ML091280159

From kanterella
Jump to navigation Jump to search
TMI Annual Assessment Meeting 4/2/09 - Summary
ML091280159
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 05/07/2009
From: Bellamy R
NRC/RGN-I/DRP/PB6
To:
bellamy rr
References
Download: ML091280159 (3)


Text

May 7, 2009 LICENSEE: EXELON GENERATION COMPANY, LLC FACILITY: THREE MILE ISLAND POWER STATION, UNIT 1

SUBJECT:

SUMMARY

OF THE APRIL 2, 2009 ANNUAL ASSESSMENT PUBLIC MEETING On April 2, 2009, at 7:00 p.m., the Annual Assessment Meeting was conducted at the Londonderry Town Hall, Middletown, PA, between the Nuclear Regulatory Commission and Exelon Generation Company, LLC. The NRC requested this meeting with the management of Exelon to discuss the NRCs Annual Assessment of the performance of the Three Mile Island Power Station, Unit 1, in 2008.

The NRC presented and discussed its assessment of the safety performance of Three Mile Island for the period from January 1 through December 31, 2008. The NRC presentations included a discussion of the ROP, a summary of national performance assessment results, and the results of NRCs performance assessment of Three Mile Island. As part of this regulatory performance meeting, Exelon presented its perspective regarding the plants performance in 2008 and operational goals for 2009.

The public was invited to observe and at the end of the meeting was offered the opportunity to communicate with the NRC regarding Exelons performance at Three Mile Island and the role of the agency in ensuring safe plant operations The NRC's assessment letter can be found in ADAMS with Accession Number ML090620783.

The annual assessment meeting notice, with the attached meeting agenda and slides, can be found in ADAMS with Accession Numbers ML090780385 and ML090750834. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA by G. Scott Barber Acting For/

Ronald R. Bellamy, Ph.D., Chief Projects Branch 6 Division of Reactor Projects Attachments:

See List of Attendees

April 2, 2009 - Three Mile Island Annual Assessment Meeting with Exelon Attendees NRC: Ronald Bellamy, Branch Chief, Region I Division of Reactor Projects David Kern, TMI Senior Resident Inspector Javier Brand, TMI Resident Inspector Peter Bamford, TMI Project Manager Diane Screnci, Region I Public Affairs Christopher Newport, Region I Project Engineer Exelon: William Noll, Site Vice President Tom Dougherty, Plant Manager Dave Atherholt, Manager, Regulatory Assurance Bill Carsky, TMI Operations Director Steven Queen, TMI Engineering Director Ralph Desantis, Manager, Communications Wendi Croft, Regulatory Engineer Harold Yeldell, Director, Work Management John Karkoska, Security Manager Beth Archer, Senior Manager, Communications Public: Roxanne Bybel Local Officials: Steve Letavic, Londonderry Town Manager Press: Monica Von Dobeneck, Harrisburg Patriot News State Officials: David Allard, Director, PA Dept of Environmental Protection Larry Ryan, Engineer, PA Bureau of Radiation Protection Mike Murphy, Engineer, PA Bureau of Radiation Protection Henry Tamanini, Planning Supervisor, PA Emergency Mgmt Agency

May 7, 2009 LICENSEE: EXELON GENERATION COMPANY, LLC FACILITY: THREE MILE ISLAND POWER STATION, UNIT 1

SUBJECT:

SUMMARY

OF THE APRIL 2, 2009 ANNUAL ASSESSMENT PUBLIC MEETING On April 2, 2009, at 7:00 p.m., the Annual Assessment Meeting was conducted at the Londonderry Town Hall, Middletown, PA, between the Nuclear Regulatory Commission and Exelon Generation Company, LLC. The NRC requested this meeting with the management of Exelon to discuss the NRCs Annual Assessment of the performance of the Three Mile Island Power Station, Unit 1, in 2008.

The NRC presented and discussed its assessment of the safety performance of Three Mile Island for the period from January 1 through December 31, 2008. The NRC presentations included a discussion of the ROP, a summary of national performance assessment results, and the results of NRCs performance assessment of Three Mile Island. As part of this regulatory performance meeting, Exelon presented its perspective regarding the plants performance in 2008 and operational goals for 2009.

The public was invited to observe and at the end of the meetings was offered the opportunity to communicate with the NRC regarding Exelons performance at Three Mile Island and the role of the agency in ensuring safe plant operations The NRC's assessment letter can be found in ADAMS with Accession Number ML090620783.

The annual assessment meeting notice, with the attached meeting agenda and slides, can be found in ADAMS with Accession Numbers ML090780385 and ML090750834. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA by G. Scott Barber Acting For/

Ronald R. Bellamy, Ph.D., Chief Projects Branch 6 Division of Reactor Projects Distribution: J. Brand, DRP, RI S. Collins, RA C. LaRegina, DRP, Resident OA M. Dapas, ORA S. Campbell, RI OEDO D. Lew, DRP H. Chernoff, NRR J. Clifford, DRP P. Bamford, NRR R. Bellamy, DRP E. Miller, NRR G. Barber, DRP C. Newport, DRP D. Kern, DRP, SRI ML091280159 After declaring this document An Official Agency Record it will be released to the Public.

Document Name: G:\DRP\BRANCH6\ROP ASSESSMENT FOLDERS\ROP 9\TMI\END-OF-CYCLE\TMI 2009 AA MEETING

SUMMARY

.DOC To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP NAME DKern/ DK SBarber/ GSB RBellamy/GSB for DATE 04/30/09 05/07/09 05/07/09 OFFICIAL RECORD COPY