Category:CONTRACTED REPORT - RTA
MONTHYEARML20203K4121998-02-28028 February 1998 H. B. ROBINSON-2 Pressure Vessel Benchmark ML20236B8051989-03-13013 March 1989 Monthly Progress Rept for Contract NRC-02-87-004 for Period 890204-890303.Financial Data Available in Central Files ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20211N5031987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,HB Robinson Steam Electric Plant,Unit 2, Salem Generating Station Units 1 & 2,Shearon Harris Nuclear Power Plant Unit 1..., Technical Evaluation Rept ML20210M4571986-09-30030 September 1986 Lepricon Analysis of Pressure Vessel Surveillance Dosimetry Inserted Into H.B. ROBINSON-2 During Cycle 9 ML20215M2351986-08-21021 August 1986 Errata to NUREG/CR-4439, Lepricon Analysis of Pressure Vessel Surveillance Dosimetry Inserted Into Hb Robinson-2 During Cycle 2, Correcting Pages ML20140G6501985-12-31031 December 1985 Review of RELAP5 Calculations for H.B. Robinson Unit 2 Pressurized Thermal Shock Study ML20151U3481985-10-15015 October 1985 Comparison of Plant-Specific Analyses of Pressurized Thermal Shock (Based on Oconee,Calvert Cliffs & Hb Robinson), Technical Ltr Rept ML20137M6621985-09-30030 September 1985 Pressurized Thermal Shock Evaluation of the H.B. Robinson Unit 2 Nuclear Power Plant ML20138J9491985-09-30030 September 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Farley Units 1 & 2,Turkey Point Units 3 & 4,Robinson Unit 2 & Summer Unit 1 ML20140C5621985-09-30030 September 1985 Pressurized Thermal Shock Evaluation of the H.B. Robinson Unit 2 Nuclear Power Plant ML20128M0201985-07-31031 July 1985 THERMAL-HYDRAULIC Analyses of Overcooling Sequences for the H.B. Robinson Unit 2 Pressurized Thermal Shock Study ML20126D0541985-04-30030 April 1985 RELAP5 THERMAL-HYDRAULIC Analyses of Pressurized Thermal Shock Sequences for H.B. Robinson Unit 2 Pressurized Water Reactor ML20116C4531985-04-15015 April 1985 Evaluation of Detailed Control Room Design Review Program Plan for Hb Robinson Steam Electric Plant,Unit 2 ML20112H7951984-12-26026 December 1984 Draft Chapter 5, Pressurized Thermal Shock Evaluation of Hb Robinson Unit 2 Nuclear Power Plant, Re Probabilistic Fracture Mechanics Analysis of Potential Overcooling Sequences ML20101Q3211984-11-21021 November 1984 Draft Chapter 3, Development of Overcooling Sequences for Hb Robinson Unit 2 Nuclear Power Plant. to Pressurized Thermal Shock Evaluation of Hb Robinson Unit 2 Nuclear Power Plant ML20101Q3081984-11-20020 November 1984 Draft App B, Pressurized Thermal Shock (PTS) Initiating Event Frequency & Branch Probability Screening Estimates for Hb Robinson Unit 2 Nuclear Power Station, to PTS Evaluation of Hb Robinson Unit 2 Nuclear Power Plant ML20106A6571984-07-31031 July 1984 Inservice Insp Program Technical Evaluation Rept ML20091J5591984-05-0707 May 1984 Control of Heavy Loads (C-10),CP&L,HB Robinson Unit 2, Technical Evaluation Rept ML20077R5531983-08-31031 August 1983 Concentration and Distribution of Copper in Effluents from the H.B. Robinson Steam Electric Plant ML20080E0391983-05-31031 May 1983 Generator Overfill Transient Failure Mode & Effects Analysis & Rejected Sys Justification Rept, Preliminary Rept ML20080E0601983-05-31031 May 1983 Overcooling Transient Failure Mode & Effects Analysis & Rejected Sys Justification Rept, Preliminary Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20070D1221982-11-30030 November 1982 Concentrations of COPPER-BINDING Proteins in Livers of Bluegills from the Cooling Lake at the H.B. Robinson Nuclear Power Station ML20066G3171982-11-18018 November 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),HB Robinson Unit 2, Technical Evaluation Rept ML20077K0291982-09-30030 September 1982 Inservice Insp Program, Technical Evaluation Rept ML20023B0131982-08-31031 August 1982 Tech Specs for Redundant DHR