Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20203K41228 February 1998H. B. ROBINSON-2 Pressure Vessel BenchmarkPower change
ML20236B80513 March 1989Monthly Progress Rept for Contract NRC-02-87-004 for Period 890204-890303.Financial Data Available in Central Files
ML20237J14117 August 1987Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807
ML20211N5039 January 1987Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,HB Robinson Steam Electric Plant,Unit 2, Salem Generating Station Units 1 & 2,Shearon Harris Nuclear Power Plant Unit 1..., Technical Evaluation Rept
ML20210M45730 September 1986Lepricon Analysis of Pressure Vessel Surveillance Dosimetry Inserted Into H.B. ROBINSON-2 During Cycle 9
ML20215M23521 August 1986Errata to NUREG/CR-4439, Lepricon Analysis of Pressure Vessel Surveillance Dosimetry Inserted Into Hb Robinson-2 During Cycle 2, Correcting Pages
ML20140G65031 December 1985Review of RELAP5 Calculations for H.B. Robinson Unit 2 Pressurized Thermal Shock Study
ML20151U34815 October 1985Comparison of Plant-Specific Analyses of Pressurized Thermal Shock (Based on Oconee,Calvert Cliffs & Hb Robinson), Technical Ltr Rept
ML20137M66230 September 1985Pressurized Thermal Shock Evaluation of the H.B. Robinson Unit 2 Nuclear Power PlantBoric Acid
Loop seal
Overspeed trip
ML20138J94930 September 1985Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Farley Units 1 & 2,Turkey Point Units 3 & 4,Robinson Unit 2 & Summer Unit 1
ML20140C56230 September 1985Pressurized Thermal Shock Evaluation of the H.B. Robinson Unit 2 Nuclear Power PlantEarthquake
Overspeed trip
Loss of condenser vacuum
ML20128M02031 July 1985THERMAL-HYDRAULIC Analyses of Overcooling Sequences for the H.B. Robinson Unit 2 Pressurized Thermal Shock Study
ML20126D05430 April 1985RELAP5 THERMAL-HYDRAULIC Analyses of Pressurized Thermal Shock Sequences for H.B. Robinson Unit 2 Pressurized Water ReactorHydrostatic
ML20116C45315 April 1985Evaluation of Detailed Control Room Design Review Program Plan for Hb Robinson Steam Electric Plant,Unit 2
ML20112H79526 December 1984Draft Chapter 5, Pressurized Thermal Shock Evaluation of Hb Robinson Unit 2 Nuclear Power Plant, Re Probabilistic Fracture Mechanics Analysis of Potential Overcooling Sequences
ML20101Q32121 November 1984Draft Chapter 3, Development of Overcooling Sequences for Hb Robinson Unit 2 Nuclear Power Plant. to Pressurized Thermal Shock Evaluation of Hb Robinson Unit 2 Nuclear Power Plant
ML20101Q30820 November 1984Draft App B, Pressurized Thermal Shock (PTS) Initiating Event Frequency & Branch Probability Screening Estimates for Hb Robinson Unit 2 Nuclear Power Station, to PTS Evaluation of Hb Robinson Unit 2 Nuclear Power Plant
ML20106A65731 July 1984Inservice Insp Program Technical Evaluation ReptHydrostatic
Dissimilar Metal Weld
ML20091J5597 May 1984Control of Heavy Loads (C-10),CP&L,HB Robinson Unit 2, Technical Evaluation ReptSafe Shutdown
Boric Acid
Control of Heavy Loads
ML20077R55331 August 1983Concentration and Distribution of Copper in Effluents from the H.B. Robinson Steam Electric Plant
ML20080E03931 May 1983Generator Overfill Transient Failure Mode & Effects Analysis & Rejected Sys Justification Rept, Preliminary Rept
ML20080E06031 May 1983Overcooling Transient Failure Mode & Effects Analysis & Rejected Sys Justification Rept, Preliminary ReptFailure to Scram
ML20126E9947 December 1982Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982
ML20070D12230 November 1982Concentrations of COPPER-BINDING Proteins in Livers of Bluegills from the Cooling Lake at the H.B. Robinson Nuclear Power Station
ML20066G31718 November 1982PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),HB Robinson Unit 2, Technical Evaluation ReptBoric Acid
Shutdown Margin
ML20077K02930 September 1982Inservice Insp Program, Technical Evaluation ReptHydrostatic
Incorporated by reference
Dissimilar Metal Weld
ML20023B01331 August 1982Tech Specs for Redundant DHR Capability,Hb Robinson Steam Electric Plant,Unit 2.
ML20028C61931 July 1982Evaluation of Failed Reactor Coolant Pump Internal Bolts from Hb Robinson Nuclear Power Station, Informal ReptStress corrosion cracking
ML20079G5038 July 1982Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts (F-11 & B-60), Technical Evaluation Rept
ML20079F29231 March 1982Override & Reset of Control Ciruitry in Ventilation/Purge Isolation & Other ESF Sys,Hb Robinson Unit 2, Technical Evaluation Rept
ML20052D01828 February 1982Tech Specs for Redundant Decay Heat Removal Capability,Hb Robinson Steam Electric Plant,Unit 2, Preliminary Technical Evaluation Rept
ML14190A62928 July 1981Containment Leakage Rate Testing.
ML19309C61629 February 1980Electrical,Instrumentation & Control Aspects of Proposed Tech Specs Change Re Blocking of Safety Injection Signals When Pressure Is Below 2000 Psig, Technical Evaluation ReptShutdown Margin
ML20086C37723 June 1971Rept on Insp of Leaks & Cracks in (a) Steam Generator at Hb Robinson IIBoric Acid
ML20087B95823 June 1971Rept on Insp of Leaks & Cracks in (a) Steam Generator at Hb Robinson IIBoric Acid
ML20086B52410 July 1970Stress Analysis of Modified Main Steam Safety Valve Nozzle & Adjacent Steamline
ML20086B57323 May 1970Rept on Design & Stress Evaluation of Failed Main Steam Safety Valve Nozzle