99 NINE MILE POINT NUCLEAR PZANT UNIT 1 PAGE: 20 N.

REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS ure Head Washers NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK~ ~

016400 RV-05-TA BG1VT1 Reactor Vessel Flange B6.50 3 X Washer 016500 RV-05-TB B G-l VT-1 Reactor Vessel Flange B6 50~

3 X Washer 016600 RV-06-TA B-G-1 Reactor Vessel Flange B6. 50 3 X Washer 016700 RV-06-TB B-G-1 Reactor Vessel Flange B6 50

~

3 X Washer 016800 RV-07-TA B G-1 VT-1 Reactor Vessel Flange B6 50

~

3 X Washer 016900 RV-07-TB B-G-1 Reactor Vessel Flange B6.50 3 X Washer 017000 RV-08-TA B-G 1 VT 1 Reactor Vessel Flange B6 50 3 X Washer 017100 RV-08-TB B-G-1 VT-1 Reactor Vessel Flange B6 50

~

Washer X

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 21 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washcrs NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~~

017200 RV TA B-G 1 VT-1 Reactor Vcsscl Flange B6 50

~

X Washer 017300 RV-09-TB B G 1 VT 1 Reactor Vessel Flange 3 X Washer 017400 RV-10 "TA B-G-1 VT-1 Reactor Vessel Flange B6.50 3 X Washer 017500 RV-10 TB B-G-1 VT 1 Reactor Vessel Flange B6.50 3 X washer 017600 RV-11-TA B"G 1 VT-1 Reactor Vcsscl Flange B6.50 3 X Washer 017700 RV-11-TB B-G-1 VT-1 Reactor Vessel Flange B6.50 3 X Washer 017800 RV-12-TA B-G-1 Reactor Vessel Flange B6.50 3 X Washer 017900 RV-12-TB B-G-1 VT 1 Reactor Vcsscl Flange B6.50 3 X Washer

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 22 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washers NUMBER: 00.0 INSPECTION ZNTERVAZ PIJN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE -OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~*CALIBRATION BLOCK**

018000 RV-13-TA B-G-1 VT-1 Reactor Vessel Flange B6.50 3 X Washer 018100 RV-13-TB BG1 Reactor Vessel Flange B6 50

~

3 X Washer 018200 RV-14-TA B-G-1 Reactor Vessel Flange B6.50 3 X Washer 018300 RV-14 TB B G-1 VT 1 Reactor Vessel Flange B6 50 F

3 X Washer 018400 RV-15-TA B-G-1 VT-1 Reactor Vcsscl Flange B6.50 3 X Washer 018500 RV-15 TB B-G-1 VT 1 Reactor Vessel Flange B6.50 3 X washer 018600 RV-16-TA B-G-1 VT-1 Reactor Vcsscl Flange 3 X Washer 018700 RV-16-TB BG1VT1 Reactor Vessel Flange B6 ~ 50 3 X Washer

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 23 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washers NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE -OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK>>~

018800 RV-17-TA B-G-l VT-1 Reactor Vessel Flange B6 50~

3 X Washer 018900 RV-17-TB B-G-1 Reactor Vessel Flange B6.50 3 X Washer 019000 RV 18-TA B-G-1 Reactor Vessel Flange B6.50 3 X Washer 019100 RV-18-TB B-G-1 Reactor Vessel Flange B6 50 F

3 X Washer 019200 RV-19-TA B-G-1 VT-1 Reactor Vessel Flange B6.50 3 X Washer 019300 RV-19-TB B G 1 VT 1 Reactor Vessel Flange B6 50

~

3 X Washer 019400 RV TA B-G-l Reactor Vessel Flange B6.50 3 X Washer 019500 RV-20-TB B-G-1 Reactor Vessel Flange B6 50

~

3 X Washer

DATE: 10/15/99 NINE MZLE POZNT NUCLEAR PLANT UNIT 1 PAGE: 24 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washers NUMBER: 00.0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~*CALIBRATION BLOCK+*

019600 RV-21-TA B-G-1 VT-1 Reactor Vessel Flange B6 50

~

3 X Washer 019700 RV-21-TB B-G-1 Reactor Vcsscl Flange B6 50 F

3 X Washer 019800 RV-22-TA B"G-1 VT-1 Reactor Vessel Flange B6.50 3 X Washer 019900 RV-22-TB B-G-1 Reactor Vcsscl Flange B6.50 3 X Washer 020000 RV-23-TA B-G-1 VT-1 Reactor Vessel Flange B6.50 3 X Washer 020100 RV-23-TB B-G-1 Reactor Vessel Flange B6.50 3 X Washer 020200 RV 24 TA B-G-1 VT-1 Reactor Vessel Flange B6.50 3 X Washer 020300 RV-24-TB B-G"1 VT-1 Reactor Vessel Flange B6.50 3 X Washer

DATE: 10/15/99 NINE MIIE POINT NUCLEAR PLANT UNIT 1 PAGE: 25 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washers NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERZOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~*CALIBRATION BLOCK*~

020400 RV-25-TA B-G-1 VT-1 Reactor Vessel Flange B6 50 F

3 X Washer 020500 RV-25-TB BG1 Reactor Vessel Flange B6.50 3 X Washer 020600 RV-26-TA B-G-1 VT 1 Reactor Vessel Flange B6.50 3 X Washer 020700 RV-26-TB B-G-1 Reactor Vessel Flange B6 50 F

3 X Washer 020800 RV-27-TA B-G-1 VT 1 Reactor Vessel Flange 3 X Washer 020900 RV-27-TB B-G-1 VT 1 Reactor Vcsscl Flange B6.50 3 X Washer 021000 RV-28-TA B-G-1 VT 1 Reactor Vcsscl Flange B6.50 3 X Washer 021100 RV-28-TB B-G-1 VT-1 Reactor Vessel Flange B6.50 3 X Washer

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 26 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS urc Head Washcrs NUMBER: 00.0 ZNSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FZRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *~CALIBRATION BLOCK**

021200 RV-29-TA B-G-1 Reactor Vessel Flange B6.50 3 X Washer 021300 RV-29-TB B"G-1 Reactor Vessel Flange B6.50 3 X Washer 021400 RV-30-TA B-G-1 Roactor Vcsscl Flango B6.50 3 X Washer 021500 RV-30-TB B-G-1 Reactor Vessel Flange B6.50 3 X Washer 021600 RV"31- TA B-G-1 Reactor Vessel Flange B6.50 3 X Washer 021700 RV-31-TB B-G-1 VT-1 Reactor Vessel Flange B6.50 3 X Washer 021800 RV-32-TA B "G-1 VT 1 Reactor Vessel Flange B6.50 3 X Washer 021900 RV-32-TB B-G-1 Reactor Vessel Flange B6.50 3 X Washer

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 27 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS urc Head Washers NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERZOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATE GY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +*CALIBRATION BLOCK**

022000 RV-33-TA B-G-1 Reactor Vessel Flange B6 ~ 50 3 X Washer 022100 RV-33-TB B-G-1 VT 1 Reactor Vessel Flange B6.50 3 X Washer 022200 RV-34-TA B G 1 Reactor Vessel Flange B6 50

~

3 X Washer 022300 RV 34 TB B-G 1 Reactor Vessel Flange B6.50 3 X Washer 022400 RV-35-TA B-G 1 Reactor Vessel Flange B6. 50 3 X Washer 022500 RV-35-TB B-G-1 Reactor Vcsscl Flange B6.50 3 X Washer 022600 RV-36-TA B-G-1 VT"1 Reactor Vcsscl Flange B6.50 3 X Washer 022700 RV-36-TB B-G-1 VT-1 Reactor Vessel Flange B6.50 3 X Washer

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 28 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COHPONENTS ure Head Washers NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD SUHHARY EXAHINATZON AREA CATEGY OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEH NO 1 2 3 4 1 2 3 4 1 2 3 4 ~*CALIBRATION BLOCK~ ~

022800 RV-37-TA B G 1 Reactor Vessel Flange B6.50 3 X Washer 022900 RV-37-TB B-G-1 VT-1 Reactor Vessel Flange B6.50 3 X Washer 023000 RV-38-TA B-G-1 VT-1 Reactor Vessel Flange B6.50 3 X Washer 023100 RV-38-TB B"G-1 Reactor Vessel Flange B6.50 3 X Washer 023200 RV 39 TA B-G-1 Reactor Vessel Flange B6.50 3 X Washer 023300 RV-39-TB B-G-1 Reactor Vessel Flange B6 ~ 50 3 X Washer 023400 RV-40-TA B G 1 Reactor Vcsscl Flange B6.50 3 X Washer 023500 RV-40-TB B-G-1 Reactor Vessel Flange B6.50 3 X Washer

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PIANT UNIT 1 PAGE: 29 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washers NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THZRD SEC. XI PERIOD PERIOD PERZOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~~

023600 RV-41-TA BG1 VT-1 Reactor Vessel Flange B6.50 X

Washer 023700 RV TB B-G-1 Reactor Vcsscl Flange B6.50 3 X Washer 023800 RV-42-TA B-G-1 Reactor Vessel Flange B6.50 3 X Washer 023900 RV-42-TB B-G-1 Reactor Vcsscl Flange B6.50 3 X Washer 024000 RV 43 TA B-G"1 VT-1 Reactor Vessel Flange B6 50

~

3 X Washor 024100 RV-43-TB B-G-1 VT-1 Reactor Vessel Flange B6.50 3 X Washer 024200 RV-44-TA B G 1 Reactor Vessel Flange B6 50 F

3 X Washer 024300 RV-44-TB B-0" 1 VT-1 Reactor Vcssol Flange B6 50

~

3 X Washer

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 30 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS urc Head Washcrs NUMBER: 00.0 INSPECTION INTERVAL PIAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERZOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ +CALIBRATION BLOCK*'~

024400 RV 45 TA BG1 Reactor Vessel Flange B6 50

~

3 X Washer 024500 RV-45-TB B-G-1 Reactor Vcsscl Flange B6.50 3 X Washer 024600 RV-46-TA B-G-1 VT-1 +*N/A++

Reactor Vessel Flange B6 50

~

3 X Washer 024700 RV-46-TB B G-1 **N/A*+

Reactor Vcsscl Flange B6 50

~

3 X Washer 024800 RV-47-TA B-G-1 Reactor Vcsscl Flange B6 50 F

3 X Washer 024900 RV-47-TB B-G-1 VT 1 Reactor Vcsscl Flange B6.50 3 X Washer 025000 RV-48-TA B-G 1 Reactor Vessel Flangh B6.50 3 X Washer 025100 RV-48-TB B-G-1 VT-1 Roactor Vcsscl Flange B6.50 3 X Washer

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 31 REVISION: 0 ZNSERVZCE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washers NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTZFZCATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK~~

025200 RV-49"TA B-G-1 Reactor Vcsscl Flange B6.50 3 X Washer 025300 RV-49-TB B-G-1 VT 1 Reactor Vessel Flange B6.50 3

Washer 025400 RV-50-TA B G-l Reactor Vcsscl Flange B6 ~ 50 3 X Washer 025500 RV-50-TB B-G-l VT-1 Reactor Vessel Flange B6.50 3 X Washer 025600 RV-51-TA B-G-1 VT 1 +*N/A**

Reactor Vessel Flange B6.50 3 X Washer 025700 RV-51-TB B-G-1 VT-1 *~N/A*~

Reactor Vessel Flange B6.50 3 X Washer 025800 RV-52-TA B-G "1 **N/A%*

Reactor Vcsscl Flange B6.50 3 X Washer 025900 RV 52 TB B-G-1 ~*N/A**

Reactor Vessel Flange B6.50 3 X Washer

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 32 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PIAN CIASS 1 SECTION XI SCHEDULED COMPONENTS ure Head Washers NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE -OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *~CALIBRATION BLOCKi~

026000 RV-53-TA B-G-1 eaN/Aaa Reactor Vessel Flange B6.50 3 X Washer 026100 RV-53-TB B-G-l VT-1 ++N/A*+

Reactor Vessel Flange B6.50 3 X Washer 026200 RV-54-TA B-G-1 ++N/PPa Reactor Vcsscl Flange B6.50 3 X Washer 026300 RV-54-TB B G 1 **N/A*~

Reactor Vessel Flange B6 50

~

3 X Washer 026400 RV-55-TA B"G"1 ktN/Akk Reactor Vessel Flange B6.50 3 X Washer 026500 RV-55-TB BG1 VT-1 ~iN/A+*

Reactor Vessel Flange B6. 50 3 X Washer 026600 RV-56-TA B-G-1 *tN/Aft Reactor Vessel Flange B6.50 3 X Washer 026700 RV-56-TB B"G-1 VT-1 *ON/A**

Reactor Vessel Flange B6. 50 3 X Washer

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 33 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washcrs NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRE SERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMZNATZON AREA CATEGY NDE -OUTAGE ZNSTRUCTIONS NUMBER IDENTIFICATION ZTEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 yqCALIBRATZON BLOCKte 026800 RV-57-TA B-G-1 VT-1 ~*N/A~*

Reactor Vessel Flange B6 50

~

3 X Washer 026900 RV-57-TB B-G-1 4kN/Ak*

Reactor Vessel Flange B6.50 3 X Washer 027000 RV-58"TA B-G-1 VT-1 ~+N/A~~

Reactor Vessel Flange B6.50 3 X Washer 027100 RV-58-TB B-G-1 **N/A~~

Reactor Vcsscl Flange B6.50 3 X Washer 027200 RV-59-TA B-G-1 *+N/A**

Reactor Vessel Flange B6 50

~

3 X Washer 027300 RV-59-TB B-G-1 **N/A**

Reactor Vessel Flange B6 50

~

3 X Washer 027400 RV-60-TA B"G-1 VT-1 **N/Aaa Reactor Vcsscl Flange B6.50 3 X Washer 027500 RV-60-TB B-G-1 VT 1 **N/A**

Reactor Vessel Flange B6.50 3 X Washer

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 34 REVISION: 0 ZNSERVZCE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS urc Head Washers NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTZFZCATION ZTEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK~i 027600 RV-61-TA B G-1 VT-1 ION/A*f Reactor Vessel Flange B6 ~ 50 3 X Washer 027700 RV-61-TB B-G-1 VT-1 **N/A+~

Reactor Vcsscl Flange B6. 50 3 X Washer 027800 RV-62-TA B-G"1 VT-1 **N/A*%

Reactor Vessel Flange B6 50 F

3 X Washer 027900 RV 62 TB B-G-1 **N/A**

Reactor Vessel Flange B6.50 3 X Washer 028000 RV-63-TA B-G-1 ~~N/A~~

Reactor Vcsscl Flange B6.50 3 X Washer 028100 RV-63-TB B-G 1 VT-1 *AN/A**

Reactor Vessel Flange B6.50 3 X Washer 028200 RV-64-TA BG-1 VT 1 **N/Af*

Reactor Vessel Flange B6 ~ 50 3 X Washer 028300 RV-64 TB B-G-1 VT-1 *AN/AOt Reactor Vcsscl Flange B6.50 3 X Washer

DATE: 10/15/99 NZNE HIIE POINT NUCLEAR PLANT UNIT 1 PAGE: 35 REVISION: 0 ZNSERVZCE INSPECTION TEN"YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COHPONENTS rol Rod Drive Housings NUMBER: 00.0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR ASHE FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAHINATZON AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 + ~CALIBRATION BLOCK**

00. 0 RPV (REF. DWG. NO. 28A) 041300 CRD XX-X B-G 2 Only when disassembled, Capscrcws (8) 8 ( B7.80 To be identified as X X X X disassembled during each

)

outage ~~N/A+~

041400 NCTS503783 1 AZZSRDH NOTS VT-2 All CRD Housings, CRD CRDH Exterior e Rx 503783 pcn. leakage req'd 3 X - - - X X - - X Bottom Head during RFO a Maint 4 Mid-cycle shutdown when drywcll De-inerted.

0 1 N/A**

041500 RV-CRD-Rl B"0 Examine outer 180 CRD Housing-to-Flange B14.10 degrccs of circufercnce 3

weld pcr RR-ISZ-9 **N/A*+

041600 RV-CRD-RS B 0 Examine outer 180 CRD Housing-to-Flange B14. 10 degrees of circumfcrencc 3 X weld pcr RR-ZSI-9 i~N/Ai+

041700 RV-CRD-Sl B-0 Examine outcr 180 CRD Housing-to-Flange B14. 10 degrees of circumfcrencc 3 X weld per RR-ZSI-9 **N/A~~

041800 RV"CRD-S3 B-0 Examine outer 180 CRD Housing-to-Flange B14.10 degrccs of circumference 3 X weld per RR-ISZ-9 *~N/A**

041900 RV-CRD-T3 B-0 Examine outer 180 CRD Housing-to-Flange B14.10 dcgrccs of circumference 3

weld pcr RR-ISZ-9 ~~N/A+~

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 36 REVZSZON: 0 ZNSERVZCE INSPECTION TEN-YEAR PIAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS rol Rod Drive Housings NUMBER: 00. 0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATZON AREA CATEGY NDE -OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~+CAIIBRATZON BLOCK**

042000 RV-CRD-T7 B-0 Examine outer 180 CRD Housing-to-Flange B14.10 degrees of circumfcrcncc weld pcr RR-ZSZ-9 ~~N/A~*

042100 RV CRD U2 B-0 Examine outer 180 CRD Housing-to-Flange B14. 10 dcgrecs of circumference 3 X weld pcr RR-ISI-9 *~N/A~~

042200 RV-CRD-U6 B-0 Examine outer 180 CRD Housing-to-Flange B14. 10 dcgrecs of circumfcrcnce 3 X weld pcr RR-ZSZ-9 *~N/A~~

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 37 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Vassal Flange NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMZNATZON AREA CATEGY NDE OUTAGE ZNSTRUCTZONS NUMSER IDENTIFICATION ZTEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK**

00. 0 RPV (REF. DWG. NO. 28) 042300 RV-01-L B-G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 **Pl LF 1*a 3 X in Flange 042400 RV-01-T B"G-1 VT-1 Only when disassembled.

Reactor Vessel B6.50 **N/A*~

3 X Bushings in Flange 042500 RV 02-L B-G-1 Only when disassembled.

Reactor Vessel Threads B6.40 **Pl-LF-lai 3 X in Flange 042600 RV-02-T B-G-1 Only when disassembled.

Reactor Vessel B6. 50 ++N/A++

3 X Bushings in Flange 042700 RV-03-L B-G-1 UT Only when disassembled.

Reactor Vcsscl Threads B6.40 **Pl LF 1++

3 X in Flange 042800 RV-03-T B-G-1 Only when disassembled.

Reactor Vessel B6.50 44N/A4 l 3 X Bushings in Flange 042900 RV-04-L B-G-l UT Only when disassembled.

Reactor Vessel Threads B6.40 **Pl LF 1**

3 X in Flange 043000 RV-04-T B-G-1 Only when disasscmblcd.

Reactor Vessel B6.50 3 X Bushings in Flange

F DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 38 REVISZON: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Vessel Flange NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 a yCALIBRATION BLOCKt s 043100 RV-05-L B-G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 tfP] LF ]1l 3 X in Flange 043200 RV 05 T B-G-1 VT"1 Only when disassembled.

Reactor Vessel B6.50 ~*N/A**

3 X Bushings in Flange 043300 RV-06-L B-G-l UT Only when disassembled.

Reactor Vessel Threads B6.40 **Pl-LF-I~~

3 X in Flange 043400 RV-06-T B-G-l VT-1 Only when disassembled.

Reactor Vessel B6.50 +~N/A~~

3 X Bushings in Flange 043500 RV-07-L B-G-1 UT Only when disasscmblcd.

Reactor Vessel Threads B6.40 +~Pl-LF-I++

3 X in Flange 043600 RV-07-T B-G-1 Only when disassembled.

Reactor Vcsscl B6. 50 **N/A**

3 X Bushings in Flange 043700 RV-08-L B G 1 UT Only when disassembled.

Reactor Vessel Threads B6.40 *~ Pl-LF-1**

3 X in Flange 043800 RV-08 T B G-1 Only when disassembled.

Reactor Vessel B6.50 *AN/AJ*

3 X Bushings in Flange

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 39 REVISION: 0 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Flange NUMBER: 00.0 INSPECTION ZNTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCTZONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 w wCALZBRATION BLOCK*s 043900 RV-09-L B-G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 eePZ LF Zaa 3 X in Flange 044000 RV-09-T B-G-1 Only when disassembled.

Reactor Vessel B6.50

  • 1 'N/A**

3 X Bushings in Flange 044100 RV-10-L B-G-1 UT Only when disassembled.

Reactor Vcsscl Threads B6.40 *~Pl-LF-l~~

3 X in Flange 044200 RV-10-T B-G-l VT-1 Only when disassembled.,

Reactor Vessel B6.50 3 X Bushings in Flange 044300 RV-11-I B G-1 UT Only when disassembled.

Reactor Vessel Threads B6 40 +*Pl LF-I++

3 X in Flange 044400 RV-11-T B-G-1 VT 1 Only when disassembled.

Reactor Vessel B6.50 %AN/A%*

3 X Bushings in Flange 044500 RV-12-L B-G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 <<*Pl-LF-I**

3 X in Flange 044600 RV-12-T B-G-1 VT-1 Only when disassembled.

Reactor Vessel B6.50 *ON/A**

3 X Bushings in Flange

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 40 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Flange NUMBER: 00. 0 ZNSPECTZON INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE -OUTAGE INSTRUCTIONS NUMBER ZDENTZFZCATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *~CALIBRATION BLOCK**

044700 RV-13-L B-G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 ~~PI-LF-I~*

3 X in Flange 044800 RV-13-T B-G-1 VT-1 Only when disassembled.

Reactor Vessel B6.50 '

+N/A~+

3 X Bushings in Flange 044900 RV-14-L B-G-l UT Only when disassembled.

Reactor Vcsscl Threads B6.40 ~~ Pl-LF-1+ ~

3 X in Flange 045000 RV-14-T B-G-1 Only when disasscmblcd.

Reactor Vessel B6. 50 ~~N/A~~

3 X Bushings in Flange 045100 RV-15-L B"G-1 UT Only when disassembled.

Reactor Vcsscl Threads B6.40 41P] IF 1*4 3 X in Flange 045200 RV-15 T B-G-1 VT-1 Only when disassembled.

Reactor Vessel B6. 50 ttN/A4*

3 X Bushings in Flange 045300 RV-16-L B-G-1 UT Only when disassembled.

Reactor Vcsscl Threads B6.40 **Pl-Z,F-1**

3 X in Flange 045400 RV-16-T B G-1 Only when disassembled.

Reactor Vessel B6. 50 **N/A~~

3 X Bushings in Flange

a DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 41 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Flange NUHBER: 00. 0 INSPECTION ZNTERVAZ PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERZOD SUHHARY EXAHZNATZON AREA CATEGY NDE OUTAGE ZNSTRUCTIONS NUHBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCX~ ~

045500 RV-17-L B-G-1 Only when disassembled.

Reactor Vcsscl Threads B6.40 ++Pl-LF-1*~

X in Flange 045600 RV-17-T B-G 1 Only when disassembled.

Reactor Vassal B6.50 *~N/A~~

3 X Bushings in Flange 045700 RV 18 L B-G 1 UT Only when disassembled.

Reactor Vessel Threads B6.40 *~PI-LF-1*~

3 X in Flange 045800 RV T B-G-1 VT-1 Only when disasscmblcd.

Reactor Vessel B6.50 ~*N/A**

3 X Bushings in Flango 045900 RV 19 L B G-1 UT Only when disasscmblcd.

Reactor Vcsscl Threads B6.40 **Pl LF-1**

3 X in Flange 046000 RV-19-T BG1 Only when disasscmblcd.

Reactor Vessel B6. 50 3 X Bushings in Flange 046100 RV-20-L B-G 1 UT Only when disassembled.

Reactor Vessel Thrca'ds B6.40 ++Pl-LF-I++

3 X in Flange 046200 RV-20-T B-G-1 VT"1 Only when disasscmblcd.

Reactor Vcsscl B6. 50 3 X Bushings in Flango

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 42 REVZSZON: 0 ZNSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Flange NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMZNATZON AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ZTEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK**

046300 RV-21-L B-G-1 Only when disassembled.

Reactor Vessel Threads B6.40 ttP] LF ]tt 3 X in Flange 046400 RV-21-T B-G-1 VT-1 Only when disassembled.

Reactor Vcsscl B6.50 3 X Bushings in Flange 046500 RV-22-L B-G-1 UT Only when disasscmblcd.

Reactor Vessel Threads B6.40 ~~Pl-LF-1*~

3 X in Flange 046600 RV-22-T BG1 Only when disasscmblcd.

Reactor Vessel B6.50 **N/A~~

3 X Bushings in Flange 046700 RV-23-L B G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 +*Pl-LF-1*~

3 X in Flange 046800 RV-23-T B-G"1 Only when disassembled.

Reactor Vessel B6. 50 3 X Bushings in Flange 046900 RV 24-L B-G-1 UT Only when disasscmblcd.

Reactor Vcsscl Threads B6.40 **Pi-LF-1~*

3 X in Flange 047000 RV-24-T B G-1 Only when disassembled.

Reactor Vcsscl B6.50 3 X Bushings in Flange

0 4 'I

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PLANT UNIT 1 PAGE: 43 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Flange NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTZFICATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~ ~

047100 RV-25-L B-G-1 Only when disassembled.

Reactor Vessel Threads B6 40 ~+Pl-LF-I**

3 X in Flange 047200 RV-25 T B-G-l Only when disasscmblcd.

Reactor Vessel B6.50 3 X Bushings in Flange 047300 RV-26-L B-G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 *~PI-LF-I+~

3 X in Flange 047400 RV 26 T B-G"1 Only when disassembled.

Reactor Vessel B6. 50 3 X Bushings in Flange 047500 RV-27-L B-G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 ~*Pi-LF-I~+

3 X in Flange 047600 RV-27-T B-G 1 Only when disassembled.

Reactor Vessel B6.50 3 X Bushings in Flange 047700 RV 28-L B-G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 **Pl-LF-I++

3 X in Flange 047800 RV-28-T B-G-1 Only when disassembled.

Reactor Vessel B6. 50 3 X Bushings in Flange

lq DATE: 10/15/99 NINE MILE POZNT NUCLEAR PLANT UNIT 1 PAGE: 44 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XI SCHEDULED COMPONENTS tor Vessel Flange NUMBER: 00.0 ZNSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THZRD SEC. XZ PERZOD PERZOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY ITEM NO NDE ---OUTAGE-- ZNSTRUCTZONS NUMBER IDENTIFICATION METH 1 2 3 4 1 2 3 4 1 2 3 4 1 rCALIBRATION BLOCK+ ~

047900 RV-29-L B-G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 0IP] LF ]**

3 X in Flange 048000 RV 29 T B-G-1 VT-1 Only when disassembled.

Reactor Vessel B6.50 ~+N/A++

3 X Bushings in Flange 048100 RV-30-L B-G-l UT Only when disasscmblcd.

Reactor Vessel Threads B6.40 ~ ~ Pl-LF-1 ~ ~

3 X in Flange 048200 RV-30-T B G-1 Only when disasscmblcd.

Reactor Vcsscl B6.50 *'~N/A~*

3 X Bushings in Flange 048300 RV-31-L B-G-l UT Only when disassembled.

Reactor Vessel Threads B6.40 ~~Pl-LF-1~~

3 X in Flange 048400 RV-31-T B G"1 Only when disassembled.

Reactor Vessel B6.50 1 O'/A1 0 3 X Bushings in Flange 048500 RV-32-L B-G-l UT Only when disassembled.

Reactor Vessel Threads B6.40 ~~Pl-LF-I**

3 X in Flange 048600 RV-32-T B G-1 Only when disassembled.

Reactor Vessel B6.50 *IN/A4*

3 X Bushings in Flange

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 45 REVZSZON: 0 ZNSERVICE ZNSPECTZON TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Flange NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERZOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK*~

048700 RV-33-L B-G-1 UT Only when disassembled.

Reactor Vcsscl Threads B6.40 a+PI-LF-Iae 3 X in Flange 048800 RV"33-T B-G-l Only when disassembled.

Reactor Vessel B6.50 4 1N/A**

3 X Bushings in Flange 048900 RV-34-L B-G"1 UT Only when disasscmblcd.

Reactor Vessel Threads B6.40 ~ +Pl-LF-1 ~ +

3 X in Flange 049000 RV 34 T B G '1 Only when disassembled.

Reactor Vcsscl B6. 50 **N/Af*

3 X Bushings in Flange 049100 RV-35-L B-G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 *+Pl-LF-I++

3 X in Flange 049200 RV-35-T BG1 Only when disassembled.

Reactor Vessel B6. 50 l*N/A11 3 X Bushings in Flange 049300 RV-36-L BG1UT Only when disasscmblcd.

Reactor Vessel Threads B6.40 aaPI LF 1**

3 X in Flange 049400 RV-36-T B-G-1 Only when disasscmblcd.

Reactor Vessel B6.50 t 1N/Ak*

3 X Bushings in Flange

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 46 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PZAN CZASS 1 SECTION XI SCHEDULED COMPONENTS tor Vcsscl Flange NUMBER: 00. 0 ZNSPECTZON ZNTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTZFZCATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 + +CALIBRATION BLOCK+ +

049500 RV-37-L B-G-l Only when disassembled.

Reactor Vessel Threads B6.40 ~+ Pl-LF-1 ~ ~

in Flange 3 - - - - X 049600 RV-37-T B-G-l Only when disassembled.

Reactor Vessel B6.50 ~kN/Af4 3 X Bushings in Flange 049700 RV-38-L B-G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 ~~Pl-LF-l~~

in Flange X 049800 RV-38-T B-G-1 Only when disassembled Reactor Vcsscl B6. 50 ~~N/A+*

3 X Bushings in Flange 049900 RV-39-L B-G-1 UT Only when disassembled.

Reactor Vcsscl Threads B6.40 ~~Pl-LF-I**

3 X in Flange 050000 RV-39-T B-G-1 VT-1 Only when disassembled.

Reactor Vessel B6.50 *+N/A+*

3 X Bushings in Flange 050100 RV-40-L B G-l UT Only when disassembled.

Reactor Vessel Threads B6.40 **Pl-LF-1*~

3 X in Flange 050200 RV-40-T B G 1 Only when disassembled.

Reactor Vessel B6.50 k4N/A*4 3 X Bushings in Flange

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 47 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Flange NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ZTEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~~

050300 RV-41-L B-G 1 Only when disassembled.

Reactor Vessel Threads B6.40 ++Pl-LF-1~~

3 X in Flange 050400 RV-41-T B-G-1 Only when disassembled.

Reactor Vessel B6.50 +AN/A+a 3 X Bushings in Flange 050500 RV-42-L B-G-1 UT Only when disassembled.

Reactor Vcsscl Threads B6.40 **Pl-LF-1**

in Flange 3 - " - - X 050600 RV 42 T B G-1 Only when disassembled.

Reactor Vessel B6. 50 t*N/A*4 3 X Bushings in Flange 050700 RV-43-I B-G-1 UT Only when disasscmblcd.

Reactor Vessel Threads B6.40 + +Pl-LF-1*~,

3 X in Flange 050800 RV 43 T B-G-1 VT-1 Only when disasscmblcd.

Reactor Vessel B6.50 1 O'/A**

3 X Bushings in Flange 050900 RV-44-L B G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 **Pl-I,F-1**

3 in Flange X 051000 RV-44-T B-G-1 Only when disasscmblcd.

Reactor Vessel B6. 50 *~N/A~~

3 X Bushings in Flange

4 DATE: 10/15/99 NINE MZLE POINT NUCLEAR PLANT UNIT 1 PAGE: 48 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Flange NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERZOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTZFZCATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *+CALIBRATIONBLOCK~+

051100 RV-45-L B-G-l Only when disassembled.

Reactor Vessel Threads B6.40 aaP1 IF 3 X in Flange 051200 RV-45-T B-G-l VT-1 Only when disassembled.

Reactor Vessel B6.50 **N/A+i 3 X Bushings in Flange 051300 RV-46-L BG1UT Only when disassembled.

Reactor Vessel Threads B6.40 ~+ Pl-LF-1 ~ ~

3 X in Flange 051400 RV-46-T B-G-1 Only when disassembled.

Reactor Vessel B6.50 ~+N/A++

3 X Bushings in Flange 051500 RV-47-L B-G-1 Only when disassembled.

Reactor Vessel Threads B6.40 *~PI-LF-l~~

3 X in Flange 051600 RV-47-T B-G-1 Only when disassembled.

Reactor Vessel B6.50 f 4N/Alt 3 X Bushings in Flange 051700 RV-48-L B-G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 **Pl-IF-1**

3 X in Flange 051800 RV-48-T B-G-1 Only when disasscmblcd.

Reactor Vessel B6.50 ~~N/Ai~

3 X Bushings in Flange

0

~ },

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 49 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PIAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vcsscl Flange NUMBER: 00.0 INSPECTION INTERVAL PIAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERZOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK+*

051900 RV-49-L B-G-l UT Only when disassembled.

Reactor Vessel Threads B6.40 3

toPI LF Itf in Flange X 052000 RV-49-T B-G-1 Only when disassembled.

Reactor Vessel B6.50 **N/A*~

3 X Bushings in Flango 052100 RV-50-L B-G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 **Pl-LF-1*~

3 X in Flange 052200 RV-50-T B-G-1 Only when disassembled.

Reactor Vessel B6.50 *iN/A*%

3 X Bushings in Flange 052300 RV-51-L B-G-1 UT Only when disassembled.

Reactor vcsscl Threads B6.40 +*Pl-LF-1**

3 X in Flange 052400 RV-51-T B"G 1 Only when disassembled.

Reactor Vcsscl B6.50 +*N/A*+

3 X Bushings in Flange 052500 RV-52-L B"G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 **Pl-LF-1**

3 X in Flange 052600 RV-52-T B-G-1 Only when disassembled.

Reactor Vessel 86.50 **N/A**

3 X Bushings in Flange

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 50 REVISION: 0 ~ INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Flange NUMBER: 00. 0 ZNSPECTION ZNTERVAL PZAN STATUS PRESERVICE YEAR I

ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~*CALIBRATION BLOCK**

052700 RV-53-L B-G-1 Only when disassembled.

Reactor Vessel Threads B6.40 3

4%PI LF Ilt X

in Flange 052800 RV-53-T B-G-1 Only when disassembled.

Reactor Vessel B6.50 ~~N/A++

3 X Bushings in Flange 052900 RV-54-L B-G-1 UT Only when disassembled.

Reactor Vcsscl Threads B6.40 ~~PI-LF-I++

3 X in Flange 053000 RV-54-T B-G-1 Only when disassembled.

Reactor Vessel B6.50 *ON/A*%

3 Bushings in Flange 053100 RV 55 L B-G-1 UT Only when disasscmblcd.

Reactor Vessel Threads B6.40 ++Pl-LF-1~~

3 X in Flange 053200 RV-55-T B-G-1 Only when disassembled.

Reactor Vessel B6.50 ++N/A++

3 X Bushings in Flange 053300 RV-56-L B-G-l UT Only when disassembled.

Reactor Vcsscl Threads B6 40 **Pl-LF-1**

3 X in Flange 053400 RV 56 T B"G 1 Only when disassembled.

Reactor Vessel B6.50 *ON/At1 3 X Bushings in Flange

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 51 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Flange NUMBER: 00.0 INSPECTZON INTERVAL PLAN STATUS PRESERVZCE YEAR FIRST SECOND THIRD SEC. XZ PERIOD PERZOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 t t CALIBRATION BLOCKtt 053500 RV-57-L BG1UT Only when disassembled.

Reactor Vessel Threads B6.40 "tPl -IF-It ~

3 X in Flange 053600 RV-57-T B-G-1 Only when disasscmblcd.

Reactor Vessel B6. 50 *'tN/A' t 3 X Bushings in Flange 053700 RV-58-L B-G-1 UT Only when disasscmblcd.

Reactor Vessel Threads B6.40 t*Pl-LF-ltt 3 X in Flange 053800 RV 58 T B G-1 Only when disassembled.

Reactor Vcsscl B6.50 *tN/A**

3 X Bushings in Flange 053900 RV"59-L B-G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 t t Pl-LF-1 t t 3 X in Flange 054000 RV-59-T BG1 VT 1 Only when disassembled.

Reactor Vessel B6. 50 ttN/Att 3 X Bushings in Flange 054100 RV 60-L B-G-1 UT Only when disassembled.

Reactor Vcsscl Threads B6.40 ttpl-LF-ltt 3 X in Flange 054200 RV-60-T B-G-1 VT 1 Only when disasscmblcd.