Capability,Hb Robinson Steam Electric Plant,Unit 2. ML20028C6191982-07-31031 July 1982 Evaluation of Failed Reactor Coolant Pump Internal Bolts from Hb Robinson Nuclear Power Station, Informal Rept ML20079G5031982-07-0808 July 1982 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts (F-11 & B-60), Technical Evaluation Rept ML20079F2921982-03-31031 March 1982 Override & Reset of Control Ciruitry in Ventilation/Purge Isolation & Other ESF Sys,Hb Robinson Unit 2, Technical Evaluation Rept ML20052D0181982-02-28028 February 1982 Tech Specs for Redundant Decay Heat Removal Capability,Hb Robinson Steam Electric Plant,Unit 2, Preliminary Technical Evaluation Rept ML14190A6291981-07-28028 July 1981 Containment Leakage Rate Testing. ML19309C6161980-02-29029 February 1980 Electrical,Instrumentation & Control Aspects of Proposed Tech Specs Change Re Blocking of Safety Injection Signals When Pressure Is Below 2000 Psig, Technical Evaluation Rept ML20086C3771971-06-23023 June 1971 Rept on Insp of Leaks & Cracks in (a) Steam Generator at Hb Robinson II ML20087B9581971-06-23023 June 1971 Rept on Insp of Leaks & Cracks in (a) Steam Generator at Hb Robinson II ML20086B5241970-07-10010 July 1970 Stress Analysis of Modified Main Steam Safety Valve Nozzle & Adjacent Steamline ML20086B5731970-05-23023 May 1970 Rept on Design & Stress Evaluation of Failed Main Steam Safety Valve Nozzle 1998-02-28
[Table view] Category:QUICK LOOK
MONTHYEARML20203K4121998-02-28028 February 1998 H. B. ROBINSON-2 Pressure Vessel Benchmark ML20236B8051989-03-13013 March 1989 Monthly Progress Rept for Contract NRC-02-87-004 for Period 890204-890303.Financial Data Available in Central Files ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20211N5031987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,HB Robinson Steam Electric Plant,Unit 2, Salem Generating Station Units 1 & 2,Shearon Harris Nuclear Power Plant Unit 1..., Technical Evaluation Rept ML20210M4571986-09-30030 September 1986 Lepricon Analysis of Pressure Vessel Surveillance Dosimetry Inserted Into H.B. ROBINSON-2 During Cycle 9 ML20215M2351986-08-21021 August 1986 Errata to NUREG/CR-4439, Lepricon Analysis of Pressure Vessel Surveillance Dosimetry Inserted Into Hb Robinson-2 During Cycle 2, Correcting Pages ML20140G6501985-12-31031 December 1985 Review of RELAP5 Calculations for H.B. Robinson Unit 2 Pressurized Thermal Shock Study ML20151U3481985-10-15015 October 1985 Comparison of Plant-Specific Analyses of Pressurized Thermal Shock (Based on Oconee,Calvert Cliffs & Hb Robinson), Technical Ltr Rept ML20137M6621985-09-30030 September 1985 Pressurized Thermal Shock Evaluation of the H.B. Robinson Unit 2 Nuclear Power Plant ML20138J9491985-09-30030 September 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Farley Units 1 & 2,Turkey Point Units 3 & 4,Robinson Unit 2 & Summer Unit 1 ML20140C5621985-09-30030 September 1985 Pressurized Thermal Shock Evaluation of the H.B. Robinson Unit 2 Nuclear Power Plant ML20128M0201985-07-31031 July 1985 THERMAL-HYDRAULIC Analyses of Overcooling Sequences for the H.B. Robinson Unit 2 Pressurized Thermal Shock Study ML20126D0541985-04-30030 April 1985 RELAP5 THERMAL-HYDRAULIC Analyses of Pressurized Thermal Shock Sequences for H.B. Robinson Unit 2 Pressurized Water Reactor ML20116C4531985-04-15015 April 1985 Evaluation of Detailed Control Room Design Review Program Plan for Hb Robinson Steam Electric Plant,Unit 2 ML20112H7951984-12-26026 December 1984 Draft Chapter 5, Pressurized Thermal Shock Evaluation of Hb Robinson Unit 2 Nuclear Power Plant, Re Probabilistic Fracture Mechanics Analysis of Potential Overcooling Sequences ML20101Q3211984-11-21021 November 1984 Draft Chapter 3, Development of Overcooling Sequences for Hb Robinson Unit 2 Nuclear Power Plant. to Pressurized Thermal Shock Evaluation of Hb Robinson Unit 2 