ML15155A591

From kanterella
Jump to navigation Jump to search

End of Interval Relief Request Associated with the Second 10- Year Risk Informed ISI Inspections
ML15155A591
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/03/2015
From: Jim Barstow
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NMP2L 2585
Download: ML15155A591 (1)


Text

Exelon Generation 200 Exelon Way Kennett Square. PA 19348 www.exeloncorp.com 10 CFR 50.55a NMP2L 2585 June 3, 2015 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Nine Mile Point Nuclear Station, Unit 2 Renewed Facility Operating License No. NPF-69 NRC Docket No. 50-410

Subject:

End of Interval Relief Request Associated with the Second 10-Year Risk-Informed ISi Inspections

Reference:

1) Letter from D. Gudger (Exelon Generation Company, LLC) to U.S.

Nuclear Regulatory Commission, "End of Interval Relief Request Associated with the Second 10-Year Risk-Informed ISi Inspections,"

dated February 16, 2015 In the Referenced letter, Exelon Generation Company, LLC (Exelon) requested relief from the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV)

Code,Section XI, "Rules for lnservice Inspection of Nuclear Power Plant Components."

This relief applied to the second 10-year ISi interval.

Based on further discussions with the U.S. Nuclear Regulatory Commission Staff on June 1, 2015, Exelon is withdrawing this request.

There are no regulatory commitments in this letter.

If you have any questions concerning this letter, please contact Tom Loomis at (610) 765-5510.

Respeau~ ~

James Barstow Director - Licensing & Regulatory Affairs Exelon Generation Company, LLC cc: Regional Administrator, Region I, USNRC USNRC Senior Resident Inspector Project Manager [Nine Mile Point] USNRC A. L. Peterson, NYSERDA