Reactor Vessel B6.50 t tN/At1 3 X Bushings in Flange

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNZT 1 PAGE: 52 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XI SCHEDULED COMPONENTS tor Vcsscl Flange NUMBER: 00.0 ZNSPECTION INTERVAL PIAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERZOD PERZOD PERZOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTZFZCATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK~'~

054300 RV-61-L B-.G-1 Only when disassembled.

Reactor Vessel Threads B6.40 i*Pl-LF-1~~

3 X in Flange 054400 RV-61-T B-G 1 Only when disassembled.

Reactor Vessel B6.50 *+N/A+*

3 X Bushings in Flange 054500 RV-62-L B-G-1 UT Only when disassembled.

Reactor Vcsscl Threads B6 40

~ ~~PI-LF-I~~

3 X in Flange 054600 RV-62-T B-G-1 VT-1 Only when disasscmblcd.

Reactor Vessel B6.50 ~~N/A~~

3 X Bushings in Flange

'* W 054700 RV-63-L B-G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 ++PI-LF-1*~

3 X in Flange 054800 RV-63-T B-G"1 Only when disassembled.

Reactor Vcsscl B6.50 3 X Bushings in Flange 054900 RV 64-L B-G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 **PI-LF-I**

3 X in Flange 055000 RV-64-T B-G-1 Only when disassembled Reactor Vessel B6.50 tAN/Atf 3 X Bushings in Flange

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 53 REVZSION: 0 ZNSERVICE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Vcsscl Interior NUMBER: 00. 0 ZNSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD SEC. XZ PERZOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATION BLOCK**

RPV (REF. DWG. NO. 28A) 056100 HS B-N-2 USNRC GL94-03, USNRC SER Shroud Support skirt B13.40 VT-3 3/24/99 RFO16 scope to 3 X H8 Weld UT* be defined, EVT1 top surface 6 Locations of prior indications; UT to be determined. **LATER**

056200 H9 B-N-2 EVT1 Scope to be dcfincd, Shroud Support Skirt B13.40 BWRVZP-38 Exam 0 to 180 H9 Weld degrees ~~N/A~~

056300 H9 B N 2 EVT1 Scope to bc dcfincd, Shroud Support Skirt B13.40 BWRVZP-38 Exam 180 to 3 X H9 Weld 360 dcgrccs ~~N/A**

056400 H9-166 B"N-2 USNRC GL94-03, USNRC SER Shroud Support Skirt B13.40 VT-3 3/24/99 RF016 scope to 3 X H9 Weld Repair Anch bc defined, EVT1 top surface of shroud support skirt to RPV H9 weld ad)accnt to TIEROD-RXVE-166. for a min. 26" ad)accnt to two togg ~~N/A~~

056500 H9-270 B-N-2 EVT1 USNRC GL94"03, USNRC SER Shroud Support Skirt B13.40 VT-3 3/24/99 RFO16 scope to H9 Wold Repair Anch bc dcfincd, EVT1 top surface of shroud support skirt to RPV H9 weld ad)accnt to TIEROD-RXVE-270 foc a min. 26" ad)accnt to two toggl ~~N/A~~

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 54 REVISION: 0 ZNSERVICE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Interior NUMBER: 00. 0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMZNATZON AREA CATEGY NDE -OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~+CALIBRATION BLOCK~+

056600 H9-350 B-N-2 EVT1 USNRC GL94-03, USNRC SER Shroud Support Skirt B13.40 VT-3 3/24/99 RF016 scope to H9 Weld Repair Anch be defined, EVT1 top surface of shroud support skirt to RPV H9 weld ad)accnt to TIEROD-RXVE-350 for 26" adjacent to two toggles.. ~~N/A*~

056700 H9-90 B"N"2 EVT1 USNRC GL94"03, USNRC SER Shroud Support Skirt B13.40 VT-3 3/24/99 RFO16 scopo to 3 X H9 Weld Repair Anch be defined, EVT1 of top surface of shroud support skirt to RPV H9 wold ad)accnt to TIEROD-RXVE-90 for a min. of 26" adjacent to two ~~N/A~~

056900 RV-01-Z SZL Once every inspection Stcam Dryer Drain 474 period ~~N/A~~

Cracking X - - - X - - - X 057000 RV 01 I B"N-1 Once cvcry inspection Stcam Dryer B13.10 period ~~N/A~~

3 X - - - X - - - X 057100 RV-02-I B-N-1 VT-3 Once every inspection Stcam Separator B13. 10 period ~~N/A~~

3 X - - - X - - - X 057200 RV-05-I NUREG VT 3 Exam required cvcry four Fccdwatcr Sparger 0619 outages, commencing in 3 X RF08, (1981), Examine flow holes a welds in sparger arms 6 tees and FW nozzle ~~N/AP~

DATE: 10/15/99 NINE MZLE POINT NUCLEAR PZANT UNIT 1 PAGE: 55 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Interior NUMBER: 00.0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERZOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +*CALIBRATION BLOCK**

057300 RV-06-I BNRVIP VT-3 Examine pcr Memo Core Spray Sparger 18 NMP1-M99-018. + +N/A+ ~

3 X - - - X X - - X 057400 RV-07-I BWRVZP VT 1 Examine per Memo Core Spray Lines 18 NMP1-M99-018. ~*N/A~~

3 X - - - X X - - X 057500 RV-08-Z B-N-2 VT-1 Examine once pcr Dryer Support Brackets B13.20 interval *+N/A+*

3 X (bcltlino) 057600 RV-09-Z B-N-2 VT 1 Examine once pcr Feedvater Sparger B13. 20 interval ++N/A++

3 X Brackets (bcltline) 00 RV-10-I B-N-2 VT-1 Examine once per Guide Rod Support B13.20 interval ++N/A**

3 X Brackets (bcltlinc) 057800 RV-11-I B-N-2 VT-1 hei tlinc, Examine once Upper Survicllancc B13. 20 pcr interval *~N/A*+

3 X Specimen Holder 057900 RV-12-Z B-N-2 VT-1 bcltlinc, Examine once Lower Survicllancc B13.20 pcr interval +~N/A+~

3 X Specimen Holder 058000 RV-13-I B-N-2 VT-3 Examine once pcr Upper Ccrc Grid B13.40 Znspection Interval 3 X

  • fN/A*0 058100 RV-13-I SZL RFO-16 scope to bc Upper Core Grid 554 defined.. +~N/A++

3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 56 REVZSZON: 0 ZNSERVZCE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Interior NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATZON AREA CATEGY NDE -OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ +CALIBRATION BLOCK**

058300 RV-14-I B-N-2 VT 3 Examine accessible Core Shroud B13.40 surface's each interval.

X  %*N/At0 058400 RV-15-Z B-N-2 VT-3 Examine once pcr Core Shroud Support B13.40 Inspection Interval 3 X aaN/A*t Ring 059000 SZL409-ZDTC1245 SZL EVT1 every other even IRM Incorc Dry Tube 409R1 numbcrcd outage ++N/A~~

4 3 X X Assembly 059900 SZI 409-IDTC3645 SIL EVT1 EVT1 cvcry other even IRM Zncoro Dry Tube 409R1 numbcrcd outage ++N/A++

3 X X Assembly 060100 Shroud Head Bolts B-N-2 VT-3 UT cxams to bc Shroud Head Bolts (36) B13.40 UT identified later pending 3 X final results of BWR Owner's Group. ~~LATER~~

060200 Skirt-166 B-N-2 EVT1 USNRC GL94-03, USNRC SER Shroud Support Skirt B13.40 3/24/99, EVT1 top 3 X Surface surface of inconel srd.

sprt. skirt where accessible around intcrfacc of lower stablizcr sprt. pedestal to conical sprt. 8 166 dcg ticrod ~+N/A~~

DATE: 10/15/99 NINE HYLE POINT NUCLEAR PLANT UNIT 1 PAGE: 57 REVZ SION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COHPONENTS tor Vessel Interior NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FZRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAHINATZON AREA CATEGY NDE -OUTAGE ZNSTRUCTIONS NUHBER ZDENTZFZCATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +~CALIBRATION BLOCK~~

060300 Skirt-270 B-N-2 EVT1 USNRC GL94-03, USNRC SER Shroud Support Skirt B13.40 3/24/99, EVT1 top 3 X Surface surface of inconcl srd.

sprt. skirt whcrc accessible around interface of lower stablizer suppt pedestal to conical sprt 6 270 dcg ticrod ~~N/A~~

060400 Skirt-350 B-N-2 EVT1 USNRC GL94-03, USNRC SER Shroud Support Skirt B13.40 3/24/99, EVT1 top 3 X Surface surface of inconcl srd.

sprt. skirt where accessible around interface of lower stablizcr supt. pcdcstal to conical sprt 6 350 deg tierod <<~N/A**

060500 Skirt-90 B-N-2 EVT1 USNRC GL94 03, USNRC SER Shroud Support Skirt B13.40 3/24/99, EVT1 top 3 X Surface surface of inconcl srd sprt skirt when accessible around interface of lower stablizcr supt pedestal to conical sprt 6 90 dcg ticrod locat **N/A~~

060600 Spaccr-RXVE-168 B-N-2 VT-3 USNRC GL94-03, USNRC SER Shroud Stabilizer B13. 40 3/24/99, BWRVIP 3 X Assembly (Spacer) rcccommends exam of shroud assembly core plate clamp/spaccr assembly located bctwcen ZD of shroud 6 core support plate 8 168 dcg.

11N/Alt

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 58 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Interior NUMBER: 00.0 ZNSPECTZON INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERZOD PERZOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ +CALIBRATION BLOCK+ +

060700 Spacer-RXVE-276 B-N-2 VT-3 USNRC GL94"03, USNRC SER Shroud Stabilizer B13. 40 3/24/99, BWRVIP 3 X Assembly (Spacer) reccommends exam of shroud assembly coro plate clamp/spaccr assembly located bctwccn ZD of shroud support plate 8 276 deg. ~~N/A~~

060800 Spacer-RXVE-348 B-N-2 VT-3 USNRC GL94-03, USNRC SER Shroud Stabilizer B13.40 3/24/99, BWRVIP 3 X X Assembly (Spaccr) rcccommcnds exam of shroud assembly core plate clamp/spcccr assembly located between ID of shroud 6 core support plate 8 348 dcg.

    • N/At*

060900 Spaccr-RXVE-96 B-N-2 VT 3 USNRC GI 94-03, USNRC SER Shroud Stabilizer B13.40 3/24/99, BWRVIP 3 X - - - X Assembly (Spaccr) rcccommcnds exam of shroud assembly core plate clamp/spaccr assembly located bctwccn ZD of shroud 4 core support plate 896 dcg.

t4N/Att 061000 Tiorod-RXVE-166 B-N-2 VT-3 USNRC GL94-03'SNRC SER Shroud Stabilizer B13. 40 3/24/99, BWRVZP Assembly (Tic Rod) 3 X - - - X rcccommcndcd **N/A**

061100 Ticrod-RXVE-270 B "N-2 VT-3 USNRC GL94-03, USNRC SER Shroud Stabilizer B13. 40 3/24/99, BWRVIP 3 X X Assembly (Tic Rod) rcccommcndcd **N/A**

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PLANT UNIT 1 PAGE: 59 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Vessel Interior NUHBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAHZNATZON AREA CATEGY NDE OUTAGE INSTRUCTZONS NUMBER ZDENTZPZCATZON ITEH NO HETH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK*n 061200 Tierod-RXVE-350 B-N-2 VT-3 USNRC GL94-03, USNRC SER Shroud Stabilizer B13.40 3/24/99, BWRVIP 3 X X n*N/A**

Assembly (Tic Rod) reccommended 061300 Tierod-RXVE-90 B-N 2 VT 3 USNRC GL94 03, USNRC SER Shroud Stabilizer B13. 40 3/24/99, BWRVIP Assembly (Tic Rod) X - - - X reccommcnded *nN/A*i 061400 Vl B-N-2 EVT1 USNRC GL94-03, USNRC SER Core Shroud Vertical B13. 40 UT 3/24/99, BWRVZP 3 X X Wclds rcccommondcd EVT1 of ZD/OD, 25% of total length, UT contgcncy only, **LATERnn 00 V10 B-N-2 EVT1 USNRC GL94-03, USNRC SER Core Shroud Vertical B13. 40 UT 3/24/99, EVT1 of ID/OD 3 X X Wclds 25% of total length, UT contgy only, BWRVZP roccommendcd *~LATER*i 061600 V11 B-N-2 EVT1 USNRC GL94 03, USNRC SER Core Shroud Vortical B13.40 UT 3/24/99, BWRVIP 3 X - - - X Wclds recommended EVT1 of ID/OD 25% of total length, UT contgy only.

~~LATER~~

061700 V12 B-N-2 EVT1 USNRC GL94-03, USNRC SER Core Shroud Vertical B13.40 UT 3/24/99, BWRVZP 3 X X Wclds roccommcndod EVTl of ID/OD 25% of total length, UT contgy only

~+LATER+~

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 60 REVISION: 0 ZNSERVZCE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Vessel Interior NUMBER: 00.0 ZNSPECTZON INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERZOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK~*

061800 V13 B-N-2 EVT1 USNRC GL94 03, USNRC SER Core Shroud Vertical B13 40

~ UT 3/24/99, BWRVZP 3 X X Wclds reccommcndcd EVT1 of ZD/OD 25% of total length, UT contgy only.

  • +LATER+*

061900 V14 B-N-2 EVT1 USNRC GL94-03, USNRC SER Core Shroud Vertical B13.40 UT

- - - - - - - 3/24/99, BWRVZP 3 X X Wclds reccommcndcd EVT1 of ID/OD 25% of total length, UT contgy only.

%*LATER**

062000 V15 B-N-2 USNRC GL94-03, USNRC SER Core Shroud Vertical B13.40 UT 3/24/99, BWRVIP 3 X X Wclds reccommended, EVT11 of ZD/OD 25% of total length, UT contgy only.

~ ~ LATER**

C 062100 V16 B-N-2 EVT1 USNRC GL94-03, USNRC SER Core Shroud Vertical B13.40 UT 3/24/99, BWRVIP 3 X X Wclds reccommcnded, EVT1 of ZD/OD 25% of total length, UT contgy only.

~~LATER**

062200 V2 B-N-2 EVT1 USNRC GL94-03, USNRC SER Core Shroud Vertical B13.40 UT 3/24/99 i BWRVIP Welds X X reccommcndcd, EVT1 of ZD/OD 225% of total length, UT contgy only.

    • LATER**

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 61 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Interior NUMBER: 00.0 INSPECTION ZNTERVAL PIAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERZOD

SUMMARY

EXAMINATZON AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATZONBLOCK~*

062300 V3 B-N-2 EVT1 USNRC GL94-03, USNRC SER Core Shroud Vertical B13.40 UT 3/24/99, BWRVIP 3 X X Welds reccommcndcd EVT1 of ID/OD 25% of total length, UT contgy only.

~~LATER~+

062400 V4 B-N-2 EVT1 USNRC GL94-03, USNRC SER Core Shroud Vertical B13.40 UT 3/24/99, BWRVIP 3 X X Wclds reccommcndcd, EVT1 of ID/OD 25% of total length, UT contgy only.

++LATER*+

062500 V5 B-N-2 EVT1 USNRC GL94-03, USNRC SER Coro Shroud Vertical B13.40 3/24/99, BWRVZP 3 X X Wclds-Ring Support rcccommended, EVT1 of ZD/OD 25% of total length, ~~N/A~*

062600 V6 B-N-2 EVT1 USNRC GL94-03, USNRC SER Core Shroud Vertical B13.40 3/24/99, BWRVIP 3 X X Welds-Ring Support rcccommended, EVT1 of ZD/OD 25% of total length, ~~N/A~~

062700 V7 B-N-2 EVT1 USNRC GL94-03, USNRC SER Core Shroud Vertical B13.40 UT 3/24/99, BWRVIP 3 X X Wclds reccommended, EVT1 of ID/OD 25% of total length, UT contgy only.

ssLATERei

DATE: 10/15/99 NINE HYLE POINT NUCLEAR PLANT UNIT 1 PAGE: 62 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COHPONENTS tor Vessel Interior NUMBER: 00.0 ZNSPECTZON INTERVAL PLAN STATUS PRESERVZCE YEAR FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE -OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ZTEH NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~*CALIBRATION BLOCX**

062800 VS B-N-2 EVT1 USNRC GL94-03, USNRC SER Core Shroud Vertical B13.40 UT 3/24/99, BWRVZP 3 X X Welds reccommcnded, EVT1 of ID/OD 25% of total length, UT contgy only.

~~LATER~~

062900 V9 B-N-2 EVT1 USNRC GL94-03, USNRC SER Core Shroud Vertical B13 40

~ UT 3/24/99, BWRVIP 3 X Welds reccommended, EVT1 of ID/OD 25% of total length, UT contgy only.

t 1 LATER*4

0 DATE: 10/15/99 NINE MZLE POINT NUCLEAR PIANT UNIT 1 PAGE: 63 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Nozzles NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERZOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTZFZCATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~*

Instrument Nozzles (REF. DWG. NO. 14) 063000 SIL571-N12 SII VT-2 VT-2 after vessel RPV N12 Instr 571 flood-up (static Nozzle-to-Safe End 3 X - - - X X - - X prcssure, no hold time) at start of each RFO 4 during System Leakage each RFO. +iN/A~~

Safety Valve Nozzles (REF. DWG. NO. 28) 063100 CH-576-07A-B B"G-2 R33 ~*N/A*+

Nozzle N7N Flange B7. 10 3 X Bolting 063200 CH-576-07B-B B"G-2 R34 ~iN/Aii Nozzle N7P Flange Bj. 10 3 X Bolting 063300 CH-576-07C-B B-G-2 Group R35 ~*N/A**

Nozzle N7R Flange B7.10 3 X Bolting 063400 CH-576-07D-B B-G-2 Group R36 *~N/A*+

Nozzle N7S Flange B7.10 3 X Bolting 063500 CH-576-07E-B B-G-2 VT 1 Group R37 ~~N/A~~

Nozzle N7T Flange B7. 10 3 X Bolting 063600 CH-576-07F-B B-G-2 Group R38 ~~N/A~~

Nozzle N7U Flange B7.10 3 X Bolting

0 DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNZT 1 PAGE: 64 REVISION: 0 ZNSERVZCE ZNSPECTZON TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Nozzles NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +*CALIBRATION BLOCK*~

063700 CH-576-12A-B B-G-2 Group R21 +~N/A~~

Nozzle N7A Flange B7. 10 3 X Bolting 063800 CH-576-12B-B B-G-2 Group R22 ~*N/A~~

No zlc N7B Flange B7.10 3 X Bolting 063900 CH-576-12C-B B-G-2 Group R23 **N/A~*

Nozzle N7C Flange B7. 10 3 X Bolting 064000 CH-576-12D-B B"G-2 Group R24 **N/A**

Nozzle N7D Flange B7.10 3 X Bolting 064100 CH-576-12E-B B G 2 Group R25 ~+N/A++

No zlc N7E Flange B7. 10 X

Bolting 064200 CH-576-12F-B B-G-2 Group R26 ~~N/A~~

Nozzle N7F Flange B7. 10 3 X Bolting 064300 CH"576-12G-B B-G-2 VT-1 Group R27 ~~N/A~~

Nozzle N7G Flange B7.10 3 X Bolting 064400 CH-576-12H-B B-G-2 Group R28 **N/A~~

Nozzle N7H Flange B7.10 3 X Bolting

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 65 REVZSZON: ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vcsscl Nozzlcs NUMBER: 00. 0 INSPECTION ZNTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMZNATZON AREA CATEGY NDE 0 U T AG E INSTRUCTZONS NUMBER ZDENTZFICATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~'~

064500 CH-576-12 J-B B-G-2 Group R29 ~~N/A**

Nozzle N7J Flange B7.10 3 X Bolting 064600 CH-576-12K-B B-G-2 Group R30 +~N/A++

Nozzle N7K Flange B7.10 3 X Bolting 064700 CH-576-12L-B B-G-2 VT-1 Group R31 ~~N/A~ ~

Nozzle N7L Flange Bj. 10 3 X Bolting 064800 CH-576-12M-B B-G-2 VT-1 Group R32 *+N/A**

Nozzle N7M Flange B7.10 3 X Bolting 064900 RV-WD 011 B-F UT Group R21 **LATER**

Nozzle N7A-to-Flange B5.10 PT 3 X 065000 RV-WD-Oll SZL Group R21, Inconcl 1S2 Nozzle N7A-to-Flange 455R1S1 butter expansion from 3 X nozzle side of weld.

    • LATERI*

065100 RV-WD-012 B-D Group R21, **LATER**

Closure Head-to N7A B3.90 3 X Nozzle 065200 RV-WD-012-IR B-D Group R21, **LATER~~

N7A Nozzle Inner B3.100 3 X Radius Section

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 66 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Nozzles z

NUMBER: 00. 0 INSPECTION INTERVAL PZAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ttCALIBRATION BLOCK~'

065300 RV WD 013 SIL Group R22, Znconel 182 Nozzle N7B-to-Flange 455R1S1 butter expansion from 3 X nozzle side of weld.

~~LATER~~

065400 RV WD 013 B-F UT GrouP R22 ++ZATER~~

Nozzle N7B-to-Flange B5 10

~

3 X 065500 RV-WD-014 B-D Group R22, ~~IATER~~

Closure Head-to-Nozzle B3 90

~

3 X N7B 065600 RV"WD"014-IR B-D Group R22, ~~IATER~~

Nozzle N7B Znner B3. 100 3 X Radius Section 065700 RV-WD-015 B-F UT Group R23, ~~LATER~~

Nozzle N7C-to-Flange B5 10

~ PT 3 X 065800 RV-WD-015 SZL Group R23, Inconel 182 Nozzle N7C-to-Flange 455R1S1 butter expansion from 3 X nozzle side of weld

    • ZATER**

065900 RV WD 016 B-D Group R23, +*ZATER**

Closure Head-to-Nozzle B3.90 3 X Njc 066000 RV-WD-016 ZR B-D UT Group R23, ++LATER~+

Nozzle N7C Inner B3. 100 X

Radius Section

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 67 REVISION: 0 ZNSERVICE ZNSPECTION TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Nozzles NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERZOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ilCALIBRATZON BLOCK>>~

066100 RV-WD-017 B-F UT Group R24 ~~LATER~~

Nozzle N7D-to-Flange B5. 10 PT 3 X 066200 RV-WD-017 SZL UT Group R24, Inconel 182 Nozzle N7D-to-Flange 455R1S1 butter expansion from 3 X nozzle side of weld

+~LATER~~

066300 RV-WD-018 B"D UT Group R24, ~~LATER' Closure Head-to-Nozzle B3 90

~

3 X N7D 066400 RV-WD-018-ZR B-D UT Group R24, **LATER~~

Nozzle N7D Inner B3.100 3 X Radius Section t

066500 RV-WD-019 B-F UT Group R25, +~ZATER+~

Nozzle N7E-to-Flange B5.10 PT 3 X 066600 RV-WD-019 . SZL UT Group R25, Inconel 182 Nozzle N7E-to-Flange 455R1S1 butter expansion from 3 X nozzle side of weld.

    • LATER~*

066700 RV"WD-020 B-D Group R25, ~~LATER~~

Closure Head-to-Noz"lc B3.90 3 X N7E 066800 RV"WD"020-ZR B-D Group R25, **LATER**

Nozzle N7E Inner B3.100 3 X Radius Section n>

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 68 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Vessel Nozzles NUMBER: 00. 0 ZNSPECTZON ZNTERVAL PZAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 >>>>CALIBRATION BLOCK>>>>

066900 RV-WD-021 B-F UT Group R26>>>>LATER>>>>

Nozzle N7F-to-Flange B5. 10 PT 3 X 067000 RV-WD-021 SIL UT Group R26, Inconel 182 Nozzle N7F-to-Flange 455R1S1 butter expansion from nozzle side of weld

    • IATER>>*

067100 RV-WD-022 B-D UT Group R26, >>>>ZATER*>>

Closure Head-to-Nozzle B3.90 3 X 067200 RV-WD-022-ZR B-D UT Group R26, **ZATER>>*

Nozzle N7F Inner B3. 100 3 X Radius Section 067300 RV-WD-023 B-F UT Group R27 **ZATER**

Nozzle N7G-to-Flange B5.10 PT 3 X 067400 RV-WD-023 SZL UT Group R27, Inconcl 182 Nozzle N7G-to-Flange 455R1S1 butter expansion from 3 X thc nozzle side of weld

>>>>LATER>>>>

067500 RV-WD-024 B D UT Group R27, **ZATER>>>>

Closure Head-to-Nozzle B3. 90 3 X N7G 067600 RV-WD-024-ZR B-D UT Group R27, >>>>LATER>>>>

Nozzle N7G Inner B3. 100 3 X Radius Section

0 DATE: 10/15/99 NZNE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 69 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Nozzlcs NUMBER: 00.0 ZNSPECTZON INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~*CALIBRATION BLOCK~~

067700 RV-WD"025 B F UT Group R28 +~LATER**

Nozzle N7H-to-Flange BS. 10 PT 3 X 067800 RV-WD-025 SZL Group R28, Znconcl 182 Nozzle N7H-to-Flange 455R1S1 butter expansion from 3 X nozzle side of weld

    • LATER**

067900 RV-WD"026 B-D UT Group R28, ~~LATER+~

Closure Head-to-Nozzle B3. 90 3 X N7H 068000 RV-WD-026-ZR B-D UT Group R28, **LATER~*

Nozzle N7H Inner B3.100 3 X Radius Section 068100 RV-WD-027 B-F UT Group R29 **LATER++

Nozzle N7J-to-Flange B5.10 PT 3 X 068200 RV-WD"027 SIL UT Group R29, Inconcl 182 Nozzle N7J-to-Flange 455R1S1 butter expansion from 3 X nozzle side of weld.

~~LATER**

068300 RV-WD"028 B D UT Group R29, **LATER+~

Closure Head-to-Nozzle B3 ~ 90 3 X N7J 068400 RV-WD-028 IR B-D Group R29, *~LATER~~

Nozzle N7J Inner B3. 100 3 X Radius Section

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 70 REVISZON: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Nozzles z

NUMBER: 00. 0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~~

068500 RV-WD-029 B-F UT Group R30, ~~LATER'*

Nozzle N7K-to-Flange B5.10 PT 3 X 068600 RV-WD-029 SZL UT Group R30, Znconcl 182 Nozzle N7K-to-Flange 455R1S1 butter expansion from 3 X nozzle siCk of weld.

~ ~LATER+ +

068700 RV-WD-030 B-D Group R30, iiZATER+~

Closure Head-to-No zlc B3.90 3 X N7K 068800 RV-WD-030-ZR B-D Group R30, **LATER~*

Nozzle N7K Inner B3. 100 3 X Radius Section 068900 RV-WD-031 B-F UT Group R32 ++LATER~i Nozzle N7M-to-Flange B5 10 PT 3 X 069000 RV-WD"031 SIL Group R32, Znconcl Nozzle N7M-to-Flange 455R1S1 butter expansion from X

the nozzle side of thc weld ~~LATER~~

069100 RV-WD-032 B-D Group R32, ~PLATER*~

Closure Head-to-Noz"lc B3.90 3 X N7M 069200 RV-WD-032-IR B-D Group R32, i~LATER~~

Nozzle N7M Inner B3.100 3 X Radius Section

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 71 REVZSZON: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Nozzles NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERZOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE -OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK~+

069300 RV-WD-033 B-F UT Group R33 +~LATER~+

Nozzle N7N-to-Flange B5.10 PT 3 X 069400 RV-WD-033 SZL Group R33, Znconcl 182 Nozzle N7N-to-Flange 455R1S1 butter expansion from 3 X nozzle side of weld.

~ ~LATER~*

069500 RV-WD-034 B-D UT Group R33, **LATER~~

Closure Head-to-Nozzle B3.90 3 X N7N 069600 RV"WD-034-ZR B-D UT Group R33, *~LATER~~

Nozzle N7N Inner B3.100 3 X Radius Section 069700 RV-WD-035 B-F UT Group R34 *~IATER~~

Nozzle N7P-to-Flange BED 10 PT 3 X 069800 RV-WD-035 SZI UT R34 , Znconel 182 butter Nozzle N7P-to-Flango 455R1S1 expansion from thc 3

nozzle side of thc weld.

+~LATER+*

069900 RV-WD-036 B-D UT R34 +~LATER~*

Closure Head-to-Nozzle B3. 90 3 X N7P 070000 RV-WD-036-ZR B-D R34 ~~LATER~~

Nozzle N7P Inner B3.100 3 X Radius Section

DATE: 10/15/99 NINE MILE POINT NUCLEAR PZANT UNIT 1 PAGE: 72 REVZ S ZON: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Nozzles NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK~~

070100 RV-WD-037 B-F UT Group R35, **LATER**

Nozzle N7R-to-Flange B5. 10 PT 3 X 070200 RV-WD-037 SZL Group R35, Inconcl 182 Nozzle N7R-to-Flange 455R1S1 butter expansion from X thc nozzlo sido of the weld. i*IATERi~

070300 RV-WD-038 B-D GrouP R35, 44LATER4~

Closure Head-to-Nozzle B3. 90 3 X N7R 070400 RV-WD-038-ZR B-D Group R35, ~iLATERi~

Nozzlo N7R Inner B3.100 3 X Radius Section 070500 RV-WD-039 B-F UT Group R36 **IATERii Nozzlo N7S-to-Flange B5.10 3 X 070600 RV-WD-039 SZL Group R36, Inconcl 182 Nozzle N7S-to-Flange 455R1S1 butter expansion from 3 X the nozzle side of thc weld. **IATER~~

070700 RV-WD-040 B-D Group R36, Closure Head-to-Nozzle B3.90 3 X N78 +~IATERi'70800 RV-WD-040-ZR B-D Group R36, <<~IATER~*

Nozzle N7S Inner B3. 100 3 X Radius Section

DATE: 10/15/99 NINE MZIE POINT NUCLEAR PLANT UNIT 1 PAGE: 73 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Nozzlcs NUMBER: 00. 0 INSPECTION ZNTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE -OUTAGE INSTRUCTIONS NUMBER ZDENTZFICATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK++

070900 RV WD 041 B F UT Group R37 **LATER~i Nozzle N7T-to-Flange B5 10

~ PT X

071000 RV-WD-041 SZL Group R37, Inconel N

Nozzle N7T-to-Flange 455R1S1 butter expansion from 3 X the noz le side of thc weld. **IATER**

071100 RV WD-042 B-D Group R37, **LATER+*

Closure Head-to-Nozzle B3. 90 3 X N7T 071200 RV-WD-042 ZR B-D Group R37, ~iLATERi~

No zlc N7T Inner B3. 100 3 X Radius Section 071300 RV WD 043 Group R38 ~~IATER*+

No" zle N7U-to-Flange B5.10 PT 3 X 071400 RV-WD-043 SIL Group R38, Inconcl 182 Nozzle N7U-to-Flange 455R1S1 butter expansion from 3 X the nozzle side of the weld. ~ ~IATER~ ~

071500 RV-WD-044 B-D Group R38

  • PLATER~~

Closure Head-to-Nozzle B3 ~ 90 3 X N7U 071600 RV-WD-044-ZR B-D Group R38 **LATER**

Nozzle N7U Inner B3. 100 3 X Radius Section

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 74 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Vessel Nozzles NUMBER: 00. 0 INSPECTION INTERVAL PLAN SIATUS PRESERVICE YEAR ASHE FIRST SECOND THIRD SEC. XI PERZOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEH NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~*

6.0" Safety Relief Valve (REF. DWG. NO. 28) 071700 V-BK-01-119A B-M-2 VT-3 V09, Examine when Safety Valve Zntcrior B12.50 disassembled +~N/A~~

X Surface Control Rod Drive Nozzles (REF. DWG. NO. 28A) 073500 CRD NOEELES B"E VT-2 129 CRD Nozzlcs, 25% or Partial Penetration B4 12

~ 32 required, included in Wclds system pressure test program **N/A**

Instrumentation Nor zlcs (REF. DWG. NO. 28A) 073600 INST-NOEELES VT"2 64 IFH's, 25% or 16 Incore Flux Honitors B4.13 repaired, included in 3 X system pressure test program *~N/A**

Instrument Worries (REF. DWG. NO. 8) 073900 SZL571-N13A SZL VT 2 VT-2 after vessel RPV N13A Instr 571 flood-up (static ic-to-Safe X - - - X X - - X prcssure, no hold time)

No End at start of each RFO f during System Lcakagc each RFO. ~~N/A~*

074000 SZL571-N13B SZL VT-2 VT-2 after vessel RPV N13B Instr 571 flood-up (static Nozzle-to-Safe End X - - - X X - - X prcssure, no hold time) at start of each RFO 4 during System Leakage each RFO. **N/A~*

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PLANT UNIT 1 PAGE: 75 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XI SCHEDULED COMPONENTS tor Vessel Nozzlas NUMBER: 00. 0 INSPECTION ZNTERVAL PLAN STATUS PRESERVICE YEAR ASME FZRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK+'~

Znstrumcnt Nozzles (REF. DWG. NO. SA) 074100 SZL571-N14A SIL VT-2 VT-2 after vessel RPV N14A Instr 571 flood-up (static Nozzle-to-Safe End 3 X - - - X X - - X pressure, no hold time) at start of each RFO a during System Lcakagc each RFO. ~~N/A~~

074200 SIL571-N14B SZL VT"2 VT-2 after vessel RPV N14B Znstr 571 flood-up (static Nozzle-to-Safe End X - - - X X - - X prcssure, no hold time) at start of each RFO a during System Leakage each RFO. ~~N/A~+

Instrument Nozzles (REF. DWG. NO. SB) 00 SZL571-N15A SIL VT-2 VT-2 after vcsscl RPV N15A Instr 571

- - - - - flood-up (static X X X X Nozzle-to-Safe End prcssure, no hold time) at start of each RFO a during System Leakage each RFO. **N/A*~

074400 SIL571 N15B SIL VT-2 VT-2 after vessel RPV N15B Znstr 571 flood-up (static 3 X - - - X X - - X Nozzle-to-Safe End pressure, no hold time) at start of each RFO 6 during System Leakage each RFO. ~+N/A~~

DATE: 10/15/99 NINE MILE POINT NUCLEAR PZANT UNIT 1 PAGE: 76 REVISION: 0 INSERVZCE INSPECTION TEN YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Vessel Nozzles NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 atCALIBRATZON BLOCK+a Instrument Nozzles (REF. DWG. NO. BC) 074500 SZL571 N16A SZL VT-2 VT-2 after vessel RPV N16A Instr 571 flood-up (static Nozzle-to-Safe End 3 X - - - X X - - X pressure, no hold tine) at start of each RFO 6 during System Leakage each RFO. ~~N/A~~

074600 SZL571-N168 SIL VT 2 VT-2 after vessel RPV N16B Instr 571 flood-up (static Nozzle-to-Safe End 3 X - - - X X - - X pressure, no hold tine) at start of each RFO a during System Lcakagc each RFO. ~*N/A*+

Instrument No zlcs (REF. DWG. NO. SD) 00 SZL571-N17A SZL VT-2 VT-2 after vessel RPV N17A Instr 571 flood-up (static Nozzle-to-Safe End X - - - X X - - X pressure, no hold time) at start of each RFO C during System Leakage each RFO. **N/A+~

074800 SIL571-N17B SZL VT 2 VT-2 after vessel RPV N17B Instr 571 flood-up (static 3 X - - - X X - - X Nozzle-to-Safe End prcssure, no hold time) at start of each RFO 6 during System Leakage each RFO. **N/A~~

'ATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 77 REVI SION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Supports NUMBER: 00.0 ZNSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE --OUTAGE-- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 4 lCALIBRATION BLOCK~ ~

Stabilizers (REF. DWG. NO. 28) 074900 RV-SB-1A F-A VT 3 Code Case N-491-1 RPV Stabilizer Strut F1.40 ~+N/A+~

3 X 075000 RV SB-1B Code Case N-491-1 RPV Stabilizer Strut F1.40 *AN/Alt 3 X 075100 RV SB-2A Coda Case N-491-1 RPV Stabilizer Strut F1.40 ++N/A~+

3 075200 RV-SB-2B F-A VT-3 Code Case N 491 1 RPV Stabilizer Strut F1.40 +*N/A+*

3 X 00 RV-SB-3A F-A VT 3 Code Case N-491-1 RPV stabilizer Strut F1.40 ~~N/A~*

3 X 075400 RV-SB-3B VT 3 Code Case N-491-1 RPV Stabilizer Strut Fl ~ 40 aeN/Aee 3 X 075500 RV-SB-4A F-A VT"3 Code Case N-491-1 RPV Stabilizer Strut F1.40 +~N/A++

3 X 075600 RV-SB-4B F-A VT-3 Code Casa N-491-1 RPV Stabilizer Strut F1.40 i*N/A%*

3 X Integral Attachments (REF. DWG. NO. 2S) 075700 RV-SB1-ZA-371/372 B-K MT WRA 50%, Examine Stabilizer Integral B10. 10 accessible length of 3 X Woldcd Lug 8 22.5 attachment weld., Coda Caso N-509. ~*N/A*~

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 78 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Supports NUMBER: 00.0 ZNSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +*CALIBRATION BLOCK~~

075800 RV-SB2-ZA-373/374 B-K MT WRA 50%, Examine Stabilircr Integral B10. 10 accessible length of 3 X Welded Lug 8 112.5 welded attachment, Code Casa N-509. ~~N/A~~

Zntcgral Attachments (REF. DWG. NO. 28A) 076200 RV"WD"356-OD B-K PT 100% of attachment weld SuPport Skirt Integral B10.10 length, Code Case N-509 3 X aaN/Aaa Attachment Weld Support Skirt (REFT DWG. NO. N/A) 076300 RPV-NR02 SKT/BLT F-A VT-3 +*N/A*+

Support Skirt F1. 40 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 79 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PZAN

.I CLASS 1 SECTZON XI SCHEDULED COMPONENTS tor Vessel Welds NUMBER: 00.0 INSPECTION ZNTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCTZONS NUMBER ZDENTZFICATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK**

Closure Head Wclds (REF. DWG. NO. 28) 076500 RV-WD-001 B-A UT Examine 100% of weld Closure Head-to-Flange Bl. 40 MT length, 1/3 each Wold X - - - X - - - X inspection period

    • IATER**

076600 RV-WD"002 B-A UT Removable steal Closure Hcad- Bl. 21 insulation platform, 50%

3 X Circumferential Weld CRV achieved, Dollar Plate) +~ IATERi i 076700 RV-WD-003 B-A UT Examine accessible Closure Hcad- Bl. 22 length of weld.

3 X Mcridional Weld **IATER**

00 RV-WD-004 B-A UT Examine accessible Closure Head- B1.22 length of wold.

3 X Mcridional Weld ~~IATER~*

076900 RV-WD-005 B-A UT Examine accessible Closure Head- B1.22 length of weld ~~IATER~~

3 X Mcridional Weld 077000 RV-WD-006 B-A UT Examine accessible Closure Hcad- B1.22 length of wold.

3 Meridional Weld **LATER~~

077100 RV-WD-007 B-A UT Examine accessible Closure Head- Bl . 22 length of weld.

3 X Mcridional Weld **ZATER~+

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNZT 1 PAGE: 80 REVISION: 0 ZNSERVZCE ZNSPECTZON TEN-YEAR PZAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Vessel Welds NUMBER: 00.0 INSPECTION INTERVAL PIAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK**

077200 RV-WD-008 B A UT Examine accessible Closure Head- B1.22 length of weld *~IATER~~

3 X Meridional Weld 077300 RV-WD-009 B-A UT Examine accessible Closure Head- B1.22 length of weld.

3 X Mcridional Weld + ~LATER~ ~

077400 RV-WD-010 B"A UT Examine accessible Closure Head- B1.22 length of weld ~~LATER~~

3 X Mcridional Weld Shell Wclds (REF. DWG. NO. 28)

RV-WD-099 B-A AUT 100% of weld length from Shell-to-Flange weld B1.30 thc shell side *~LATER**

3 X 077600 RV-WD-099 100% of wold length from Shell-to-Flange weld Bl 30

~ the seal surface 3 X **LATER*+

077900 RV-WD-130 B-A AUT 100% of weld length, and Upper Shell Long Weld B1.12 intersection of 3

15 circumferential weld RV-WD 100 *+LATER+*

078000 RV-WD 131 B-A 100% of weld length and Upper Shell Long Weld B1.12 intersection of 3 X 8 135 RV WD 100. +*LATER*+

078100 RV-WD-132 B-A AUT 100% of weld length and Upper Shell Long Weld B1.12 intersecting 3 X 8 255 circumfcrcntial weld RV-WD-100. ~~LATER~~

DATE: 10/15/99 NINE MZZE POINT NUCLEAR PLANT UNZT 1 PAGE: 81 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vassal Welds NUMBER: 00.0 INSPECTZON ZNTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCTZONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 + +CALIBRATION BLOCK>> ~

078200 RV-WD-133 B-A 100% of weld length and Upper Intermediate B1.12 intersecting 3 X Shell Long Weld 8 90 circumferential weld RV-WD-100 C RV-WD-101.

++IATER~+

078300 RV-WD-134 B-A 100% of weld length and Upper Intermedi ate Bl . 12 intcrsccting 3 X Shell Long Weld 8 210 circumferential weld RV-WD-100 C RV-WD-101.

    • LATER+~

078400 RV-WD-135 B-A 100% of weld length and Upper Intermediate Bl. 12 intcrsccting 3 X Shell Long Weld 8 330 circumferential weld Rv wD 100 a Rv-wD 101.

~+LATER**

078700 RV-WD-139 B-A 100% of weld length and Lower Intcrmediatc B1.12 intersecting 3 X Shell Long Weld 8 105 circumfcrcntial weld RV-WD-101 4 RV-WD-137.

+ ~IATER~ +

078800 RV-WD 140 B-A 100% of weld length and Lower Zntcrmcdiatc B1.12 intersecting 3

Shell Long Weld 8 225 circumferential weld RV-WD-101 6 RV-WD-137.

    • LATER**

078900 RV-WD-141 B A 100% of weld length and Lower Intermediate Bl. 12 intersecting X

Shell Long Weld 8 345 circumferential weld RV-WD-101 S RV-WD-137.

    • LATER**

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNZT 1 PAGE: 82 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN lI CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Wclds NUMBER: 00. 0 INSPECTZON INTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE -OUTAGE- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~ +

079000 RV-WD-142 B-A AUT 100% of weld length and Lower Shell Long Weld B1.12 intersecting 3 X 8 18 circumf crential weld RV-WD-101 6 RV-WD-137.

  • +LATER'~'

079100 RV-WD-143 B-A AUT 100% of weld length and Lower Shell Long Weld B1.12 intersecting 3 X 138 circumferential weld RV-WD-137 6 RV-WD-138.

  • +LATER*+

079200 RV-WD-144 B-A AUT 100% of weld length and Lower Shell Long Weld B1.12 intersecting 3 X e 258 circumforontial wclds RV-WD 137 6 RV"WD-138.