Nuclear Power Plant ML20101Q3081984-11-20020 November 1984 Draft App B, Pressurized Thermal Shock (PTS) Initiating Event Frequency & Branch Probability Screening Estimates for Hb Robinson Unit 2 Nuclear Power Station, to PTS Evaluation of Hb Robinson Unit 2 Nuclear Power Plant ML20106A6571984-07-31031 July 1984 Inservice Insp Program Technical Evaluation Rept ML20091J5591984-05-0707 May 1984 Control of Heavy Loads (C-10),CP&L,HB Robinson Unit 2, Technical Evaluation Rept ML20077R5531983-08-31031 August 1983 Concentration and Distribution of Copper in Effluents from the H.B. Robinson Steam Electric Plant ML20080E0391983-05-31031 May 1983 Generator Overfill Transient Failure Mode & Effects Analysis & Rejected Sys Justification Rept, Preliminary Rept ML20080E0601983-05-31031 May 1983 Overcooling Transient Failure Mode & Effects Analysis & Rejected Sys Justification Rept, Preliminary Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20070D1221982-11-30030 November 1982 Concentrations of COPPER-BINDING Proteins in Livers of Bluegills from the Cooling Lake at the H.B. Robinson Nuclear Power Station ML20066G3171982-11-18018 November 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),HB Robinson Unit 2, Technical Evaluation Rept ML20077K0291982-09-30030 September 1982 Inservice Insp Program, Technical Evaluation Rept ML20023B0131982-08-31031 August 1982 Tech Specs for Redundant DHR Capability,Hb Robinson Steam Electric Plant,Unit 2. ML20028C6191982-07-31031 July 1982 Evaluation of Failed Reactor Coolant Pump Internal Bolts from Hb Robinson Nuclear Power Station, Informal Rept ML20079G5031982-07-0808 July 1982 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts (F-11 & B-60), Technical Evaluation Rept ML20079F2921982-03-31031 March 1982 Override & Reset of Control Ciruitry in Ventilation/Purge Isolation & Other ESF Sys,Hb Robinson Unit 2, Technical Evaluation Rept ML20052D0181982-02-28028 February 1982 Tech Specs for Redundant Decay Heat Removal Capability,Hb Robinson Steam Electric Plant,Unit 2, Preliminary Technical Evaluation Rept ML14190A6291981-07-28028 July 1981 Containment Leakage Rate Testing. ML19309C6161980-02-29029 February 1980 Electrical,Instrumentation & Control Aspects of Proposed Tech Specs Change Re Blocking of Safety Injection Signals When Pressure Is Below 2000 Psig, Technical Evaluation Rept ML20086C3771971-06-23023 June 1971 Rept on Insp of Leaks & Cracks in (a) Steam Generator at Hb Robinson II ML20087B9581971-06-23023 June 1971 Rept on Insp of Leaks & Cracks in (a) Steam Generator at Hb Robinson II ML20086B5241970-07-10010 July 1970 Stress Analysis of Modified Main Steam Safety Valve Nozzle & Adjacent Steamline ML20086B5731970-05-23023 May 1970 Rept on Design & Stress Evaluation of Failed Main Steam Safety Valve Nozzle 1998-02-28
[Table view] Category:ETC. (PERIODIC
MONTHYEARML20203K4121998-02-28028 February 1998 H. B. ROBINSON-2 Pressure Vessel Benchmark ML20236B8051989-03-13013 March 1989 Monthly Progress Rept for Contract NRC-02-87-004 for Period 890204-890303.Financial Data Available in Central Files ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20211N5031987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,HB Robinson Steam Electric Plant,Unit 2, Salem Generating Station Units 1 & 2,Shearon Harris Nuclear Power Plant Unit 1..., Technical Evaluation Rept ML20210M4571986-09-30030 September 1986 Lepricon Analysis of Pressure Vessel Surveillance Dosimetry Inserted Into H.B. ROBINSON-2 During Cycle 9 ML20215M2351986-08-21021 August 1986 Errata to NUREG/CR-4439, Lepricon Analysis of Pressure Vessel Surveillance Dosimetry Inserted Into Hb Robinson-2 During Cycle 2, Correcting Pages ML20140G6501985-12-31031 December 1985 Review of RELAP5 Calculations for H.B. Robinson Unit 2 Pressurized Thermal Shock Study ML20151U3481985-10-15015 October 1985 Comparison