Category:E-Mail
MONTHYEARML23269A0232023-09-22022 September 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - TSTF-505 Audit Questions ML23240A3412023-08-28028 August 2023 NRR E-mail Capture - ANO-2, Grand Gulf, and River Bend - Acceptance Review of LAR Revising TSs to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23194A1752023-07-13013 July 2023 NRR E-mail Capture - ANO-1 - Acceptance Review of Alternative Request ANO1-ISI-037 ML23187A0432023-07-0303 July 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 1 - TSTF-505 Audit Agenda ML23166A0132023-06-14014 June 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 1 - TSTF-505 Audit Questions ML23130A2752023-05-10010 May 2023 NRR E-mail Capture - ANO Unit 2- Acceptance of Requested Licensing Action LAR to Adopt TSTF-505 Revision 2 ML23118A0692023-04-28028 April 2023 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to Modify ANO-1 TS 3.3.1, Reactor Protection System Instrumentation (L-2023-LLA-0048) ML23104A1052023-03-10010 March 2023 NRR E-mail Capture - ANO-2 Final RAI Alternative Request for Life-of-Repair of RVCH Pen. 46 ML23072A3672023-03-0909 March 2023 NRR E-mail Capture - Entergy Fleet - Acceptance Review of Quality Assurance Program Manual Reduction in Commitment ML23039A0872023-02-0808 February 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - Acceptance Review of Relief Request ANO2-RR-23-001, Half-Nozzle Repair of RVCH Penetration 46 (L-2023-LLR-0000) ML23026A1322023-01-26026 January 2023 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to Adopt TSTF-505 Revision 2 ML22354A0122022-12-19019 December 2022 NRR E-mail Capture - ANO-1 and ANO-2 - Acceptance Review of Request for Alternative ANO-CISI-002 Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (L-2022-LLR-0080) ML22349A0112022-12-14014 December 2022 NRR E-mail Capture - Final RAI Relief Request ANO1-ISI-035 ML22341A1202022-12-0707 December 2022 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation (L-2022-LLA-0161) ML22273A0982022-09-30030 September 2022 NRR E-mail Capture - ANO Units 1 and 2 - Acceptance of Requested Licensing Action Emergency Plan Staffing Requirements ML22265A2012022-09-22022 September 2022 NRR E-mail Capture - ANO-1 - Acceptance Review of Relief Request ANO1-ISI-036 ML22188A1782022-07-0707 July 2022 NRR E-mail Capture - ANO-1 - Acceptance Review of Relief Request ANO1-ISI-035 ML22174A1362022-06-23023 June 2022 NRR E-mail Capture - ANO-2 Final RAI Relief Requests ANO2-ISI-023 Through -028 (EPIDs L-2022-LLR-0022 Through -0027) ML22151A3262022-05-31031 May 2022 August 2022 Emergency Preparedness Exercise Inspection - Request for Information ML22124A2452022-05-0404 May 2022 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI 2 License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22108A1642022-04-18018 April 2022 NRR E-mail Capture - ANO-1: Final RAI License Amendment Request Concerning TS Changes Due to Revised Dose Calculations (L-2021-LLA-0181) ML22081A3902022-03-22022 March 2022 NRR E-mail Capture - ANO-2 - Acceptance Review of Relief Requests ANO2-ISI-023, -024, -025, -026, -027, and -028 (Epids: L-2022-LLR-022, -023, -024, -025, -026, and -027) ML22034A5482022-02-0303 February 2022 NRR E-mail Capture - Final RAI License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22020A0822022-01-19019 January 2022 NRR E-mail Capture - ANO-1 and 2 - Final RAI 2 License Amendment Requests to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML22020A0742022-01-13013 January 2022 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action Alternative ANO2-PT-003 ML21314A1212021-11-0909 November 2021 Verbal Authorization of Relief Request ANO2-RR-21-002 ML21312A4792021-11-0505 November 2021 Email: NRC Staff Preliminary Questions Regarding X Energy LLC Xe-100 Topical Report: Risk-Informed Performance-Based Licensing Basis Development ML21312A0382021-11-0505 November 2021 NRR E-mail Capture - ANO-2 RAI Relief Request ANO2-RR-21-002 ML21308A5602021-11-0404 November 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, Grand Gulf, River Bend, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML21292A0112021-10-18018 October 2021 NRR E-mail Capture - ANO, 1 and 2, Grand Gulf, River Bend, Waterford, 3 - Acceptance Review of LAR to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21287A1692021-10-13013 October 2021 Record of 10-13-21 Verbal Authorization of ANO2-R&R-012 (L-2021-LLR-0082) ML21298A1562021-10-11011 October 2021 NRR E-mail Capture - ANO-2 Final RAI Relief Request ANO2-R&R-012 Concerning Rv Closure Head Penetration 46 ML21273A0672021-09-29029 September 2021 NRR E-mail Capture - ANO-2 Final RAI 2 License Amendment Request to Adopt a Safety Function Determination Program ML21238A3742021-08-23023 August 2021 RFI Email - Cyber PI&R Inspection (ANO) ML21252A0052021-08-20020 August 2021 NRR E-mail Capture - ANO-1 and 2 Final RAI License Amendment Request to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML21217A3302021-08-0505 August 2021 (ANO) Problem Identification and Resolution (PIR) Request for Information Combined ML21202A1662021-07-20020 July 2021 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action Alternative ANO2-PT-003 ML21201A0062021-07-19019 July 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21197A0372021-07-16016 July 2021 NRR E-mail Capture - ANO-1 and 2 - Final RAI Final Response to GL 2004-02 ML21179A0052021-06-25025 June 2021 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action License Amendment Request to Adopt 10 CFR 50.69 ML21179A0042021-06-25025 June 2021 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action License Amendment Request to Adopt 10 CFR 50.69 ML21174A0342021-06-22022 June 2021 NRR