+iLATER+*

Bottom Head Wclds (REF. DWG. NO. 28A) 079300 RV-WD-147 B A UT Accessible length of Bottom Head Dollar B1.21 weld **LATER*~

3 Plate Circ. Weld 079400 RV-WD-148 B-A UT Accessible length of Bottom Head Meridional B1.22 wold +*LATER~~

3 X Weld 079500 RV-WD-149 B A Accessible length of Bottom Head Meridional B1.22 weld **LATER'~

3 X Weld 079600 RV-WD-150 B-A Acccssiblc length of Bottom Head Meridional B1.22 weld ~~LATER**

3 X Weld

DATE: 10/15/99 NINE MZLE POINT NUCLEAR PLANT UNIT 1 PAGE: 83 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Vessel Wclds NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS XRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTIPICATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK+~

079700 RV-WD-151 B A Accessible length of Bottom Head Meridional B1.22 weld **LATER+a 3 X Weld 079800 RV-WD-152 B-A UT Accessible length of Bottom Head Meridional B1.22 weld **LATER*~

3 X Weld 079900 RV-WD-153 B A UT Acccssiblc length of Bottom Head Meridional B1.22 weld +PLATER**

3 X Weld 080000 RV-WD-154 B-A UT Accessible length of Bottom Head Meridional B1.22 weld ~~LATER++

3 X Weld 080100 RV-WD-155 B-A UT Accessible length of Bottom Head Meridional B1.22 weld ~*LATER'*

3 X Weld 080200 RV-WD-156 Accessible length of Bottom Head Meridional B1.22 weld **LATER*~

3 X Weld 080300 RV-WD-157 Accessible length of Bottom Head Meridional B1.22 weld **LATER~~

3 X Weld 080400 RV WD-158 Acccssiblc length of Bottom Head Meridional B1.22 weld ~*LATER**

3 X Weld

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 84 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Vessel Welds

~ NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~ ~

080500 RV-WD-159 B-A Accessible length of Bottom Head Meridional Bl. 22 weld ~~LATER~~

3 X Weld 080600 RV-WD-160 B-A UT Acccssiblc length of Bottom Head Meridional Bl. 22 weld ~~LATER~+

3 X Weld 080700 RV-WD-161 B-A UT Accessible length of Bottom Head Meridional B1.22 weld ++LATER**

3 X Weld 080800 RV-WD-162 B A UT Accessible length of Bottom Head Bl . 21 weld ~~LATER~~

3 X Circumfcrcntial Weld

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 85 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS Steam System NUMBER: 01 . 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAHZNATZON AREA CATEGY NDE OUTAGE INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +*CALIBRATION BLOCK+*

24. 0" HSB (REF. DWG. NO. 2) 080900 01-01-VB B-G-2 V01, Limited to valve Globe Valve 01-01 B7.70 selected under B-M-2 Bolting SAN/At+

081000 01-01-VBY B-M-2 V01, Only when Globe Valve 01-01 B12.50 disassembled, onc valve 3 X Interior Surface in a group of valves.

%*N/A+*

6.0" HSB Relief (REF. DWG. NO. 2) 081900 01-07-VB B-G-2 V02, Limited to valve Gate Valve 01-07 B7.70 selected under B-M-2 3 X Bolting 14N/At%

000 01-07-VBY B-M-2 VT-3 V02, Only when Gate Valve 01-07 B12.50 disassembled, one valve X in a group of valves.

Interior Surface

    • N/A**
6. 0" MSB (REF. DWG. NO. 2) 082700 01-102-A-SVB B-G-2 V03, 12 Bolts, Limited Relief SV 01-102A B7,70 to valve selected under 3 X Bolting B-H-2 ~*N/A**

~ 082800 01-102-A-SVBY B"M-2 V03, Only when Rclicf SV 01-102A B12. 50 disassembled, one valve 3 X Interior Surface in a group of valves

%*N/A%4 082900 01-102-A-WD-001 B "M-1 UT V03, Limited to one Relief SV 01 102A B12. 40 valve in a group of 3 X Valve Body Weld valves. ~~LATER*~

DATE: 10/15/99 NINE MILE POINT NUCZEAR PIANT UNIT 1 PAGE: 86 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS Steam System NUMBER: 01. 0 INSPECTION INTERVAL PLAN STATOS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *~CALIBRATION BLOCK**

2.0" MSA Vent Line (REF. DWG. NO. 2) 084900 01-120-VB B-G-2 VT-1 2 Bolts ~*N/A~*

Valve 01-120 Bolting B7. 70 3 X 24 . 0" MSA (REF. DWG. NO. 2) 086600 01 MSH 21 WD 001 B-K Code Case N-509, Welded Integral Attachment B10. 20 on 3 sides ~~N/A~~

3 X Lug 1 086700 01-MSH-21-WD-002 B-K Code Case N-509, Welded Integral Attachment B10. 20 on 3 sides **N/A~*

3 X Lug 2 6800 01-MSH-21 WD 003 B-K PT Code Case N-509, Welded Integral Attachment B10. 20 on 3 sides ~~N/Ai*

3 X Lug 3 086900 01 MSH-21-WD-004 B-K Code Case N-509, Welded Integral Attachment B10. 20 on 3 sides ~*N/A~~

3 X Lug 4 087000 01-MSH-21A F-A VT-3 Code Case N-491-1, 4 Spring Hanger F1.10 Integrally Welded Lugs 3

    • N/Af4 087100 01-MSH 21B VT-3 Code Casa N-491-1 Spring Hanger Fl. 10 ++N/A~~

3 X

0 DATE: 10/15/99 NZNE MZLE POINT NUCLEAR PIANT UNIT 1 PAGE: 87 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS Stcam System NUMBER: 01. 0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK**

24 . 0" MSB (REF. DWG. NO. 2) 087600 01-MSH-22A F-A VT-3 Code Case N-491-1.

Spring Hanger Fl . 10 ~~N/A~~

3 X 24 . 0" MSA (REF. DWG. NO. 2) 087800 01-MSH-23 F A VT-3 Code Case N-491-1 Pipe Stanchion Fl. 10 saN/A+a 3 X

32. 0" MSA (REF. DWG. NO. 2) 088200 01-WD-001 B-D Group Rll, 87% CRV, Nozzle N3A-to-Vessel B3.90 Limitation due to 3 X ad)accnt nozzle and Bioshicld. ~ ~IATER+ +

00 01-WD 001 IR B D UT Group Rll, 54% CRV, Nozzle z N3A Inner B3. 100 Limitation duc to 3 X Radius Section ad)accnt nozzle and Bioshicld. ~~LATER~~

24 . 0" MSA (REF. DWG. NO. 2) 088400 01-WD-002 B-J Group Rll, *~LATER~~

Nozzle N3A -to-Safe B9.11 3 X End 088500 01-WD 003 B-J UT Terminal End, Examine Nozzle N3A Safe B9.11 MT 100% of weld length 3 X End-to-Elbow ~~NMPI-24-080-CS~~

088700 01-WD-006 B-J MT To Vent Line, Examine Branch Connection B9.32 100% of weld length 3 X (24"x2" WOL) a sN/AP a

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 88 REVISION: 0 INSERVICE ZNSPECTZON TEN YEAR PZAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS Steam System NE NUMBER: 01.0 PRESERVICE YEAR INSPECTION INTERVAL PZAN STATUS ASHE FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD SUHMARY EXAHINATZON AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTZFZCATZON ITEM NO HETH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK**

089800 01-WD-016 B-J UT Examine 100% of weld Branch Connection B9. 31 HT length i~NHP1-24-080-CS, 3 X 6-80 **

(24"X6" WOL) NMP1 090400 01-WD-019 B-J UT Terminal End, High Pipo-to-Valvo 01-02 B9. 11 HT Stross Wold, Examine 3 X 100% of weld length

+~NMPI-24-080"CS**

090500 01-WD-020 B-J UT Terminal End, High Valve 01-02 -to-Pipe B9.11 HT Stress Weld, Examine 3 X 100% of weld length.

    • NMPI-24-080-CS~*
32. 0" HSB (REF. DWG. NO. 2) 0800 01 "WD-033 B-D Group R12, 91% CRV Nozzle N3B-to-Vessel B3.90 Limitation duc to 3 X ad)acent nozzle and Bioshicld ~*LATER+*

090900 01-WD-033-ZR B-D Group R12, 78% CRV Nozzle N3B Inner B3.100 Limitation due to 3 X Radius Section ad)accnt nozzlo and Bioshi old **LATER~~

24 . 0" HSB (REF. DWG. NO. 2) 091000 01 WD-034 B-J MT Group R12, Nozzle N3B-to-Safe End B9.11 *ePIR-l. 475-1++

3 X 091100 01-WD-035 B-J UT Tarnd.nal End, Examine Nozzlo N3B Safe B9. 11 100% of wold length.

3 X **NHP1-24-080-CSs*

End-to-Elbow

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 89 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS Steam System E NUMBER: 01.0 INSPECTION INTERVAL PZAN STATUS PRESERVICE 1'EAR ASHE FIRST SECOND THZRD SEC. XZ PERIOD PERZOD PERIOD SUMHARY EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ZTEH NO HETH 1 2 3 4 1 2 3 4 1 2 3 4 ~*CALIBRATION BLOCK*+

2. 5" MSB (REP. DWG. NO. 2) 091600 01-WD-042 B-J HT Cont. on sht. 2A, Reducer B9. 21 Examine 100% of weld 3 X (2. 5" x2. 0" ) -to-Pipe length **N/A+a
6. 0" HSB (REF. DWG. NO. 2) 092100 01-WD-046-A B-J UT Terminal End, High Branch B9.11 HT Stress Weld, Examine 3 X Connection-to-Valve 100% of weld length.

01-08 +~NMPZ-6-80-CS~~

24. 0" MSB (REP. DWG. NO. 2) 092600 01"WD-048 B-J HT Examine 100% of weld Branch Connection B9.31 UT length +~PZR-1.219-1, X

{24 "x6" WOL) 94-6007+*

6 . 0" MSB (REF . DWG. NO. 2) 092700 01-WD"048-A B-J UT Terminal End, High Branch B9. 11 HT Stress Weld, Examine 3 X Connection-to-Valve 100% of weld length 01-12 +*NHPZ-6-80-CS~+

092800 01-WD-048-B B-J UT Terminal End, High Valve 01-12 -Plangc B9.11 MT Stress Weld, Examine 3 X 01-102E 100% of wold length

    • NMP1-6"80-CS~~
24. 0" MSB (REP. DWG. NO. 2) 092900 01-WD-050 B"J UT Terminal End, High Pipe-to-Valve 01-01 B9. 11 Stress Weld, Examine 3 X 100% of weld length
    • NMP1-24-080-CS~ ~

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 90 REVISZON: 0 ZNSERVICE INSPECTION TEN YEAR PIAN CIASS 1 SECTION XI SCHEDULED COMPONENTS Steam System NUMBER: 01 . 0 PRESERVICE YEAR INSPECTION INTERVAL PZAN STATUS ASME FIRST SECOND THZRD PERIOD PERIOD PERZOD SEC. XZ

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK~~

093000 01-WD-051 B-J UT Terminal End, High Valve 01-01-to-Pipe B9. 11 MT Stress Weld, Examine 3 X 100% of weld length.

+*NMP1-24-080-CS(

P1R-1. 219-~ ~

2.0" MSA Vent Linc (REF. DWG. NO. 2) 093300 01-WD-448 B-J PT Examino 100% of weld Sock-0-Lct -to-Pipe B9.21 length ++N/A+*

3 X 093500 01-WD-450 B J Examino 100% of weld Elbow-to-Pipe B9. 21 length ~*N/A~~

3 X 800 01-WD-453 B-J Examine 100% of weld Pipe-to-Valve 01-120 B9. 21 length. *~N/A~~

3 X 2.0" MSA Valve By-Pass Line (REF. DWG. NO. 2B) 094300 01-WD-454 B-J MT Examino 100% of weld Pipe-to-Coupling B9. 40 length. ~~N/A++

3 X

DATE: 10/26/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 91 REVISION: 0 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS water System NUMBER: 31 . 0 INSPECTION INTERVAL PIAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

NUHBER EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS ZDENTIFZCATION ITEH NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK+ +

18. 0" FWA (REF. DWG. NO. 5) 095900 31-01R-FLG B-G-1 VT-1 V04, Limited to valve Check Valve 31-01R B6.220 selected under B-M-2 Flange Surface 3 X *IN/Ak l 096000 31-01R-VB BG1 UT Limited to valve Check Valve 31-01 B6. 210 selected under B-M-2 3 X Studs (18) +*LATER**

096100 31-01R-VBY B-M-2 V04, Only when Check Valve 31-01R B12. 50 disassembled, one valve Interior 3 X Surface among group of valves

%IN/A% 1 0 31 01R-VNW B-G-1 VT-1 V04, Limited to valve Check Valve 31-01R B6.230 selected under B-M-2 Nuts and Washers **N/A*~

096700 31-07-VB B-G-2 V05, Limited to valve Gate Valve 31-07 B7.70 selected under B-M-2.

Bolting 3 X 096800 31-07 VBY B-H-2 VT-3 V05, Only when Gate Valve 31-07 B12.50 disassembled, Limited Interior 3 X Surface onc valve among group of valves. **N/A**

18. 0" FWD (REF. DWG. NO. 5) 098000 31-A2 F-A VT 3 Code Case N-491-1 Anchor Fl . 10 **N/A~*

3 X

DATE: 10/26/99 NZNE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 92 REVISZON: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ater System ZONE NUMBER: 31.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 t tCALZBRATION BLOCKtt

10. 0" FWC {REF. DWG. NO. 5) 099900 31-HS-A F-A VT 3 4 Lugs welded 3 sides, Spring Hanger F1.10 Code Case N-491-1.

3 X **N/Att 100000 31-HS-B F-A VT 3 4 lugs, woldcd 3 sides, Spring Hanger Fl. 10 Codo Case N-491-1 3 X **N/At*

100100 31-H5-WD-001 B"K MT CRA 90%, Code Case N-509 Zntcgral Attachment B10. 20 ttN/A**

3 X 31-HS-WD-002 B-K MT CRA 90%, Code Case N-509 Integral Attachment B10. 20 ttN/At*

3 X 100300 31 "HS-WD-003 B-K MT CRA 90%, 4 Lugs, pipe Integral Attachment B10. 20 clamp contacts one side 3 X of lug. Code Case N-509

  • t'N/Att 100400 31-H5 WD-004 B-K MT CRA 90%, 4 Lugs, pipe Integral Attachment B10. 20 clamp contacts ono side 3

of lug, Codo Case N-509

  • t'N/A**

10 0" FWD {REF. DWG. NO, 5) 100500 31-H6 F-A VT 3 Code Case N 491-1 Spring Support F1.10 ttN/A*i 3 X Stanchion

DATE: 10/26/99 NINE HILE POINT NUCLEAR PIANT UNIT 1 PAGE: 93 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COHPONENTS water System E NUMBER: 31.0 INSPECTION INTERVAI PLAN STATUS PRESERVICE YEAR ASHE FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAHINATION AREA CATEGY NDE -OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEH NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK*~

18. 0" FWA (REF. DWG. NO. 5) 101300 31-HS F-A Code Case N-491-1 Spring Support F1.10 *AN/A*4 X

w/welded stanchion

18. 0" FWB (REF. DWG. NO. 5) 101900 31-WD-001 B-J HT Terminal End, High Valve 31-02R-to-Valve B9.11 UT Stress Weld, Examine 3 X 100% of weld length.

Extension

~ ~ P1R-1 . 156-1*'~

102500 31-WD-015 B-J UT Examine 100% of weld Pipe-to-Tee B9.11 HT length. ~~PIR-1.156-1**

3 - - - - X

10. 0" FWB (REF. DWG. NO. 5) 103000 31-WD-019 B-J UT Terminal End, Examine Pipe-to-Nozzle N4B B9. 11 HT 100$ of weld length 3 X ~ ~ PIR-1 . 156-1* ~

Safe End 103100 31-WD-020 B-J UT Group R14, ~~LATER~~

Safe End-to Nozzle N4B B9.11 HT 3

103300 . 31-WD-021 B-D Group R14, 78% CRV Nozzle N4B-to-Vcsscl B3.90 Limitation duc to 3 X ad)accnt nozzle and Bioshield ~~LATER~~

103400 31-WD-021 NUREG UT Group R14, Auto UT Nozzle N4B Bore (Zone 0619 Gene-Gcris 2000 system

3) ~~LATER+~

DATE: 10/26/99 NZNE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 94 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PIAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS water System NUMBER: 31.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERZOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 + +CALIBRATION BLOCK*+

103500 31-WD-021-ZR B D UT Group Rli, Auto UT Noz. N4B Inner Radius B3 100 Gene-Gcris 2000 system, 3 X Section (zone 1/2) ,

Frequency per NUREG 0619, 47% CRV Limitation due to ad)acent nozzle and ioshield. ~ ~LATER~ +

10. 0" FWA (REF. DWG. NO. 5) 104300 31-WD-028 B-J UT Terminal End *~LATER**

Pipe" to "Nozzle N4A B9 11

~ MT 3 X Safe End 104400 31 WD-029 B J UT Group R13, 99% CRV Safe End-to-Nozzle N4A B9.11 PT Limitation duc to 3 X thermocouplc lugs

++LATER'~~

104600 31"WD-030 B D UT Group R13, 94% CRV N4A Nozzle-to-Vessel B3. 90 Limitation due to 3 X ad)acent nozzle and Bioshicld, ~~IATER~~

104700 31-WD-030 NUREG UT Group R13, Auto UT N4A Nozzle Bore (Zone 0619 Gene-Geris 2000 system 3

3) **LATER**

104800 31-WD-030-ZR B"D Group R13, 82% CRV, N4A Noz. Inner Radius B3.100 Limitation duc to 3 X Section(zone 1/2) ad)acent nozzle and Bioshield, Auto UT Gene-Gcris 2000 system ,

Frequency by NUREG 0619

    • LATER**

DATE: 10/26/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 95 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PIAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS water System NUMBER: 31. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASHE FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERZOD SUHMARY EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK~~

18.0" FWA (REF. DWG. NO. 5) 10490031-WD-031 B"J MT Torminal End, High Valve 31-01-to-Valve B9. 11 UT Stress Weld, Examine 31-07 Extension 100% of weld length.

    • P1R-1. 156-1**
18. 0" FWB (REF. DWG. NO. 5) 105500 31-WD"045 B-J UT Examine 100% of weld Pipe-to-Tcc B9.11 length +*PZR-1.156-1~~

3 X

10. 0" FWC (REF. DWG. NO. 5) 106000 31-WD-049 B J HT Torad.nal End, Examine Pipo-to-Nozzle N4C B9.11 100% of weld length.

3 Safe End ++PZR-. 75-2++

106100 31 WD-050 B-J UT Group R15, 86% CRV, 99%

N4C Nozzlo-to-Safe End B9.11 HT for UT ~*PIR-1.156-1*~

3 X 106300 31-WD-051 B D UT Group R15, 84% CRV.

N4C Nozzle-to-Vessel B3 90

~ Limitation duc to 3 X ad)acent nozzle and Bioshicld ~~ZATERi~

106400 31 WD 051 NUREG UT Group R15, Frequency N4C Nozzle Bore (Zone 0619 pcr NUREG-0619 **LATER+a 3 X 3) 106500 31-WD-051-ZR B-D Group R15, (Zone 1 4 2)

N4C Noz. Inner Radius B3.100 Frequency per 3 X Section (Zones 1/2 NUREG-0619, 86% CRV, Limitation duc to ad)acent nozzle and Bioshield. ~~LATER~~

DATE: 10/26/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 96 REVISZON: 0 ZNSERVZCE INSPECTION TEN-YEAR PIAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS water System ZONE NUMBER: 31.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~*CALIBRATION BLOCK~ ~

10. 0" FWD (REF. DWG. NO. 5) 107300 31 WD-058 B-J Terminal End Pipe-to-Nozzle N4D B9.11 ~*FIR-.75-2~*

X Safe End 107400 31-WD-059 B J UT Group R16, ~*LATER++

N4D Safe End-to-Nozzle B9.11 3 X 107600 31 "WD-060 B-D Group R16, 82% CRV N4D Nozzle-to-Vessel B3. 90 Limitation due to 3 X Bioshield **IATER*~

107700 31-WD-060 Group R16, Frequency per N4D Nozzle Bore (Zone 0619 NUREG-0619 **N/A~+

3 X 3) 107800 31-WD" 060-ZR B D Group R16, Zone 1 4 2, N4D Noz. Inner radius B3.100 59% CRV Limitation duc 3 X Section (zones 1/2 to Bioshield, Frcqucncy by NUREG-0619 ~~LATER~~

Page 97 Left Blank Intentionally

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNZT 1 PAGE: 98 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Discharge E NUMBER: 32.0 PRESERVICE YEAR INSPECTION INTERVAL PIAN STATUS ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~*

28.0" Discharge 12D (REF. DWG. NO. 7) 109200 32-12-H4A F-A VT-3 Removed verify, Code Spring Hanger Fl. 10 Case N-491-1 *~N/A~~

3 X 109300 32-12-H4B Removed verify, Code Spring Hanger Fl. 10 Caso N-491-1 ~~N/A~+

3 X 28.0" Discharge 13D (REF. DWG. NO. 7) 109600 32-13-H4 WD 001 B K PT (32-13-H-4-A), Code Case Integral Attachment B10. 20 N-509 **N/A**

3 X Lug 109700 32-13"H4"WD-002 B-K (32-13-H-4-A), Code Case Integral Attachment B10.20 N-509 **N/A**

X Lug 109800 32-13-H4-WD-003 B K (32-13-H-4-B), Code Case Zntcgral Attachment B10. 20 N-509 ~*N/A~*

X Lug 109900 32-13-H4-WD-004 B-K (32-13-H-4-B), Code Case Integral Attachment B10. 20 N-509 ~*N/A~*

3 X Lug 110000 32-13-H4A Code Case N-491-1 Spring Hanger Fl . 10 ++N/A+*

3 X 110100 32-13-H4B Code Case N-491-1 Spring Hanger Fl. 10 **N/A**

3 - - - - X

DATE: 10/15/99 NINE MZLE POINT NUCLEAR PLANT UNIT 1 PAGE: 99 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Discharge ZONE NUMBER: 32.0 ZNSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~*

28.0" Discharge 15D (REF. DWG. NO. 7) 112000 32-15-H4A F-A VT-3 Code Case N-491-1 Spring Hanger Fl. 10 *~N/A~*

3 X 112100 32-15 "H4B F-A Code Case N-491-1 Spring Hanger Pl. 10 +*N/A++

3 X 2.0" Discharge 11D (REF. DWG. NO. 7) 113900 32-385-VB B-G-2 VT-1 2.0" Valve By-pass Linc Valve 32-385 Bolting B'7. 70 **N/At1 3 X 2.0" Discharge 12D (REP. DWG. NO. 7) 000 32-386-VB B-G-2 VT-1 2.0" Valve by-pass linc Valve 32-386 Bolting B7. 70 3 X 2.0" Discharge 13D (REF. DWG. NO. 7) 114100 32 "387 VB B-G-2 VT"1 2.0" Valve by-pass linc Valve 32-387 Bolting B7.70 ~*N/A*+

3 X 2.0" Discharge 14D (REP. DWG. NO. 7) 114200 32-388-VB B-G 2 VT-1 2.0" Valve by-pass line Valve 32-388 Bolting B7.70 **N/A+~

3 X 2.0" Discharge 15D (REF. DWG. NO. 7) 114300 32-389 VB B-G 2 VT 1 2.0" Valve by-pass line Valve 32-389 Bolting B7.70 %AN/A*t 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 100 REVISION: 0 ZNSERVICE INSPECTZON TEN-YEAR PLAN CZASS 1 SECTION XI SCHEDULED COMPONENTS or Recirculation Discharge NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 + +CALIBRATION BLOCK**

28. 0" Discharge 13D (REF. DWG. NO. 7) 115000 32-SB-6A F-A Code Case N-491-1 Sway Brace Fl. 10 *+N/A**

3 X 115100 32-SB-6B Code Case N-491"1 Sway Brace Fl. 10 eaN/Ate 3 X 28.0" Discharge 11D (REF. DWG. NO. 7) 115400 32-WD "017 B-J UT Terminal End, High Pump 11 B9. 11 Stress Wold, Examine 3 X Discharge-to-Elbow 100% of weld length.

~~PSR-Z.2*~

00 32-WD"017-Dl B-J UT Code Case N-524 Elbow-Long Scam OR B9.12 PT ~*PSR-Z.2~~

3 X 115700 32"WD-017-D2 B-J UT Code Casa N-524 Elbow-Long Seam ZR B9. 12 PT e t PER-1 . 2*a 3 X 3.0" Dischargo 11D (REF. DWG. NO. 7) 115900 32-WD-020 B-J PT **N/A~*

Branch Connection B9.32 3 X

-Dccon 116000 32-WD"020-FB B-G-2 VT"1 Examine in place, when 11D Dccon Flango B7.50 removed or disasscmblcd.

3 X Bolting *+N/A**

DATE: 10/15/99 NINE MZLE POINT NUCLEAR PIANT UNIT 1 PAGE: 101 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDUZED COMPONENTS or Recirculation Discharge NUMBER: 32. 0 PRESERVICE YEAR INSPECTION INTERVAL PIAN STATUS ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~ ~

28.0" Discharge llD (REF. DWG. NO. 7) 116600 32"WD-022 B-J UT Terminal End, High Pipe-to-Gate Valve B9. 11 PT Stress Weld, Examine 3 X 32-380 100% of weld length.

  • +PSR-1 . 2 +*

116700 32-WD-022 GL A +*PSR-1. 109-l~~

Pipe-to-Gate Valve 88-01 3 X 32"380 116800 32-WD-022-U B-J Code Case N-524 Pipe-Long Seam B9.12 <<~PSR-1. 2**

3 - - - - X 2.0" Discharge 11D (REF. DWG. NO. 7) 32-WD-023 B"J PT **N/A**

Coupling-to-Pipe B9.40 H 3 X 118000 32-WD-034 B J PT 4*N/A*1 Pipe-to-Coupling B9. 40 3 X 28.0" Discharge 11D (REF. DWG. NO. 7) 118100 32-WD-035 B-J UT **PSR-1. 2*~

Gate Valve B9. 11 PT 32-380-to-Pipe 118200 32-WD-035 GL-A UT ~*PSR-I . 109-1*~

Gate Valve 88 01 3 X 32-380-to-Pipe 119300 32-WD-040 GL-A UT **PSR-1.109-1)

Elhow-to-Pipe 88-01 PSR-1 . 260**

3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 102 REVISZON: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Recirculation Discharge NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATE GY NDE OUTAGE INSTRUCTIONS NUMBER IDENTZFZCATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +~CALIBRATION BLOCK+~

119800 32-WD-041 B-J PT Examine 100% of weld Pipe-to-Nozzle N2A B9. 11 UT length.

3 - - - - X ~~PSR-l. 655/1. 150-1,PSR-Safe End 119900 32-WD-041 GL-A UT +*PSR-1. 655/1. 150**

Pipe-to-Nozzle N2A 88-01 3 X Safo End 120000 32-WD-041-U B-J Code Case N-524 Pipe-Long Seam B9.12 ~~PSR-l. 2~~

3 X 120100 32-WD-042 GL A UT Group R06 ~~LATER~~

N2A Nozzle-to-Safe End 88-01 X

120200 32-WD-042 B-F UT Group R06, ~~IATER~~

NPA Nozzle-to-Safe End B5.10 PT 3 X 120300 32-WD-042 SZL Group R06, Incolal 182 N2A Nozzle-to-Safe End 455R1S1 butter expansion from 3 X nozzle side of weld

  • +ZATER+*

120400 32-WD-043 B-D AUT Group R06, 75% CRV N2A No" zle-to-Vessel B3. 90 Limitation due to bottom 3 X head taper of shell thickness +~N/A**

120500 32"WD-043-ZR B-D AUT Group R06, 60% CRV N2A Nozzle Inner B3.100 Limitation due to bottom 3 X Radius Section head taper of shell thickness *~N/A+~

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 103 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Recirculation Discharge NUMBER: 32.0 INSPECTION INTERVAI PLAN STATUS PRESERVZCE YEAR ASME FZRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATZON AREA CATEGY NDE OUTAGE ZNSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK~*

28.0" Discharge 12D (REF. DWG. NO. 7) 120600 32-WD"057 B J PT Terminal End, High Pump 12 B9 11

~ UT Stress Weld, Examine 3

Discharge-to-Elbow 100% of weld length.

3 X 120900 32-WD-057-D2 B-J PT Code Case N-524 Elbow-Long Seam ZR B9 12

~ UT **PSR-1.260**

3 X 3.0" Discharge 12D (REF. DWG. NO. 7) 00 32 WD 060-FB BG2 VT-1 Examine in place, when Dccon Flange Bolting B7.50 removed or when 3 X disasscmblcd. ~*N/A~~

2S.O" Discharge 12D (REF. DWG. NO. 7) 121300 32-WD-061 GL-A UT ~ ~ PER" 1 . 109-1 + ~

Elbow-to-Pipe 88 "01 3 X 121400 32-WD-061 B-J UT ~~PSR-1. 2**

Elbow-to-Pipe B9. 11 PT 3 X 121900 32-WD"062 GL-A UT ~~PSR-1. 109-1*+

Pipe-to-Gate Valve 88-01 3 X 32-381

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 104 REVISZON: 0 INSERVZCE INSPECTION TEN-YEAR PLAN 1 SECTION XZ SCHEDULED COMPONENTS

'ZASS r Recirculation Discharge NUMBER:l 32 . 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCTZONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 + +CALIBRATION BLOCX**

2.0" Discharge 12D (REF. DWG. NO. 7) 122100 32-WD-063 B-J PT Examine 100% of weld Coupling-to-Pipe B9. 40 length. ~~N/A~*

3 X 123200 32-WD-074 B-J Examino 100% of weld Pipo-to-Coupling B9.40 length. ~~N/A*~

3 X 28.0" Discharge 12D (REF. DWG. NO. 7) 123300 32-WD-075 B-J UT Examine 100% of weld Gate Valve B9. 11 PT length. *~PBR-1.109-1**

3 X 32-381-to-Pipe 32-WD-075-D B J Code Case N-524.

Pipe-Long Scam B9.12 **PBR-1.109-1~~

3 X 124000 , 32-WD-079 GL A UT Pipe-to-Elbow 88-01 ~ ~PBR-1. 260/PSR-1. 109-1*

3 X 124800 32 "WD-081 B-J UT Examine 100% of weld Pipe-to-Nozzle N2B B9. 11 PT length +~PBR-1.109-1+~

3 X Safe End 125000 32-WD-081-U B-J UT Code Case N-524 Pipe-Long Weld B9. 12 FT **PBR-1.109-1**

3 X 125100 32-WD-082 SIL UT Group R07, Znconel 182 N2B Safe End-to-Nozzle 455R1S1 buttor oxpansion from 3 X nozzle sido of weld t1LATERft

DATE: 10/15/99 NINE MZIE POINT NUCLEAR PIANT UNZT 1 PAGE: 105 REVISION: 0 INSERVICE ZNSPECTZON TEN-YEAR PIAN CZASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Discharge NUMBER: 32. 0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

NUMBER EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *~CALIBRATION BLOCK~ ~

125200 32-WD-082 B-F Group R07 *~LATER~~

N2B Safe End-to-Nozzle B5.10 3 X 125300 32-WD-082 GL-A Group R07 +*LATER~~

N2B Safe End-to-Nozzle SS-01 3 X 125400 32-WD-083 B-D AUT Group R07, 75.4% CRV N2B Nozzle-to<<Vcsscl B3 90

~

Limitation duc to bottom 3 X head taper of shell weld. **LATER**

125500 32-WD-083-IR B-D Group R07, 608 CRV N2B Nozzle Inner B3.100 Limitation duc to bottom 3 X radius Section head taper of shell weld. +*LATER~*

28.0" Discharge 13D (REF. DWG. NO. 7) 125600 32"WD-097 B-J UT Terminal End, High Pump 13 B9.11 PT Stress Wold, Examine Discharge-to-Elbow 3 X 100% of weld length

    • PSR-1. 109-1*+

125800 32-WD-097-Dl B-J UT Formerly LW-032-A, Code Elbow-Long Scam OR B9.12 PT Case N-524 3 X

  • ~PSR-1.109-1~~

125900 32"WD-097-D2 B-J UT Formerly LW-032-B, Code Elbow-Long Seam ZR B9.12 PT Caso N-524 3 X saPSR 1.109 la*

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 106 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Discharge NUMBER: 32. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTZFZCATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK~ ~

2.5" Dischargo 13D (REF. DWG. NO. 7) 126000 32-WD"099 B-J PT Examine 1008 of weld Branch B9.32 length +~N/AP~

3 X Connection-Thermowcll 3.0" Discharge 13D (REF. DWG. NO. 7) 126200 32-WD-100-FB B-G-2 VT-1 Examine in place, when Decon Flange Bolting B7.50 removed or when 3 X disassembled. ~~N/A~+

28.0" Discharge 13D (REF. DWG. NO. 7) 126300 32-WD-101 GL-A UT Pipe-to-Pipe 88-01 **PBR-1. 109-1, PBR-1. 260*

X 126800 32-WD-102 GL-A UT ~~PBR-1.109-1+*

Pipe-to-Gate Valve 88 01 32-382 3 X 126900 32-WD-102 B-J Terminal End, High Pipe-to-Gate Valve B9. 11 Stress Weld, Limitation 3 X 32-382 588 CRV, Examine 1008 of wold length

~~PBR-1. 109-1**

127000 32-WD-102-U B-J Code Case N-524 Pipe-Long Seam B9. 12 +*PBR-I . 109-1 +*

3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 107 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Discharge NUMBER: 32.0 INSPECTION INTERVAL PIAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 >>>>CALIBRATION BLOCK>>>>

2.0" Discharge 13D (REF. DWG. NO. 7) 127200 32-WD-104 B-J PT Examine 100$ of weld Pipe-to-Coupling B9. 40 length >>>>N/A>>>>

3 X 127400 32-WD-106 B J PT Examine 100% of weld Pipe- to-Elbow B9. 21 length >>>>N/A>>*

3 X 127900 32-WD-111 B-J PT Examine 100% of weld Elbow-to-Pipe B9.21 length **N/A**

3 X 128200 32-WD-114 B-J PT Examine 100% of weld Pipe-to-Coupling B9. 40 length **N/A**

3 X 28.0" Discharge 13D (REF. DWG. NO. 7) 128400 32-WD-115 B"J UT Terminal End, High Gate Valve B9. 11 PT Stross Wold, Examine 32-382-to-Pipe 3 X 100% of weld length

>>>>PSR-1 . 109-1*>>

128500 32-WD-115-D B-J UT Formerly LW-034, Codo Pipo-Long Scam B9. 12 PT Caso N-524 3 X

  • >>PSR-1. 109-1*>>

129000 32-WD-119 B J <<<<P8R-1. 109-1*>>

Pipe-to-Elbow B9. 11 3 X 129100 32-WD-119 GL-A UT >>>>P8R-1. 109-1)

Pipe-to-Elbow 88-01 PSR-1. 260<<>>

3 X 129600 32-WD-120 GL-A UT >>>>PSR-1. 109-1, Elbow-to-Pipo 88 01 PSR-1. 260>>*

3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 108 REVIS ZON: 0 ZNSERVICE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Discharge ZONE NUMBER: 32.0 PRESERVICE YEAR INSPECTION INTERVAL PZAN STATUS ASME FIRST SECOND THIRD SEC. XZ PERIOD PERZOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 <<<<CAI,ZBRATION BLOCK>>>>

130000 32-WD-121 B-J UT Examine 100% of weld Pipe-to-Nozzle N2C B9 11

~ PT length >>*PBR-1.109-1**

X Safe End 130100 32-WD-121 GL-A UT >><<PBR-1. 109-1>>>>

Pipe-to"Nozzle N2C 88-01 3 X Safe End 130200 32-WD "121-U B-J Code Case N-524 Pipe-Long Soam B9.12 <<*PER-1.109-1*>>

3 X 130300 32-WD-122 B F UT Group ROB, <<>>LATER>>>>

N2C Safo End-to-Nozzlo B5 10

~

3 X 30400 32-WD"122 SIL Group ROB, Inconcl 182 N2C Safe End-to-Nozzle 455R1S1 butter expansion from 3 X nozzle side of weld,

<<<<LATER>>*

130500 32 WD-122 GL-A UT GrouP ROB **ZATER>>>>

N2C Safe End-to-Nozzle 88-01 X

130600 32-WD-123 B D Group ROB, 75.4% CRV N2C Nozzle-to-Vessel B3.90 **ZATER>>>>

3 X 130700 32-WD "123-IR B D Group ROB, 82% CRV N2C Nozzle Innor B3.100 <<>>LATER*>>

3 X Radius Section

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 109 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Discharge E NUMBER: 32.0 PRESERVZCE YEAR INSPECTION INTERVAL PLAN STATUS ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +*CALIBRATIONBLOCK+ +

3. 0" Discharge 14D (REF. DWG. NO. 7) 131400 32-WD-142-FB B-G-2 VT-1 Examine in place, when 14D Dccon Flange B7.50 removed or when 3 X disassembled *~N/A+~

Bolting 2.0" Discharge 14D (REF. DWG. NO. 7) 132300 32-WD-145 B-J PT Examine 100% of weld Coupling-to-Pipe B9. 40 length ~~N/A~+

3 X 133400 32-WD-156 B-J Examine 1008 of weld Pipe-to-Coupling B9.40 length ~~N/A+~

3 X 28.0" Discharge 14D (REF. DWG. NO. 7) 00 32-WD-157 GL A UT ~'~PSR-1. 109-1*+

Valve 32-383-to-Pipe 88-01 3 X 134900 32-WD-163 B J UT Examine 100% of weld Pipe-to-Nozzle N2D B9. 11 PT length ~~PSR-1.109-1**

3 X Safe End 135100 32-WD-163-U B J UT Code Case N-524 Pipe-Long Seam B9. 12 PT ++PER-1.109-1++

3 X 135200 32-WD-164 B F UT Group R09 ~+LATER'+

N2D Safe End-to-Nozzle B5.10 X

135300 32-WD-164 SIL Group R09, Inconcl 182 N2D Safe End-to-Nozzle 455R1S1 butter expansion from 3 X nozzle side of weld

~ ~LATER~ ~

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 110 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Recirculation Discharge NUMBER: 32.0 ZNSPECTION INTERVAI PZAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMZNATZON AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTZFICATION ZTEM NO METH 2 3 3 ~+CALIBRATION BLOCK**

1 4 1 2 4 1 2 3 4 135400 32-WD-164 GL-A Group R09, ~+LATER~~

N2D Safe End-to-Nozzle 88-01 3 X 135500 32-WD-165 B-D Group R09, 75.4% CRV N2D Nozzle-to-Vessel B3. 90 Limitation due to bottom 3 X "

head taper of shell thickness **LATER**

135600 32-WD-165-ZR B-D Group R09, 82% CRV N2D Nozzle Inner B3. 100 Limitation duc to bottom 3 X Radius Section head taper of shell thickness *~LATER*~

28.0" Discharge 15D (REF. DWG. NO. 7) 0 32-WD-181 B-J UT Terminal End, High Pump 15 B9. 11 PT Stress Weld, Examine 3

Discharge-to-Elbow 100% of weld length stPSR-1.109 lao 135900 32-WD-181-Dl B-J Formerly LW-OSS-A, Code Elbow-Long Scam B9. 12 Case N-524 3 X *aPSR 1. 109 Zest 136000 32-WD-181-D2 B-J UT Formerly LW-058-B, Code Elbow-Long Scam ZR B9. 12 PT Case N-524 3

    • P8R-1. 109-1*~

3.0" Discharge 15D (REF. DWG. NO. 7) 136300 32-WD-184-FB B"G-2 VT 1 Examine in place, when 15D Decon Flange B7.50 rcmcnrcd, or when 3 X Bolting disassembled **N/A*~

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 111 REVISION: 0 INSERVZCE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Recirculation Discharge NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCTZONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *+CALIBRATION BLOCK**

28.0" Discharge 15D (REF. DWG. NO. 7) 136700 32 "WD-186 B-J UT Terminal End, High PiPc-to-Valve 32-384 B9. 11 PT Stress Weld, Examine 3

100% of weld length

~~PER-1.109-1~~

136900 32 "WD-186-U B-J Code Case N-524 Pipe-Long Seam B9. 12 ~~PSR-1. 109-1~~

3 X 2.0" Discharge 15D (REF. DWG. NO. 7) 137000 32-WD-187 B-J PT Examine 100% of weld Coupling-to-Pipe B9.'40 length **N/A~*

3 X 00 32-WD-193 B-J Examine 100% of weld Valve 32-389-to-Pipe B9.21 length +*N/A+~

3 X 137700 32-WD-194 B-J Examine 100% of weld Pipe-to-Elbow B9. 21 length *~N/A~~

3 X 137800 32-WD-195 B-J Examine 100% of weld Elbow-to-Pipe B9.21 length **N/A**

3 X 14.0" Discharge 15D (REF. DWG. NO. 7) 139700 32-WD-204-MT ZNPO UT 100% of base material, Mixing Tcc-Base Metal 5-85 each RFO.