of Plant-Specific Analyses of Pressurized Thermal Shock (Based on Oconee,Calvert Cliffs & Hb Robinson), Technical Ltr Rept ML20137M6621985-09-30030 September 1985 Pressurized Thermal Shock Evaluation of the H.B. Robinson Unit 2 Nuclear Power Plant ML20138J9491985-09-30030 September 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Farley Units 1 & 2,Turkey Point Units 3 & 4,Robinson Unit 2 & Summer Unit 1 ML20140C5621985-09-30030 September 1985 Pressurized Thermal Shock Evaluation of the H.B. Robinson Unit 2 Nuclear Power Plant ML20128M0201985-07-31031 July 1985 THERMAL-HYDRAULIC Analyses of Overcooling Sequences for the H.B. Robinson Unit 2 Pressurized Thermal Shock Study ML20126D0541985-04-30030 April 1985 RELAP5 THERMAL-HYDRAULIC Analyses of Pressurized Thermal Shock Sequences for H.B. Robinson Unit 2 Pressurized Water Reactor ML20116C4531985-04-15015 April 1985 Evaluation of Detailed Control Room Design Review Program Plan for Hb Robinson Steam Electric Plant,Unit 2 ML20112H7951984-12-26026 December 1984 Draft Chapter 5, Pressurized Thermal Shock Evaluation of Hb Robinson Unit 2 Nuclear Power Plant, Re Probabilistic Fracture Mechanics Analysis of Potential Overcooling Sequences ML20101Q3211984-11-21021 November 1984 Draft Chapter 3, Development of Overcooling Sequences for Hb Robinson Unit 2 Nuclear Power Plant. to Pressurized Thermal Shock Evaluation of Hb Robinson Unit 2 Nuclear Power Plant ML20101Q3081984-11-20020 November 1984 Draft App B, Pressurized Thermal Shock (PTS) Initiating Event Frequency & Branch Probability Screening Estimates for Hb Robinson Unit 2 Nuclear Power Station, to PTS Evaluation of Hb Robinson Unit 2 Nuclear Power Plant ML20106A6571984-07-31031 July 1984 Inservice Insp Program Technical Evaluation Rept ML20091J5591984-05-0707 May 1984 Control of Heavy Loads (C-10),CP&L,HB Robinson Unit 2, Technical Evaluation Rept ML20077R5531983-08-31031 August 1983 Concentration and Distribution of Copper in Effluents from the H.B. Robinson Steam Electric Plant ML20080E0391983-05-31031 May 1983 Generator Overfill Transient Failure Mode & Effects Analysis & Rejected Sys Justification Rept, Preliminary Rept ML20080E0601983-05-31031 May 1983 Overcooling Transient Failure Mode & Effects Analysis & Rejected Sys Justification Rept, Preliminary Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20070D1221982-11-30030 November 1982 Concentrations of COPPER-BINDING Proteins in Livers of Bluegills from the Cooling Lake at the H.B. Robinson Nuclear Power Station ML20066G3171982-11-18018 November 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),HB Robinson Unit 2, Technical Evaluation Rept ML20077K0291982-09-30030 September 1982 Inservice Insp Program, Technical Evaluation Rept ML20023B0131982-08-31031 August 1982 Tech Specs for Redundant DHR Capability,Hb Robinson Steam Electric Plant,Unit 2. ML20028C6191982-07-31031 July 1982 Evaluation of Failed Reactor Coolant Pump Internal Bolts from Hb Robinson Nuclear Power Station, Informal Rept ML20079G5031982-07-0808 July 1982 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts (F-11 & B-60), Technical Evaluation Rept ML20079F2921982-03-31031 March 1982 Override & Reset of Control Ciruitry in Ventilation/Purge Isolation & Other ESF Sys,Hb Robinson Unit 2, Technical Evaluation Rept ML20052D0181982-02-28028 February 1982 Tech Specs for Redundant Decay Heat Removal Capability,Hb Robinson Steam Electric Plant,Unit 2, Preliminary Technical Evaluation Rept ML14190A6291981-07-28028 July 1981 Containment Leakage Rate Testing. ML19309C6161980-02-29029 February 1980 Electrical,Instrumentation & Control Aspects of Proposed Tech Specs Change Re Blocking of Safety Injection Signals When Pressure Is Below 2000 Psig, Technical Evaluation Rept ML20086C3771971-06-23023 June 1971 Rept on Insp of Leaks & Cracks in (a) Steam Generator at Hb Robinson II ML20087B9581971-06-23023 June 1971 Rept on Insp of Leaks & Cracks in (a) Steam Generator at Hb Robinson II ML20086B5241970-07-10010 July 1970 Stress Analysis of Modified Main Steam Safety Valve Nozzle & Adjacent Steamline ML20086B5731970-05-23023 May 1970 Rept on Design & Stress Evaluation of Failed Main Steam Safety Valve Nozzle 1998-02-28
