ML20203K412 | 28 February 1998 | H. B. ROBINSON-2 Pressure Vessel Benchmark | Power change |
ML20236B805 | 13 March 1989 | Monthly Progress Rept for Contract NRC-02-87-004 for Period 890204-890303.Financial Data Available in Central Files | |
ML20237J141 | 17 August 1987 | Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 | |
ML20211N503 | 9 January 1987 | Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,HB Robinson Steam Electric Plant,Unit 2, Salem Generating Station Units 1 & 2,Shearon Harris Nuclear Power Plant Unit 1..., Technical Evaluation Rept | |
ML20210M457 | 30 September 1986 | Lepricon Analysis of Pressure Vessel Surveillance Dosimetry Inserted Into H.B. ROBINSON-2 During Cycle 9 | |
ML20215M235 | 21 August 1986 | Errata to NUREG/CR-4439, Lepricon Analysis of Pressure Vessel Surveillance Dosimetry Inserted Into Hb Robinson-2 During Cycle 2, Correcting Pages | |
ML20140G650 | 31 December 1985 | Review of RELAP5 Calculations for H.B. Robinson Unit 2 Pressurized Thermal Shock Study | |
ML20151U348 | 15 October 1985 | Comparison of Plant-Specific Analyses of Pressurized Thermal Shock (Based on Oconee,Calvert Cliffs & Hb Robinson), Technical Ltr Rept | |
ML20137M662 | 30 September 1985 | Pressurized Thermal Shock Evaluation of the H.B. Robinson Unit 2 Nuclear Power Plant | Boric Acid Loop seal Overspeed trip |
ML20138J949 | 30 September 1985 | Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Farley Units 1 & 2,Turkey Point Units 3 & 4,Robinson Unit 2 & Summer Unit 1 | |
ML20140C562 | 30 September 1985 | Pressurized Thermal Shock Evaluation of the H.B. Robinson Unit 2 Nuclear Power Plant | Earthquake Overspeed trip Loss of condenser vacuum |
ML20128M020 | 31 July 1985 | THERMAL-HYDRAULIC Analyses of Overcooling Sequences for the H.B. Robinson Unit 2 Pressurized Thermal Shock Study | |
ML20126D054 | 30 April 1985 | RELAP5 THERMAL-HYDRAULIC Analyses of Pressurized Thermal Shock Sequences for H.B. Robinson Unit 2 Pressurized Water Reactor | Hydrostatic |
ML20116C453 | 15 April 1985 | Evaluation of Detailed Control Room Design Review Program Plan for Hb Robinson Steam Electric Plant,Unit 2 | |
ML20112H795 | 26 December 1984 | Draft Chapter 5, Pressurized Thermal Shock Evaluation of Hb Robinson Unit 2 Nuclear Power Plant, Re Probabilistic Fracture Mechanics Analysis of Potential Overcooling Sequences | |
ML20101Q321 | 21 November 1984 | Draft Chapter 3, Development of Overcooling Sequences for Hb Robinson Unit 2 Nuclear Power Plant. to Pressurized Thermal Shock Evaluation of Hb Robinson Unit 2 Nuclear Power Plant | |
ML20101Q308 | 20 November 1984 | Draft App B, Pressurized Thermal Shock (PTS) Initiating Event Frequency & Branch Probability Screening Estimates for Hb Robinson Unit 2 Nuclear Power Station, to PTS Evaluation of Hb Robinson Unit 2 Nuclear Power Plant | |
ML20106A657 | 31 July 1984 | Inservice Insp Program Technical Evaluation Rept | Hydrostatic Dissimilar Metal Weld |
ML20091J559 | 7 May 1984 | Control of Heavy Loads (C-10),CP&L,HB Robinson Unit 2, Technical Evaluation Rept | Safe Shutdown Boric Acid Control of Heavy Loads |
ML20077R553 | 31 August 1983 | Concentration and Distribution of Copper in Effluents from the H.B. Robinson Steam Electric Plant | |
ML20080E039 | 31 May 1983 | Generator Overfill Transient Failure Mode & Effects Analysis & Rejected Sys Justification Rept, Preliminary Rept | |
ML20080E060 | 31 May 1983 | Overcooling Transient Failure Mode & Effects Analysis & Rejected Sys Justification Rept, Preliminary Rept | Failure to Scram |
ML20126E994 | 7 December 1982 | Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 | |
ML20070D122 | 30 November 1982 | Concentrations of COPPER-BINDING Proteins in Livers of Bluegills from the Cooling Lake at the H.B. Robinson Nuclear Power Station | |
ML20066G317 | 18 November 1982 | PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),HB Robinson Unit 2, Technical Evaluation Rept | Boric Acid Shutdown Margin |
ML20077K029 | 30 September 1982 | Inservice Insp Program, Technical Evaluation Rept | Hydrostatic Incorporated by reference Dissimilar Metal Weld |
ML20023B013 | 31 August 1982 | Tech Specs for Redundant DHR Capability,Hb Robinson Steam Electric Plant,Unit 2. | |
ML20028C619 | 31 July 1982 | Evaluation of Failed Reactor Coolant Pump Internal Bolts from Hb Robinson Nuclear Power Station, Informal Rept | Stress corrosion cracking |
ML20079G503 | 8 July 1982 | Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts (F-11 & B-60), Technical Evaluation Rept | |
ML20079F292 | 31 March 1982 | Override & Reset of Control Ciruitry in Ventilation/Purge Isolation & Other ESF Sys,Hb Robinson Unit 2, Technical Evaluation Rept | |
ML20052D018 | 28 February 1982 | Tech Specs for Redundant Decay Heat Removal Capability,Hb Robinson Steam Electric Plant,Unit 2, Preliminary Technical Evaluation Rept | |
ML14190A629 | 28 July 1981 | Containment Leakage Rate Testing. | |
ML19309C616 | 29 February 1980 | Electrical,Instrumentation & Control Aspects of Proposed Tech Specs Change Re Blocking of Safety Injection Signals When Pressure Is Below 2000 Psig, Technical Evaluation Rept | Shutdown Margin |
ML20086C377 | 23 June 1971 | Rept on Insp of Leaks & Cracks in (a) Steam Generator at Hb Robinson II | Boric Acid |
ML20087B958 | 23 June 1971 | Rept on Insp of Leaks & Cracks in (a) Steam Generator at Hb Robinson II | Boric Acid |
ML20086B524 | 10 July 1970 | Stress Analysis of Modified Main Steam Safety Valve Nozzle & Adjacent Steamline | |
ML20086B573 | 23 May 1970 | Rept on Design & Stress Evaluation of Failed Main Steam Safety Valve Nozzle |