3 X - - - X X - - X ~*PSR-2. 055-1 + +

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 112 REVISION: 0 INSERVICE ZNSPECTZON TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Discharge ZONE NUMBER: 32.0 PRESERVICE YEAR INSPECTION INTERVAL PLAN STATUS ASME PIRST SECOND THIRD SEC. XZ PERIOD PERZOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~*CALIBRATION BLOCK+~

28.0" Discharge 15D (REF. DWG. NO. 7) 141400 32-WD-207 B-J Examine 100% of weld Pipo-to-Nozzle N2E B9. 11 length 3 X Safe End + *P8R-1 . 655/1 . 150-1**

141500 32-WD-207 "U B-J former LW-064, Code Case Pipe-Long Weld B9.12 N-524 ~~PSR-I.I09-1+~

3 X 141600 32-WD-208 B-F UT Group R10 ++LATER~+

N2E Safe End-to-Nozzle B5.10 PT 3

t 141700 32-WD "208 SIL Group R10, Znconel 182 N2E Safe End-to-Nozzle 455R1S1 buttor expansion from 3

nozzle sido of weld

  • +LATER**

141800 32 WD-208 Group R10, ~*LATER~~

N2E Safe End-to-Nozzle 88-01 3 X 141900 32-WD 209 B"D Group R10, 74.5% CRV N2E Nozzlo-to-Vessel B3. 90 Limitation duc to bottom 3 X head taper of shell thickness. *+IATER**

142000 32-WD-209-IR B-D Group R10, 82% CRV N2E Nozzle Inner B3. 100 Limitation due to bottom 3 X Radius Section head taper of shell thickness. *+LATER~*

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 113 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Pump NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK e 32-187 (REF. DWG. NO. 7A) 142900 32-187 F-A VT 3 Code Case N-491-1 Pump 11 Support Fl . 40 *~N/A~~

3 X 143000 32-187-PBB B-G-l VT-1 One pump in a group of Pump 11 Busihings (1 B6.200 pumps, only when 3 X thru 16) disassembled. ~~N/A~~

143100 32-187-PBN B G-l VT-1 Liad.tcd to pump selected Pump 11 Nuts, (1 thru B6 ~ 200 under B-L-2, One pump in 3 X

16) a group of pumps ++N/A++

143200 32-187-PBS B-G-1 UT Limited to pump selected Pump 11 Flange Studs B6.180 under B-L-2, Onc pump in 3 X (1 thru 16) a group of pumps.

++NMP1 2.75-RCP-STUD**

143300 32-187-PBW B-G-1 Limited to pump sclcctcd Pump 11 Washcrs (1 B6.200 under B-L-2, One pump 3 X thru 16) among a group of pumps k*N/A%4 143400 32-187-PBY B-L-2 VT 3 When disasscmblcd, one Pump 11 Interior B12. 20 pump among a group of 3 X Surface pumps ~*N/A~*

143500 32-187-PFS B-G-1 VT-1 Limited to pump selected Pump 11 Flange Surface B6.190 under B-L-2, Examine 1 3 X in. annular surface oi flange surrounding each stud ~*N/A+~

DATE: 10/15/99 NINE MZLE POINT NUCLEAR PZANT UNIT 1 PAGE: 114 REVIS ZON: 0 INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Pump NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME PIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

NUMBER EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK~+

143700 32-187-SHB B-G-2 VT-1 P01, Limited to pump Pump 11 Seal Housing B7.60 selected under B-L-2, Bolting (I thru 16) one pump among group of pumps. ~~N/A*~

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 115 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Pump 15 NUMBER: 32. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

NUMBER EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *iCALIBRATIONBLOCK+

32-191 (REF. DWG. NO. 7) 148900 32-15-H1 F A Code Case N-491-1 Spring Hanger F1. 40 **N/A*i 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNZT 1 PAGE: 116 REVISZON: 0 INSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Recirculation Suction NUMBER: 32. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERZOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 i~CALIBRATION BLOCK~~

28.0" Suction 11S (REF. DWG. NO. 7) 151000 32-11-H3A F-A VT-3 Code Case N-491-1 Spring Hanger Fl. 10 *AN/A**

3 X 151100 32-11-H3B F A VT-3 Code Case N-491-1 Spring Hanger F1.10 eaN/A*a 3 X 28.0" Suction 12S (REF. DWG. NO. 7) 151300 32-12-H3-WD-001 B-K PT (32-12-H-3-A), Code Case Integral Welded Lug B10.20 N"509 *~N/A~~

3 X 151400 32-12-H3-WD-002 B-K PT (32-12-H-3-A), Code Case Integral Welded Lug B10.20 N-509 **N/A~*

3 X 1 1500 32-12-H3-WD-003 B"K (32-12-H-3-B), Code Case Integral Welded Lug B10.20 N-509 **N/A~*

3 X 151600 32-12-H3-WD-004 B-K (32-12-H-3-B), Code Case Integral Wcldcd Lug B10.20 N-509 ~+N/A~*

3 X 28.0" Suction 14S (REF. DWG. NO. 7) 153100 32-14-H3A F A Code Case N-491-1 Spring Hanger F1.10 1 O'/A1 t 3 X 153200 32-14-H3B F-A Code Case N-491-1 Spring Hanger Fl. 10 **'N/A**

3 X

DATE: 10/15/99 NINE HILE POZNT NUCLEAR PIANT UNIT 1 PAGE: 117 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Suction ZONE NUHBER: 32.0 INSPECTION INTERVAL PRESERVICE YEAR PLAN STATUS ASHE FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD SUHHARY EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 >>*CAZ,IBRATZON BLOCK>>>>

28.0" Suction 11S (REF. DWG. NO. 7) 155600 32-375-VB B-G-2 V06, Limited to valve Gate Valve 32-375 B7.70 selected under B-M-2 3 X >>>>N/A>>*

Bolting 155700 32-375-VBY B"H-2 VT-3 V06,Only whe'n Gate Valve 32-375 B12.50 disassembled, one valvo 3 X Interior Surface among group of valves

>>*N/A>>>>

28.0" Suction 12S (REP. DWG. NO. 7) 156800 32-SB"3A P-A VT-3 Code Case N-491-1 Sway Brace F1. 10 *>>N/A>>>>

3 - - - - - - - X 6900 32-SB-3B F-A Code Case N-491-1 Sway Brace F1.10 >>>>N/A*>>

3 28.0" Suction 13S (REF. DWG. NO. 7) 157000 32-SB-5A F-A VT-3 Code Case N-491"1 sway Brace Fl . 10 >>>>N/A>>*

3 X 157100 32-SB-5B P-A VT 3 Code Case N-491-1 Sway Brace Fl. 10 *>>N/A>>>>

3 X 28.0" Suction 11S (REP. DWG. NO. 7) 157600 32-WD-001 B D AUT Group R01, 65% CRV N1A Nozzle-to-Vessel B3. 90 Limitation duc to lug, 3 X ad)acent nozzle and Bioshicld >>>>LATER>>>>

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNZT 1 PAGE: 118 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Suction NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THZRD SEC. XZ PERIOD PERIOD PERZOD

SUMMARY

NUMBER EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK*~

157700 32-WD-001-IR B-D Group R01, 73% CRV N1A Nozzle Inner B3. 100 Limitation due to lug, 3 X Radius Section ad)accnt nozzle and Bioshield ~iLATER~i 157800 32-WD-002 GL-A UT Group R01 +*LATER*~

N1A Nozzle-to-Safe End 88-01 3 X 157900 32-WD-002 SIL Group R01, Inconcl 182 N1A Nozzle-to-Safe End 455R1S1 butter expansion from X

nozzle side of weld

    • LATER~*

158000 32-WD"002 Group R01 **LATER~~

N1A Nozzle-to-Safe End B5.10 3 X 158200 32 WD-003 B J ++PSR 1.2++

Nozzle N1A Safe B9. 11 End-to-Elbow 3 X 158300 32-WD-003-Dl formerly LW-001-A, Coda Elbow-OR Long Scam B9.12 PT Case N-524 **PSR-1.2~~

3 X 158400 32-WD-003-D2 B-J UT formerly LW-001-B, Code Elbow-IR Long Scam B9. 12 PT Case N-524 **PSR 1.2++

3 X 12.0" Suction 11S (REF. DWG. NO. 7) 159400 32 WD 004A-MT ZNPO UT UT Only, every rcfucling Mixing Tee -Base Metal 5-85 outage, 100% asc Exams 3 X - - - X X - - X Material +~PSR-2.055-1**

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNZT 1 PAGE: 119 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Suction NUMBER: 32. 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERZOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +~CALIBRATION BLOCK~~

28.0" Suction 11S (REF. DWG. NO. 7) 160800 32-WD-007 B-J UT Examine 100% of weld Branch Connection B9.31 PT length. ~~PSR-1.2~~

3 X 161800 32-WD-009 B J Terminal End, High Pipe-Valve 32-375 B9.11 PT Stress Weld, Examine 3 X 100% of weld length.

  • +LATER**

161900 32-WD-009-U B-J UT Formerly LW-004, Code Pipe-Long Seam B9. 12 PT Case N-524 *~LATER**

3 X 3.0" Suction 11S (REF. DWG. NO. 7) 00 32-WD-011-FB B-G 2 Examine in place, when 11S Decon Flange B7.50 removed, or Bolting X disassembled. ~+N/A++

28. 0" Suction 11S (REF. DWG. NO. 7) 162500 32-WD-012 B-J UT Examine 100% of weld Pipe-to-Elbow B9. 11 PT length. +~P8R-1.2**

3 X 162700 32-WD-012"Dl Code Case N-524 Elbow-Long Scam OR B9.12 PT ~~PSR-I.2~~

3 X 162800 32-WD-012-D2 Code Case N-524 Elbow-Long Seam IR B9.12 PT ~+PSR-1.2~~

3 X 162900 32-WD-012-U B-J UT Code Case N-524 Pipe-Long Seam B9. 12 PT **PSR-1. 2**

3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 120 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Suction NUHBER: 32.0 INSPECTZON INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD SUHHARY EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUHBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~ ~

163100 32-WD-015 B-J Examine 100% of weld Elbow-to-Elbow B9. 11 length. +~PSR-1.2**

3 X 163500 32-WD-015-Ul B-J UT Formally LW-006-A, Code Elbow>>Long Seam OR B9.12 PT Casa N-524. ~*PSR-1.2~*

3 X 163600 32-WD-015-U2 B-J UT Formally LW-006-B, Coda Elbow-Long Scam IR B9.12 PT Case N-524 ~+PSR-1.2~*

3 X 28.0" Suction 12S (REF. DWG. NO. 7) 163700 32-WD-044 B-D UT Group R02, 65% CRV N1B Nozzle-to-Vessel B3.90 Limitation duc to 3 X Bioshield ~+LATER**

00 32-WD"044-ZR B D Group R02, 73% CRV N1B Nozzle Inner B3. 100 Limitation duo to Radius Section 3 X Bioshield

    • NHP1-GE-7875~~

163900 32-WD-045 SZL Group R02, Inconcl 1S2 N1B Nozzle-to-Safe End 455R1S1 butter expansion from 3 X nozzle side i*LATER*~

164000 32-WD-045 Group R02, i+LATER++

N1B Nozzle-to-Safe End B5.10 PT 3 X 164100 32"WD-045 GL-A UT Group R02, **LATER~*

N1B Nozzle-to-Safe End 88-01 3 X 164200 32"WD-046 B-J Examine 100% of weld Nozzle N1B Safe B9.11 length, **PSR-1.2~*

3 X End-to-Elbow

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 121 REVISION: 0 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Suction E NUMBER: 32.0 PRESERVZCE YEAR INSPECTION ZNTERVAL PLAN STATUS ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTIFZCATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~+CALIBRATION BLOCK++

164300 32-WD-046 N/A IWB-2420 (b) Exaad.nc flaw Nozzle N1B Safe N/A growth area next 3 3 X - - - X - - - X periods. ~*PSR-1.2+~

End-to-Elbow 164400 32-WD-046 GL F UT Examine each refueling Nozzle N1B Safe 88-01 outage flaw growth.

3 X - - - X X - - X **P8R-1. 260++

End-to-Elbow 164500 32-WD-046-Dl B-J UT Code Case N-524 Elbow-Long Seam OR B9. 12 ++PSR-1.260*~

3 X 164600 32-WD-046-D2 B-J UT Coda Case N-524 Elbow-Long Scam ZR B9.12 PT **PSR-1.260+*

3 00 32-WD-049 B- J UT Terminal End, High Pipe-to-Gate Valve . B9. 11 PT Stress Weld, Examine 3 X 100% of weld length 32-376

  • +PSR-1.2+~

165700 32-WD-049-U B J UT Code Case N-524 Pipe-Long Scam B9. 12 PT ++PSR-1.2++

3 X 165800 32-WD-050 B-J Tarad.nal End, Limitation Gate Valve B9. 11 58% CRV, ~~PSR-1.2~~

3 X 32-376-to-Pipe 165900 32-WD-050 N/A Re-cxaminc pcr Gate Valve N/A IWB-2420 (b) Flaw growth 3 X - - - X - - - X area next 3 periods, 32-376-to-Pipe acceptable USNRC TAC No.

MA5696. . ++PSR 1.2*+

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNZT 1 PAGE: 122 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Suction INSPECTION INTERVAL PIAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

NUMBER EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS IDENTZFZCATION ZTEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK~ ~

166100 32-WD-050"D B-J Code Case N-524 Pipe-Long Seam B9.12 +*PSR-1 . 2**

3 X 166200 32-WD-051 B-J PT Examine 100& of weld Branch Connection B9.32 length. +*N/A**

-Decon 3 X 3.0" Suction 12S (REF. DWG. NO. 7) 166300 32-WD-051-FB B-G-2 Examine in place, when Dccon Flange Bolting B7.50 removed or disassembled.

3 X ~~N/A+~

2.5" Suction 12S (REF. DWG. NO. 7) 00 32-WD-053 B-J PT Examine 100% of weld Thcrmowel 1 B9. 21 length *~N/A~*

3 X 28.0" Suction 13S (REF. DWG. NO. 7) 167400 32-WD-084 B-D UT Group R03, 65% CRV N1C Nozzle-to-Vessel B3.90 Limitation due to lug, 3 X ad)accnt nozzle and bioshicld **LATER~>>

167500 32-WD-084-IR B-D Group R03, 73% CRV N1C Nozzle Inner B3.100 Limitation duc to lug, 3 X Radius Section ad)acent nozzle and bioshicld

~~NMP1-GE-7875+~

167600 32-WD"085 B-F UT Group R03, ~~LATER~*

N1C No"zlc-to-Safe End B5.10 PT 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 123 REVZSZON: 0 ZNSERVICE INSPECTION TEN-YEAR PIAN CIASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Suction NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THZRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION CATEGY ITEM NO NDE METH


OUTAGE------ INSTRUCTIONS 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATZONBLOCK*+

167700 32-WD-085 SZL Group R03, Inconel 182 N1C Nozzle-to-Safo End 455R1Sl butter expansion from 3 X nozzle side of weld,

  • + ZATER**

167800 32-WD-085 GL A UT Group R03 **IATER*~

N1C Nozzle-to-Safe End 88-01 3 X 167900 32-WD-086 B-8 Examine 100% of weld Nozzle N1C Safe B9. 11 length, ~~PSR-1.109-1*~

3 X End-to-Elbow 168000 32-WD-086 N/A IWB-2420 (b) Examine flaw Nozzle N1C Safe N/A growth area next 3 3 X End-to-Elbow periods. ~*PSR-1.109-1**

168100 32-WD-086 GL-F UT Examine each refueling Nozzle N1C Safe 88-01 outage flaw growth.

End-to-Elbow 3 X - - - X X - - X ++PSR-1. 260, PSR-l. 655/1.

150-~~

168200 32-WD-086-Dl B a7 UT Formerly LW-026-A, Code Elbow-Long Seam OR B9.12 PT Case N-524 **PSR-1.260~~

3 X 168300 32-WD-086-D2 B-J UT Formerly LW-026-A, Code Elbow-Long Seam IR B9.12 Case N-524 **PSR-1.260~*

3 X 169300 32-WD-089 Terminal End, High Pipe-to-Valve 32-377 B9.11 PT Stress Weld, Examine 3 X 100% of weld length

~~PSR-1.109-1**

DATE: 10/15/99 NINE MZLE POINT NUCLEAR PLANT UNIT 1 PAGE: 124 REVISION: 0 ZNSERVZCE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Suction ZNSPFCTION INTERVAL PZAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 yyCALIBRATION BLOCKa~

169500 32-WD-089-U B-J Formerly I.W-028, Code Pipe-Long Scam B9.12 Case N-524 3 X **PSR-1. 109-1**

169600 32-WD-090 B-J UT Terminal End, High Valve 32-377-to-Pipe B9. 11 PT Stress Weld, Limitation 3 X duc to configuration 58%

CRV, Examine 100% of weld length.

+*PSR-I . 109-1**

169800 32-WD-090-D B-J Formally LW-029, Code Pipe-Long Seam B9. 12 Case N-524 X **P8R-1. 109-1*~

3.0" Suction 13S (REF. DWG. NO. 7) 170000 32-WD-091-FB ~ B-G-2 Examine in place, when 13S Dccon Flange B7.50 removed or when Bolting X disassembled. <<*N/A~*

28.0" Suction 13S (REF. DWG. NO. 7) 170100 32-WD-092 B-J UT **PSR-1 ..109-1**

Pipe-to-Elbow B9.11 3 X 170200 32-WD-092 GL-A UT Pipe-to-Elbow 88-01 ++PSR 1. 109-1 ) PSR-1. 260~

3 X

DATE: 10/15/99 NINE MZIE POZNT NUCLEAR PLANT UNIT 1 PAGE: 125 REVISION: 0 ZNSERVICE INSPECTION TEN YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Suction NUMBER: 32. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~~

28.0" Suction 14S (REF. DWG. NO. 7) 171300 32-WD-124 B D UT Group R04, 65% CRV N1D Nozzle-to-Vessel B3. 90 Limitation duc to Bioshield + <<LATER~>>

171400 32-WD-124-IR B D Group R04, 73& CRV N1D Nozzle Znner B3. 100 Limitation duc to 3 X radius Section Bioshield

  • +NMP1-GE-7875~+

171500 32-WD-125 SII Group R04, Znconel 182 N1D Nozzle-to-Safe End 455R1S1 butter expansion from 3

nozzle side of weld

~~LATER~*

00 32-WD-125 B-F UT Group R04 +~LATER~+

N1D Nozzle-to-Safe End B5.10 PT 3 X 171700 32-WD-125 GL A UT Group R04 ~*LATER~~

N1D Nozzle<<to-Safe End 88-01 3 X 171800 32-WD-126 B-J Examine 100% of weld Nozzle N1D Safe B9. 11 length, +~PSR-I 109-1~*

3 X End-to-Elbow 171900 32-WD-126 N/A UT IWB-2420 (b) Examine flaw Nozzle N1D Safe N/A growth area next 3 End-to-Elbow 3 X X periods. ~~P8R-1.109-1*~

172000 32-WD-126 GL-F UT Examine each rcfucling Nozzle N1D Safe 88-01 outage flaw growth.

3 X End-to-Elbow **PSR-1.655/1.150"1~~

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 126 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Suction INSPECTION ZNTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERZOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATZONBLOCK*+

172100 32-WD-126-Dl B-J UT Code Case N-524 Elbow-Long Seam OR B9.12 PT **PSR-1 . 109-1 +*

3 X 172200 32"WD-126-D2 B-J UT Code Case N-524 Elbow-Long Scam ZR B9. 12 PT ~ ~PSR-1. 109-1**

3 X 14.0" Suction 14S (REF. DWG. NO. 7) 173200 32-WD-128A GL A UT Removablc pipe clamp Pipe-to-Gate Valve 88-01 **PSR-.935-1**

3 X 38-01 173300 32-WD-128A B J Terminal End, High Pipe-to-Gate Valve B9. 11 Stress Wold, Removablc X

38-01 pipe clamp, Examine 100%

of weld length.

~+PSR-l. 109-l~~

173400 32-WD-128A-U B-J UT Code Case N-524 Pipe-Long Seam B9.12 PT ~~PSR-1.109-1~~

3 X 28.0" Suction 14S (REF. DWG. NO. 7) 174300 32-WD-131 B-J UT Terminal End, High PiPe-to-Valve 32-378 B9. 11 PT Stress Weld, Examine 3 X 100% of weld length e*PSR 1.109-1*a 174500 32-WD-131-U B-J Rcmovablc pipe clamp, Pipe-Long Seam B9. 12 Coda Case N-524 3 X *~PSR" 1. 109-1**

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PIANT UNIT 1 PAGE: 127 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Recirculation Suction NUMBER: 32. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 + +CALIBRATION BLOCK**

3.0" Suction 14S (REF. DWG. NO. 7) 175000 32-WD-133-FB B G-2 Examine in place, when Decon Flange Bolting B7.50 removed or when 3 X disassembled. ~ ~N/A~~

2.5" Suction 14S (REF. DWG. NO. 7) 175600 32 "WD-135 B-J PT Examine 100% of weld Branch Connection- B9.32 length +~N/A~~

3 X Thcrmowell 28.0" Suction 15S (REF. DWG. NO. 7) 176300 32-WD-166 B-D AUT Group R05, 33.8% CRV N1E Nozzle-to-Vessel B3.90 Limitation duc to lug, 3 X thermocouple and bioshicld *~LATER*~

176400 32-WD-166-IR B-D Group R05, 73% CRV N1E Nozzle Znncr B3. 100 Limitation due to lug, 3 X Radius Section thermocouplc and bioshicld ~~ZATER~~

176500 32-WD-167 B-F UT GrouP R05 ++LATER~~

N1E Nozzle-to-Safe End B5.10 PT 3 X 176600 32-WD-167 SII Group R05, Znconcl 182 N1E Nozzle-to-Safe End 455R1S1 butter expansion from 3 X nozzle side of weld

  • +LATER+~

176700 32-WD-167 GL-A UT Group R05 ~~LATER*~

N1E Nozzle-to-Safe End 88-01 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNZT 1 PAGE: 128 REVIS ZON: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Suction NUMBER: 32. 0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCTIONS NUMBER IDENTIFICATION ZTEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK**

176800 32-WD-168 B-J Examine 100% of weld Nozzle N1E Safe B9.11 length, ++PSR-1.260~~

3 X End-to-Elbow 176900 32-WD-168 N/A WB-2420 (b) Examine flaw Nozzle N1E Safe N/A growth area next 3 End-to-Elbow 3 X X - - - X periods. **PSR-1. 260~*

177000 32 "WD-168 GL"F UT Examine each rcfucling Nozzle N1E Safe 88"01 outage flaw growth.

End-to-Elbow 3 X - X X - X stPSR-1.260,PSR-1.655/1.

150-~*

177100 32-WD-168 "Dl B-J Formerly LW-051-A, Code Elbow-Long Seam OR B9.12 Case N-524 ~*P8R-1.260*~

3 X 177200 32-WD-168-D2 Formerly IW-051-B, Coda Elbow-Long Seam ZR B9. 12 PT Case N-524 ++P8R-1.260*~

3 X 178600 32-WD-171-MT ZNPO UT Base metal scans Mixing Tee Base Metal 5-85 required each Refueling X - - - X X Outage **PSR-1.109-1*~

178SOO 32-WD-171A B-J Examine 100% of weld Reducer-to-Pipe B9. 11 length ++PSR-1.109-1~*

3 X 179000 32 WD-171A-D B-J UT Code Case N-524 Pipe-Long Seam B9. 12 PT ~+PSR-I . 109-1**

3 X

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PLANT UNIT 1 PAGE: 129 REVISION: 0 ZNSERVZCE ZNSPECTZON TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Suction ZONE NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERZOD PERIOD PERZOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +*CALIBRATION BLOCK*~

10.0" Suction 15S (REF. DWG. NO. 7) 179200 32-WD" 171BR GL A UT ~*NMP-10-XX1-SS**

Valve 39-01-to-Reducer 88>>01 3 X 179300 32-WD-171BR B-J Tcrnd.nal End, High Valve 39-01-to-Reducer B9. 11 Stress Weld 3 X ~iNMP-10"XXI-SSi~

28.0" Suction 15S (REF. DWG. NO. 7) 179400 32-WD-172 Limitation duc to Tee-to-Pipo B9. 11 fitting configuration, 3 X and material 58%

CRV.Examine 100% of weld length. ~~PSR-1.109-1~~

179700 32"WD-172-D B-J (CW172, 173), Code Case Pipe-Long Scam B9. 12 N-524 **P8R-1. 109 1**

3 X 179800 32-WD-172-U B-J UT Coda Case N-524 Tee - Long Seam B9. 12 PT *+PSR-l. 109-1*+

3 X 180200 32-WD-174 B-J UT Terminal End, High Valve 32-379-to-Pipe B9. 11 PT Stress Weld, Examine 3

100% of weld length

++PSR 1.109 I+*

180400 32-WD-174-D B"J Code Case N-524 Pipe Long Scam B9.12 + *PER-1 . 109 1 ~ ~

3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 130 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Suction NUMBER: 32. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEOY NDE -OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK*~

3.0" Suction 15S (REF. DWO. NO. 7) 150600 32-WD-175-FB B-6-2 VT-1 Examine in place, when Decon Flange Bolting BI 50

~ removed or when 3 X disassembled. *~N/A**

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE 131 REVISZON: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTZON XZ SCHEDULED COMPONENTS r Clean Up NUMBER: 33. 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *~CALIBRATION BLOCK**

6.0" Line (REF. DWG. NO. 20) 181900 33 01R VBY B-M-2 VT"3 V07, Onlc when Valve 33-01R Znterior B12.50 disassenbled, one valve X of valves.

Suriace among group

~~N/A~~

182300 33-03-VB B-G-2 V13, Limited to valve Valvo 33-03 Bolting B7.70 sclcctcd under B-M-2.

3 X <<*N/A~~

182400 33"03-VBY B-M"2 VT-3 V13, Only when Valve 33-03 Interior B12.50 disassembled, onc valve X

Surface among group of valves.

eaN/Aea 00 33"03-WD-001 B-K PT Code Case N-509, Examine Valve 33-03 Integral ~ B10. 40 100% of wold length Attachment X +~N/A*+

183700 33-WD" 001 B"J PT Examine 100% of weld Branch Connection B9.32 length. **N/A~*

3 X 183800 33-WD-002 B J UT Terminal End, High Pipe-to-Valve 33-02 B9.11 PT Stress Weld, Limitation 3

duo to fitting configuration 62% CRV, Examine 100% of weld length. **LATER**

184000 33-WD-003 Terminal End, High Valve 33-02R-to-Pipe B9.11 PT Stress Weld, Limitation 3

duc to fitting configuration 62% CRV, Examine 100% of wold length. *~LATER*~

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 132 REVZSION: 0 INSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Clean Up NUMBER: 33. 0 INSPECTION INTERVAL PZAN STATUS PRESERVICE YEAR ASME PIRST SECOND THIRD SEC. XZ PERZOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~*CALIBRATION BLOCK*~

184300 33-WD-004 GL-D Pipe-to-Pipe Bend 88-01 3 X X 184900 33-WD-014 GL-G VT-2 Inaccessible, inside Pen Pipe-to-Pipe 88-01 X"9, Visual VT-2 each X - - - X X - - X outage for evidence of leakage. +~N/A++

185100 33-WD" 015 GL-A Znaccossible inside Pen Pipe-to-Valve 33"04 88-01 X-9. Visual VT-2 each 3 X - - - X X " - X outage for cvidcnce of leakage. i~N/A~i 185500 33-WD-035 VT-2 Znaccossible located Valvo 33-03-to-Pipe 88-01 inside pen X-154, VT-2 X - - - X X - - X Each Rcfucling Outage for evidence of leakage

~*N/A~~

185700 33"WD-036 GL-G Inaccessible located Pipe-to-Elbow 88-01 inside pcn X-154, VT-2 X - - - X X - - X Each Rcfucling Outage for evidcncc of leakage

~~N/A*+

185900 33"WD-046 B-J Bimettalic weld, Examine Pipe-to-Pipe B9. 11 100% of weld length.

3 X ++IATER+*

186000 33 "WD-046 GL-D UT Bimettalic weld Pipe-to-Pipe 88-01 ~~LATER~+

3 X X 186300 33-WD-047C1 B-J Examine 100% of weld Pipe-to-Valve 33-01R1 B9.11 length *~PER-.432-2~~

3 X

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PLANT UNIT 1 PAGE: 133 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Clean Up NUMBER: 33. 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTIFZCATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK*+

186700 33-WD-048C1 B J UT ~*PSR-.432-2~*

Valve 33"01R to Pipe B9.11 PT 3

186900 33-WD"049 B-J BiMattalic weld, Limited Pipe-to-Elbow B9. 11 duc to pcrmn't hanger 3 X attach. 90% CRV, 90%

CRA. Exam 100% of weld length. **IATER**

1S7000 33-WD-049 GL D UT +~LATER~+

Pipe-to-Elbow 88 01 3 X X 187500 33-WD-054 B J UT Examine 100% of weld Pipe-to-Tcc B9. 11 length +*LATER**

3 X 187600 33-WD-055 B-J Examine 100% of weld Tee-to-Reducer B9. 11 length **LATER**

3 X 4.0" Line (REF. DWG. NO. 20) 187700 33-WD-056 B J UT Examine 100% of weld Reducer-to-Pipe B9. 11 PT length. **LATER~~

3 X 6.0" Line (REF. DWG. NO. 20) 188200 33-WD-061 B-J UT Examine 100% of weld Tcc-to-Reducer B9. 11 PT length ~+IATER~~

3 X 4.0" Linc (REF. DWG. NO. 20) 188700 33-WD"066 B-J UT Examino 100% of weld Pipe-to-Reducer B9. 11 PT length '

~LATER~~

3 - - - - X

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 134 REVISION: 0 INSERVZCE ZNSPECTZON TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Clean Up NUMBER: 33.0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERZOD PERIOD PERZOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK~~

6.0" Lino (REF. DWG. NO. 20) 189900 33.2-6-R5 F-A Code Case N 491 1, 4 Seismic Restraint F1.10 Lugs **N/A~+

3 X 190000 33.2-6-R5-WD-001 B K PT Code Case N-509, Examine Integral Attachment B10 20

~ 100% of wold length X *ON/A4*

190100 33.2-6"R5-WD-004 B-K Code Caso N-509, Examine Integral Attachment B10.20 100% of wold length 3 X **N/A~*

6.0" Line Outside CZV (REF. DWG. NO. C26852-1) 00 33-FW-22 GL-E UT Outside CIV, 10% each Pipe-to-SS Nozzle 88-01 refueling, weld overlay/

3 X - - - X Examine once cvcry 2 RFO's. ~~SK"JAF-88-006**

190300 33-FW-22"R GL-G UT Outside CZV, 10% each Pipe-to-SS Nozzle 88-01 rcfucling, weld overlay 3 X X ~~8K-JAF-88-006+*

190800 33-FW-35 GL S UT Terminal End, Outside Elbow-to-Nozzle 88 01 CIV, 10% each refueling 3 X - - - X X ~~PSR-.432"2**

190900 33-FW-36 GL-8 UT Terminal End, Outside Nozzle" to-Elbow 88 01 CIV, 10% each rcfucling X - - - X X - - X ~~PSR-.432-2*~

191000 33-FW" 37 GL-S UT Terminal End, Outside Elbow-to-Nozzle 88 "01 CZV, 10% each refueling 3 X - - - X X ~~PSR-.432-2'~*

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 135 REVISION: 0 ZNSERVICE INSPECTION TEN YEAR PLAN CIASS 1 SECTION XI SCHEDULED COMPONENTS tor Clean Up NUMBER: 33. 2 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTZFZCATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~~

6.0" Line (REF. DWG. NO. 20) 195100 33-32 F-A VT 3 Code Case N-491 ++N/A+~

Pipe Stanchion F1. 10 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 136 REVISION: 0 INSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Instrumentation NUMBER: 36. 0 PRESERVICE YEAR INSPECTION INTERVAL PLAN STATUS ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTZFZCATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 >><<CALIBRATION BLOCK>><<

2.0" Linc (REF. DWG. NO. 28) 195200 36-WD-1073 B-D UT Group R31, *>>ZATER>>*

N7L Closure B3.90 3 X Head-to-Nozzle 195300 36-WD-1073-IR B-D UT Group R31, **ZATER*>>

N7L Closure Head B3.100 3 X Nozzle Inner Radiu 195400 36-WD-1074 B"F UT Group R31>>*LATER*>>

N7L Closure Head B5. 10 PT 3 X Nozzle-to-Flange 500 36 "WD"1074 SZL UT Group R31, Znconel 182 N7L Closure Head 455R1S1 butter expansion from 3 X nozzlo side of weld.

Nozzle'-to-Flange

>> <<LATER>> '>>

2.0" Linc (REF. DWG. NO. 8) 195800 36-R12-A F-A VT-3 Code Case N-491-1 Spring Hanger Fl. 10 >>*N/A>>>>

3 X 196000 36-WD 003 B-F Group R42, Examine 100%

Nozzle N13A-to-Safe B5.20 of weld length. *<<N/A<<>>

3 End 196050 36-WD-003 SIL PT Group R42, Examine 100%

Nozzle N13A-to-Safe 571 of weld length. <<>>N/A>>>>

3 X End 196100 36 WD 004 B J Terminal End, Examine Safe End-to-Coupling B9.21 100% of weld length.

3 X **N/A**

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 137 REVISION: 0 INSERVZCE ZNSPECTZON TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Instrumentation NUMBER: 36.0 PRESERVZCE YEAR INSPECTION INTERVAL PLAN STATUS ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK++

2.0" Linc (REF. DWG. NO. SC) 196500 36-WD-924 Group R43, iiN/A++

N16A Nozzle-to-Safe BS. 20 X

End 196600 36-WD-924 SZL Group R43, Determine if N16A Nozzle-to-Safe 571 PT Aug. Sur/Vol on nozzle 3 X End and safe cnd is required, SIL 571 ?

s*N/Aaa 196700 36-WD-925 B-J Terminal End Nozzle Safe End-to-Coupling B9. 21 N16A, Examine 100% of 3 weld length +~N/Ai*

00 36-WD-932 B-J Examine 100% of weld Elbow-to<<Coupling " B9.40 length **N/A**

3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 138 REVISION: ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Drain NUMBER: 37. 0 PRESERVICE YEAR INSPECTION INTERVAL PLAN STATUS ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ +CALIBRATION BLOCK~*

2.0" Line (REF. DWG. NO. 9) 197600 37-WD-030 B-J PT Examine 100% of weld Pipe-to-Elbow B9. 21 length ++N/A+~

3 - - X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 139 REVISION: 0 INSERVZCE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Head Vent NUMBER: 37.0 INSPECTION ZNTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK**

2.0" Line (REF. DWG. NO. 9) 197800 37-01-VB B-G-2 VT-1 ~~N/A~~

Valve 37-01 Bolting B7.70 3 X 197900 37-02-VB B G-2 4 lN/A**

Valve 37-02 Bolting B7.70 3 X 198000 37-06-VB B G-2 VT 1 t tN/At1 Valve 37-06 Bolting B7. 70 3 X 198200 37-R11 F-A Code Case N"491-1 Spring Hanger Fl. 10 **N/A+*

3 X 0 37-R12 F A VT-3 Code Case N-491-1 Spring Hanger Fl . 10 ktN/Atf 3 X 4.0" Zine (REF. DWG. NO. 9) 199100 37-WD-001 B D UT Group R39, ~*LATER~~

NS Nozzle-to-Head B3.90 3 X 199200 37-WD-001-ZR B-D UT Group R39, ~ +LATER**

N8 Nozzle Znner Radius 3 X Section 199300 37-WD-002 B-F UT Group R39, Examine 100%

Nozzle N8-to-Flange BS. 10 PT of weld length ++IATER++

3 X 199400 37-WD-002 SZL UT Inconel 182 Butter Nozzle NS-to-Flango 455R1S1 Expansion from Nozzle 3

side. ~ ~IATER~ +

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 140 REVISZON: 0 INSERVICE INSPECTION TEN YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Head Vent NUMBER: 37.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERZOD PERZOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 >>>>CALIBRATION BLOCK<<>>

199500 37-WD-002-FB B-G-2 Examine in place, when Flange Bolting B7.50 removed, or when 3 X >>*N/A*>>

disassembled.

199700 37-WD-003 GL-D UT <<>>4-A396-.337>>>>

Flange-to-Rcduccr 88-01 3 X X 199710 37-WD-003 N/A VT-2 each outage for Flange-to-Rcduccr N/A cvidcncc of leakage 3 X - " - X X - - X >>>>4-A396-.337>>>>

2.0" Linc (REF. DWG. NO. 9) 199800 37-WD-004 B-J Examine 100% of weld Rcduccr to Pipe B9.40 length <<<<N/A<<>>

3 X 200000 37-WD-006 B-J Examino 100% of weld Elbow-to-Pipe B9. 21 length >>>>N/A>>>>

3 X 200100 37-WD-007 B-J Examine 100% of weld Pipe-to-Flange B9.40 length >>*N/A**

3 X 200200 37-WD-007-FB B-G-2 VT-1 Examine in place, when Refueling Platform B7.50 removed, or when 3 X Flange Bolting disassembled >>>>N/A>>>>

200500 37-WD-010 B-J Examine 100% of weld Tcc to Pipo B9. 21 length **N/A*>>

3 X 201000 37-WD-015 B-J Terminal End, High Pipe-to-Valvo 37-01 B9.40 Stress Weld, Examine 3 X 100% of weld length

    • N/A**

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 141 REVISION: 0 ZNSERVZCE ZNSPECTZON TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Head Vent E NUMBER: 37.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE, OUTAGE INSTRUCTIONS NUMBER ZDENTIPZCATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK~*

201300 37-WD-018 B"J Examine 100% oi'eld Tee-to-Pipe B9.21 length. ~+N/A~+

X 201700 37-WD-022 B J Examine 100% of weld Elbow-to-Pipe B9.21 length *~N/A*~

3 X 202200 37-WD-027 B J Terminal End, High Pipe-to-Valve 37-02 B9.40 Stress Wclds, Examine X

100% of wold length arN/Aaa

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNZT 1 PAGE: 142 REVISION: 0 INSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Drain NUMBER: 37. 1 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THZRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTZFICATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~~

2.0" Linc (REF. DWG. NO. 9) 202700 37-Hl F-A VT-3 Code Case N-491-1 Spring Hanger Fl . 10 ++N/A+*

3 X 203100 37-SC-2 Code Casa N-491-1 Box Restraint Fl . 10 **N/A**

3 X 203300 37. 1 "07R-VB B-G-2 VT-1 Examine in place, when Valve 37-07R Bolting disassembled or when X +*N/A~+

removed.

203400 37.1-37-08R-VB B G 2 Examine in place, when Valve 37-08R Bolting B7 ~ 70 removed, or when 3

disassembled. ++N/A~~

203500 37. 1-37-10-VB B-G-2 VT 1 Examine in place, when Valve 37-10 Bolting B7.70 removed, or when 3 X disassembled +*N/A**

203600 37. 1-37-11-VB B-G-2 VT-1 Examine in place, when Valve 37-11 Bolting B7.70 removed or when 3 X disassembled. **N/A*+

203900 37.1-WD-003 B J Terminal End, High Pipe-to-Valve 37-10 B9.40 Stress Weld, Examine 3 X 100% of weld length

~*N/A**

204500 37.1-WD-009 B J Terminal End, High PiPc to-Valve 37 07R B9. 40 Stress Weld, Examine 3 X 100% of wold length

~~N/A~~

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 143 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Drain NUMBER: 37.1 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERZOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~'iCALIBRATION BLOCK~~

204900 37. 1-WD-013 B-J Examine 100% of weld Pipe-to-Coupling B9.40 length +iN/Aii 3 X 205100 37. 1-WD-015 B-J Terminal End, High Pipe-to-Valve 37-11 B9.40 Stress Weld, Examine X

100% of wold length.