[Table view] Category:TEXT-PROCUREMENT & CONTRACTS
MONTHYEARML20203K4121998-02-28028 February 1998 H. B. ROBINSON-2 Pressure Vessel Benchmark ML20236B8051989-03-13013 March 1989 Monthly Progress Rept for Contract NRC-02-87-004 for Period 890204-890303.Financial Data Available in Central Files ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20211N5031987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,HB Robinson Steam Electric Plant,Unit 2, Salem Generating Station Units 1 & 2,Shearon Harris Nuclear Power Plant Unit 1..., Technical Evaluation Rept ML20210M4571986-09-30030 September 1986 Lepricon Analysis of Pressure Vessel Surveillance Dosimetry Inserted Into H.B. ROBINSON-2 During Cycle 9 ML20215M2351986-08-21021 August 1986 Errata to NUREG/CR-4439, Lepricon Analysis of Pressure Vessel Surveillance Dosimetry Inserted Into Hb Robinson-2 During Cycle 2, Correcting Pages ML20140G6501985-12-31031 December 1985 Review of RELAP5 Calculations for H.B. Robinson Unit 2 Pressurized Thermal Shock Study ML20151U3481985-10-15015 October 1985 Comparison of Plant-Specific Analyses of Pressurized Thermal Shock (Based on Oconee,Calvert Cliffs & Hb Robinson), Technical Ltr Rept ML20137M6621985-09-30030 September 1985 Pressurized Thermal Shock Evaluation of the H.B. Robinson Unit 2 Nuclear Power Plant ML20138J9491985-09-30030 September 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Farley Units 1 & 2,Turkey Point Units 3 & 4,Robinson Unit 2 & Summer Unit 1 ML20140C5621985-09-30030 September 1985 Pressurized Thermal Shock Evaluation of the H.B. Robinson Unit 2 Nuclear Power Plant ML20128M0201985-07-31031 July 1985 THERMAL-HYDRAULIC Analyses of Overcooling Sequences for the H.B. Robinson Unit 2 Pressurized Thermal Shock Study ML20126D0541985-04-30030 April 1985 RELAP5 THERMAL-HYDRAULIC Analyses of Pressurized Thermal Shock Sequences for H.B. Robinson Unit 2 Pressurized Water Reactor ML20116C4531985-04-15015 April 1985 Evaluation of Detailed Control Room Design Review Program Plan for Hb Robinson Steam Electric Plant,Unit 2 ML20112H7951984-12-26026 December 1984 Draft Chapter 5, Pressurized Thermal Shock Evaluation of Hb Robinson Unit 2 Nuclear Power Plant, Re Probabilistic Fracture Mechanics Analysis of Potential Overcooling Sequences ML20101Q3211984-11-21021 November 1984 Draft Chapter 3, Development of Overcooling Sequences for Hb Robinson Unit 2 Nuclear Power Plant. to Pressurized Thermal Shock Evaluation of Hb Robinson Unit 2 Nuclear Power Plant ML20101Q3081984-11-20020 November 1984 Draft App B, Pressurized Thermal Shock (PTS) Initiating Event Frequency & Branch Probability Screening Estimates for Hb Robinson Unit 2 Nuclear Power Station, to PTS Evaluation of Hb Robinson Unit 2 Nuclear Power Plant ML20106A6571984-07-31031 July 1984 Inservice Insp Program Technical Evaluation Rept ML20091J5591984-05-0707 May 1984 Control of Heavy Loads (C-10),CP&L,HB Robinson Unit 2, Technical Evaluation Rept ML20077R5531983-08-31031 August 1983 Concentration and Distribution of Copper in Effluents from the H.B. Robinson Steam Electric Plant ML20080E0391983-05-31031 May 1983 Generator Overfill Transient Failure Mode & Effects Analysis & Rejected Sys Justification Rept, Preliminary Rept ML20080E0601983-05-31031 May 1983 Overcooling Transient Failure Mode & Effects Analysis & Rejected Sys Justification Rept, Preliminary Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20070D1221982-11-30030 November 1982 Concentrations of COPPER-BINDING Proteins in Livers