Annual Assessment Meeting Summary for April 17, 2014
ML14119A029
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 04/29/2014
From: Kevin Mangan
NRC/RGN-I/DRP/PB6
To:
MANGAN, KA
Shared Package
ML14063A453 List:
References
Download: ML14119A029 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 April 29, 2014 MEETING

SUMMARY

LICENSEE: Exelon Generation Company, LLC FACILITY: Three Mile Island Nuclear Station, Unit 1

SUBJECT:

SUMMARY

OF PUBLIC MEETING On April 17, 2014, at 5:30 pm to 7:30 pm, the U. S. Nuclear Regulatory Commission (NRC) conducted a public open-house at the Londonderry Township Municipal Building in Middletown, PA. The NRC conducted the open-house to discuss its assessment of the safety performance at Three Mile Island, Unit 1, for 2013.

A notice of the open-house was issued on April 2, 2014 and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML14092A036. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.

The NRC presented poster boards and was available to discuss its assessment of the safety performance of Three Mile Island for the period of January 1 through December 31, 2013, as documented in our letter dated March 4, 2014 (ADAMS Accession No. ML14062A095). The NRC poster boards presented included background on the Reactor Oversight Process (ROP).

Additional information relative to the NRC's Annual Assessment Process and the safety performance of Three Mile Island, Unit 1 can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Members of the public attended the open-house and were offered the opportunity to question the NRC regarding Three Mile Islands performance and the role of the agency in ensuring safe plant operations.

/RA/ _______

Kevin A. Mangan, Acting Chief Projects Branch 6 Division of Reactor Projects

ML14062A095). The NRC poster boards presented included background on the Reactor Oversight Process (ROP).

Additional information relative to the NRC's Annual Assessment Process and the safety performance of Three Mile Island, Unit 1 can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Members of the public attended the open-house and were offered the opportunity to question the NRC regarding Three Mile Islands performance and the role of the agency in ensuring safe plant operations.

/RA/

Kevin A. Mangan, Acting Chief Projects Branch 6 Division of Reactor Projects Distribution: (via email) D.Werkheiser, DRP K.Mangan, DRP J.Heinly, DRP L.Cline, DRP RidsNRRPMThreeMileIslandResoure C. Roettgen, DRP DOC NAME: G:\DRP\BRANCH6\Communications\Public Meetings\Annual Assessment Meetings\2014\TMI\TMI Annual Assessment Meeting Summary 2014.docx ADAMS Accession No.: ML14119A029 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME LCline/ LC KMangan/ KAM DATE 04/25 /14 04/28/14