~~N/A~~

205300 37. 1-WD-017 B-J Terminal End, High Pipe-to-Valve 37-OSR B9.40 Stress Weld, Examine 3 X 100% of wold length.

ikN/A%0

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 144 REVISION: 0 INSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Shutdown Cooling NUMBER: 38. 0 INSPECTION INTERVAL PIAN STATUS PRESERV ICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAHINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO HETH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK~ ~

14.0" SDC Line (REF. DWG. NO. 10) 205600 38-01-VB B G-2 VT-1 V07, Limited to valve Valve 38-01 Bolting B7.70 selcctcd under B-M-2 3 ++N/A++

205700 38-01-VBY B"H-2 VT-3 V07, Only when Valve 38-01 Interior B12.50 disassembled, One valve 3 X Surf aco among a group of valves.

~~N/A~~

1 206100 38-12-FLG B-G-1 VT 1 Vlo, When connection is Valve 38-12 Flange B6.220 disasscmblcd, Examine Surface X 1.0" annular surface of flange surrounding each stud. ~~N/A~~

206200 38-12-NBW B G-1 VT 1 V10 ( ~ <<N/A>> ~

Valve 38-12 Nuts, B6.230 3 X Bushing, Washers 206300 38-12-VB B-G-1 UT V10, 16 studs, Examine Valve 38-12 Bolting B6.210 inplacc, when 3 X disasscmblcd, or when removed.

+ ~NM1-2 . 50-Bl 6-1 ~ +

206400 38 "12-VBY B-H-2 VT-3 V10, Only when Valve 38-12 Zntcrior B12.50 disassembled, Onc valve Surface X among a group of valves tfN/At*

206500 38-12-WD-003 B K Code Case N-509 ~~N/A~+

Valve 38-12 Integral B10.40 3 X Attachment

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 145 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Shutdown Cooling NUMBER: 38. 0 PRESERVICE YEAR ZNSPECTZON INTERVAL PLAN STATUS ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCX~~

207300 38-H1 F-A Code Case N-491-1 Spring Hanger Fl . 10 1 fN/Afi 3 - - - - - - - - X 208100 38-WD-001 GL-D UT Requires 38-H-1 Clamp to Valve 38-01-to-Pipe 88-01 be removed. ~~PSR-.760~~

3 - - - X - - - X 208200 38-WD-001 B-J UT Support 38-Hl support Valve 38-01-to-Pipe B9. 11 PT clamp is required to bc 3 X removed prior to pcrformanco. ~*LATER**

208300 38"WD-002 B-J UT Examine 100% of weld Pipe-to-Elbow B9. 11 PT length ~*LATER~+

3 X 00 38-WD-002 GL D UT **LATER**

Pipe" to-Elbow 88-01 3 X X 208500 38-WD-002-Dl B-J UT Code Case N-524 Elbow-hong Seams OR B9.12 ~~LATER++

3 X 208600 38-WD-002-D2 B-J UT Code Case N-524 Elbow-Long Seams IR B9 12

~ PT **IATER++

208800 38-WD-003 GL D UT *~LATER~~

Elbow-to-Elbow 88-01 3 X X 209400 38-WD"004 GL-D UT +~IATER~+

Elbow-to-Pipe 88-01 3 X X 209900 38-WD-005 GL D UT **PSR-.760**

Pipe-to-Elbow 88 "01 X X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 146 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS r Shutdown Cooling NUMBER: 38.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *<<CALIBRATION BLOCK<<<<

210400 38-WD-006 GL-D UT *<<PSR-.760<<<<

Elbow-to-Pipe 88-01 3 X X 210900 38-WD-007 GL-G Inaccessible inside pen.

Pipe-to-Pipe 88 01 X-S, Examine area each 3 X - - - X X - - X outage for evidence of leakage. **N/A**

211200 38-WD-008 GL-G VT-2 Inaccessible inside Pipe-to-Valve 38-02 88-01 pcnctration X-8, Examine 3 X - - - X X - X each outage for evidence of leakage. **N/A*<<

211400 38-WD-087 GL-G Inaccessible inside pen.

Valve 38-12-to-Pipe 88-01 X-7. Examine area each X - " - X X - - X outage for cvidcncc of leakage. <<<<N/A**

211500 38 WD-088 GL G Inaccessible inside pen.

Pipe-to-Pipe 88-01 X-7. Examine area each X - - - X X - - X outage for evidence of leakage. <<*N/A<<<<

211700 38-WD-089 B J Examine 100% of weld Pipe-to-Elbow B9.11 length *<<LATER<<<<

3 X 211800 38-WD-089 GL-D UT <<<<LATER<<<<

Pipe-to-Elbow 88-01 3 X X 212200 38-WD-090 GL D UT '

  • LATER<<<<

Elbow-to" Pipe 88-01 X X

DATE: 10/15/99 NINE HILE POZNT NUCLEAR PLANT UNIT 1 PAGE: 147 REVISION: 0 ZNSERVICE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Shutdown Cooling NUMBER: 38. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD SUMHARY EXAHINATION AREA CATE GY NDE OUTAGE INSTRUCTIONS NUHBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~+CALIBRATION BLOCK~~

212700 38 "WD-091 GL-D UT ~~PBR-.760~*

Pipe- to-Pipe 88-01 3 X 212800 38-WD-092 GL"D UT +*P8R-.760~*

Pipe-to-Pipe 88-01 3 X X 213100 38-WD-093 GL-D UT **LATER**

Pi pe-to-Elbow 88-01 3 X X 213500 38-WD-094 GL-D UT +*PBR .760+*

Elbow-to-Valve 38-13 88-01 3 X X

DATE: 10/15/99 NINE HZLE POINT NUCLEAR PZANT UNIT 1 PAGE: 148 REVISION: 0 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COHPONENTS cncy Condenser Return HUHBER: 39.0 PRESERVZCE YEAR INSPECTION INTERVAL PLAN STATUS ASHE FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *+CALIBRATIONBLOCK*

10.0" ECC I ine (REF. DWG. NO. 11A) 213800 39-01R-VB B G-2 V15, Limited to valve Valve 39-01 Bolting B7.70 selected under B-M-2 X ~~N/A+~

213900 39-01R-VBY BH2 V15, Only when Valve 39-01 Interior B12.50 3 X disassembled, One valve Surface among a group of valves.

1tN/Af*

214200 39-03-VB B-G-2 VT-1 V12, Limited to valve Valve 39-03 Bolting B7. 70 selected under B-H-2.

3 X ++N/A**

0 39-03-VBY B-H-2 VT-3 V12, Only when Valve 39-03 Interior B12.50 di.assembled,, One valve 3 X Surface among a group of valves.

    • N/A0f 214600 39-05 "VB B-G-2 VT-1 V09, Limited to valvo Valve 39-05 Bolting B7.70 selected under B-M-2 3 X  %*N/A**

214700 39-05-VBY B-M-2 VT 3 V09, Only when Valve 39-05 Interior B12. 50 disassembled, Onc valve 3 X Surface among a group of valves.

esN/Aaa 215200 39-A2 F-A Code Case N-491-1 Anchor Fl. 10 tiN/Aft 3 X

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 149 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS ency Condenser Return NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTZFZCATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ +CALIBRATION BLOCK**

215300 39-A2-WD-001 B-K Code Case N-509 **N/Ai~

Anchor Integral B10. 20 3 X Attachment 215400 39-A2-WD-002 B-K PT Code Case N-509 +*N/A**

Anchor Integral B10. 20 3 X Attachment 215900 39-H16 VT-3 Code Case N-491-1.

Spring Hanger Fl . 10 *AN/Af*

3 X 217200 39-H9 VT-3 Code Case N-4 91-1 .

Spring Hanger Fl . 10 e*N/A+a 3 X 0 39-WD-194 GL-G Examine each outage for Valvo 39-05-to-Pipe . 88-01 evidence of leakage.

X - - X X *~N/A~~

218000 39-WD-194A GL-G Inaccessible inside Pipe-to-Pipe 88-01 penetration X-5B, 3 X - - - X X - - X Examine each outage for evidence of leakage

  • 0 N/Al*

218400 39-WD-195 GL-D UT +*NMP-10 XX1 SS*+

Pipe-to-Elbow 88 01 3 X X 218800 39-WD-196 GL-D UT Removal of pipe support Elbow-to-Pipe 88-01 clamp 39-HS-12 6 16 3 X - - X required.

++NMP 10 XX1-SS**

DATE: 10/15/99 NINE MILE POINT NUCLEAR PZANT UNIT 1 PAGE: 150 REVZSZON: 0 INSERVICE INSPECTION TEN-YEAR PIAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS eney Condenser Return NUMBER: 39.0 INSPECTION ZNTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +~CALIBRATION BLOCK+~

219200 39-WD-197 GL D Remove Clamps on Pipe-to-Elbow 88-01 39-HS-12 6 16.

3 X X ~ ~NMP-10-XXI-SS**

219600 39-WD-198 GL-D UT ~ ~NMP-10-XX1-SS**

Elbow-to-Pipe 88"01 3 - - - - X X 220000 39-WD-199 GL-D UT **NMP-10-XX1 SS**

Pipe-to-Elbow 88-01 3 X X 220400 39-WD-200 GL-D UT UT exams every 2 RFO's.

Elbow-to-Pipe 88-01 *+NMP 10-XX1-SS++

3 X X 0 39-WD-201 GL-D UT UT cxams cvcry 2 RFQ'.

Pipe-to-Elbow 88-01 3 X X 221100 39-WD "202 GL-D UT UT cxams cvry 2 RFO '

Elbow-to-Pipe 88 01 +*LATER++

X - - - - X 221600 39 "WD-203R GL-D UT ++NMP-10 XX1-SS**

Pipe-to-Elbow 88 01 3 X X 222000 39-WD-204A GL-D UT Sensitized, UT exams Pipe-to-Pipe 88-01 cvcry 2 RFO's, 3 X - - - X ~ <<NMP-10-XXI-SS>> ~

222400 39-WD-204R GL-D UT Sensitized, UT cxams Elbow-to-Pipe 88-01 every 2 RFO's 3 X X

~+NMP-10-XXI-SS"

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 151 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS cncy Condenser Return NUMBER: 39.0 ZNSPECTZON ZNTERVAL PZAN STATUS PRESERVICE YEAR ASHE FIRST SECOND THIRD SEC. XZ PERIOD PERZOD PERIOD

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION CATEGY ITEM NO NDE METH


OUTAGE------ INSTRUCTIONS 1 2 3 4 1 2 3 4 1 2 3 4 +~CALIBRATION BLOCK**

223200 39-WD-226 GL G VT-2 exam each RFO for Valve 39-06-to-Pipe 88 01 evidence of leakage 3 X 4 1N/At*

223400 39-WD-226A GL-G Inaccessible inside pen.

Pipe-to-Pipe 88-01 X-SA, VT-2 exam each RFO 3 X - - - X X - - X for evidence of leakage.

++N/A+*

223900 39-WD-226B GL-D UT UT exam every 2 RFO's Pipe-to-Pipe 88-01 *+ LATER**

3 X - - - - X 224300 39-WD-227 GL D UT UT exam every 2 RFO's Pipe-to-Elbow 88-01 **NMP-10-XX1-SS**

3 X X 224500 39-WD-228 GL-D UT UT exam cvcry 2 RFO's Pipe-to-Elbow 88 01 + +ZATER*+

3 X X 225000 39-WD-229 GL-D UT UT exam every 2 RFO's, Pipe-to-Elbow 88 01 Rcmove clamps on support 3 X X 39-H9, HS-9 and 10.

    • NMP-10-XX1-SS**

225300 39-WD-230 GL-D UT UT exam every 2 RFO's Elbow-to-Pipo 88-01 **NHP-10-XX1-SS**

3 X 225800 39-WD-231 GL D UT UT exam every 2 RFO's Pipe-to-Pipe 88-01 IfLATER* t 3 X X 226200 39-WD"232 GL-D UT UT exam every 2 RFO's Pipe-to-Elbow 88-01 +*NHP-10-XX1-SS+*

3 X X

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 152 REVISION: 0 INSERVZCE INSPECTION TEN YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS cney Condenser Return NUMBER: 39.0 INSPECTION ZNTERVAL PLAN STATUS PRESERVZCE YEAR ASHE FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAHZNATZON AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTZFZCATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 + +CALIBRATION BLOCX+ +

226500 39-WD-233 GL D UT UT cx~ every 2 RFO's Elbow-to-Pipe 88-01 **NHP-10-XXZ-SS~~

3 X 226900 39-WD-233A GL-D UT Sensitized, UT exalts Pipe-to-Elbow 88 01 every 2 RFO's 3 X X **NHP-10-XX1-SS**

227300 39-WD-234A GL-D UT Sensitized Pipe- to-Elbow 88" 01 +'~NHP 10 XX1 SS++

3 X 227800 39-WD-235R GL D Sensitized Elbow-to-Pipe 88-01 ~+NMP-10-XX1-SS**

3 X X

DATE: 10/15/99 NINE HYLE POINT NUCLEAR PIANT UNIT 1 PAGE: 153 REVISZON: 0 ZNSERVZCE INSPECTZON TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS cncy Condenser Supply NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

NUHBER EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK>> t 10.0" ECC Line (REF. DWG. NO. 11) 229800 39-07R-VB B-G-2 VT 1 V16, Limited to valve Valve 39-07R Bolting B7.70 selected under B-H-2 3

t*N/A**

229900 39-07R-VBY B-M-2 VT 3 V16, Only when Valve 39-07R Interior B12.50 disassembled, one valve 3 X Surface among a group of valves.

    • N/Att 230500 39-09R-WD-001 GL-G VT-2 VT-2 exam each RFO for Valve 39-09R 88-01 cvidcncc of leakage Body-to-Extension Weld 3 X - - - X X - - X ~ >>N/Att 0 39 "10R-WD-001 GL-G VT 2 VT-2 exam each RFO for Valve 39-10R 88-01 cvidcnce of leakage Body-to-Extension 3 X - - - X X t>>N/A>>*

18.0" ECC Nozzlcs (REF. DWG. NO. 11) 231000 39-WD-001 B-D UT Group R17, 65% CRV N5A Nozzle-to-Vessel B3.90 Limitation duc to 3 X ad)accnt nozzle and bioshield t >>LATER**

231100 39-WD-001-ZR B D UT Group R17, 55% CRV NSA Nozzle Incr Radius B3.100 limitation due to Section 3 X ad)accnt nozzle and bioshicld **ZATER>>t 231200 39-WD-002 GL-A UT Group R17, t*ZATER>>>>

NSA Nozzle-to-Safe End 88-01 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 154 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XI SCHEDULED COMPONENTS ency Condenser Supply NUMBER: 39.0 ZNSPECTZON INTERVAL PZAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 4*CALIBRATION BLOCK~~

10.0" ECC Nozzlcs (REF. DWG. NO. 11) 231300 39-WD-002 B-F PT Group R17, +~LATER~~

N5A Nozzle-to-Safe End B5.10 UT 3 X 231400 39-WD-002 SZL UT Znconel 182 Butter NSA Nozzle-to-Safe End 455R1S1 Expansion from nozzle side of weld. ++IATER++

10.0" ECC Line (REF. DWG. NO. 11) 231500 39-WD-003 B J UT Terminal End, High Nozzle N5A Safe B9. 11 PT Stress Weld +~LATER~~

End-to-Pipe 3 X 00 39-WD-003 GL-A UT +*LATER**

Nozzle NSA Safe 88-01 3 X End-to-Pipe

~~

231900 39-WD-006 GL-A UT ~*ZATER*~

Pipe-to-Pipe 88-01 3 X 232700 39-WD-008 GL-A UT ~~LATER~*

Pipe-to-Pipe 88 01 3 X 233100 39 WD-009 GL-A VT-2 Inaccessible inside Pipe-to-Valve 39-09R 88-01 penetration X-3A, VT-2 3 X - - - X X - - X exam each RFO for evidence of leakage,

    • N/A**

233500 . 39-WD-011 B J UT Terminal End, High Valve B9. 11 PT Stress Weld, Examine 3 X 39-07R-to-Reducer 100% of weld length

    • ZATER**

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 155 REVISION: = 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS cncy Condenser Supply NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS ZRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATE GY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 <<<<CALIBRATION BLOCK**

18.0" ECC Nozzles (REF. DWG. NO. 11) 233800 39-WD-089 B-D UT Group R18, 73% CRV NSB Nozzle-to-Vessel B3.90 Limitation due to ad)acent nozzle and bioshield **LATER*<<

233900 39-WD-089-IR B-D Group R18, 75% CRV N5B Nozzle Inner B3.100 Limitation duc to 3 X Radius Section ad)accnt nozzle and bioshield *<<ZATER**

10.0" ECC Nozzles (REF. DWG. NO. 11) 234000 39-WD-090 B F UT Group R18, 91.02% CRV NSB Nozzle-to-Safe End B5.10 PT *<<LATER<<<<

3 X 2 4100 39-WD-090 GL-D UT Group R18, 91.02% CRV NSB Nozzle-to-Safe End 88-01 <<<<LATER<<<<

3 - - - - X - - - X 234200 39-WD-090 SIL Group R18, Znconcl 182 NSB Nozzle-to-Safe End 455R1S1 Butter Expansion from 3 X nozzle side of weld

<<<<LATER<<<<

10.0" ECC Linc (REF. DWG. NO. 11) 234300 39-WD"091 B-J UT Terminal End, High Nozzle N5B Safe B9. 11 PT Stress Weld, Examine 3 X End-to-Pipe 100% of weld length

<<*LATER<<<<

235500 39-WD-096 B-J Examine 100% of weld Elbow-to-Pipe B9.11 length *<<ZATER<<*

3 X

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PLANT UNIT 1 PAGE: 156 REVISZON: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ency Condenser Supply NUMBER: 39. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK**

235900 39-WD-097 GL-A VT-2 exam each RFO for PiPe-to-Valve 39-10R 88-01 evidence of leakage X - - - X X - - X iiN/At1 236300 39-WD-099 B-J Terminal End, High Valve B9.11 Stress Weld, Examine 3 X 39-OSR-to-Reducer 100% of weld length

    • LATER*~

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 157 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray NUMBER: 40.0 IRESERVZCE YEAR INSPECTION INTERVAL PLAN STATUS ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMZNATZON AREA CATEGY NDE - ~

OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 t tCAI.IBRATION BLOCKt t

12. 0" CSA (REF. DWG. NO. 12) 236700 40-01"VB B-G-2 VT-1 V14, Limited to valve Valve 40-01 Bolting B7.70 sclectcd under B-M-2 3 X *tN/A**

236SOO 40-01-VBY B-M"2 VT-3 V14, Only when Valvo 40-01 Interior B12.50 disasscmblcd, onc valve 3 X Surface among group of valves t*N/Att 237100 40-03-FLG B-G-1 VT"1 Vll, Examine 1.0" Valve 40-03 Flange B6.220 annular surface of 3 X Surface flange surrounding each stud **N/At*

00 40 03 NBB B-G-1 VT-1 Vll, Only when Valve 40-03 Bushings ~ B6. 230 disassembled t*N/A**

3 X 237300 40-03-NBN B G 1 VT 1 Vl1, Examine inplacc, Valve 40-03 Nuts B6.230 when removed or 3 X disassembled **N/A**

237400 40-03-NBW B-G-l VT-1 Vll, Examino inplaco, Valve 40-03 Washers B6.230 when rcmovcd or 3 X disassembled ttN/A*t 237500 40-03-VB B-G-1 UT Vll, Limited to valve Valve 40-03 Bolting B6.210 sclcctcd under B-M-2 3 X ttLATERtt

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNZT 1 PAGE: 158 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Core Spray NUMBER: 40.0 ZNSPECTZON INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *+CALIBRATIONBLOCK~*

237600 40-03-VBY B-M-2 Vll, Only when Valve 40-03 Interior B12.50 disassembled, one valve Surface 3 X among group of valves

+*N/A*+

2. 0" CSB (REF. DWG. NO. 12) 239500 40"20-VB B-G-2 Examine in place, when Valve 40-20 Bolting B7.70 removed or when X

disassembled. **N/A~~

12. 0" CSA (REF. DWG. NO. 12) 239600 40-Al F-A VT-3 Code Case N-491-1 Anchor Fl . 10 ++N/A++

3 X 12.0" CSB (REF. DWG. NO. 12) 240200 40-H17 F-A Code Case N-491-1 Spring Hanger Fl . 10 ~~N/Ai~

3 X 240600 40-H21-A F-A VT-3 Code Case N-491-1 Constant Spring Hanger F1.10 **N/A~~

3 X 240700 40"H21-A-WD-001 B"K Code Case N-509 ++N/A~~

Integral Attachment B10.20 3 X 240800 40-H21-A-WD-004 PT Code Case N-509 **N/A**

Integral Attachment B10. 20 3 X 240900 40-H21-A-WD-007 B-K PT Code Case N-509 +~N/A+a Integral Attachment B10.20 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 159 REVZSION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS J

or Cora Spray E NUMBER: 40.0 PRESERVICE YEAR INSPECTION ZNTERVAL PLAN STATUS ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATE GY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK**

241000 40 "H21-A-WD-010 B K PT Code Case N-509 **N/A*~

Integral Attachment B10. 20 3

241100 40-H21-B F A VT 3 Code Case N-491-1 Constant Spring Hangar F1.10 N/Aff 3 X

12. 0" CSA (REF. DWG. NO. 12) 241700 40-H54 F-A VT 3 Code Case N-491-1 Spring Support Fl . 10 **N/At%

3 X 243100 40-H57-B F-A Code Case N-491-1 Constant Weight hanger F1.10 **N/A+~

X 00 40-WD-001 GL-D UT UT exams every 2 RFO '

Valve 40-03-to-Pipe 88-01 *~NMP-12-XXI-SS~~

3 X

2. 0" CSA (REF. DWG. NO. 12) 245900 40-WD 002 B-J Examine 100% of weld Branch Connection B9.32 length *~N/A~*

3 X

6. 0" CSA (REF. DWG. NO. 12) 246100 40-WD-003 GL D UT UT exams every 2 RFO's.

Branch Connection 88-01 **PSR-1. 5-2~ ~

3 - - - - X 246300 40-WD-004 GL"D UT UT exams cvcry 2 RFO's.

Pi pc- to-Elbow 88-01 **PSR-.42-2~~

3 X X 246500 40-WD-005 GL-D UT UT exams cvcry 2 RFO's Elbow-to-Pipe 88-01 to the extent practical 3 X X **PSR".432-2i~

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 160 REVZSZON: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray NUMBER: 40.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

NUHBER EXAHINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS IDENTIFICATION ITEM NO HETH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK'>>~

246510 40-WD-005 N/A VT 2 VT-2 each outage, for Elbow-to-Pipe N/A evidence of leakage 3 X X X - - X **PSR-.432-2i~

246700 40-WD-006 GL-D UT UT cxams every 2 RFO's.

Pipe-to-Pipe 88-01 **LATER++

3 X X 246710 40-WD-006 N/A VT-2 VT-2 exam each outage Pipo-to-Pipe N/A for evidence of leakage 3 X - - - X X 246900 40-WD-007 GI -D UT UT cxams every 2 RFO's.

Pipe-to-Valve 40-05 88-01 *~PSR-.432-2**

3 X X

12. 0" CSA (REF. DWG. NO. 12) 247100 40 WD-008 GL-D UT UT exams every 2 RFO's.

Pipe-to-Elbow 88-01 +*NMP-12-XX1-SS**

3 X X 247300 40-WD-009 GL"D UT UT exams cvcry 2 RFO's Elbow-to-Valve 40-02 88-01 **NMP-12-XXI-SS++

3 X X 247700 40-WD-010A GL-G VT 2 Inaccessible inside pen.

Valve 40-02-to-Pipe 88-01 X-13A, VT-2 exam each X - X X RFO for evidence of leakage. **N/A~i 248000 40-WD-011 GL-D UT UT exams cvcry 2 RFO's.

Pipe-to-Elbow 88-01 *~NHP-12-XX1-SS**

3 X X 248010 40-WD-011 N/A VT-2 each outage for Pipe- to-Elbow N/A evidence of leakage 3 X - - - X X X

~~NHP-12-XX1-SS~ ~

DATE: 10/15/99 NINE HYLE POINT NUCLEAR PIANT UNIT 1 PAGE: 161 REVISION: 0 INSERVICE INSPECTION TEN-.YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Core Spray E NUMBER: 40.0 INSPECTZON INTERVAL PRESERVZCE YEAR PLAN STATUS ASHE FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD SUHMARY EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO HETH 1 2 3 4 1 2 3 4 1 2 3 4 *+CALIBRATION BLOCK~~

248300 40-WD-012 GL-D UT cxams every 2 RFO's.

Elbow-to-Pipe 88-01 ++NHP-12 XX1-SS**

3 - - - - X 248600 40"WD"013 GL D UT UT exam every 2 RFO's.

Pipe-to-Pipe 88 "01 **NMP-12-XXI-SS'~+

3 - - - - X 249000 40-WD-014 GL D UT UT exams every 2 RFO's.

Pipe-to-Pipe 88-01 ++NMP-12 XX1 SS**

3 - - - - X X 249400 40 WD-015 GL-D UT UT cxams every 2 RFO's.

Pipe-to-Elbow 88-01 '~ ~NMP-12-XX1-SS~ ~

3 X X 9700 40-WD-016 GL-D UT cxams every 2 RFO's.

Elbow-to-Pipe 88-01 **NMP-12-XXI-SS+~

X 249900 40-WD-017 GL-D UT UT exams every 2 RFO's.

Pipe-to-Elbow 88-01 +*NMP-12-XX1-SS**

X - - - X 250000 40-WD-018 GL D UT UT exam every 2 RFO's.

Elbow-to-Pipo 88-01 ~ ~NMP-12-XXI-SS~ ~

3 - - - - X X 250400 40-WD-020 GL D UT UT exams every 2 RFO's.

Pipe to Tcc 88-01 + +NMP-12-XX1-SS*+

3 X X 250600 40 WD-021 GL-D UT UT exam every 2 RFO~s.

Tcc-to-Pipe 88-01 **NHP-12-XXZ-SS**

X - - - X 250900 40-WD-022 GL D UT UT cxams every 2 RFO's.

Pipe-to-Elbow 88 01 *+NMP 12 XX1 SS+*

X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 162 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Core Spray NUMBER: 40.0 ZNSPECTION INTERVAZ PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~"

251200 40-WD-023 GL-D UT exams every 2 RFO's.

Elbow-to-Pipe 88-01 ++NMP 12 XXZ-SS+*

3 X X 251500 40-WD-024 GL-D UT UT exams every 2 RFO's.

Pipe-to-Valve 40-09 88-01 ~ ~NMP-12-XXl-SS~*

3 X 251800 40-WD"025 GL D UT UT exams cvcry 2 RFO's.

Valve 40-09-to-Elbow 88-01 ~~NMP"12-XX1-SS**

X X 252000 40-WD-026 GL-D UT UT exams every 2 RFO'st Elbow-to-Pipe 88 01 ~+NMP-12-XXI-SS**

3 X X 2 2200 40-WD-027 GL-D UT UT every 2 RFO's Pipe-to-Tee 88-01 ~~NMP-12-XX1-SS~~

3 X X 252500 40-WD-028 GL D UT UT exams cvcry 2 RFO's.

Tcc-to-Valve 40-01 88-01 **NMP-12-XXI-SS~~

3 X X 252800 40-WD-029 GL"D UT UT cxams cvcry 2 RFO's.

Valve 40-01-to-Pipe 88-01 ~~NMP-12-XXZ-SS**

3 X X 253100 40-WD-030 GL-D UT UT exams every 2 RFO's.

Pipe-to- Tec 88 01 ~ ~NMP-12-XX1-SS*~

3 X X 253400 40-WD-031 GL-D UT UT exams every 2 RFO's.

Tec-to-Pipe 88 "01 **NMP-12-XX1-SS*~

3 X 253800 40-WD-032 GL-D UT UT cvcry 2 RFO's Pipe- to-Elbow 88-01 ~ ~NMP-12-XX1-SS**

3 X X

DATE: 10/15/99 NINE MZLE POINT NUCLEAR PLANT UNIT 1 PAGE: 163 REVISION: 0 ZNSERVICE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray NUMBER: 40.0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERZOD SUHHARY EXAHINATION AREA CATEGY NDE OUTAGE ZNSTRUCTZONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK*~

254100 40-WD-033 GL D UT exams every 2 RFO's.

Elbow-to-Elbow 88-01 ~~NHP-12-XXZ-SS~~

3 X X 254300 40"WD"034 GL-D UT UT cxams avery 2 RFO's.

Pipe- to-Elbow 88 01 **NMP-12-XX1-SS~~

3 X X 254400 40-WD"035 GL-D UT UT exams cvcry 2 RFO's.

Elbow-to-Reducer 88-01 *~NHP-12-XX1-SS~ ~

3 X X 6.0" CSA (REF. DWG. NO. 12) 254600 40-WD"036 B-J UT Examine 100% of weld Reducer-to-Pipe B9. 11 PT length ~*LATER*~

3 X 0 40-WD-036 GL-D UT UT exams every 2 RFO ',

Rcducor-to-Pipo 88-01 **PSR-.432-2*~

3 X X 254800 40-WD-038 GL-D UT UT exam every, 2 RFO's Nozzle N6A Outcr Safe 88-01 **PSR-.75-3~*

3 X End-to-Elbow 254900 40-WD-038 B J PT Terminal End, Nozzlo N6A Outcr Safe B9.11 UT **PSR-.75-3**

3 X End-to-Elbow 255000 40-WD-038A B"J UT Examine 100% of weld Nozzle N6A Znnor Safe B9.11 PT length ~*IATER**

3 X End-to-Outcr Safe 255100 40-WD-038A GL-D UT UT cxams evory 2 RFO's.

Nozzle N6A, Inner Safe 88-01 ~~LATER*~

3 X X End-to-Outcr Safe

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 164 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray NUMBER: 40.0 PRESERVICE YEAR INSPECTION INTERVAL PLAN STATUS ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE -OUTAGE INSTRUCTIONS NVMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ +CALIBRATION BLOCK*~

255200 40-WD-039 B F Group R19, UT 28.4% CRV Nozzle N6A-to-Inner BS. 10 **LATER**

3 X Safe End 255300 40-WD-039 SZL UT Znconel 182 Butter Nozzle N6A-to-Inner 455R181 Expansion from nozzle Safe End side of weld ~~N/A+~

255400 40-WD-039 GL D UT UT exams every 2 RFO's.

Nozzle N6A-to-Inner 88-01 etN/Aee 3 - - - - X X Safe End 255500 40-WD-040 B-D VT Group R19, 66% CRV N6A Nozzle-to-Vessel B3.90 ,Limitation duc to X ad)accnt nozzle and bioshiold **IATER+s 255600 40-WD-040-ZR B-D UT Group R19, 66% CRV N6A Nozzle Inner B3.100 ,Limitation duc to 3 X ad)accnt nozzle and Radius Section bioshicld ~~LATER~~

12. 0" CSB (REF. DWG. NO. 12) 255800 40-WD-041 GL-D VT UT exams every 2 RFO's Valve 40-13-to-Pipe 88-01 ~ +LATER~ ~

3 X - - - - X

6. 0" CSB (REF. DWG. NO. 12) 256200 40-WD"043 GL-D UT UT exam every 2 RFO's.

Branch Connection 88-01 ~+LATER~~

3 X X 256400 40-WD-043A GL D UT UT exam cvcry 2 RFO's Pipe-to-BR Stub Nozzle 88-01 ++LATER*+

X - - X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNZT 1 PAGE: 165 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CIASS 1 SECTZON XI SCHEDULED COMPONENTS or Core Spray NUMBER: 40.0 PRESERVICE YEAR INSPECTION ZNTERVAL PLAN STATUS ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTZFZCATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 >>>>CALIBRATION BLOCK>>>>

256600 40-WD-044 GL-D UT cxams every 2 RFO's.

Pipe-to-Elbow 88 01 **LATER>>>>

3 X X 256800 40 WD 045 GL-D UT UT cxams every 2 RFO's.

Elbow-to-Pipe 88-01 >>>>LATER>>*

3 X X

12. 0" CSB (REF. DWG. NO. 12) 257100 40-WD-047 GL D UT UT cxams every 2 RFO's.

Pipe-to-Valve 40-06 88-01 >>>>LATER>>>>

X - - - - X 257300 40-WD-048 GL-D UT UT cxams every 2 RFO's Pipe-to-Elbow 88 01 **LATER**

3 X X 0 40-WD-049 GL D UT UT cxams every 2 RFO's Elbow-to-Valve 40-12 88-01 >>>>LATER>>>>

3 X X 257900 40-WD-050A GL G VT-2 VT-2 exam each RFO for Valve 40-12-to-Pipe 88-01 cvidcnco of leakage.

X - - - X X - - X >>>>N/A>> ~

258100 40-WD-051 GL-D UT UT cxams cvcry 2 RFO's Pipe-to-Elbow 88-01 >>>>LATER>>>>

X X 258110 40-WD-051 N/A VT-2 VT-2 each outage for Pipe-to-Elbow N/A evidence of leakage 3 X - - - X X - - X >>>>IATER>>>>

258500 40 WD 052 GL-D UT UT cxams every 2 RFO's.

Elbow-to-Pipe 88-01 **LATER>>>>

3 X X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNZT 1 PAGE: 166 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray NVMBER: 40.0 INSPECTZON INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERZOD PERIOD PERIOD

SUMMARY

EXAMZ NATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NVMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *>>CALIBRATION BLOCK>> t 258800 40-WD-053 GL-D UT cxams every 2 RFO's.

Pipe-to-Elbow 88-01 **LATER**

3 X - - X 259100 40-WD-054 GL-D UT UT exams every 2 RFO's.

Elbow-to-Pipe 88-01 t >>LATER>>t X X 259300 40-WD-055 GL D VT UT exam every 2 RFO's Pipe-to-Elbow 88-01 t*ZATER**

3 X X 259700 40-WD-056 GL-D UT UT cxams every 2 RFO's.

Elbow-to-Pipe 88-01 <<*LATER>>>>

3 X X 2 200 40-WD-058 GL-D UT UT exams every 2 RFO'.

Pipe-to-Tcc 88-01 t t LATER>> t 3 X X 260500 40-WD-059 GL-D VT UT cxams every 2 RFO's.

Tcc-to-Valve 40-10 88-01 t>>IATER>>t X X 260900 40-WD-060 GL-D UT UT exams every 2 RFO's.

Valve 40-10-to-Pipe 88-01 t>>LATER>>t 3 X X 261200 40-WD-061 GL-D UT UT cvcry 2 RFO's.

Pipe- to-Elbow 88-01 t>>LATER>>t X X 261400 40-WD-062 GL"D VT VT every 2 RFO's.

Elbow-to-Pipe 88-01 t<<LATER>>t X X 261800 40-WD-063 GL-D VT UT exams cvcry 2 RFO's.

Pipe-to-Elbow 88-01 **LATER>>t 3 X X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNZT 1 PAGE: 167 REVISION: 0 INSERVZCE ZNSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray E NUMBER: 40.0 PRESERVZCE YEAR INSPECTION INTERVAL PZAN STATUS ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~ ~

262200 40-WD-064 GL-D UT exams every 2 RFO's.

~ '~ IATER~ ~

Elbow-to-Pipe 88 01 3 X X 262500 40-WD-065 GL D UT UT exams every 2 RFO's.

Pipe-to-Elbow 88-01 **ZATER**

3 X X 263000 40-WD-066 GL-D UT UT cxams every 2 RFO's.

Elbow-to-Pipe 88-01 ~~LATER~~

X X 263400 40-WD-067 GL-D UT UT cvcry 2 RFO's Pipe-to-Tce 88"01 ~*LATER**

3 X X 600 40-WD 068 GL-D UT UT exams every 2 RFO's.

Tce to-Pipe 88-01 **IATER1*

3 X X 264000 40-WD-069 GL-D UT UT exams every 2 RFO's.

Pipe-to-Valve 40-11 88-01 ~~LATER**

X - - - - X 264300 40-WD-070 GL-D UT UT exams every 2 RFO>s.

88-01 ~ ~ZATER~ ~

Valve 40-11-to-Pipe 3 X X 264600 40-WD"072 GL-D UT UT exams every 2 RFO's.

Elbow-to-Pipe 88-01 ~+IATER++

3 X X 265000 40"WD-073 GL-D UT UT cxams every 2 RFO's.

Pipe-to-Tcc 88-01 **IATER**

X - - - - X 265400 40-WD"074 GL-D UT UT every 2 RFO's.

Tec-to-Pipe 88-01 ~~ZATER~~

3 X X

DATE: 10/15/99 NINE MZI E POINT NUCLEAR PLANT UNIT 1 PAGE: 168 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COHPONENTS or Core Spray NUHBER: 40.0 PRESERVICE YEAR ZNSPECTION INTERVAL PLAN STATUS ASME FIRST SECOND THIRD SEC. XZ PERZOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEH NO HETH 1 2 3 4 1 2 3 4 1 2 3 4 +~CALIBRATION BLOCK*+

265800 40"WD-075 GL-D UT exams every 2 RFO's.

Pipe-to-Pipe 88 01 ~ ~LATER*~

3 X - - - - X 266100 40-WD-076 GL-D VT UT axams every 2 RFO's.

Pipe-to-Reducer 88-01 **LATER++

3 X - - - " X (12'x6")

266400 40-WD-077 GL D UT UT exams every 2 RFO's.