of Bluegills from the Cooling Lake at the H.B. Robinson Nuclear Power Station ML20066G3171982-11-18018 November 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),HB Robinson Unit 2, Technical Evaluation Rept ML20077K0291982-09-30030 September 1982 Inservice Insp Program, Technical Evaluation Rept ML20023B0131982-08-31031 August 1982 Tech Specs for Redundant DHR Capability,Hb Robinson Steam Electric Plant,Unit 2. ML20028C6191982-07-31031 July 1982 Evaluation of Failed Reactor Coolant Pump Internal Bolts from Hb Robinson Nuclear Power Station, Informal Rept ML20079G5031982-07-0808 July 1982 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts (F-11 & B-60), Technical Evaluation Rept ML20079F2921982-03-31031 March 1982 Override & Reset of Control Ciruitry in Ventilation/Purge Isolation & Other ESF Sys,Hb Robinson Unit 2, Technical Evaluation Rept ML20052D0181982-02-28028 February 1982 Tech Specs for Redundant Decay Heat Removal Capability,Hb Robinson Steam Electric Plant,Unit 2, Preliminary Technical Evaluation Rept ML14190A6291981-07-28028 July 1981 Containment Leakage Rate Testing. ML19309C6161980-02-29029 February 1980 Electrical,Instrumentation & Control Aspects of Proposed Tech Specs Change Re Blocking of Safety Injection Signals When Pressure Is Below 2000 Psig, Technical Evaluation Rept ML20086C3771971-06-23023 June 1971 Rept on Insp of Leaks & Cracks in (a) Steam Generator at Hb Robinson II ML20087B9581971-06-23023 June 1971 Rept on Insp of Leaks & Cracks in (a) Steam Generator at Hb Robinson II ML20086B5241970-07-10010 July 1970 Stress Analysis of Modified Main Steam Safety Valve Nozzle & Adjacent Steamline ML20086B5731970-05-23023 May 1970 Rept on Design & Stress Evaluation of Failed Main Steam Safety Valve Nozzle 1998-02-28
[Table view] |
Text
TECHNICAL EVALUATION REPORT CONTAINMENT LEAKAGE RATE TESTING CAROLINA POWER AND LIGHT COMPANY H.B. ROBINSON, UNIT 2 NRC DOCKET NO. 50-261 NRC TAC NO- 01954 FRC PROJECT C5257 NRC CONTRACT NO. NRC-03-79-118 FRC TASK 48 Prepared by Franklin Research Center Author: G. J. Overbeck (WESTEC)
The Parkway at Twentieth Street Philadelphia, PA 19103 FRC Group Leader: T. J. DelGaizo Prepared for Nuclear Regulatory Commission Washington, D.C. 20555 Lead NRC Engineer: Y. S. Huang July 28, 1981 This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, or any of their employees, makes any warranty, expressed or Implied, or assumes any legal liability or responsibility for any third party's use, or the results of such use, of any information, apparatus, product or process disclosed in this report, or represents that its use by such third party would not infringe privately owned rights.
Franklin Research Center A Division of The Franklin Institute The Benjamin Franklin Parkway, Phila., Pa. 19103 (215) 448-1000 8201210373 811228 iPDR ADOCK 05000261J P PD-R
TER-C5257-48 CONTENTS Section Title Page 1 BACKGROUND . . . . . . . . . . . . . 1
- 2. REVIEW CRITERIA. . . . . . . . . . . . . 2 3 TECHNICAL EVALUATION. . . . . . . . . . 3 3.1 Request for Exemption . . . . . . . 3 3.1.1 Exemption from the Method of Calculating the Maximum Allowable Leakage Rate at the Reduced Containment Test Pressure * * * * * * . 3 3.1.2 Airlock Testing. . . . . . . . . . 4 3.2 Technical Specification Changes. . . . . . . . 6 4 CONCLUSIONS.. . . . . . . . . . . 7 5 REFERENCES . . . . . . . . . . . . . . 8 111 kranlin Research Center A Division of The Franklin Institute
TER-C5257-48
- 1. BACKGROUND On August 7, 1975 [1], the NRC requested Carolina Power and Light Company (CP&L) to review the containment leakage testing program at H. B. Robinson Unit 2 and to provide a plan for achieving full compliance, where necessary, including appropriate design modifications, changes to technical specifica tions, and requests for exemption from the requirements pursuant to 10CFR50.12.