E-mail Capture - Entergy Fleet (ANO, Ggulf, Rbend, & Waterford) - Acceptance Review for Relief Request to Use a Provision of a Later Edition of the ASME Code, Section XI for Periodic System Pressure Tests Exemptions ML21116A1092021-04-26026 April 2021 NRR E-mail Capture - ANO-1 and ANO-2: Final Supplemental RAI Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of ECP Supply Piping ML21105A0122021-04-0909 April 2021 NRR E-mail Capture - ANO-2 Final RAI License Amendment Request to Adopt a Safety Function Determination Program ML21074A2552021-03-15015 March 2021 NRR E-mail Capture - ANO-1 and ANO-2 - Acceptance of Requested Licensing Action LAR for One-Time Change to Support Upgrade of the ECP Supply Piping ML21071A2172021-03-10010 March 2021 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI Proposed Change to Quality Assurance Program Manual ML21022A1692021-01-22022 January 2021 NRR E-mail Capture - Entergy Fleet (ANO, Grand Gulf, River Bend, and Waterford) - Acceptance Review for RR EN-20-RR-003, Proposed Alternative to Use ASME Code Case N-711-2 ML21019A5142021-01-14014 January 2021 March 2021 Emergency Preparedness Exercise Inspection - Request for Information ML20356A1142020-12-17017 December 2020 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action LAR Concerning LCO 3.0.6 and Proposed Adoption of SFDP ML20350B7602020-12-14014 December 2020 NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - Acceptance Review of Request to Use Alternative Examination Requirements - ANO2-ISI-022 2023-09-22
[Table view] |
Text
NRR-PMDAPEm Resource From: Orenak, Michael Sent: Friday, March 14, 2014 3:53 PM To: BICE, DAVID B (ANO) (DBICE@entergy.com)
Cc: Bamford, Peter
Subject:
ANO1 Steam Generator Inspection Report draft RAIs Attachments: MF3251 draft RAI.docx
- Dave, The NRC staff has additional questions on your October 23, 2013 (ADAMS Accession No. ML13296A746) letter summarizing the results of the Spring 2013 steam generator tube inspections performed at Unit 1 during refueling outage 1R24. Please see the attached draft RAIs. We request that you review these draft RAIs and provide comments or inform us if you would like a teleconference to discuss by next Friday, March 21th.
Please let me know if you have any questions.
Mike Michael Orenak ANO 1 & 2 Project Manager NRR - Division of Operating Reactor Licensing Phone: 301-415-3229 e-mail: Michael.Orenak@nrc.gov 1
Hearing Identifier: NRR_PMDA Email Number: 1168 Mail Envelope Properties (Michael.Orenak@nrc.gov20140314155326)
Subject:
ANO1 Steam Generator Inspection Report draft RAIs Sent Date: 3/14/2014 3:53:26 PM Received Date: 3/14/2014 3:53:26 PM From: Orenak, Michael Created By: Michael.Orenak@nrc.gov Recipients:
"Bamford, Peter" <Peter.Bamford@nrc.gov>
Tracking Status: None "BICE, DAVID B (ANO) (DBICE@entergy.com)" <DBICE@entergy.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 731 3/14/2014 3:53:26 PM MF3251 draft RAI.docx 23765 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
REQUEST FOR ADDITIONAL INFORMATION REGARDING ARKANSAS NUCLEAR ONE, UNIT 1 1R24 STEAM GENERATOR TUBE INSERVICE INSPECTION REPORT DOCKET No. 50-313 TAC MF3251
- 1. Section 3.7 indicates that there is plastic deformation in the first-span tie rod region of both steam generators (SGs) and that as a result there will be residual bowing during normal power operation. Please discuss what effects this residual bowing may have on normal operation of the SGs.
- 2. Section 3.7 indicates that the direction of tie rod bowing in the first span for SGs A and B are not consistent. For SG B, some of the bowing is circumferential as opposed to being all radially inward, as with SG A. Please discuss any insights on why there is a difference in the direction of bowing.
- 3. Peripheral tubes were inspected for signs of denting to assist in identifying locations where the tube support plates are suspected to be hanging up (i.e., suspension of the plate in an elevated manner). Please discuss the results of these inspections and your assessment of these results.
- 4. Figure 3.7.1 indicates that one tie rod in the first span would have been in contact with a tube during normal (hot) operating conditions. Please confirm that no tube wear was identified in the first span region of the tube that was in contact with the tie rod. The staff notes that in 1R24 (2013 outage), tube stabilization and plugging was performed in tubes that were predicted to be in contact with the tie rods during operation (hot conditions). Was this a change in practice since the prior inspection?
- 5. Figure 3.7.1 indicates that the bow in 1R23 was slightly less than the bow observed in 1R22. Please discuss any insights on this trend.
- 6. Please provide a listing of the location, orientation, and measured size of all service induced wear indications detected during the 1R24 (2013) outage. It does not appear that this information was provided for the wear indications attributed to interaction between the tube and tube support plates.
- 7. The 95th percentile growth rate in SG A was higher in 2013 (1R24) than it was in 2011 (1R23). In addition, the maximum growth rate observed was higher in SG B in 2013 than it was in 2011. Please discuss any insights on this trend since the growth rate for wear tends to decrease with time. In addition, please discuss how this trend was factored into your operational assessment (an increasing growth rate with time).
- 8. In Tables 3.7.5 and 3.7.6, depths are not provided in the X-probe column when 2 wear scars were detected by an array coil. Please clarify why the depth for each of the wear ENCLOSURE
scars was not provided (presumably, the indications could have been sized with the array (X-) probe).