Reducer 88-01 ~ + ZATER+ +

3 X - - - - X (12" x6" ) to Pipe 266500 40-WD-077 B"J VT Examine 100% of weld Reducer B9.11 PT length ~+LATER~~

3 X (12" x6" ) -to-Pipe

6. 0" CSB (REF. DWG. NO. 12) 266600 40-WD-079 B-J UT Terminal End ~*LATER~+

Nozzle N6B Outer Safe B9.11 PT 3 X End-to-Elbow 266700 40-WD-079 GL-D VT Terminal End, UT exam Nozzle N6B Outcr Safe 88-01 every 2 RFO's. ~*LATER~*

End-to-Elbow 3 X - - - - X 266800 40-WD-079A GL-D UT UT exam every 2 RFO's Nozzle N6B Inner Safe 88-01 ~~IATER+*

3 X X End-to-Outcr Safe 266900 40-WD"079A B-J VT Examine 100% of weld Nozzle N6B Znncr Safe B9.11 length **ZATER~~

3 X End-to-Outer Safe

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 169 REVISION: 0 ZNSERVZCE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray NUMBER: 40.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERZOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE -OUTAGE INSTRUCTIONS NUMBER ZDENTZFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK+*

267000 40-WD-080 B-F Group R20, Examine 100%

Nozzle N6B-to-Inner B5. 10 of weld length **LATER**

X Safe End 267100 40-WD-080 SIL 182 Butter Expansion No" zlc N6B-to-Inner 455R1S1 from nozzle sido of 3 X Safe End weld. aaLATER+a 267200 40-WD-080 GL-D UT exams cvcry 2 RFO's Nozzle N6B-to-Inner 88-01 **LATER+*

3 X X Safe End 267300 40-WD-081 B-D Group R20, 56% CRV N6B Nozzle-to-Vcsscl B3. 90 ,Limitation due to 3 X ad)acent nozzle and bioshield

~~NMPI-GE-7.875~~

267400 40-WD-081-ZR B-D Group R20, 54% CRV N6B Nozzle Znner B3. 100 ,Limitation duc to 3 X Radius Section ad)accnt nozzle and bioshicld

+*NMP1 GE 7.875++

2.0" CSS (REF. DWG. NO. 12) 267500 40-23"VB B-G-2 Examine in place, when Valve 40-23 Bolting B7.70 removed or when 3 X disasscmblcd *~N/A~*

267600 40-24-VB B-G-2 Examine in place, when Valve 40-24 Bolting B7.70 removed or when X

disassembled ~~N/A~*

DATE: 10/15/99 NZNE MZLE POINT NUCLEAR PIANT UNIT 1 PAGE: 170 REVISION: 0 ZNSERVZCE ZNSPECTION TEN YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray NUMBER: 40. 1 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATE GY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK**

267700 40. 1-25-VB B-G-2 Removed Crom schedule as Valve 40-25 B7.70 Class 2, and less than 2.0~ diameter. *~N/A~*

267800 40. 1-WD-001 B J *AN/Al0 Sock-0-let -to-Pipe B9. 21 3 X 267900 40. 1-WD-002 B-J Terminal End, +*N/A++

Pipe-to-Valve 40-19 B9.21 X

268600 40.1-WD"009 B-J Terminal End <<*N/A*>>

Valve 40-22-to-Pipe B9. 21 3 X 0 40. 1-WD-011 B-J ~+N/A~*

Tce-to-Pipe B9. 21 3 X 268900 40. 1-WD-012 B-J Terminal End iiN/A++

Pipe-to-Valve 40-23 B9.21 3 X 270300 40.1-WD-026 B-J f*N/A%1 Tec-to-Pipe B9.21 3 X 270400 40.1-WD-027 B-J +*N/A**

Pipe<<to-Elbov B9. 21 3 X 271200 40. 1-WD-035 B-J Tcrmnal End **N/A~~

Pipe-to-Valve 40-20 B9.21 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 171 REVISION: 0 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray NUMBER: 40.1 INSPECTION INTERVAL PIAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK**

1 . 0" CSS (REF. DWG. NO. 12) 271400 40.1 WD 037 B-J PT Terminal End *~N/A~~

Pipe-to-Valve 40-24 B9. 21 3

271500 40. 1-WD-038 B-J PT Terminal End ~~N/Ai~

Valve 40-24 -to-Pipe B9. 21 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 172 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS d Poison NUMBER: 42. 1 ZNSPECTZON INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 >>*CALIBRATION BLOCK>>>>

1.5" Liquid Poison Line (REF. DWG. NO. 14) 271700 42. 1-02-VB B-G-2 VT-1 >>>>N/A>>>>

Valve 42. 1-02 Bolting B7. 70 3 X 271800 42. 1-03-VB B-G-2 VT-1 **'N/A>>*

Valve 42.1-02 Bolting B7.70 3 X 271900 42. 1-R1-A VT 3 Code Caso N-491-1 Spring Hanger Fl. 10 >>>>N/A>>>>

3 X 272800 42. 1-WD-005 B-J Examine 100% of weld Pipe- to-Elbow B9. 21 length **N/A**

3 X 0 42. 1-WD-006 B"J PT Examine 100% of wold Elbow-to-Pipe B9. 21 length **N/A>>>>

3 X 273500 42.1-WD-017 B-J PT Terminal End >>>>N/A>>>>

Valve B9. 21 3 X 42.1-02-to-Reducer 273800 42.1-WD-026 B-J PT Terminal End, Examine Valve 42.1-01-to-Pipe B9.21 100% of weld length 3 X

>>>>N/A>>>>

274100 42.1-WD-029 B-J PT Examino 100% of weld Pipe-to-Elbow B9. 21 length >>>>N/A>>>>

3 X 274600 42. 1-WD-034 SZL Augmcnetd UT and PT to Safe End-to-Nozzle N12 571 dotermincd>>>>IATER>>>>

3 X

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PLANT UNIT 1 PAGE: 173 REVZSZON: 0 INSERVICE INSPECTION TEN YEAR PLAN I CLASS 1 SECTION XZ SCHEDULED COMPONENTS d Poison NUMBER: 42. 1 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERZOD PERIOD PERIOD

SUMMARY

NUMBER EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK~~

274700 42. I-WD-034 B-F Group R41, Terminal End Safe End-to-Nozzle N12 B5.20 Examine 100% of weld 3 X length ~~N/A**

274800 X-131 Penetration F-A VT-3 Code Casa N-491-1 System Anchor Point F1.10 1 tN/A1*

3 X

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PIANT UNIT 1 PAGE: 174 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PZAN CZASS 1 SECTION XI SCHEDULED COMPONENTS ol Rod Drive NUMBER: 44. 1 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCTZONS NUMBER IDENTIFICATION ZTEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK**

3.0" Control Rod Drive Line (REF. DWG. NO. 18) 275000 44.1-H1 F-A VT-3 Code Case N-491-1 Spring Hanger Fl. 10 +*N/A+*

3 X 275300 44. 1-SC-1 F-A VT-3 Code Casa N-491-1 Pipe Clamp F1.10 1tN/Ait 3 X 275500 44.1-WD-001 B"J Terminal End, Examine Valve 44-189 -to-Pipe B9 21

~ 100% of wold length 3 X

    • N/A+*

275600 44.1-WD-002 B-J PT Examine 100% of weld Pipe-to-Elbow B9. 21 length ~*N/A**

3 X 00 44. 1-WD-003 B-J Examine 100% of weld Elbow-to-Pipe B9. 21 length. ~~N/A**

3 X 275900 44.1-WD-005 B-J Examino 100% of wold Elbow-to-Pipe B9. 21 length. **N/A**

3 X 276900 44.1-WD-015 B-J Examine 100% of weld Pipe-to-Elbow B9.21 length ~+N/A*~

3 X 277000 44.1-WD-016 B-J PT Terminal End ++N/A++

Elbow-to-Safe End (N9) B9.21 X

277100 44. 1-WD-017 B-F PT Group R40, Examine 100%

N9 Safe End -to-Nozrlc B5 20

~ of weld length ~*N/A**

3 X 277200 44.1-WD-017 Group R40 ~+ZATER*~

N9 Safe End -to-No""lc 0619 3 X

DATE: 10/15/99 NINE MZLE POINT NUCLEAR PLANT UNIT 1 PAGE: 175 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS ol Rod Drive NUMBER: 44. 1 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME PIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +~CALIBRATION BLOCK*~

277300 44. 1-WD-017 SZL Group R40, Inconel 182 N9 Safe End -to-Noz lc 455R1S1 Butter Expansion from 3 X nozzle side of weld.

    • LATER**

277400 44.1-WD-018 B-D UT Group R40, 63% CRV N9 Nozzle-to-Vcssol B3.90 Limitation duc to 3 X bioshicld ~+LATER*~

277500 44 . 1 "WD-018-IR NUREG UT Group R40, ~iIATERii N9 Nozzle-to-Vessel 0619 RUT X

277600 44. 1-WD-018-ZR B-D Group R40, 48% CRV, N9 Nozzle Inner Radius B3.100 I imitation due to 3 X Section bioshicld ~iLATERi+

3.0" Control Rod Drive Line (REF. DWG. NO. 19) 277800 44.3-12-VB B-G-2 VT 1 10 Studs 20 Nuts, Valvo 44-3-12 Bolting B7.70 Examine in place, when removed or when disassembled **N/A**

277900 44.3-13-VB B-G-2 VT-1 Examine in place, when Valve 44-3-13 Bolting B7. 70 removed or when 3 X disasscmblcd. ~*N/A~~

278000 44.3-189-VB B G-2 VT-1 Examine 10 studs and 20 Valve 44-189 Bolting B7.70 nuts, in place, when 3 X removed or when disassembled ~~N/A++

278100 44. 3-WD-093 B-J Terminal End ~~N/Ai~

Pipe-to-Valve 44-3-12 B9 21

~

3 X

DATE: 10/15/99 NINE MZLE POINT NUCLEAR PLANT UNIT 1 PAGE: 176 REVISION: 0 INSERVICE INSPECTION TEN YEAR PIAN CIASS 1 SECTION XI SCHEDULED COMPONENTS ol Rod Drive NUMBER: 44. 3 PRESERVICE YEAR INSPECTION ZNTERVAL PLAN STATUS ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCTIONS NUMBER ZDENTIFICATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~*

278200 44.3-WD"094 B-K PT Code Case N-509 ~~N/A'~

Valve 44.3-12 Integral B10 40~

3 X AttachrN:nt 278500 44.3-WD-111 B J Examfne 100% of weld Valve 44.3-13 -to-Pipe B9.21 length ~~N/A~+

X

NINE MILE POINT NMP1-ISI-003-10 Y NIAGARA NUCLEAR POWER STATION N U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE 5.0 CLASS 2 INSERVICE INSPECTION PLAN TABLES This section contains the Long Term Ten-Year Inservice Inspection Examination Tables for nondestructive examinations of selected systems and components for the Second Inservice Inspection Interval.

02.0 Main Steam System 177 thru 179 03.0 Main Steam System .. 180thru181 39.0 Emergency Condenser System .. 182 thru 196 44.2 Control Rod Drive System .. 197 thru198 80.0 Reactor Containment Spray System .. 199 thru 210 81.0 Reactor Core Spray System ~ 211 thru 222 93.0 Reactor Containment Spray System 223 thru 225 File: NMP1ISIPL.wpd

f, DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 177 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS Steam System NUMBER: 02. 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

NUMBER EXAMZNATZON AREA CATE GY NDE OUTAGE INSTRUCTIONS ZDENTZFZCATZON ZTEM NO METH 1 2 3 3 4 1 2 4 1 2 3 4 4*CALIBRATION BLOCK~*

18. 0" MSA (REF. DWG. NO. 3) 284000 02-MS-H10 F-A VT-3 Code Case N-491-1 Spring Hanger Fl. 20 ++N/A~*

3 X 284100 02-MS-Hll VT 3 Code Case N-491-1 Spring Hanger Fl . 20 41N/AI4 3 X

24. 0" MSB (REF. DWG. NO. 3) 286400 02-SR-1A F-A VT-3 Code Case N-491-1 Seismic Restraint Fl . 20 ~~N/A~*

3 X 286500 02 "SR-1A-WD-001. 1 C C 1-1/4"x 14xl'-4" Lug ,

Integral Attachment C3. 20 Code Case N-509 **N/A**

3 X 286600 02-SR-1A-WD-001. 11 C-C Code Case N-509 **N/A**

Integral Attachment C3.20 3 X 286700 02-SR-1A-WD-001 . 13 C-C Code Case N-509 +AN/Aee Integral Attachment C3.20 3 X 286800 02-SR-1A-WD-001.15 C-C MT Code case N-509 ~~N/A~~

Integral Attachment C3. 20 3 X 286900 02-SR-1A-WD-001.3 C C MT Code Case N-509 +~N/A~~

Integral Attachment C3. 20 3 X 287000 02-SR-1A-WD-001.5 C-C MT Code Case N-509 ~+N/A++

Integral Attachment C3. 20 3 X

DATE: 10/15/99 NINE HZLE POZNT NUCLEAR PLANT UNIT 1 PAGE: 178 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS Steam System NUHBER: 02. 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASHE FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUHBER IDENTIFICATION ZTEH NO METH 3 4 4CALZBRATION BLOCK~ ~

1 2 4 1 2 3 4 1 2 3 4 287100 02-SR-1A-WD-001. 7 C-C HT Code Case N-509 ++N/Ai+

Integral Attachment C3.20 3 X 287200 02-SR-1A-WD-001. 9 C C MT Code Case N-509 **N/A**

Zntegral Attachment C3.20 3 X

24. 0" HSA (REF. DWG. NO. 3) 290800 02"WD-041 C-F-2 PT **N/A%*

Branch Connection C5. 81 3 X (24 "x18" Header)

24. 0" HSB (REF. DWG. NO. 3) 02-WD-073 C-F-2 UT **NMP1-24-080-CS*~

Tcc-to-Pipe C5.51 HT 3 X 293400 02"WD-078 C-F-2 UT ~'~NMP1-24-080-CS~*

Pipe-to-Elbow C5.51 3 X

18. 0" MSA (REF. DWG. NO. 3) 294000 02-WD-182 C" F-2 UT ~~NMPI-18-. 937-CS-106*~

Rct-to-Pipe C5. 51 3 X 294100 02-WD-190 C-F-2 UT ++NHP1-18-.937-CS-106**

Pipe-to-180 dcg Ret C5.51 HT 3

294500 02-WD-329 CF2UT Terminal End Pipe-to-Turbine Stop C5 ~ 51 PT ~+NHP1-18-.937-CS-106**

3 X Valve

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 179 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS Steam System NUMBER: 02'.0 INSPECTION INTERVAL PLAN STATUS PRE SERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

NUMBER EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK*'~

294600 02-WD-330 C-F-2 Terminal End Pipe-to-Turbine Stop C5. 51 ~ ~NMP1-18". 937-CS-106**

3 X Valve

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 180 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS Stcam NUMBER: 03. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK~*

16. 0" MSS (REF. DWG. NO. 4) 294900 03-H1 VT 3 Code Case N-491-1 Pipe Anchor Fl . 20 *+N/A+'

3 X 295000 03-Hl-WD-001. 1 C-C Code Case N-509 *~N/A+*

Integrally Welded C3.20 3 X Attachment 295100 03-Hl WD-001.2 C C Code Caso N-509 ~~N/A~~

Integrally Welded C3. 20 3 X Attachment 295200 03-H1-WD-001.3 C C Code Case N-509 ~~N/A~~

Integrally Welded C3.20 3 X Attachment 295300 03-Hl-WD-001. 4 C-C Coda Case N-509 ++N/A++

Integrally Welded C3.20 3 X Attachment 295700 03-H3 F-A Coda Case N-491-1 Rod Hanger F1.20 ftN/Att 3 X 297800 03-WD-001 CF2UT Examine 100% of weld Tec-to-Pipe C5.51 MT length ~ *PZR-I . 24-1 ~ ~

3 X 299400 03-WD-020 C-F-2 UT Examine 100% of weld Pipe-to-Elbow C5.51 MT length * ~ PZR-1 . 24-1**

3 X

DATE: 10/15/99 NINE HZLE POINT NUCLEAR PIANT UNIT 1 PAGE: 181 REVISION: 0 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS Steam NUMBER: 03. 0 INSPECTION INTERVAL PIAN STATUS PRESERVZCE YEAR ASHE FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

NUMBER EXAHINATION AREA IDENTIFICATION CATEGY ZTEH NO NDE METH


OUTAGE------ ZNSTRUCTIONS 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK*~

299700 03-ND-023 C-F-2 MT Terminal End, Examine Tee-to-Valve Hanifold C5 ~ 51 UT 100% of weld length 3 X **NMP ISW 1020 CSiPIR-1.

24-1**

300800 Valve Manifold 03-1 F-A VT-3 Tuxbine By-Pass Valve Hanifold 03-1 F1.40 Hanifold, Code Case X N-491-1 ~~N/A~i

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 182 REVISION: 0 ZNSERVZCE INSPECTION TEN"YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS ency Condenser Heat Exchanger 122 NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 + +CALIBRATION BLOCK*~

EC Heat Exchanger 60-42 (REF. DWG. NO. 11) 303300 60-42-WD-001 N/A UT This weld was replaced Hx 60-42 N/A PT by 60-42-WD-001 Nozzle-to-Inlet Head **LATER**

303400 60-42-WD-001C1 C-B **IATER**

Hx 60-42 C2.21 3 X Nozzle-to-Inlet Head 303600 60"42"WD-002C1 C-A ~~LATER~~

Hx 60-42 Inlet C1.30 3 X Head-to Tube Shcct 800 60-42-WD-005C1 C-A Hx 60-42 Tube C1. 30 X

Sheet-to-Outlet Head 303900 60-42-WD-006C1 C-B UT ~~LATER~~

Hx 60-42 Outlet C2.21 PT 3 X Head-Nozzle

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 183 REVISION: 0 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS cncy Condenser Return NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE -OUTAGE INSTRUCTZONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK++

10.0" ECC Line (REF. DWG. NO. 11A) 305500 39"H2 F A VT-3 Code Case N-491-1 Spring Support Fl . 20 i 0 N/Al0 3 X 305600 39-H2-WD"001C1 C-C Code Case N-509 **N/A~~

Integral Attachment C3.20 3 X 305700 39-H2-WD-003C1 C C Code Case N-509 ~*N/A*~

Integral Attachment C3.20 3 X 305800 39-H2"WD-005C1 C-C Code Case N-509 +*N/A++

Integral Attachment C3.20 3 X 0 39-H2-WD-007C1 C C Code Case N-509.~*N/A~i Integral Attachment C3.20 3 X 306000 39-H27 F A VT-3 Code Case N-491-1 Spring Hanger F1. 20 ++N/A+*

3 X 307300 39-H4 Code Case N-491-1 Spring Hanger F1.20 ~~N/A~~

3 X 307400 39-H4-WD-001C1 C-C Code Case N-509 +~N/Ai~

Integral Attachment C3.20 3 X 307500 39-H4-WD-004C1 C"C Code Case N-509 ++N/A++

Integral Attachment C3.20 3 X 307600 39-H4-WD-007C1 C C PT Code Case N-509 **N/A**

Integral Attachment C3. 20 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 184 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PIAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS ancy Condenser Return NUMBER: 39. 0 INSPECTION INTERVAL PLAN STATUS FRESERVICE YEAR ASME FIRST SECOND THZRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

NVMBER EXAMINATION AREA IDENTIFICATION CATEOY ITEM NO NDE METH


OUTAOE------ INSTRUCTIONS 1 2 3 4 1 2 3 4 1 2 3 4 ~+CALIBRATION BLOCK~*

307700 39-H4-WD-010C1 C-C Code Case N-509 ~*N/A~*

Integral Attachment C3.20 3 X 313500 39-WD-178-D C-F-1 Code Casa N-524 Pipe-Long Seam C5. 12 **ZATER*~

3 X 313600 39-WD-178C1 C-F-1 UT Examine 100% of weld Hx 60-46 Outlet C5. 11 pT length ~~ZATER~+

3 X Nozzle-to-Pipe 313800 39"WD-179-D C-F 1 VT Code Casa N-524 Elbow-Long Scam (60 C5.12 pT +~ZATER*~

3 X dcg. LR) 0 39-WD-179-U CF1 Code Casa N-524 Pipe-Long Seam C5. 12 ~*LATER~+

3 X 314000 39-WD-179C1 C-F 1 +~LATER*~

Pipe-to-Elbow C5. 11 3 X 314500 39-WD-181 C-F-1 VT Examine 100% of weld Pipe-to-Tcc C5. 11 PT length ~~ZATER~~

3 X 314600 39-WD-181-D C-F-1 Coda Case N-524 Pipe>>Long Seam C5. 12 **IATER**

3 X 314700 39-WD-181-U C-F-1 VT Code Case N-524 Teo-Long Seam C5.12 pT *+LATER+'~

3 X 315200 39-WD-183-D C-F-1 UT Code Case N-524 Pipe-Long Seam C5. 12 pT *~LATER~~

3 X

0 DATE: 10/15/99 NINE MIIE POINT NUCLEAR PLANT UNIT 1 PAGE: 185 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS gency Condenser Return E NUMBER: 39.0 INSPECTION INTERVAL PRESERVZCE YEAR PLAN STATUS ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERZOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFZCATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK*+

315300 39-WD-183-U C-F-1 Code Case N-524 Elbow-Long Seam (60 C5.12 *~LATER~*

X deg LR) 315400 39-WD-183C1 C-F" 1 UT Examine 100% of weld Elbow-to-Pipe CS. 11 PT length +~LATER+~

3 - - - - X 315700 39-WD-184-D C-F-1 Code Case N-524 1 t LATER' Elbow-Long Seam (60deg CS. 12 3 X LR) 315800 39-WD-184-U C-F-1 UT Code Case N-524 Pipe-Long Seam CS. 12 PT **IATER~~

3 X 900 39-WD-184C1 C-F-1 Examine 100% of weld Pipe-to-Elbow CS. 11 length ~~ZOSTER~*

3 X 316100 39-WD 185 D C F 1 Code Caso N-524 Pipe-Long Weld C5.12 **LATER**

3 X 316200 39-WD-185C1 C-F-1 UT Examine 100% of weld Hx 60-45 Nozrlc C5. 11 PT length **LATER**

3 X Outlet-to-Pipe 319300 39-WD-211C1 GL-A UT Examined 100% of weld Pipe-to-Elbow (60dcg 88-01 length ~~LATER**

X LR) 319900 39-WD-213 C-F-1 UT Examine 100% of weld Pipe-to- Tec CS. 11 PT length *~LATER~*

3 X

DATE: 10/15/99 NINE MZLE POINT NUCLEAR PIANT UNZT 1 PAGE: 186 REVZSZON: 0 ZNSERVICE INSPECTION TEN YEAR PLAN CIASS 2 SECTION XZ SCHEDULED COMPONENTS cncy Condcnscr Return INSPECTION INTERVAL PIAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK~+

320000 39-WD-213-D C F1 Coda Casa N-524 Tcc-Long Seam C5.12 ~+IATER++

3 X 320100 39-WD-213-U CF1 Code Casa N-524 Pipe-Long Scam C5. 12 111ATERA*

3 X 321400 39-WD-217-D C-F-1 UT Codo Casa N-524 Pipe-Long Scam C5. 12 PT ~~LATER**

3 X 321500 39-WD-217C1 C-F-1 Examine 100% of weld Hx 60-42 No@tie C5.11 length ~+IATERi~

3 X Outlet-to-Pipe 0 39-WD-224-D C-F-1 UT Code Case N-524 Pipe-Long Seam C5. 12 PT **LATER**

3 X 323600 39-WD-224-U C-F 1 Code Case N-524 Pipe-Long Seam C5. 12 *~LATER~~

3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 187 REVISION: 0 INSERVZCE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS cncy Condenser Supply NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD SVMMARY EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTZFICATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *~CALIBRATION BLOCK~ ~

12.0" ECC Linc (REF. DWG. NO. 11) 323900 39-WD-012 CF1UT Examine 100% of weld Reducer-to-Pipe CS. 11 PT length **IATER**

3 X 324400 39-WD-014 GL-D VT **IATER~*

Pipe-to-Pipe 88-01 3 X - - - - X 324700 39"WD-016 GL-D VT <<~IATER**

Pipe-to-Pipe 88 01 3 X X 325100 39-WD-017 GL-D UT UT exam every 2 RFO's.

Pipe-to-Pipe 88-01 i~ZATER~~

X X 0 39 WD-020 GL D UT UT exam cvcry 2 RFOis.

Pipe-to-Pipe 88-01 +~IATER*~

3 X X 325900 39-WD-021 C-F 1 VT Examine 100% of weld Pipe-to-Tee C5.11 PT length ~~LATER*~

3 X 326000 39-WD-021 GL-D UT UT exam avery 2 RFO's Pipe-to-Tee 88-01 ~*NMP-12-XXI-SS**

3 X X 326100 39-WD-021-D C-F-1 UT Code Case N-524 Tcc-Long Scam C5.12 ++IATER~~

3 X 326200 39-WD-021-U C-F-1 VT Code Case N-524 Pipe-Long Seam C5.12 PT **IATER**

3 X 326300 39-WD-022 C-F-1 Examine 100% of wold Tcc-to-Pipe CS. 11 PT length **IATER**

3 X

0 DATE: 10/15/99 NINE MIZE POINT NUCLEAR PLANT UNIT 1 PAGE: 188 REVZSZON: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS gcncy Condenser Supply NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK**

326400 39-WD-022 GL-D UT exam every 2 RFO's Tcc-to-Pipe 88-01 ++LATER++

X X 326500 39-WD-022-D C-F-1 UT Code Case N-524 Pipe-Long Seam C5.12 PT **LATER*l 3 X 326600 39-WD-022-U C-F-1 Code Case N-524 Tcc-Long Seam C5.12 **IATER++

3 X 326700 39-WD-024 C-F-1 Examine 100% of weld Tcc-to-Pipe C5. 11 length ~~LATER~~

3 X 326800 39-WD-024 GL-D UT UT exam every 2 RFO's Tcc-to-Pipe 88-01 **LATER**

3 X X 326900 39-WD-024-U C-F-1 Code Case N-524 Tcc-Long Seam C5. 12 **ZATER**

3 X 327000 39"WD-025 GL-D UT UT exam every 2 RFO~s Elbow-to-Pipe 88-01 ~~LATER~~

3 X - - - X 327100 39-WD-025 C-F-1 Examine 100% of weld Elbow-to-Pipe C5. 11 length ~+ZATER~~

3 X 327200 39-WD-025-D C-F-1 Code Case N-524 Pipe-Long Seam C5.12 **LATER**

3 X 327400 39-WD-026 GL-D UT UT exam every 2 RFO's Pipe-to-Pipe 88-01 + + LATER~ +

3 X X

NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 189 DATE: 10/15/99 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS cncy Condenser Supply E NUMBER: 39.0 PRESERVZCE YEAR INSPECTION ZNTERVAL PZAN STATUS ASME FIRST SECOND THZRD PERIOD PERIOD PERIOD SEC. XZ

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCTZONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~*CALIBRATION BLOCK**

327800 39-WD-027 GL D UT UT exam cvcry 2 RFO's 88-01 +~LATER~~

Pipe-to-Pipe 3 X X 328300 39-WD"029-D C-F-1 UT Code Case N-524 Elbow-Long Seam C5. 12 PT ~*LATER**

3 X 328400 39-WD-029-U C-F-1 Code Case N-524 C5. 12 ++LATER*+

Pipe-Long Seam 3 X 328500 39-WD-029C1 C F1 Examine 100% of weld Pipe-to-Elbow C5.11 length ~~LATER~*

3 X 800 39-WD-030 GL-D UT UT exam every 2 RFO's Elbow-to-Pipe 88-01 **LATER*~

3 X X 329200 39-WD-033 N/A UT every 2 RFO's, This Pipe-to 60-46 EC Hx N/A weld no longer exists, 3 X X Thcrcforc ZGSCC Category Nozzle Znlct D no longer applicable.

  • +LATER**

329700 39-WD-034 GL-D UT Examine cvcry 2 RFO's

~ ~ZATER~ ~

Pipe-to-Pipe 88 01 3 X X 330000 39-WD-035 GI-D UT UT exam every 2 RFO's Pipe-to-Pipe 88-01 +~LATER+*

3 X X 330500 39"WD-037 N/A UT exam cvcry 2 RFO's, Pipe-to-Elbow N/A This weld no longer 3 X - - - - X exists *~LATER**

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 190 REVISION: 0 INSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS cncy Condenser Supply NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK>>>>

330600 39-WD-037-D C-F-1 Code Case N-524 Elbow-Long Seam CS. 12 >>>>LATER>>>>

3 X 330700 39-WD-037-U C-F 1 UT Coda Case N-524 Pipe-Long Scam C5. 12 PT >>*LATER>>>>

3 X 330800 39-WD-037C1 CF1UT Examine 100% of weld Pipe-to-Elbow C5. 11 length >>*IATER*>>

3 X 330900 39-WD-037C1 GL-A UT **LATER>>>>

Pipe-to-Elbow 88-01 3 X 3 000 39-WD-038 C-F-1 UT Examine 100% of weld Elbow- to-Pipe C5. 11 PT length >>>>LATER>>>>

3 X 331100 39-WD-038 GL-D UT UT exam every 2 RFO's Elbow-to-Pipe 88-01 >>*LATER**

3 X - - - - X 331300 39-WD-038-U C" F-1 UT Code Case N-524 Elbow-Long Scam C5. 12 PT >>>>LATER>>>>

3 X 331400 39-WD-041 N/A UT exam cvcry 2 RFO's, Pipe-to-Hx 60-45 N/A This weld was cut out, 3

Nozzle Inlet X X ZGSCC Cat. D no longer applies **LATER>>>>

331500 39-WD-041 N/A This weld was cut out, Pipe-to-Hx 60 45 N/A Replaced by 39-WD-041C1 3

Nozzle Inlet X *>>LATER>>>>

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 191 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PIAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS ency Condenser Supply E NUMBER: 39.0 INSPECTION INTERVAL PRESERVZCE YEAR PLAN STATUS ASME FIRST SECOND THIRD PERIOD PERIOD PERIOD XI

SUMMARY

EXAMINATION AREA SEC.

CATEGY ITEM NO NDE METH


OUTAGE------ INSTRUCTIONS

>><<CALIBRATION BLOCK>>>>

NUMBER IDENTIFICATION 1 2 3 4 1 2 3 4 1 2 3 4 331700 39-WD-041C1 C F-1 Examine 100% of weld Pipe-to-Hx 60-45 CS. 11 length >>*LATER**

3 X Nozzle Inlet 331800 39-WD-041C1 GL-A UT **LATER>><<

Pipe-to-Hx 60-45 88-01 3 X Nozzle Inlet 331900 39-WD-100 C-F-1 Examine 100% of weld Reducer to-Pipe C5. 11 length >>>>ZATER>>>>

3 X 332000 39-WD-100 GL A UT **LATER>>>>

Reducer-to-Pipe 88-01 3 X 00 39-WD-102 GL-D UT VT exam every 2 RFO's Pipe-to-Pipe 88-01 >>*LATER**

3 X X 332800 39-WD" 104 GL D VT VT cvcry 2 RFO's Pipe-to-Pipe 88-01 >>>>LATER>><<

3 X X 333200 39-WD-105 GL-D UT UT exam every 2 RFO's Pipe-to-Pipe 88-01 **LATER**

3 X X 333600 39 "WD-108 GL-D UT UT exam cvcry 2 RFO's Pipe-to-Pipe 88-01 **LATER>>>>

3 X X 334000 39-WD-109 GL-D UT VT exam every 2 RFO's Pipe-to-Tec 88-01 >>>>LATER>><<

3 X X 334300 39"WD-110 C-F-1 Examine 100% of weld Tce-to-Pipe C5. 11 length >>>>LATER>>>>

3 X

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PLANT UNIT 1 PAGE: 192 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CZASS 2 SECTION XI SCHEDULED COMPONENTS cncy Condenser Supply E NUMBER: 39.0 PRESERVICE YEAR ZNSPECTION INTERVAL PZAN STATUS ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCI'ZONS NUMBER IDENTIFZCATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~*CALIBRATION BLOCK~~

334400 39-WD-110 GL-D UT UT exam every 2 RFO's Tcc-to-Pipe 88"01 ~+LATER~+

3 X X 334500 39-WD-110-D C-F-1 Coda Case N-524 Pipe-Long Seam C5. 12 ~~ZATER~~

3 X 334600 39-WD-110-U C-F-1 Code Case N-524 Tco-Long Scam C5.12 4*IATERt*

3 X 334800 39"WD"112 GL D UT UT exam cvcry 2 RFO's Tec-to-Elbow 88-01 *OIATER**

3 X X 100 39-WD-113 C-F-1 Examine 100% of weld Elbow-to-Pipe C5. 11 length ~~LATER**

X 335200 39-WD-113 GL-D UT UT exam every 2 RFO's Elbow-to-Pipe 88-01 ~ ~ZATER~ ~

3 X X 335300 39-WD-113-D C F-1 Code Case N-524 Pipe-Long Scam C5. 12 **ZATER*~

3 X 335400 39-WD-113-U C F-1 Code Case N-524 Elbow-Long Scam C5. 12 ~~LATER~~

3 X 335600 39-WD-114 GL-D UT UT exam every 2 RFO's Pipe-to-Pipe 88-01 **ZATER*+

3 X X 336000 39-WD-115 GL-D UT UT exam cvcry 2 RFO's Pipe-to-Elbow 88-01 **LATER+*

3 X X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PZANT UNIT 1 PAGE: 193 REVISION: 0 ZNSERVICE ZNSPECTION TEN YEAR PLAN CIASS 2 SECTION XI SCHEDULED COMPONENTS ency Condcnscr Supply NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD SEC. XZ, PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +~CALIBRATION BLOCK+~

336300 39-WD-117 N/A This weld was cut out, Pipe"to-Elbow N/A Replaced by 39-WD-117C1 3 X **ZATER**

336400 39-WD-117 N/A VT exam every 2 RFO's.

Pipe-to-Elbow N/A This weld no longer 3 X X exists, ZGSCC Cat. D no longer applies **LATER~*

336500 39-WD-117-D C-F-1 UT Code Case N-524 Elbow-Long Scam C5. 12 PT ~~LATER*i 3 X 336600 39-WD-117-U CF1 Code Case N-524 Pipe-Long Seam C5. 12 ~+IATER++

3 X 336700 39-WD-117C1 C F-1 ++LATER+*

Pipe- to-Elbow C5. 11 3 X 336800 39-WD-117C1 GL-A VT ~*LATER**

Pipo-to-Elbow 88-01 3 X 337000 39-WD-118 GL"D VT VT every 2 RFO's Elbow-to-Pipe 88-01 4 PLATER**

3 X - - - - X 337500 39-WD-121-U C-F"1 UT Coda Case N-524 Pipe-Long Seam C5. 12 *+IATER**

3 337600 39-WD-121C1 C F-1 VT Examine 100% of weld Pipe-to Hx 60-42 C5. 11 PT length i+LATER~i 3

Nozzle Inlet X

NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 194 DATE: 10/15/99 REVISION: 0 INSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS cncy Condensor Supply NUMBER: 39. 0 PRESERVICE YEAR INSPECTION INTERVAL PIAN STATUS ASME FIRST SECOND THIRD PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTZONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *~CALIBRATION BLOCK~~

GL-A ~+LATER*~

337700 39-WD-121C1 Pipo-to-Hx 60-42 88-01 3 X Nozzle Inlet 337800 39-WD-122 C-F-1 UT Examine 100% of weld Pipe- to-Elbow C5. 11 PT length +'~LATER+*

3 - - - - - - - - X 39-WD-122 GL-D UT UT exam every 2 RFO's 337900 88-01 ~ ~ LATER**

Pipe- to-Elbow 3 X X 338300 39-WD" 123 GL-D UT UT exam every 2 RFO's Pipe-to-Pipe 88-01 **LATER~+

3 X - - - - X 0 39-WD-124 GL-D UT UT exams every 2 RFO's 88-01 ~ ~IATER*+

Pipe-to-Elbow 3 X X 339000 39-WD-125 C-F-1 Examine 100% of weld Elbow-to-Pipe C5.11 length ~+LATER~+

3 X 339100 39-WD-125 GL-D UT UT every 2 RFO's Elbow-to" Pipe 88 01 PT ~~NMP-12-XX1-SS**

3 - - - - X X 339200 39-WD 125-D C-F-1 Coda Case N-524 Pipe-Long Seam C5.12 ~~LATER~~

3 X 339300 39-WD-125"U CF1 Codo Case N-524 Elbow-hong Scam CS. 12 ~~LATER*+

3 X 339600 39-WD-127-D C-F-1 Code Case N-524 Elbow-Long Scam C5. 12 ~~IATER~~

3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 1 95 REVISION: 0 ZNSERVICE INSPECTION TEN YEAR PLAN CIASS 2 SECTION XZ SCHEDULED COMPONENTS gcncy Condenser Supply NUMBER: 39.0 INSPECTION INTERVAL PZAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

NUMBFR EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK~*

339700 39-WD" 127-U C-F"1 Coda Case N-524 Elbow-Long Seam C5.12 *~LATER*~

X 339800 39-WD-127C1 C-F 1 Examine 100% of weld Pipe-to-Elbow CS. 11 length ~~ZATER~~

3 X 340100 39-WD-128 GL-D UT UT cvcry 2 RFO's Elbow-to-Pipe 88 "01 +*IATER++

3 X X 340500 39-WD-129 GL-D UT UT exam every 2 RFO's Pipe-to-Pipe 88-01 **LATER*4 3 X X

12. 0" ECC Linc (REF. DWG. NO. 11A) 0 39-H21 F-A VT-3 Codo Case N-491-1 Spring Hanger Pl. 20 *AN/A4*

3 X 341800 39 "H22 F-A VT-3 Coda Case N-491-1, 4 Spring Hanger F1. 20 Lugs ~~N/A~*

3 X 341900 39-H22-WD-001 C-C Code Case N-509 +~N/A**

Integral Attachment C3.20 3 X 342000 39-H22-WD-004 C-C Coda Casa N-509 **N/A**

Integral Attachment C3.20 3 X 342100 39-H22-WD-007 C C Code Case N-509 ++N/A**

Integral Attachment C3. 20 3 X 342200 39-H22-WD-010 C-C Code Case N-509 **N/A~~

Integral Attachment C3.20 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 196 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS ency Condenser Supply NUMBER: 39.0 INSPECTZON INTERVAL PLAN STATUS PRESERVZCE YEAR FIRST SECOND THIRD SEC. XI PERIOD PERZOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCTIONS NUMBER IDENTZFZCATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 e eCALIBRATION BLOCK*a 342300 39-H25 F A VT 3 Code Case N 491 1 Spring Hanger F1.20 l 4N/A1

  • 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 197 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS ol Rod Drive NUMBER: 44 . 2 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

NUMBER EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK~*

10.0" CRD Line (REF. DWG. NO. 17) 346400 44.2-H2 F-A VT-3 Code Case N-491-1 Sway Brace Fl. 20 *ON/A**

3 X 347000 44.2-H9 Code case N-491-1 Spring Hanger Fl ~ 20 t 1N/A1 t 3 X 350200 44.2-SB-1 Code Case N-491-1 Sway Brace F1.20 **N/A*+

3 X 350700 44.2-SB-6 F-A Code Casa N 491-1 Sway Brace Fl . 20 *+N/A+~

3 X 6.0" CRD Line (REF. DWG. NO. 17) 352500 44.2-WD-045 C-F-2 UT Examine 100% of weld Pipe-to<<Cap C5. 51 PT length **IATER~~

3 X 10.0" CRD Zinc (REF. DWG. NO. 17) 353000 44.2-WD-085 C-F-2 MT Examine 100% of weld Elbow-to-Reducer C5.51 UT length 3

353100 44.2-WD-086 C-F-2 UT Examine 100% of weld Pipe-to-Elbow C5.51 PT length **LATER~~

3 X 353600 44.2-WD-092 C-F-2 MT Examine 100% of weld Pipe-to-Tcc CS. 51 UT length 3

~+NMP-1SW 1020 CS, P1R-. 6 00-1~*

DATE: 10/15/99 NINE HZLE POINT NUCLEAR PIANT UNIT 1 PAGE: 198 REVISION: 0 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS ol Rod Drive NUHBER: 44.2 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD SUHHARY NUMBER EXAMINATION AREA IDENTIFICATION CATEGY ITEM NO NDE METH


OUTAGE------ ZNSTRUCTIONS 1 2 3 4 1 2 3 4 1 2 3 4 *+CALIBRATIONBLOCK~+

8.0" CRD Line (REF. DWG. NO. 17) 353900 44.2-WD-096 C-F-2 UT Examine 100% of weld Reducer-to-Elbow C5.51 PT length **LATER**

3 X 8.0" CRD Line (REF. DWG. NO. 17A) 357500 44.2-WD"432 C-F-2 UT Examine 100% of weld Pipe-to-Elbow C5.51 PT length ~~LATER~~

3 X

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PLANT UNZT 1 PAGE: 199 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS or Containment Spray NUMBER: 80.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THZRD SEC. XZ PERZOD PERZOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +*CALIBRATION BLOCK+ +

16.0" RCS Line (REF. DWG. NO. 15) 358000 80-09 ZEB VT-3 Examine strainer for CTMT. Spray Suction 96-03 debris every outage.