On September 16, 1975 [2], CP&L replied that three areas had been found which, while in compliance with technical specifications, did not comply with Appendix J. In this reply, CP&L submitted requests for exemption from the method of calculating the maximum allowable leakage rate at the reduced containment test pressure and from Type B testing of the containment airlocks every 6 months or after each opening. In addition, CP&L noted that a technical specification change was required so that the acceptance criteria for Type A tests would comply with Appendix J.
This report provides technical evaluations of the requests for exemption from the requirements of Appendix J submitted by CP&L in Reference 2.
IUFranklin Research Center A Division of The Franklin institute
TER-C5257-48
- 2. REVIEW CRITERIA Code of Federal Regulations, Title 10, Part 50 (10CFR50), Appendix J, Containment Leakage Testing, was specified by the NRC as the basis of these evaluations. The criteria are either referenced or briefly stated to support the results of the evaluations. Furthermore, in recognition of the plant-specific conditions which could lead to requests for exemption not explicitly covered by the regulations, the NRC directed that the technical review constantly emphasize the basic intent of Appendix J, that potential containment atmospheric leakage paths be identified, monitored, and maintained below established limits.
-2 UUFranklin Research Center A Division of The Franklin Institute
TER-C5257-48
- 3. TECHNICAL EVALUATION 3.1 REQUEST FOR EXEMPTION FROM THE REQUIREMENTS OF APPENDIX J Reference 2 requested exemptions from the requirements of Appendix J regarding (1) the method of calculating the maximum allowable leakage rate at the reduced containment test pressure and (2) Type B testing of the containment airlocks every 6 months or after each opening. The following sections provide an evaluation of these requests.
3.1.1 Exemption from the Method of Calculating the Maximum Allowable Leakage Rate at the Reduced Containment Test Pressure Section III.A.4(a)(iii) of Appendix J requires that the following equations be used to calculate Lt, the maximum allowable leakage rate at the reduced containment test pressure, Pt:
It L I(tm) for - < 0.7 Lam -Lam Pt 1/2Le Lt = La (Pt_) for - > 0.7 P L a am La is the maximum allowable leakage rate at the calculated peak containment pressure (Pa) related to the design basis accident. The subscript '!i"denotes the total measured containment leakage rates.
In Reference 2, CP&L stated:
Technical Specification 4.4.1.1.f.2 of H. B. Robinson Unit 2 utilizes the same equations, although with a different nomenclature, but specifies that the minimum of the values determined from the equations be used as the limit. The use of the lowest value of acceptable test leakage is clearly conservative.
CP&L requested an exemption from the above-cited requirement of Appendix J for the maximum acceptable test leakage if the ratio Ltm/L becomes greater than 0.7, and proposed to continue using the lower of the values calculated by the use of the two equations.
-3 ILFranklin Research Center A Division of The Franklin Institute
TER-C5257-48 Evaluation. The procedure used by CP&L for the H. B. Robinson Unit 2 facility meets the requirements of Appendix J,Section III.A.4(a)(iii), and the use of the lower calculated value of Lt is acceptable. Using the lower calculated value of Lt results in a smaller value of maximum acceptable test leakage, never greater than the value allowed by Appendix J. No exemption from the requirements of Appendix J is required.
3.1.2 Airlock Testing In Reference 2, CP&L requested exemption from the Type B testing requirements of the containment airlocks. Specifically, CP&L requested an exemption from the frequency of airlock testing and indicated that the airlock door seals are tested at pressure Pa on a continuous basis by the plant penetration pressurization system. In Reference 3, the NRC requested additional information. This request questioned the definition of an acceptable leakage rate for the airlock door seals, the sensitivity of the continuous pressurization monitoring system to detect the leakage rate, and the reliability of maintaining an acceptable leak rate for the total airlock system when the interval between tests is increased.
In response to Reference 3, CP&L submitted additional information [4]
supporting the contention that airlocks should be tested during each refueling outage. In addition to providing the basis for leakage detection sensitivity, CP&L stated that the only unmonitored portion of the airlock is the handwheel shaft seals. CP&L also cited the need for continuous access to containment and the performance history of the shaft seals as sufficient bases for exemption from the required 6-month test interval and for continued use of refueling interval testing.
Evaluation. Appendix J, Sections III.B.2 and III.D.2, require that reactor containment airlocks be leak tested at the peak calculated accident pressure, Pa, at 6-month intervals. Further, should the airlocks be opened between such intervals, they will be leak tested after each opening. Airlocks represent potentially large leakage paths that are more subject to human error than other isolation barriers; therefore, they are tested more often than
-4 1UFranklin Research Center A Division of The Franidin Institute
TER-C5257-48 other isolation barriers. Additionally, to ensure that the sealing mechanisms were not damaged during an airlock entry and also to ensure that this large potential leakage path was correctly secured after use, the requirement to test after each use was added.