Strainer 3 X - - - X X *+N/A+*

12.0" RCS Line (REF. DWG. NO. 15) 358600 80-H12 F A VT-3 Code Case N-491-1 Seismic Restraint Fl . 20 *+N/A++

3 X 358700 80-H12-WD-001 C-C MT Code Case N-509 ~*N/A**

Integral Attachment C3. 20 3 X 80-H12-WD-004 C C MT Code Case N-509 ~~N/A~~

Integral Attachment C3.20 3 X 358900 80-H12-WD-007 C-C MT Code Case N-509 **N/A~~

Integral Attachment C3.20 3 X 359000 80-H12-WD-010 C-C Code Case N-509 ~~N/A~~

Integral Attachment C3 ~ 20 3 X 359100 80-H14 F-A 4 Lugs, Code Casa Spring Hanger F1.20 N-491-1 *+N/A+~

3 X 359200 80-H14-WD-001 C-C Code Case N-509 ~~N/A+~

Integral Attachment C3.20 3 X 359300 80-H14-WD"004 C-C Code Case N-509 ~*N/A~*

Zntegral Attachment C3.20 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 200 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray NUMBER: 80. 0 ZNSPECTZON INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK**

359400 80-H14-WD-007 C-C MT Code Case N-509 +~N/Aii Integral Attachment C3.20 3 X 359500 80-H14-WD-010 C-C Code Case N-509 ~*N/A+*

Integral Attachment C3.20 3 X 359900 80-H20 F A Code Case N-491-1 Rod Hanger F1.20 f%N/A**

3 X 360500 80-H46 F-A Code Case N-491-1 Rod Hanger Fl. 20 ++N/A+~

3 X 360600 80-H46-WD-001 C-C Code Case N-509 **N/A**

Integral Attachment C3. 20 3 X 362800 80-SC-14 VT-3 Code Case N-491-1 Seismic Restraint F1.20 1*N/A*4 3 X 362900 80-SC-14-WD-001 C-C Code Case N-509 ~~N/A~~

Integrally Welded Lug C3 20

~

3 X 363000 80-SC-14-WD-002 C-C Code Case N-509 ~~N/A~~

Integrally Wcldcd Lug C3.20 3 X 363100 80-SC-14-WD-003 C-C Code Case N-509 ~~N/A*~

Integrally Welded Lug C3.20 3 X 363200 80-SC-14-WD-004 C-C Code Case N-509 ~~N/A**

Integrally Welded Lug C3.20 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 201 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray NUMBER: 80. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK*~

363300 80-SC-14-WD-005 C-C Code Case N-509 ~~N/A~~

Integrally Welded Lug C3. 20 3 X 363400 80-SC-14-WD-006 C-C Code Case N-509 ~iN/A++

Integrally Welded Lug C3.20 3 X 363500 80-SC-14-WD-007 C-C Code Case N-509 *+N/A*+

Integrally Welded Lug C3.20 3 X 363600 80-SC-14-WD-008 C C Code Case N-509 ++N/A+<

Integrally Welded Lug C3. 20 3 X 80 SR 47 Code Case N-491-1 Seismic Pipe Restraint F1.20 0 1M/A1 1 3 X 367100 80-88-1 VT-3 Code Case N-491-1 Sway Strut F1.20 ~~N/A~~

3 X 367200 80-SS-2 VT-3 Code Case N-491-1 Sway Strut F1.20 t*N/A*I 3 X 367800 80-WD-008 C-F"2 Examine 100% of weld Flange-to-Pipe C5.51 length ~*LATER~~

3 X 368300 80-WD-017 C-F 2 UT Examine 100% of weld Pipe-to-Elhow C5. 51 MT length ~~LATER~~

3 X 368400 80-WD-019 C-F-2 Examine 100% of weld Pipe-to-Flange C5.51 length ~~IATER~*

3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 202 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray NUMBER: 80.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~ '~

369000 80-WD-026 C-F-2 Examine 100% of weld Pipe- to-Elbow C5. 51 length **LATER**

3 X 370800 80-WD-046 C-F-2 Examine 100% of weld FE-to-Pipe C5. 51 length +~ZATER~~

3 X 372200 80-WD-062 C-F-2 UT Examine 100% of weld Reducer-to-Nozrle C5. 51 MT length ~~LATER~~

3 X 373700 80-WD-082 C-F-2 Examine 100% of weld Pipe-to-Elbow C5.51 length 1tLATERt1 3 X 16.0" RCS Linc (REF. DWG. NO. 15A)

II oo 80-30 CTMT. Spray Suction IEB 96-03 VT-3 Examine strainer outage for debris each Strainer 3 X - - - X X - - X t*N/A*4 12.0" RCS Linc (REF. DWG. NO. 15A) 374900 80-H30 Code Case N-491-1 Spring Support Fl. 20 **N/A*~

3 X 375000 80-H30-WD-001 C-C Code Case N-509 +~N/A~*

Integral Attachment C3.20 3 X 375100 80 H30 WD-004 C-C Code Case N-509 +iN/A+i Integral Attachment C3.20 3 X 375200 80-H30-WD-007 C-C Code Case N-509 +AN/Ate Integral Attachment C3.20 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 203 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Containmcnt Spray NUMBER: 80.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK'~~

375300 80-H30-WD-010 C-C MT Code Case N-509 +~N/Aii Integral Attachment C3. 20 X

375600 80-H34 Code Case N 491 1 Spring Hanger F1.20 *~N/A+*

3 X 375700 80-H34-WD-001 C-C MT Code Case N-509 *~N/A~*

Integral Attachment C3.20 3 X 375800 80-H34-WD-004 C-C MT Code Case N-509 **N/A*t Integral Attachment C3. 20 3 X 80-H34-WD-007 C-C MT Code Case N-509 *wN/A+~

Integral Attachment C3. 20 3 X 376000 80-H34-WD-010 C-C MT Code Case N-509 ~+N/A~~

Integral Attachment C3. 20 3 X 376100 80-H36 F A Code Case N 491 1 Spring Hanger F1. 20 ktN/A4t 3 X 376200 80-H36-WD-001 C-C Code Case N-509 *~N/A*~

Integral Attachment C3.20 3 X (West Side) 376300 80-H36-WD-002 C-C Code Case N-509 ~~N/A~~

Zntegral Attachment C3.20 3 X (East Side) 376800 80-H59 F-A VT 3 Code Case N-491-1 Spring Hanger Fl . 20 1 *N/A1*

3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 204 REVISION: 0 INSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS tor Containment Spray NUMBER: 80.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTZFZCATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK++

376900 80-H59-WD-001 C C MT Code Case N-509 +~N/A~~

Integral Attachment C3. 20 3 X 377000 80-H60 F-A VT 3 Code Case N-491-1 Spring Hanger Fl . 20 ~~N/A~~

3 X 377100 80-H60-WD-001 C C Code Case N-509 **N/A**

Integral Attachment C3.20 3 X 388900 80-WD-144 C-F-2 UT Examine 100% of weld Pipe-to-Rcduccr C5.51 MT length **P1R-.375-2' 3 X 391100 80-WD-169 C-F"2 Terminal End, Examine Valve 80-31 C5.51 100% of weld length 3

-to-Reducer ~ ~NMP-ISW-1020-CS

)

PIR-.375-ae 391300 80-WD-171 C-F-2 MT Terminal End, located No""le-to-Reducer C5.51 UT inside floor grating, 3 X Examine 100% of weld length

"~NMP-ISW-1020-CS,NMP2-2 0 5%*

391400 80-WD-172 C-F-2 UT located inside floor Reducer-to-Pipe C5.51 MT grating Examine 100% of X

weld length

~~PZR-.375-2++

391800 80-WD-176 C-F-2 Examine 100% of weld Pipe-to-Tcc C5.51 length 3 X ~~NMP-ZSW-1020-CS)

P1R .375-~i

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 205 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COHPONENTS tor Containmcnt Spray NUMBER: 80.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAHZNATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUHBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +*CALIBRATION BLOCK*'~

392000 80-WD-178 C-F 2 Examine 100% of weld Pipe-to-Elbow C5.51 MT length ~~PZR-.375-2, NHP-ZSW-1020-C~~

393100 80-WD-194 C-F-2 Examine 100% of weld Elbow-to-Pipe C5.51 length ~~PZR-.375-2~~

3 X 16.0" RCS Linc (REF. DWG. NO. 15B) 393300 80-10 ZEB VT-3 Examine strainer each CTHT. Spray Suction 96-03 outage for debris Strainer 3 X - - - X X - - X r*N/A+a 12.0" RCS Linc (REF. DWG. NO. 15B) 00 SO-SC-20 F-A VT-3 2 Lugs , Coda Case Seismic Box Restraint Fl ~ 20 N-491-1 ~+N/A~~

3 X 400200 80-SC-20-WD-001 C C Code Case N-509 ~~N/A+*

Integral Attachment, C3. 20 3 X 400300 80-SC-20-WD-004 C"C Coda Caso N-509 ~~N/A~~

Integral Attachment C3.20 3 X 400400 80-SC-20-WD-007 C-C MT Coda Caso N-509 ~~N/A~i Integral Attachment C3.20 3 X 400500 80 SC-20-WD-011 C C MT Code Case N-509 ~~N/Ai~

Integral Attachment C3. 20 3 X 400600 80-SC"20-WD-015 C-C MT Code Case N-509 *~N/A*+

Integral Attachment C3. 20 3 X

DATE: 10/15/99 NINE MILE POINT NUCLZAR PLANT UNIT 1 PAGE: 206 REVZSZON: 0 ZNSERVZCE ZNSPECTION TEN YEAR PIAN CLASS 2 SECTION XZ SCHEDULED COHPONENTS tor Containment Spray NUMBER: 80. 0 INSPECTZON INTERVAL PLAN STATUS PRESERVICE YEAR AS ME FIRST SECOND THIRD SEC. XZ PERI OD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~ ~

405200 80-SR-50 F-A VT-3 Code Case N-491-1 Seismic Pipe Restraint F1.20 a aN/PP t X

406500 80-WD-233 C-F-2 Examine 100% of weld Elbow-to-Pipe C5.51 length ~~PIR-.375-2~*

3 X 407500 80-WD-245 C-F-2 UT Examine 100% of weld Elbow-to-Pipe C5. 51 HT length ~~PIR-.375-2~~

3 X 408100 80-WD-251 C-F-2 Examine 100% of weld Pipe-to-Reducer C5.51 length ~~PIR-.375-2~~

3 X 80-WD-281 C-F-2 UT Examine 100% of weld Pipe-to-Tce C5. 51 HT length ~~PIR-.375-2~~

X 411400 80-WD-287 C-F 2 Examine 100% of weld Tcc-to-Pipe C5.51 length ++PIR-.375-2++

3 X 6.0" RCS Linc (REF. DWG. NO. 15B) 411500 80 "WD-290-A C F-2 MT Examine 100% of wold 6.0~ Branch Connection C5.81 length ~~N/A~~

3 X 16.0" RCS Linc (REF. DWG. NO. 15C)

'412700 80-29 IEB Examine strainer Each CTMT. Spray Suction 96-03

- - - - - outage for debris Strainer X X X X eeN/Aea

DATE: 10/15/99 NINE HYLE POINT NUCLEAR PLANT UNIT 1 PAGE: 207 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray NUMBER: 80.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASHE FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD SUHHARY EXAHZNATZON AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCKi i 12.0" RCS Line (REF. DWG. NO. 15C) 413200 80-H28 VT-3 4 Lugs, Code Case Spring Support Fl. 20 N-491-1 ++N/A**

3 X 413300 80-H28-WD-001 C-C Code Case N-509 ~~N/A~*

Integral Attachment C3.20 3 X 413400 80-H28-WD-004 C-C Code Case N-509 +~N/Ai+

Integral Attachment C3.20 3 X 413500 80-H28-WD-007 C-C MT Code Case N-509 ~*N/A~i Integral Attachment C3. 20 3 X 00 80-H28-WD-010 C-C MT Code Case N-509 i~N/A~~

Integral Attachment C3.20 3 X 419400 80 SS 3 F-A VT"3 Code Case N-491-1 Sway Strut Fl . 20 t*N/Atf 3 X A

419900 80 WD"338 C-F-2 Examine 100% of wold Pipe-to-Flange C5. 51 length ~~PIR-.375-2**

3 X 422100 8()-WD-363 C-F-2 Examine 100% of weld Pipe-to-Elbow C5.51 length **PZR-.375-2*i 3 X 12.0" RCS Line (REF. DWG. NO. 15D) 427600 80-H88 F A VT 3 Code Caso N-491-1 Spring Support Fl . 20 *+N/A++

3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 208 REVISION: INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COHPONENTS tor Containmcnt Spray NUMBER: 80.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ZTEH NO METH 1 2 3 4 1 2 3 4 1 2 3 4 '~ +CALIBRATION BLOCK*'~

6.0" RCS Line (REF. DWG. NO. 15D) 433400 80-SS-15 F-A Code Case N-491-1 Sway Strut F1.20 +*N/A**

3 X 433600 80-88-6 Code Case N-491-1 Sway Strut F1.20 lkN/Aft 3 X 433700 80-88-7 Code Case N-491-1 Sway Strut F1. 20 eeN/Aea 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 209 REVZSION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTZON XZ SCHEDULED COMPONENTS tor Containment Spray Heat Exchanger 122

~ NUMBER: 80.0 INSPECTION ZNTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *4CALIBRATION BLOCK**

RCSHE 80-13 (REF. DWG. NO. 15A) 438500 80-13 F A VT 3 Coda Casa N-491-1 Hx Support F1. 40 *+N/A++

3 X 438600 80-13-WD-001 C-B MT H02 ++N/A++

Hx 80-13 C2. 11 3

Nozzle-to-Vessel 438700 80-13-WD"002 C-C MT H02, Coda Casa N-509 Hx 80-13 Integral C3.10 +*N/A*+

3 X Attachment Inlet 80-13-WD-004 C-B MT H02 s+N/A+a Hx 80-13 C2.11 3 X Vessel-to-Noz le 439000 80-13-WD-005 C-A UT H02 **NMP2-24-.500-CS*i Hx 80-13 C1.30 3 X Tubcshcct-to-Shell Inlet 439100 80-13-WD-006 C-A UT H02 ~~NMP2-24-.500"CS~+

Hx 80-13 C1. 30 3 X Tubcshcct-to-Shell Outlet

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 210 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS tor Containment Spray Pump 121 NUMBER: 80. 0 INSPECTION ZNTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~ ~

RCSP 80-03 (REF. DWG. NO. 15) 442600 80-03 F-A VT-3 Code Case N-491-1 Pump Support F1. 40 1tN/At%

3 X 442900 80-03-WD-003 C-F-2 MT Terminal End ~~N/A~~

Pipe-to-Casing CS. 81 3 X 443100 80-03-WD-005 C-G PT 0 lN/A**

Upper Head-to-Shaft C6.10 3 X Channel 443200 80-03-WD-006 **N/A*t t

Shaf Channel-to-Shaf t C6.10 3 X Guide 443300 80-03-WD-007 C"G P03 ~*N/A~~

Upper Casing-to-Head C6.10 X

443400 80-03-WD-008 C-G P03 +~N/A**

Upper Casing-to-Flange C6.10 3 X 443900 80-03-WD-013 C-G P03 atN/Aas Upper Casing Long Weld C6.10 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 211 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COHPONENTS tor Core Spray NUMBER: 81 . 0 INSPECTION INTERVAL'SME PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD SUMHARY NUMBER EXAMINATION AREA IDENTIFICATION CATEGY ITEH NO NDE METH


OUTAGE------ INSTRUCTIONS 1 2 3 4 1 2 3 4 1 2 3 4 +~CALIBRATION BLOCK**

12.0" CS Line (REF. DWG. NO. 13) 446000 58-SC-1 F A Code Case N-491-1 Pipe Restraint Fl. 20 aaN/Ant 3 X 446100 58-SC-1-WD-001 C C MT Code Case N-509 ~~N/Ai~

Integral Attachment C3.20 3 X 446200 58-SC-1-WD-002 C-C MT Code Case N-509 ~~N/A~~

Integral Attachment C3. 20 3 X 446300 58 SC-1-WD-003 C C MT Code Case N-509 ~~N/A+*

Integral Attachment C3. 20 3 X 00 58-SC-1-WD-004 C-C Code Case N-509 ~~N/A~+

Integral Attachment C3. 20 3 X 16.0" CS Line (REF. DWG. NO. 13) 447000 81-05 IEB VT-3 Examine strainer each Suction Strainer 96-03 outage for debris X X X X i IN/AIi 447100 81-06 ZEB VT-3 Examine strainer each Suction Strainer 96-03 outage for debris X X X X 1 0 'N/AP +

447200 81"24 ZEB VT 3 Examine strainer each Suction Strainer 96-03

- - - outage for debris X X X X ++N/A++

447300 81-25 IEB VT-3 Examine strainer each Suction Strainer 96-03

- - - - - outage for debris 3 X X X X i~N/A~~

DATE: 10/15/99 NINE MZLE POINT NUCLEAR PIANT UNIT 1 PAGE: 212 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CIASS 2 SECTION XZ SCHEDULED COMPONENTS tor Core Spray NUMBER: 81. 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERZOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCTZONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *>>CALIBRATION BLOCK>>>>

12.0" CS Li.nc (REF. DWG. NO. 13) 453900 81-H10 F-A VT-3 Coda Case N-491-1 Spring Hanger Fl . 20 *>>N/A**

3 X 454000 81-H10-WD-001 C-C MT Coda Case N-509 >>>>N/A>>>>

Spring Hanger Integral C3.20 3 X Attachment 454300 81-H12 F-A Code Case N-491-1 Pipe Stanchion F1.20 **N/A**

3 X 454400 81-H12-WD-001 C-C Coda Casa N-509 >>>>N/A>>>>

Pipe Stanchion C3.20 3 X 00 81 H14 Code Case N 491-1 Rod Hanger F1.20 **N/A>>>>

3 X 454800 81-H15 VT 3 Code Caso N-491-1 Rod Hanger Fl. 20 **N/A*>>

3 X 455000 81-H15-WD-001 C-C Coda Case N-509 >>>>N/A>>>>

Rod Hangar Integral C3.20 3 X Attachment 455100 81-H15 "WD-002 C-C Code Case N-509 >>>>N/A>>>>

Rod Hanger Zntcgral C3.20 3 X Attachment 455200 81-H15-WD-003 C-C Code Case N-509 >>>>N/A>>>>

Rod Hanger Integral C3.20 3 X Attachment

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 213 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Cora Spray NUMBER: 81 . 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 >>>>CALIBRATION BLOCK>>>>

455300 81-H15-WD-004 C-C MT Code Case N-509 >>>>N/A**

Rod Hanger Integral C3.20 3 X Attachment 455400 81-H15-WD 005 C-C MT Code Case N-509 >>>>N/A*>>

Rod Hanger Integral C3.20 3 X Attachment 455500 81-H15-WD-006 C C MT Code Case N-509 >>>>N/A>> ~

Rod Hanger Zntegral C3.20 3 X Attachment 456200 81-H34 F"A Code Case N-491-1 Pipe Stanchion F1.20 >>*N/A**

3 X 456700 81-H34-WD-001 C-C MT Code Case N-509 >>>>N/A>>>>

Pipe Stanchion C3.20 3 X 458700 81"H37 VT-3 Code Case N-491-1 Spring Hanger Fl . 20 >>>>N/A>>>>

3 X 458800 81-H37-WD-001 C-C Code Case N-509 >>>>N/A>>>>

Integral Attachment C3.20 3 X 458900 81-H38 F A CoCk Case N-491-1 Spring Hanger Fl. 20 >>>>'N/A>>>>

3 X 459000 81-H38-WD-001 C-C Code Case N-509 >>>>N/A>>>>

Integral Attachment C3.20 3 X

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 214 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Core Spray NUMBER: 81 . 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTZFZCATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +*CALIBRATION BLOCK++

460100 81-H5 F-A Code Case N-491-1 Pipe Stanchion Fl . 20 ~~N/A~~

3 X 460600 81-H5-WD-001 C-C MT Code Case N-509 +iN/A+~

Pipe Stanchion C3.20 3 X 6.0" CS I.ine (REF. DWG. NO. 13) 460700 81-H50 F"A VT-3 Code Case N-491-1 Rod Hanger F1.20 **N/A*~

3 X 12.0" CS Line (REF. DWG. NO. 13) 461600 81-Hj F-A VT-3 Code Case N-491-1 Spring Hanger Fl. 20 +AN/Ass 3 X 1700 81-H7-WD-001 C-C Code Case N-509 +*N/A~+

Spring Hanger Integral C3.20 3 X Attachment 461800 81-H7-WD-002 C-C Coda Case N-509 ~~N/A++

Spring Hanger Integral C3.20 3 X Attachment 461900 81-H7-WD-003 C-C Code Case N-509 ~*N/A**

Spring Hanger Integral C3.20 3 X Attachment 462000 81-H7-WD-004 C C Code Case N-509 ++N/A++

Spring Hanger Zntegral C3.20 3 X Attachment

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 215 REVISZON: 0 ZNSERVZCE INSPECTION TEN-YEAR PIAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Core Spray NUMBER: 81 . 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +~CALIBRATION BLOCK~~

462100 81-H7-WD-005 C-C MT Code Case N-509 **N/A~*

Spring Hanger Integral C3.20 3 X Attachment 462200 81 H7-WD-006 C-C Code Case N-509 ~~N/A~~

Spring Hanger Integral C3.20 3 X Attachment 462300 81-H7-WD-007 C-C MT Code Case N-509 ~~N/A++

Spring Hanger Integral C3.20 3 X Attachment 462500 81-HB VT"3 Code Case N-491-1 Spring Hanger Fl. 20 **N/Ak*

3 X 462600 81-HB-WD-001 C-C MT Code Case N-509 ~+N/A~i Zntegral Attachment C3.20 3 X 471300 81 "SC-21 VT-3 Code Case N-491-1 S~ay Brace F1.20 ~*N/A~~

3 X 6.0" CS Line (REF. DWG. NO. 13) 483200 81-SC-45 F-A VT 3 Code Case N-491-1 Seismic Restraint F1. 20 esN/Aas 3 X 483300 81-SC-46 Code Case N-491-1 Seismic Restraint F1.20 **N/A+*

3 X 483400 81-SC-47 F-A VT 3 Code Casa N-491-1 Seismic Restraint F1.20 l4N/Af4 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 216 REVISION: 0 INSERVZCE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS tor Core Spray NUMBER: 81.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK~~

12.0" CS Linc (REF. DWG. NO. 13) 484700 81 SC-51 F-A Code Case N-491-1 Seismic Restraint F1.20 **N/A~~

3 X 6.0" CS Linc (REF. DWG. NO. 13) 486100 81-SR-4 Code Case N-491-1 Seismic Restraint F1.20 **N/A++

3 X 14.0" CS Line (REF. DWG. NO. 13) 487300 81-88-1 F-A Code Case N-491-1 Sway Strut F1.20 saN/Ate 3 X 487400 81-SS-1-WD-001 C C Code Case N-509 aeN/Ass Sway Strut Integral C3.20 3 X Attachment 487700 81-88-11 Code Case N-491-1 Sway Strut F1.20 1*N/A4*

3 X 6.0" CS Lino (REF. DWG. NO. 13) 487900 81"88-13 F-A VT 3 Code Case N-491-1 Sway Strut F1.20 f 1N/A*t 3 X 14.0" CS Linc (REF. DWG. NO. 13) 490400 81-SS 8 F-A Code Case N-491-1 Sway Strut F1.20 tf N/A*%

3 X 490500 81-SS-8 "WD-001 C-C Code Case N-509 ~~N/A~*

Sway Strut Integral C3.20 3 X Attachment

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 217 A

REVISION: 0 ZNSERVZCE INSPECTION TEN YEAR PIAN CIASS 2 SECTION XI SCHEDUZED COMPONENTS tor Core Spray NUMBER: 81 . 0 ZNSPECTZON INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAHZNATZON AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTIFZCATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~ ~

4 91300 81-WD-006 C-F-2 UT Terminal End, Examine Valve 81-01-to-Pipe C5. 51 HT 100% of weld length 3 X + ~ NHP-1 SW-1 020-CS ~ ~

492000 81-WD-013 C-F 2 Examine 100% of weld Pipe-to-Elbow C5. 51 length 3 X ~ *NMP-1SW-1020-CS~ ~

492200 81-WD-016 C-F-2 Examine 100% of wold Pipe-to-Rcduccr C5.51 HT length 3 X (14x12") ~*NMP-1SW-1020-CS**

12.0~ CS Linc (REF. DWG. NO. 13) 493000 81-WD-024 C-F" 2 UT Examine 100% of weld Elbow-to-Pipe C5.51 length

    • NMP-1SW 1020"CS**

16.0" CS I inc (REF. DWG. NO. 13) 493300 81-WD-028 C-F-2 UT Examine 100% of weld 81-05 C5. 51 HT length 3 X STRT-to-Reducer(12"x16 +*NMP-ISW-1020-CS+~

12.0" CS Linc (REF. DWG. NO. 13) 494000 81 WD 035 C-F-2 UT Examine 100% of weld Pipe-to-Reducer C5.51 MT length (12" x10") X ~ ~NMP-1SW-1020-CS*~

494500 81-WD-040 C-F-2 UT Examine 100% of weld Pipe-to-Rcduccr C5.51 HT length (12" x14") **NMP-1SW-1020-CS*+

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 218 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 2 SECTION XI SCHEDULED COMPONENTS

.tor Core Spray NUMBER: 81 . 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALZBRATION BLOCK*~

14.0" CS Linc (REF. DWG. NO. 13) 494900 81 WD 044 C-F-2 UT Examine 100% of weld Pipe-to-Elbow C5.51 MT length 3 X ~ +NMP-ISW-1020 "CS~ ~

12.0" CS Linc (REF. DWG. NO. 13) 4 96200 81-WD-058 C-F-2 UT Terminal End, Examine Pipe-to-Valve 81-37 C5. 51 100% of weld length 3 X **NMP-ISW-1020-CS*~

496600 81-WD-065 C-F-2 Examine 100% of weld Tcc-to-Flange C5.51 MT length eeNMP 1SW 1020 CS*e 00 81-WD-125 C-F-2 Examine 100% of weld Reducer-to-Flange CS. 51 length 3 X (14'x12") **NMP-1SW-1020-CS~~

501200 81-WD-136 C-F-2 UT Examine 100% of weld Pipe-to-Reducer C5.51 length 3 X (12"x16~) ~ ~NMP-1SW-1020-CS~*

502400 81-WD-149 CF2 Examine 100% of weld Pipe-to-Elbow C5.51 length 3 X

    • NMP-1SW 1020 CS++

502600 81 WD 151 C-F-2 UT Terminal End, Examine Reducer-to-Pump 81-50 C5.51 MT 100% of weld length 3 X ~~NMP-ISW-1020-CS**

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 219 REVISION: 0 ZNSERVZCE ZNSPECTION TEN-YEAR PIAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Core Spray NUMBER: 81 . 0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR ASHE FIRST SECOND THIRD SEC. XI PERZOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATZON ITEH NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK*>>

14.0" CS Zine (REF. DWG. NO. 13) 504200 81-WD-167 C-F-2 UT Examine 100% of weld Elbow-to-Pipe CS. 51 HT length 3 - - - - X ~~NMP 1SW 1020-CS~~

12.0" CS Linc (REF. DWG. NO. 13) 504600 81 WD 172 C-F-2 UT Examine 100% of weld Tee-to-Pipe CS. 51 HT length 3 X

~~NMP-ISW-1020-CS~*

506000 81 WD-189 C-F-2 UT Examine 100% of weld Pipe-to-Reducer C5.51 length 3 ~ ~NMP-1 SW-1020-CS**

DATE: 10/15/99 NINE MZLE POINT NUCLEAR PLANT UNIT 1 PAGE: 220 L

REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Core Spray Pump 121 NUMBER: 81 . 0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR ASME FIRST SECOND THZRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK~~

CSP 81-03 (REF. DWG. NO. 13) 511200 81-03-WD-005 C-G P03 **N/A**

Upper Head-to-Shaf t C6.10 3 X Channel 511300 81-03-WD-006 C-G P03 **N/A**

Shaft Channel-to-Shaf t C6.10 3 X Guide 511500 81 03 WD"008 C-G P03 ~*N/A+~

Upper Casing-to-Flange C6. 10 3 X 512000 81-03-WD-013 C-G P03 +'~N/A++

Lower Casing Long Weld C6.10

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PIANT UNIT 1 PAGE: 221

~ REVISION: INSERVICE INSPECTION TEN-YEAR PLAN CIASS 2 SECTION XZ SCHEDULED COMPONENTS tor Core Spray Topping Pump 111 NUMBER: 81. 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *+CALIBRATION BLOCK+ ~

CSTP 81-50 (REF. DNG. NO. 13) 514100 81-50 F-A Code Case N-491-1 Purap Support F1.40 +AN/Ant 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 222 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS tor Core Spray NUMBER: 81. 1 INSPECTION INTERVAL PLAN STATUS PRE SERVICE YEAR AS ME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEH NO HETH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK*~

12.0" CS Linc (REF. DWG. NO. 13) 516200 81. 1-WD-023 C-F-2 UT Examine 100$ of weld Pipe-to-Flange C5. 51 HT length 3

517000 81.1-WD-031 C F-2 Examine 100$ of weld Elbow-to Pipe C5. 51 length 3 X *~ NHP-1 SW-1020-CS ~ i 518400 81. 1-WD-047 C-F-2 MT Terminal End, Examine Tee-to-Valve 81-30 C5. 51 UT 100$ of weld length X ~ ~NHP-1SW-1020-CS**

519400 81.1 WD-059 C-F 2 Examine 100$ of weld Pipe-to-Tcc CS. 51 length 3 X *~NHP-ISW-1020-CS~~

0 0

DATE: 10/15/99 NINE MIZE POINT NUCLEAR PLANT UNIT 1 PAGE: 223 REVISION: 0 ZNSERVICE INSPECTION TEN YEAR PZAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray NUMBER: 93.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK+ +

12.0" Raw Water Line (REF. DWG. NO. 16) 521400 93-R23-A VT-3 Code Case N-491-1 Rod Hanger Fl. 20 ~~N/A~+

X 521800 93-R23-E F-A Code Case N 491-1 Rod Hanger Fl . 20 **N/A**

3 X 522000 93-R24-A F-A VT 3 Code Case N-491-1 Anchor Fl . 20 eaN/A@a 3 X 529600 93"R27"F F-A Code Case N-491-1 Dead Weight Support F1.20 ~~N/A**

3 X 00 93"R30 Code Case N-491-1 Rod Hanger Fl. 20 t 1N/A1k X

533400 93-SCR-9E F A Code Case N-491-1 Seismic Box Restraint Fl 20

~ ++N/A++

3 X 533500 93-SCR-9E-WD-001 C-C Coda Case N-509 +iN/A~+

Integral Attachment C3.20 3 X 533600 93-SCR-9E-WD-002 C C Code Case N-509 +*N/A++

Integral Attachment C3. 20 3 X 533700 93-SCR-9E-WD-003 C-C Code Case N-509 *~N/A*t Integral Attachment C3.20 3 X 533800 93-SCR-9E-WD-004 C-C MT Coda Case N-509 **N/A~*

Integral Attachment C3.20 3 X

0 0

DATE: 10/15/99 NINE HII E POINT NUCLEAR PLANT UNIT 1 PAGE: 224 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray NUMBER: 93.0 INSPECTION ZNTERVAL PIAN STATUS PRESERVZCE YEAR ASHE FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD SUHMARY EXAHINATZON AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTIFZCATION ITEH NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~+CALIBRATION BLOCK' ~

533900 93-SCR-9E-WD-005 C-C HT Code Case N-509 **N/A~*

Integral Attachment C3.20 3 X 534000 93-SCR-9E-WD"006 C C HT Code Case N-509 *~N/A~*

Integral Attachment C3. 20 3 X 534100 93-SCR-9E-WD-007 C-C HT Code Case N-509 <<N/A4~

Integral Attachment C3. 20 3 X 534200 93"SCR"9E-WD-008 C-C Code Case N-509 ~+N/Art Integral Attachment C3.20 3 X 535200 93-SCR-9G VT 3 Code Case N-491-1 Seismic Box Restraint F1.20 a+N/Ate 3 X 535300 93-SCR-9G-WD-001 C-C Code Case N-509 *~N/A~~

Integral Attachment C3.20 3 X 535400 93-SCR-9G-WD-002 C-C Code case N-509 ++N/A%a Integral Attachment C3.20 3 X 535500 93-SCR-9G-WD-003 C-C Code Case N-509 ~~N/A~*

Integral Attachment C3.20 3 X 535600 93 SCR 9G-WD-004 C-C Code Case N-509 <<~N/A**

Integral Attachment C3.20 3 X 535700 93-SCR-9G"WD-005 C-C Code Case N-509 ~~N/A~*

Integral Attachment C3.20 3 X

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PIANT UNZT 1 PAGE: 225 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PIAN CLASS 2 SECTION XI SCHEDULED COMPONENTS tor Containmcnt Spray NUMBER: 93.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD SUMHARY EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~ ~

535800 93-SCR-9G-WD-006 C-C MT Code Case N-509 *~N/A~~

Integral Attachment C3.20 3 X 535900 93-SCR-9G-WD"007 C C MT Code Case N-509 ~*N/A~i Integral Attachment C3. 20 3 X 536000 93-SCR-9G-WD"008 C-C Code Case N-509 ~*N/A~*

Integral Attachment C3.20 3 X 542200 93-WD-055 C-F-2 UT Examine 100% of weld Valve 93-72 -to-Pipe C5.51 HT length 3 X

    • NHP 1SW 1020-CS++

~00 93. 1-WD-005 C-F-2 ExamLnc 100% of weld Elbow-to-Pipe CS. 51 length i~PZRP.375-2**

3 543900 93.1-WD-012 C-F-2 UT Examine 100% of weld Pipe-to-Elbow C5.51 MT length 3 + ~NMP-ISW-1020-CS*~

544700 93.1-WD-020 C-F-2 Examine 100% of weld Pipe-to-Elbow C5.51 length ~*PZR-.375-2, 3 X 94-6007+~

544900 93. 1-WD-022 C-F-2 HT Pipe restraint Elbow-to-Valve 93-52 CS. 51 interfercncc, scan in 3 X both directions to achieve 100% CRV.

  • ~94-6007iPZR-.375-2~*

545200 93.1-WD-028 CF2UT Examine 100% of weld Pipe-to-Valve 93-71 C5.51 HT length *~PZR-.375-2*~

3 X

NINE MILE POINT NMP1-ISI-003-10 EI T NIAGARA NUCLEAR POWER STATION H kJ MOHAWK THIRD INSERVICEINSPECTIONINTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE 6.0 CLASS 3 INSERVICE INSPECTION PLAN TABLES This section contains the Long Term Ten-Year Inservice Inspection Examination Tables for nondestructive examinations of selected systems and components for the Second Inservice Inspection Interval.

38.0 Shutdown Cooling Water System 226 thru 226 39.0 Emergency Condenser System 227 thru 227 54.0 Spent Fuel Pool Cooling System 228 thru 235 57.0 Spent Fuel Pool Cooling System 236 thru 236 70.0 Reactor Building Closed Loop Cooling System 237 thru 242 72.0 Emergency Service Water System 243 thru 244 93.0 Reactor Containment Spray System 245 thru 248 File: NMP1ISIPL.wpd

0 DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNZT 1 PAGE: 226 REVISION: 0 INSERVICE INSPECTION TEN YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS down Cooling Water Heat Exchanger 11 NUMBER: 38.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERZOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK'~+

SDCW HX 38-129 (REF. DWG. NO. C-26855-C7) 548000 38-129-WD-001 D-A VT-1 Code Case N-509, Examine SDC Hx Front Support D1.10 100% of weld length 3 X ~~N/A+~

548100 38-129-WD-002 D-A Code case N<<509, Examine SDC Hx Roar Support D1. 10 100% of weld'ength X ttN/Ail SDCW HX 38-135 (REF. DWG. NO. C-26855-C7) 548200 38-SDC-HX-11 Code Case N-491-1 SDC Heat Exchanger F1.40 +~N/A~~

3 X Support

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PLANT UNIT 1 PAGE: 227 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS gency Condenser Heat Exchanger 122 NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 i*CALIBRATIONBLOCK**

ECHE 60-42 (REF. DWG. NO. 11A) 550100 60-42-WD-007 VT 1 Code Case N-509 ~~N/A~~

North Saddle-to-Shell Dl. 10 3 X Weld 550200 60-42-WD-008 D-A Code Case N-509 ~~N/A+*

Center Saddle-to-Shell D1.10 3 X Weld 550300 60-42-WD-009 D-A VT-1 Code Case N-509 **N/A**

South Saddle-to-Shell Dl . 10 3 X Weld 550400 HX-60-42 Code Case N-491"1 Heat Exchanger Support Fl 40 ~ **N/A*~

X

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PLANT UNIT 1 PAGE: 228 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS t Fuel Pool Cooling NUMBER: 54 . 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~ ~

6.0" Spent Fuel Pool Cooling Line (REF. DWG. NO. C-27171-C) 551200 54-R1-B F A Code Case N-491-1 Rod Hanger F1. 30 iON/Afk 3 X 551600 54-R1"D F-A VT 3 Code Case N-491-1 Rod Hanger F1.30 +~N/A++

3 X 552000 54-R1-H F A VT-3 Code Case N-491-1 Rod Hanger Fl . 30 *AN/A*~

3 X 552900 54-Rll-A F-A Includes U-Bolt and Pipe Stanchion Fl. 30 protection saddle, Code Case N-491-1 ~~N/A+~

00 54 R13-A Code Case N-491-1 Spring Hanger F1. 30 ~~N/A~+

3 X 555000 54-R2-BA F-A VT-3 Code Case N-491-1 Rod Hanger F1.30 %AN/A**

3 X 55S100 54-SCR-1E VT-3 Code Case N-491-1 Seismic Box Restraint F1.30 ~~N/A~+

3 X 558200 54-SCR" 1E"WD-001 D-A Code Case N-509 **N/A**

Integrally Welded Lug Dl 20

~

3 X 1

55S300 54-SCR-1E-WD-002 Code Case N-509 **N/A~~

Integrally Welded Lug D1.20 3 X 2

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 229 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS t Fuel Pool Cooling NUMBER: 54 . 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~*

558400 54 SCR 1E-WD-003 D-A Code Case N-509 ~*N/A*~

Zntdgrally Welded Lug D1.20 3 X 3

558500 54-SCR-1E-WD-004 D-A VT-1 Code Case N-509 **N/A~*

Integrally Wcldcd Lug Dl. 20 3 X 8.0" Spent Fuel Pool Cooling Line (REF. DWG. NO. C-27171-C) 563700 54-SCR-1N Code Case N-491-1 Seismic Box Restraint Fl ~ 30 eaN/Ass 3 X 563800 54-SCR-1N-WD-001 D-A Code Case N 509 ~+N/A++

Integrally Welded I.ug D1.20 3 X 1

563900 54-SCR-1N-WD-002 D-A VT-1 Code Case N-509 +iN/Aii Integrally Welded Lug D1.20 3 X 2

564000 54"SCR-1N-WD-003 D-A Code Casa N-509 ~~N/Ai~

Integrally Welded Lug D1.20 3 X 3

564100 54"SCR-1N-WD-004 D-A VT-1 Code Case N-509 ~~N/Ai~

Integrally Welded Lug Dl 20

~

3 X 4

DATE: 10/15/99 NINE HYLE POINT NUCLEAR PLANT UNIT 1 PAGE: 230 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COHPONENTS t Fuel Pool Cooling NUMBER: 54 . 0 INSPECTION ZNTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD SUHHARY EXAHZNATZON AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEH NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~ ~

6.0" Spent Fuel Pool Cooling Line (REF. DWG. NO. C-27171-C) 567100 54-SCR-3BA F-A Code Case N-491-1 Seismic Box Restraint F1.30 ktN/A%4 3 X 567200 54-SCR-3BA-WD-001 Code Case N-509 ++N/A~~

Integrally Welded Lug D1.20 3 X 1

567300 54-SCR-3BA-WD-002 VT 1 Code Case N-509 +*N/A**

Integrally Welded I.ug Dl. 20 3 X 2

567400 54-SCR" 3BA-WD-003 D A Code Case N 509 *+N/A++

Integrally Welded Lug D1.20 3 X 3

567500 54-SCR-3BA WD 004 D-A Code Case N-509 **N/A~*

Integrally Woldcd Lug D1.20 3 X 4

567600 54-SCR-3BA-WD-005 D-A VT-1 Code Case N-509 *~N/A~~

Integrally Welded Lug D1.20 3 X 5

567700 54"SCR-3BA-WD-006 D-A VT"1 Code Case N-509 ++N/A++

Integrally Welded Lug D1.20 3 X 6

567800 54-SCR-3BA-WD-007 VT 1 Code Case N-509 ++N/Ai+

Integrally Welded Lug D1.20 3 X 7

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 231 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS t Fuel Pool Cooling NUMBER: 54 . 0 INSPECTION INTERVAL PLAN STATUS PRESERV ICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +~CALIBRATION BLOCK~~

567900 54-SCR-3BA-WD-008 D-A Code Case N-509 <<*N/A~~

Integrally Welded Lug Dl. 20 3 X 8

8.0" Spent Fuel Pool Cooling Line (REF. DWG. NO. C-27171-C) 571500 54-SCR-5F F"A Code Case N-491-1 Seismic Box Restraint F1.30 **N/A**

3 X 571600 54-SCR-5F-WD-001 D-A Code Case N-509 ~~N/A~~

Integrally Welded Lug D1.20 3 X 1

571700 54-SCR-5F-WD-002 D-A Code Case N-509 ~~N/A~~

Integrally Wcldcd Lug D1.20 X

2 571800 54-SCR-5F-WD-003 D-A Code Case N-509 ~*N/A~i Integrally welded Lug D1.20 3 X 3

571900 54-SCR-5F-WD-004 D-A Code Case N-509 ~~N/A*~

Integrally Welded Lug D1.20 3 X 4

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 232 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS t Fuel Pool Cooling Filter 11 NUMBER: 54 . 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~>

SFPCF 54-03 (REF. DWG. NO. C-27171-C) 574800 FP-54-03 F A VT-3 Coda Case N-491-1 FP Filter 11 Support F1.40 +~N/A~~

3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 233 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS t Fuel Pool Cooling Heat Exchanger 12 NUMBER: 54 . 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 t +CALIBRATION BLOCK**

SFPCHE 54-04 (REF. DWG. NO. C-27171-C) 575300 FP 54-04 Code Case N-491-1 FP Hx 12 Support Fl . 40 e*N/Ase 3 X 575400 FP-54-04-WD-001 D A Code Case N-509 **N/A~*

FP Hx 12 Front D1. 10 3 X Integral Attachment 575500 FP-54-04-WD-002 Code Case N-509 **N/A*~

FP Hx 12 Roar Integral D1.10 3 X Attachment

E DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 234 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS t Fuel Pool Cooling Pump 11 NUMBER: 54 . 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATZON BLOCK**

SFPCCP 54-01 (REF. DWG. NO. C-27171-C) 575600 FP-54-01 Code Case N-491-1 Pump Support F1.40 ~+N/A~~

3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 235 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS t Fuel Pool Cooling Surge Tank NUMBER: 54 . 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERZOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +*CALIBRATION BLOCK**

SFPCST 54 68 (REF. DWG. NO. C-27171 C) 575800 TK-54-68 VT 3 Code Casa N-491-1 Surge TK Support F1.40 aaN/Awe 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PZANT UNIT 1 PAGE: 236 REVISION: INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS t Fuel Pool Cooling System NUMBER: 57. 0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATZON AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ZTEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK~*

Spent Fuel Pool Cooling Linc (REF. DWG. NO. C-27172-C) 576000 57-R3-C VT 3 U Bolt, Code Case Pipe Stanchion Fl. 30 N 491 1 ~~N/A++

X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 237 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS tor Building Closed Loop Cooling NUMBER: 70.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 11CALZBRATZON BLOCK11 RBCLC Line (REF. DWG. NO. C-26855-C) 582900 70-R17-D F-A VT-3 Code Case N-491-1 Rod Hanger F1.30 11N/A11 3 X 583200 70-R17-I VT-3 Code Case N-491-1 Rod Hanger Fl . 30 **N/A1*

3 X 583700 70-Rl 7-N F-A VT-3 Code Case N-491-1 Rod Hanger Fl. 30 11N/A11 3 X 584000 70-R19-A F-A Code Case N-491-1 Pipe Stanchion Fl . 30 1 1N/A1 1 3 X 00 70-R19-B F-A Code Case N-491-1 Pipe Stanchion F1.30 *1N/A*1 3 X 584200 70-R19-C F-A Code Case N-491-1 Pipe Stanchion F1.30 11N/A11 3 X 588400 70 R7 G F-A Code Case N-491-1 Rod Hanger Fl. 30 11N/A1 1 3 X 588500 70-Rj-H F-A Code Case N-491-1 Rod Hanger Fl . 30 11'N/A1*

3 X 588600 70-R7-I Code Case N-491-1 Rod Hanger Fl . 30 11N/A11 3 X 590700 70 R9 A F-A Code Case N-491-1 Pipe Stanchion F1. 30 1 1N/A1 1 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 238 REVZSZON: 0 ZNSERVZCE ZNSPECTZON TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS tor Buf.lding Closed Loop Cooling NUMBER: 70. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATZON AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTZFZCATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK**

590800 70 R9 A WD 001 D A VT-1 Code Case N 509 ++N/A~~

Pipe Stanchion D1.20 3 X 591700 70-R9-F F-A VT-3 Code Case N-491-1 Pipe Stanchion F1.30 ++N/A++

3 X 591800 70-R9-F-WD-001 D-A VT-1 Code Case N-509 a*N/Ass Pipe Stanchion D1.20 3 X 592300 70-83 F"A Code Case N-491-1 Pipe Stanchion Fl. 30 ssN/A*a 3 X 70 "S3-WD-001 VT"1 Code Case N-509 +~N/A~+

Pipe Stanchion Dl. 20 3 X 594500 70-SC-3 VT 3 Code Case N-491-1 Seismic Box Restraint F1.30 aaN/Att 3 X 597200 70-SC-8 F A Code Case N-491-1 Seismic Box Restraint F1.30 ~~N/A**

3 X 597300 70-SC-9 F-A Code Case N-491-1 Seismic Pipe Restraint F1.30 aaN/Aea 3 X 599900 70 SCR-SA F A Code Case N-491-1 Box Restraint F1.30 **N/A**

3 X 600000 70 SCR SA WD 001 D-A Code Case N-509 +~N/A++

Integral Attachment D1.20 3 X

DATE: 10/15/99 NINE HZLE POINT NUCLEAR PLANT UNIT 1 PAGE: 239 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COHPONENTS tor Building Closed Loop Cooling NUMBER: 70. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERZOD PERIOD PERZOD SUHMARY EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 '1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~*

600100 70-SCR-BA-WD-002 D-A VT 1 Code Case N-509 ++N/A++

Integral Attachment D1.20 3 X 600200 70-SCR-BA-WD-003 D A Code Case N-509 i~N/A~~

Integral Attachment D1.20 3 X 600300 70-SCR-BA-WD-004 D-A Coda Case N-509 *~N/A*~

Integral Attachment Dl. 20 3 X A ~

601800 70-SR-23 Code Case N-491-1 Seismic Box Restraint F1.30 *I'N/At*

3 X 70-SR-24 VT-3 Code Case N-491-1 Seismic Box Restraint F1.30 +AN/Ate 3

602200 70-SR-27 VT 3 Codo Case N-491-1 Seismic Box Restraint F1.30 /AP a 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 240 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CIASS 3 SECTION XI SCHEDULED COMPONENTS tor Building Closed Loop Cooling Heat Exchange NUMBER: 70. 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *+CALIBRATION BLOCK~~

RBCLCHE 70-13R (REF. DWG. NO. C-26855-C) 603400 70-13R F-A VT-3 Code Case N-491-1 RBCLCHE Support Fl. 40 ~~N/A~~

3 X 603500 70 13R-WD-001 D-A Code Case N-509 ~~N/A~~

RBCLCHE Front Integral D1.10 3 X Attachment 603600 70-13R-WD-002 Code Case N-509 ++N/A~~

RBCLCHE Rear Integral D1.10 3 X Attachment

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PLANT UNIT 1 PAGE: 241 REVISZON: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS tor Building Closed Loop Cooling MU Tank NUMBER: 70.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK*~

RBCLC M.U. Tank 71-126 (REF. DNG. NO. C-26855-C) 604300 71-126 F-A VT-3 Code Case N-491-1 CLC M.U. Tank Fi . 40 1 4N/A1 4 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 242 REVZSZON: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS tor Building Closed Loop Cooling Pump NUMBER: 70 . 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 '~

~CALIBRATION BLOCK*+

RBCLCP 70-01 (REF. DWG. NO. C-26855-C) 604400 70-01 Coda Case N-491-1 RBCLC Pump Support F1.40 eeN/Ate 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 243 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS gency Service Water NUMBER: 72.0 ZNSPECTION ZNTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~~

ESW Line (REF. DWG. NO. F-45235-C) 604700 72-Al F-A Code Case N-491-1 Pipe Stanchion F1.30 ++N/A++

3 X 604800 72-Al-WD-001 D-A Code Case N-509 **N/A**

Pipe Stanchion D1.20 3

604900 72-A2 F-A Code Case N-491-1 Pipe Stanchion F1.30 ++N/A++

3 X 605000 72-A2-WD-001 D-A VT 1 Code Case N-509 ~~N/A++

Pipe Stanchion D1.20 3 X 00 72-H159 VT-3 Code Case N-491-1 Rod Hanger F1.30 @AN/Aea 3 X 607600 72-H162 VT-3 Code Case N-491-1 Rod Hanger F1.30 +~N/A++

3 X 607700 72-H163 Code Case N-491-1 Rod Hanger Fl. 30 *~N/A~*

3 X 608700 72-SC-4 F-A Code Case N-491-1 Seismic Restraint F1.30 i*N/Aff 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 244 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS gcncy Service Water Pump 11 INSPECTION ZNTERVAI PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERZOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +~CALIBRATION BLOCK~~

ESWP 72-04 (REF. DWG. NO. F-45235-C) 613300 72-04 Code Casa N-491-1 Pump Support F1. 40 %AN/APk 3

1

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 245 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray NUMBER: 93.0 PRESERVZCE YEAR INSPECTION ZNTERVAL PLAN STATUS ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMZNATZON AREA CATEGY NDE OUTAGE INSTRUCTZONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 >>>>CALIBRATION BLOCK>>>>

12.0" Raw Water Linc (REF. DWG. NO. 16) 613700 93-H3 F A VT-3 Code Case N-491-1 Gravity Support Fl . 30 I *>>N/A>>>>

3 X 613900 93-HS F A VT 3 Code Case N-491-1 Gravity Support F1.30 **N/A>>*

3 X 614100 93-H7 Code Case N-491-1 Gravity Support F1.30 **N/A*>>

3 X 615100 93-R10-A VT 3 Code Case N-491-1 Rod Hanger Fl . 30 **N/A>>*

3 X 00 93 Rll A2 VT-3 Code Case N-491-1 Rod Hanger F1.30 >>>>N/A>>>>

3 X 616400 93-R13-B F-A VT 3 Code Case N-491-1 Rod Hanger F1.30 >>>>N/A>>>>

3 X 617500 93-R16-A F-A Code Case N-491-1 Pipe Stanchion Fl. 30 >>>>N/A>>>>

3 X 617600 93-R16-A-WD-001 D-A VT-1 Code Case N-509 **N/A>>>>

Pipe Stanchion Dl . 20 3 X 617700 93-R16-B F-A Code Case N-491-1 Pipe Stanchion F1.30 >>>>'N/A>>>>

3 X 617900 93-R16-C F-A VT-3 Code Case N-491-1 Pipe Stanchion F1.30 **N/A**

3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 246 REVISION: 0 ZNSERVICE ZNSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS tor Containment Spray NUMBER: 93.0 INSPECTION ZNTERVAZ PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATE GY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 saCALIBRATION BLOCK+ t 618000 93 R16-C-WD-001 D-A Code Case N-509 ~*N/A*~

Pipe Stanchion Dl. 20 3 X 621000 93-R2-C F-A Code Case N-491-1 Spring Hanger F1.30 4 fN/A4 1 3 X 621100 93-R2-C"WD-001 D-A Code Case N-509 ~~N/A~~

Integral Attachment Dl. 20 3 X 628300 93-SCR-10A F-A Code Case N-491-1 Seismic Restraint F1.30 *~N/A~~

3 X 93-SCR 10B F-A Code Case N-491-1 Seismic Restraint F1.30 **N/A**

3 X 637000 93-SCR-4A F"A VT-3 Code Case N-491-1 Seismic Box Restraint F1.30 **N/Aff 3 X 637100 93-SCR-4A-WD-001 D-A VT-1 Code Case N-509 ~*N/A~~

Integral Attachment D1.20 3 X 637200 93-SCR-4A-WD-002 Code Case N-509 +~N/A~~

Integral Attachment D1.20 3 X 637300 93-SCR-4A-WD-003 D-A VT-1 Code Case N-509 ~*N/A~*

Zntcgral Attachment D1.20 3 X 637400 93-SCR-4A-WD-004 D-A VT 1 Code Case N-509 +*N/A~~

Zntegral Attachment D1.20 3 X

DATE: 10/15/99 NINE HII E POINT NUCLEAR PLANT UNIT 1 PAGE: 247 REVISION: 0 INSERVICE ZNSPECTION TEN YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray NUHBER: 93.0 INSPECTION INTERVAI PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD SUHHARY EXAHI NATION AREA CATEGY NDE OUTAGE ZNSTRUCTZONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +*CALIBRATION BLOCK+*

642000 93-SCR-7A1 F A VT-3 Code Case N-491-1 Seismic Box Restraint F1.30 +*N/A*~

3 X 642100 93-SCR-7A1-WD-001 Code Case N 509 *+N/A*+

Integral Attachment Dl. 20 3 X 642200 93-SCR-7A1-WD-002 D-A Code Case N-509 ++N/A++

Integral Attachment D1.20 3 X 642300 93 SCR 7A1-WD-003 VT 1 Code Case N-509 ~~N/A~~

Integral Attachment D1.20 3 X 93-SCR-7A1 "WD-004 D A VT-1 Code Case N-509 4wN/Aiw Integral Attachment D1.20 3 X 648000 93-SCR-9A Code Case N-491-1 Seismic Box Restraint F1.30 ~+N/A+~

3 X 648100 93-SCR-9A-WD-001 D-A Code Case N-509 ~~N/A~+

Integral Attachment Dl. 20 3 X 648200 93-SCR-9A"WD-002 VT-1 Code Case N-509 +~N/A++

Integral Attachment D1. 20 3 X 648300 93-SCR-9A-WD-003 D-A Code Case N-509 ~*N/A**

Integral Attachment D1.20 3 X 648400 93 SCR-9A-WD-004 VT-1 Code Case N-509 ++N/A~+

Integral Attachment D1.20 3 X

4 DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 248 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PZAN CZASS 3 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray Raw Water Pump 111 NUMBER: 93. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERZOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~*CALIBRATION BLOCK~ ~

RCSRWP 111 (REF. DWG. NO. 16) 649500 RWP-111 F-A VT-3 Code Case N-491-1 Pump Support F1.40 ~~N/A~+

X

NINE MILE POINT NMP1-ISI-003-1 0 V NlAGARA NUCLEAR POWER STATION N U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE APPENDIXA ACCEPTANCE CRITERIA Indications detected by inservice examinations, shall be compared against the acceptance criteria of Section XI as defined in Tables A-1 through A-4.).

'ABLEA-1 CLASS::1:ACCEPTANCE STANDARDS EXAMINATION:

" ,, COMPONENT;.,OR PART EXAMINED",- ,,-:,j-;gg '"ACCEPTANCE STANDARD CATEGORY 8-A Welds In Reactor Vessels IW84510 B-B Welds in Other Vessels IW84510 8-D Vessel Nozzle Wolds IW84512 8-E Partial Penetration welds In Vessels IW84522 B-F, 84 Dissimilar and Similar Metal Welds In Pl !n IW84514 8-G-1 Boltln > 2" dia. IW8451 5/3517 8-G-2 Boltin < 2" dla. IW84517 B-H, 8-K-1 Into ralAttachmentsforPI in, Valves Pum s & Vessels IW84516 B-L-1, 8-M-1 Welds In Pum s & Valves IW84518 B-L-2, 8-M-2 Pum Casln s & Valvo Bodies IW8<519 8-N-1 8-N-2 Interior Surfaces & Internal Components of Reactor Vessels IW84520.1 8-N4 IW84520.2 B-O Control Rod Drive Housln Welds IW84523 8-P Pressure Rotainin Bounda IW84522 8-0 Steam Generator Tubln IW84521 File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-1 0 V NIAGARA NUCLEAR POWER STATION N UmomwK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE TABLE A-2 CLASS 2 ACCEPTANCE STANDARDS EXAMINATION ACCEPTANCE COMPONENT OR PART EXAMINED CATEGORY STANDARD C-A Welds In Pressure Vessels IWC4510 C-B Nozzle Welds In Vessels IWC4511 C-C Inte raIAttachmentsfor Vessels Pi In Pum sand Valves IWC4512 C-D Boltln IWC4513 C-F-1, C-F-2 Weids in Pi in IWC4514 Welds In Pum s and Valves IWC4515 C-H Pressure Retainln Com onents IWC4516 TABLE AN CLASS 3 ACCEPTANCE STANDARDS EXAMINATION COMPONENT OR PART EXAMINED ACCEPTANCE CATEGORY STANDARD D-A Pressure Boundary (VT-2) "No Leakage 'Mfg. Code &

Inte ral Attachments VTQ llcablo Standards D-B Pressure Boundary (VT-2) "No Leakage 'Mfg. Codo &

Inte ralAttachments VTQ llcablo Standards D-C Pressure Boundary (VT-2) IWA-5250 'Mfg. Code &

Into ral Attachments VTN A Ilcablo Standards ASME Section XI Acceptanco Standard in course of preparation.

Defined as no leakago from the pressure boundary, in excess of that which is expected and determined to bo within acceptablo limits, l.e., at valve packing, bolted connections, pump seals, etc.

TABLE A-4 COMPONENT SUPPORT ACCEPTANCE STANDARDS EXAMINATION COMPONENT OR PART EXAMINED ACCEPTANCE CATEGORY , STANDARD F-A Su rts IWF-3410 File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-1 0 El Y NIAGARA NUCLEAR POWER STATION H kl MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE APPENDIX B NONDESTRUCTIVE EXAMINATIONPROCEDURE LISTING NDEP REVISION TITLE VT 2.01 Note 1 "ASME XI Visual Examination Procedure" PT 3.00 Note 1 "Li uid Penetrant Examination Procedure" MT 4.00 Note 1 "Ma netic Particle Examination Procedure" RT 5.00 Note 1 "Radio ra hic Examination" UT 6.01 Note 1 "Ultrasonic Linearit Verification" UT 6.04 Note 1 "Ultrasonic Examination of Bolts, Studs, Nuts and Cylindrical Com onents" UT 6.05 Note 1 "Ultrasonic Thickness Measurement" UT 6.06 Note 1 "Ultrasonic IGSCC Sizin Procedure" Manual UT 6.07 Note 1 "Ultrasonic Examination of Nozzle Inner Radii" UT 6.09 Note 1 "Ultrasonic Examination Procedure for RPV Flange Weld and Stud Hole Threads in the RPV Flan e" UT 6.10 Note 1 "S stem Performance Checks" UT 6.13 Note 1 "Ultrasonic Examination of Bi-Metallic Pi in Welds" UT 6.15 Note 1 "Ultrasonic Examination to Determine Water Level" UT 6.16 Note 1 "Ultrasonic Thickness Measurement Utilizin Di ital E ui ment" UT 6.19 Note 1 "Freeze Seal Ultrasonic Examination Procedure for Ferritic Pipe and Fittin s" UT 6.20 Note 1 "Ultrasonic Examination of Reactor CRD Housin s" UT 6.21 Note 1 "Ultrasonic Examination Procedure for Vessel Welds 2" Thick or Less and Associated Nozzle Inner Radius Areas" UT 6.23 Note 1 "Ultrasonic Examination of Ferritic Pi e Welds" UT 6.24 Note 1 "Ultrasonic Examination of Austenitic Pi e Welds" UT 6.25 Note 1 "Strai ht Beam Ultrasonic Examination of Bolts and Studs" File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-10 LI V NIAGARA NUCLEAR POWER STATION a U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE

.." ';,",',: AP.P...END)X-:B

': NONDESTRUCTIV.E'.EXAMlNATlON;PROCEDU,RE L'ISTING REVlSfON

'P 7.00 Note 1 "Standard Method for Etchin Metals and Allo s" SP 7.01 Note 1 "Hardness Testin of Metals" SP 7.02 Note 1 "Visual Examination of Weldin 0 erations" SP 7.03 Note 1 "Visual Examination of Brazed Joints" SP 7.04 Note 1 "Measurin Coatin Thickness b Use of Edd Current" SP 7.05 Note 1 "Weld Detection b Use of Edd Currents" ET 8.00 Note 1 "Eddy Current Examination of Nonferromagnetic Heat Exchange Tubing" See controlled copy of NDE Procedures for latest approved revision.

File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-10 hl Y NIAGARA NUCLEAR POWER STATION H U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE

-APPENDIX C '.'-

' ': 'ULTRASONIC.'CALIBRATIONBL'GCKS':,'. '. ";;,

  • " '.", BL'OCK.; '
    ::"'.""':: ':- .THICKNESS:

";-" ITEMNUMBER,.:,-,

1-2 NMP1-29-SE-1 1.655/1.1501.151.11 1-3 NMP1-28-2.00-SS 2.055 1-4 NMP-28-1.200-SS 1.109 1-6 NMP1-24-SE-1 1.475 1-7 NMP1-24-080-CS 1.219 1-8 NMP.1-20-1.500-CS 1.63 1-12 NMP1-18-1.375-CS 1.375 1-13 NMP1-18-1.156-CS 1.156 1-14 NMP1-18-.937-CS-106 .937 1-16 NMP-18-120-CS 1.375 1-17 NMP-18-100-CS 1.156 1-21 NMP1-16-120-CS 1.24 1-22 NMP-16-100-CS 1.031 1-23 NMP1-16-.375-CS-106 .375 1-25 NMP1-14-120-CS 1.219 1-28 NMP1-14-XX2-SS .935 1-29 NMP-14-XX1-SS .760 1-30 NMP-14-STD-CS .375 1-32 NMP1-12-1.44-CS-105 1.44 1-33 NMP1-12-.688-SS .688 1-36 NMP1-12-XX2-SS .855 1-37 NMP-12-XX1-SS .720 1-38 NMP-12-STD-CS .375 File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-1 0 El Y NIAGARA NUCLEAR POWER STATION H U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE

'PPENDIX C

"- 'ULFRASONIC:CALIBRATIONBLot:-KS-: "-'- '- .- --:-:--:

v ITEM NUMBER B LO Q Kg <~~<i< c~,.

"'-40 NMP1-10-.594-CS .700 1-42 NMP1-10-.522-SS-F2 ~ 522 1-43 NMP1-10-.500-SS-403 .500 1-44 NMP1-10-160-SS 1.141 1-47 NMP1-10-100-CS .75 1-49 NMP1-10-80-CS .600 1-50 NMP-10-XX1-SS .727 1-51 NMP1-10-XX1-SS-358 .591 1-52 NMP1-1 0-SE-1 .900 1-55 NMP1-8-120-CS .720 1-56 NMP1-8-80-CS .495 1-61 NMP1-6.25-RPV-STUD 2.72 1-62 NMP1-6-.596-SS .596 1-64 NMP1-6-160-CS .720 1-65 NMP1-6-80-SS .432 1-66 NMP-6-080-CS .432 1-68 NMP1-6-80-SS-312 .432 1-69 NMP1-6-SE-2 1.5 1-70 NMP1-6-SE-1 .75 1-77 NMP1-4-80-CS .337 1-81 NMP1-2.75-RCP-STUD 1-82 NM1-2.50-B16-1 1-83 NM1-2.50-B16-2 1-84 NM1-2.25-B16 File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-10 Y NIAGARA NUCLEAR POWER STATION kL MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE APPENDIX C Uk.TRASONlt CALIBRATIONBLOCKS ITEM NUMBER BLOCK THICKNESS.

1-92 NMP1-FW-1.50-CS-516 1-94 FWMU-N1-P3-8.1-RV 1-96 NMP1-IR-9 1-97 NMP1-IR-7.5 1-98 NMP1-IR-5.5 1-99 NMP1-IR-3.3 1-1 00 NMP1-IR-1.7 1.7 1-108 NMP-80XI-N278-ALT-BL1 10.75 NMP1-SW-1020-CS .1-3.00 1-113 NMP1-SW-304-SS .1-3.00 1-114 NMP1-SW-600-IN .1-1.0 1-128 P8R-1.260 1.260 1-130 P8R-.75-1 .75 1-133 P8R-.3-1 1-137 PIS-6.25 2.72 1-138 PIS-2.5 16.7 1-140 P IR-1.5-1 1.5 1-143 PIN-6.25 1.62 1-146 PIF-1.5C 1.5 1-158 NMP1-RPV-4 27.0 1-159 NMP1-RPV-1 4.60 1-165 NMP-EPRI-CS 1-166 NMP-EPRI-SS 2-1 NMP2-48-3.50-CS 3.50 File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-1 0 V NIAGARA NUCLEAR POWER STATION 4 MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE APPENDlX C ULTRASONlC CAL1BRATION BLOCKS lTEM NUMBER BLOCK THlCKNESS 2-2 NMP2-30-2.90-CS 2.90 2-3 NMP2-28-2.60-CS 2.60 2-4 NMP2-28-1.34-CS 1.34 2-5 NMP2-27-1.57-CS 1.57 2-6 NMP2-26-1.26-CS 1.26 2-7 NMP2-25-1 .84-NOZ 1.84 2-8 NMP2-24-2.469-CS 2.469 2-9 NMP2-24-2.06-CS 2.06 2-10 NMP2-24-1.317-SS 1.317 2-11 NMP2-24-1.234-SS 1.234 2-12 NMP2-24-1.219-CS 1.219 2-13 NMP2-24-1.002-SS 1.002 2-14 NMP2-24-.500-SS .500 2-15 NMP2-24-.500-CS .500 2-16 NMP2-24-.375-CS .375 2-17 NMP2-20-1.031-SS 1.031 2-18 NMP2-20-1.031-CS 1.031 2-19 NMP2-20-.84-SS .84 2-20 NMP2-20-.812-CS .812 2-21 NMP2-20-.594-CS .594 2-22 NMP2-20-.500-CS .500 2-23 NMP2-20-.375-CS .375 2-24 NMP2-20-.375-SS .375 2-25 NMP2-18-.938-CS .938 File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-1 0 V NIAGARA NUCLEAR POWER STATION U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE APPEND)X C ULTRASONlC CALlBRATlQNBLOCKS 1TEM NUMBER BLOCK THlCKNESS 2-26 NMP2-18-.500-CS .500 2-27 NMP2-18-.375-CS .375 2-28 NMP2-18-.375-SS .375 2-29 NMP2-16-1.031-CS 1.031 2-30 NMP2-16-.822-SS .822 2-31 NMP2-16-.500-CS .500 2-32 NMP2-16-.375-SS .375 2-33 NMP2-16-.375-CS .375 2-34 NMP2-14-.375-CS .375 2-35 NMP2-12-1.00-SS 1.00 2-36 NMP2-12-.844-SS .844 2-37 NMP2-12-.844-CS .844 2-38 NMP2-12-.688-CS .688 2-39 NMP2-12-.688-SS .688 2-40 NMP2-12-.657-SS .657 2-41 NMP2-12-.375-SS .375 2-42 NMP2-12-.375-CS .375 2-43 NMP2-11.625-1.125-CS 1.125 2-44 NMP2-10-1.00-CS 1.00 2-45 NMP2-10-.719-CS .719 2-46 NMP2-10-.594-CS .594 2-47 NMP2-1 0-.365-CS .365 2-48 NMP2-9.3-1.77-CS 1.77 2-49 NMP2-8-.906-CS .906 File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-1 0 V NIAGARA NUCLEAR POWER STATION U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE

' "'>>', '>> 'w 'w '*",

PENDIX Q

,',',ULTR'A'SONIC CAL'IBRATION'BLOCKS.

':".'-,.'"'TEM NUMBER '; . -'.", "..'"".'-".""'":BLOCK 2-50 NMP2-8-.718-CS .718 2-51 NMP2-8-.594-CS .594 2-52 NMP2-8-.500-CS .500 2-53 NMP2-8-.322-SS .322 2-54 NMP2-8-.322-CS .322 2-55 NMP2-6.3-1.24-CS .562 2-57 NMP2-6-.432-CS .432 2-58 NMP2-6-.280-CS .280 2-59 NMP2-5.8-.365-SS .365 2-60 NMP2-5.25-.69-NOZ .69 2-61 NMP2-5-.78-CS .78 2-62 NMP2-4-.337-SS .337 2-63 NMP2-4-.337-SS-182 .337 2-64 NMP2-4-.337-CS .337 2-65 NMP2-4-.250-CS .250 2-66 NMP2-4-.250-SS .250 2-67 NMP2-3.25-23.5-STUD 23.5 2-68 NMP2-2.25-10-STUD 10.0 2-69 NMP2-IR-9-CS 9.0 2-70 NMP2-IR-7.5-CS 7.5 2-71 NMP2-IR-4-CS 4.0 2-72 NMP2-RHS-.75-CS .75 2-73 NMP2-RHS-IR-3.75-CS 3.75 2-74 NMP2-FLG-RPV 38.0 File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-1 0 Y NIAGARA NUCLEAR POWER STATION N @MOHAWK THIRD INSERVICEINSPECTIONINTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE

'," "APPENDIX:C;:; '; ',";,"',:~~," -;:. "."' ' ..."

ULTRASONIC CALIBRATIONBLOCKS;::,':: '::

': ":i; BLOCK."". ".

",THICKNESS,'.69 2-75 NMP2-RPV-STUD-1 2-76 NMP2-RPV-NUT-1 7.125 2-77 NMP2-128-1-RPV 5.25 2-78 NMP2-127-1-RPV 3.18 2-79 NMP2-126-1-RPV 7.90 2-80 NMP2-1 25-1-RPV 6.80 2-81 NMP2-124-1-RPV 6.68 2-82 NMP2-123-1-RPV 8.11 2-900 GE795E254G3 2-84 NMP2-2.24-15.88-STUD 15.88 1-95 H JT-6-13-A .55 File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-10 hl Y NIAGARA NUCLEAR POWER STATION H V MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE

,,APPENDIX D CL'ASS 1, 2 and 3 WELDlSUPPORT LOCATION QAPS-DRAWING NUMBER SYSTEM TITLE C-26830-C 01 Main Steam C-26831-C 02 Main Steam C-26832-C 03 Main Steam C-27165-C 05 Emergency Condenser Vent C-27165-C 05.1 Emergency Condenser Vent C-27165-C 05.2 Emergency Condenser Vent C-26839-C 31 High Pressure Reactor Feedwater C-26846-C 32 Reactor Recirculation C-26852-C 33 Reactor Clean UP C-26852-C 33.1 Reactor Clean UP C-26839-C 33.2 Reactor Clean UP C-26839-C 33.3 Reactor Clean UP C-26851-C 34 Reactor Head Spray F-45028-C 36 Reactor Instrumentation C-26852-C 37 Reactor Drain C-45060-C 37 Reactor Head Vent C-26852-C 37.1 Reactor Drain C-26847-C 38 Reactor Shutdown Cooling C-26843-C 39 Emergency Condenser C-26844-C 40 Reactor Core Spray C-35682-C 40.1 Reactor Core Spray C-27168-C 41 Liquid Poison C-27168-C 42 Liquid Poison File: NMP1ISIPL.wpd

0 NINE MILE POINT NMP1-ISI-003-10 El Y NIAGARA NUCLEAR POWER STATION H 4 MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE APPENDIX D CLASS 1, 2 and 3 VlELNSUPPORT LOCATION MAPS DRAY/ING NUMBER SYSTEM TITLE C-27168-C 42.1 Liquid Poison C-26849-C 44.1 Control Rod Drive Hydraulic C-34124-C 44.2 Control Rod Drive Hydraulic C-27171-C 54 Fuel Pool Cooling C-27178-C 66 Main Steam Line C-26855-C 70 Reactor Building Closed Loop Cooling C-39816-C 70 Closed Loop Cooling C-27179-C 72 Service Water System F-45236-C 72 Service Water System C-26848-C 80 Reactor Containment Spray C-27181-C 80.1 Reactor Containment Spray C-26845-C 81 Reactor Core Spray C-26845-C 81.1 Reactor Core Spray C-27183-C 93 Containment Spray Cooling Raw Water N/A Weld Map Index 01 Main Steam 2A 01 Main Steam 2B 01 Main Steam 02 Main Steam 3A 02 Main Steam 03 Main Steam Turbine By Pass to Condenser 31 Reactor Feedwater 5A Reactor Feedwater 34 Reactor Head Spray File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-10 hl Y NIAGARA NUCLEAR POWER STATION H U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE

-'- CLASS 1, 2 an'd,3 WELD/SUPPORT,L'OCATfON IIIIAPS;: -;

J F DRAW!NG":NUMBER,- ;SY'TEM'=,"",-,.",

32 Reactor Recirculation 7A 32 Reactor Recirculation 7B 32 Reactor Recirculation Pump Discharge Instrumentation 7C 32 Reactor Recirculation Pump Instrumentation 7D 36 Reactor Recirculation Pump Seal Cavity Instrumentation 36 Reactor Instrumentation Level Protection System 8A 36 Reactor Instrumentation Level Control Range 8B 36 Reactor Instrumentation Level Control Range 8C 36 Reactor Instrumentation Level Protection System 8D 36 Reactor Instrumentation Wide Range Level 8E 36 Reactor Instrumentation Seal Leak Detection 8F 36 Reactor Instrumentation Level Triple Low 8G 36 Reactor Instrumentation Level Triple Low 8H 36 Reactor Instrumentation Emergency Condenser Steam 8J 36 Reactor Instrumentation Emergency Condenser Steam 37, 37.1 Reactor Head Vent and Drain 10 38 Reactor Shutdown Cooling 10A 38 Reactor Shutdown Cooling 39 Emergency Condenser Steam Supply 11A 39 Emergency Condenser Steam Return 11B 39 Emergency Condenser Drain and Overflow Lines 12 40, 40.1 Reactor Core Spray 12A 40,40.1 Reactor Core Spray 13 80,80.1 Reactor Core Spray File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-1 0 V NlAGARA NUCLEAR POWER STATION N U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE

'"" -:" ":;=';"""CLASS"1"2and 3 WELDtSUPPQRT,.:LOCATION MAPS""-"""'"':,"

DRAWING NUMBER, SYSTEM'-'0,80.1 13A Reactor Core Spray 13B 80,80.1 Reactor Core Spray 13C 80,80.1 Reactor Core Spray 14 42.1 Liquid Poison 15 80 Reactor Containment Spray 15A 80 Reactor Containment Spray 15B 80 Reactor Containment Spray 15C 80 Reactor Containment Spray 15D 80 Reactor Containment Spray 16 93,93.1 Reactor Containment Spray 16A 93,93.1 Reactor Containment Spray 16B 93,93.1 Reactor Containment Spray 16C 93,93.1 Reactor Containment Spray 17 44.2 Control Rod Drive 17A 44.2 Control Rod Drive 18 44.1 Control Rod Drive 19 44.3 Control Rod Drive 20 33332333 Reactor Clean Up 21 27 Reactor Head Spray 22 05,05.1,05.2 Emergency Condenser Vent 22A 05,05.1,05.2 Emergency Condenser Vent 23 23 Main Steam Line Drain 24 66 Main Steam Power Operated Relief Valve Discharge 24A 66 Main Steam Power Operated Relief Valve Discharge File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-1 0 4Y NIAGARA NUCLEAR POWER STATION MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE

. ': ~';",- "'::, - ":-CLASSi1'2 and'3'-"~VfFL'DISUPPORT LQCATjON,MAPS:.:::,'; -";"':;i": ':::':--':,9!-"::.

'DRAWING NUMBER'SYSTEM,.,".;r",,%w TlTL'E:,'

- " ';, ',','i'i ',

z '<'P 'ill'qg~P~;, "'j;"l'P,",.;,ii," .i'~! .'""s ',~;> j;", '"~ ', '; ', .'...r.': ~":,.;"".".',

25 80.1 Reactor Containment Spray 25A 80.1 Reactor Containment Spray 26 41,42 Liquid Poison 28 00.0 Reactor Vessel 28A 00.0 Reactor Vessel File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-1 0 Y NIAGARA NUCLEAR POWER STATION N U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE APPENDIX E ASME CODE CASES The following ASME Code Cases have been reviewed for possible use during the Third Inservice Inspection Interval. Code Cases used during the inspection interval shall be identified with the specific component within the Inspection/ Examination Tables.

ASME CODE CASE LISTING CODE CASE TITLE RG 1.147 IMPLEMENTED NUMBER Revision IN PROGRAM N-236-1 Repair and Replacement of Class MC Vessels,Section XI, Rev. 12 No Division 1.

N-355 Calibration Block for Angle Beam Ultrasonic Examination of Rev. 12 Large Fittings in accordance with Appendix III-3410,Section XI, Division 1.

N-389-1 Alternative Rules for Repairs, Replacements, or Modifications, Rev. 12 No Section XI, Division 1 N-416-1 Alternative Pressure Test Requirement for Welded Repairs or Rev. 12 Yes Installation of Replacement Items by Welding, Class 1, 2 and 3,Section XI, Division 1.

N-432 Repair Welding Using Automatic or Machine Gas Tungsten-Arc Rev. 12 No Welding (GTAW) Temper Bead Technique,Section XI, Division 1.

N-457 Qualification Specimen Notch Location for Ultrasonic Rev. 12 Examination of Bolts and Studs,Section XI, Division 1.

N-458-1 Magnetic Particle Examination of Coated Materials,Section XI, None No Division 1.

N-460 Alternative Examination Coverage for Class 1 and Class 2 Rev. 12 Yes Welds,Section XI, Division 1 N-461 Alternative Rules For Piping Calibration Block Thickness, Section Rev. 12 No XI, Division 1 N-472 Use of Digital Readout and Digital Measurement Devises for Rev. 12 No performing Pump Vibration Testing,Section XI, Division 1.

N-485-1 Eddy Current Examination of Coated Ferritic Surfaces as an Rev. 12 No alternative to Surface Examination,Section XI, Division 1.

N-490-1 E, S t'I Alternative Vision Test Requirements for Nondestructive Division 1 Rev. 12 No File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-10 V NlAGARA NUCLEAR POWER STATION U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE ASME CODE CASE LISTING CODE CASE TITLE RG 1.147 IMPLEMENTED NUMBER Revision IN PROGRAM N-491-1 Alternative Rules for Examination of Class 1, 2, 3, and MC Rev. 12 Yes Component Supports,Section XI, Division N-496-1 Helical Coil Threaded Inserts,Section XI, Division 1 Rev. 12 N-498-1 Alternative Rules for 10-Year System Hydrostatic Testing for Rev. 12 Class 1, 2 and 3 Systems,Section XI, Division 1 N-504-1 Alternative Rules for Repair of Class 1, 2 and 3 Austenitic Rev. 12 No Stainless Steel Piping,Section XI, Division 1 N-509 Alternative Rules for the Selection and Examination of Class 1, 2 Rev. 12 Yes and 3 Integrally Welded Attachments,Section XI, Division 1 N-516 Underwater Welding,Section XI, Division 1 Rev. 12 No Pressure Testing of Containment Penetration Piping,Section XI, Division 1 N-523 Mechanical Clamping Devices for Class 2 and 3 piping, Section None No XI, Division 1.

N-524 Alternative Examination Requirements for Longitudinal Welds in Rev. 12 Yes Class 1 and Class 2 Piping,Section XI, Division 1 N-526 Alternative Requirements for Successive Inspection of Class 1 None Yes and 2 Vessels,Section XI, Division 1 N-532 Alternative Requirements to Repair and Replacement None Yes Documentation Requirements and Inservice Summary Report Preparation and Submission as required by IWA-4000 and IWA-6000,Section XI, Division 1.

N-534 Alternative Requirements for Pneumatic Pressure Testing, None No Section XI, Division 1 N-537 Location of Ultrasonic Depth Sizing Flaws,Section XI, Division 1. Rev. 12 No N-554 Alternative Requirements for Reconciliation of Replacement None No Items,Section XI, Division 1.

N-573 Transfer of Procedure Qualification Records Between Owners, None YesSection XI, Division 1.

File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-1 0 V NIAG'AHA NUCLEAR POWER STATION U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE END OF DOCUMENT File: NMP1ISIPL.wpd