For certain types of reactors in which airlocks are used frequently, testing of airlocks after each opening may create a situation in which more rapid degradation of the critical isolation barriers occurs. Moreover, experience obtained from testing of airlocks since 1969 indicates that only a few airlock tests have resulted in greater-than-allowable leakage rates. This infrequent failure of airlock tests plus the possibility that excessive testing could lead to a loss of reliability due to equipment degradation leads to the conclusion that testing after each opening may be undesirable.
Since 1969, there have been approximately 40 instances in which airlock leak tests have resulted in greater-than-allowable leak rates. However, they all were caused by the failure of door seals, not the entire doors.
Continuous pressurization at a pressure of Pa between the double-gasketed seals at H. B. Robinson Unit 2 is an acceptable method for detecting door seal leakage while at the same time eliminating the impracticalities, and perhaps the reduction of reliability, associated with full airlock testing at Pa after each opening. In Reference 4, CP&L has demonstrated that the plant pene tration pressurization system is sufficiently sensitive to detect a change in the leakage rate of the door seals with an alarm setpoint on this system equivalent to 0.1 La.
CP&L proposes to test airlocks once per refueling cycle and opposes a 6-month test interval because of an apparent need for continuous and immediate access to the containment during normal operation. Although continuous pressurization at Pa demonstrates the adequacy of the door seals, it does not satisfy the objective of the 6-month test interval, i.e., to provide an integrated leakage rate for the entire airlock assembly, including electrical and mechanical penetrations, the airlock cylinder, hinge assemblies, welded connections, and other potential leakage paths.
nn -5 ID Franklin Research Center A Division of The Franklin Institute
TER-C5257-48 In view of the above discussions, CP&L's proposal to verify airlock door seals at Pa on a continuous basis by pressurizing between the double-gasketed seals is an acceptable alternative to performing a Type B test of the airlock after each use; an exemption from this requirement of Appendix J is acceptable.
However, CP&L's request for an exemption from the required testing of airlocks every 6 months is not acceptable, and a Type B test in accordance with Appendix J must be performed every 6 months.
3.2 TECHNICAL SPECIFICATION CHANGES In Reference 2, CP&L stated that a revised Technical Specification 4.4.1.1.f.3 would be submitted to bring it into compliance with Appendix J.
Specifically, the Technical Specification currently requires that the allowable test leakage "shall not exceed 0.75," while the acceptance criteria for Type A test in Section III.A.4(b).(l) and (2) of Appendix J require that values "shall be less than 0.75."
Ealuation. CP&L's suggested modification meets the requirements of Appendix J, Sections III.A.4.(b).(l) and (2). A Technical Specification modification would be acceptable.
-6 UUUFranklin Research Center A Division of The Franklin Institute
TER-C5257-48
- 4. CONCLUSIONS Technical evaluation of CP&L's requests for exemptions from the requirements of 10CFR50, Appendix J, Containment Leakage Testing, and technical evaluation of a proposed modification to Technical Specification 4.4.l.l.f.3 for H. B. Robinson Unit 2 have resulted in the following conclusions:
- 1. CP&L's request for exemption from the maximum acceptable test leakage if the ratio Len/Lam becomes greater than 0.7 is not necessary since the intent of Appendix J has been satisfied.
- 2. CP&L's request for exemption from testing airlocks every 6 months is unacceptable.
- 3. CP&L's request for exemption from testing airlocks after each opening is acceptable provided that the double seals are pressurized on a continuous basis at pressure Pa.
- 4. A proposed modification to Technical Specification 4.4.l.l.f.3 to change "shall not exceed 0.75" to read "shall be less than 0.75" is acceptable.
-7 UUFranklin Research Center ADivision of The Franklin Institute
TER-C5257-48
- 5. REFERENCES
- 1. K. Goller (NRC)
Letter to Carolina Power and Light Company August 7, 1975
- 2. E. E. Utley (CP&L)
Letter to K. Goller (NRC)
September 16, 1975
- 3. R. W. Reid (NRC)
Letter to J. A. Jones (CP&L)
July 5, 1977
- 4. E. E. Utley (CP&L)
Letter to R. W. Reid (NRC)
September 21, 1977 nn -8 UUFranklin Research Center A Division of The Franklin Institute