MONTHYEARML13310B0241983-10-17017 October 1983 Informs of Organizational & Personnel Changes Resulting from Jan 1980 Centralization of Nuclear Engineering & Operations Dept.Revs to Tech Specs Being Prepared for Future Submittal Project stage: Other ML20081B5641984-03-0707 March 1984 Application for Amend 10 to License NPF-15,revising Tech Spec 4.8.1.1.2.C to Determine Operability of Diesel Generator Should Diesel Fuel Oil Fail to Meet Test for Insolubles & Revising Section 6 Re Organization Changes Project stage: Request ML20081B5731984-03-0707 March 1984 Proposed Revs to Tech Spec 4.8.1.1.2.C to Determine Operability of Diesel Generator Should Diesel Fuel Oil Fail to Meet Test for Insolubles & Proposed Revs to Section 6 Re Organizational Changes Project stage: Other ML13305A5371984-03-0707 March 1984 Forwards Application for Amend 24 to License NPF-10 & Amend 10 to License NPF-15.Amends Revise Tech Spec 4.8.1.1.2.C Re Level of Insolubles in Diesel Fuel Oil & Section 6 Re Organizational Changes Project stage: Request ML13310B3901984-05-0101 May 1984 Forwards Amend Application 117 to License DPR-13,consisting of Proposed Change 130,revising Tech Specs to Reflect Recent Organization Changes & Incorporating Revs Requested in Generic Ltr 83-43.Fee Encl Project stage: Request L-83-043, Amend Application 117 to License DPR-13,consisting of Proposed Change 130,revising Tech Specs to Reflect Recent Organization Changes & Incorporating Revs Requested in Generic Ltr 83-431984-05-0101 May 1984 Amend Application 117 to License DPR-13,consisting of Proposed Change 130,revising Tech Specs to Reflect Recent Organization Changes & Incorporating Revs Requested in Generic Ltr 83-43 Project stage: Request ML13310B5511984-07-17017 July 1984 Proposed Changes to Tech Spec Section 6.2.2, Administrative Controls, to Add Requirements Re Administration & Use of Staff Overtime Project stage: Request ML13310B5481984-07-17017 July 1984 Forwards Amend Application 122 to License DPR-13,changing Tech Specs to Reflect Staff Overtime & Administrative Requirements,Per Generic Ltrs 82-12 & 82-16.Fee Encl Project stage: Other ML13310B5501984-07-17017 July 1984 Amend Application 122 to License DPR-13,revising Tech Specs to Add Requirements Re Administration & Use of Unit Staff Overtime,Per Generic Ltrs 82-12 & 82-16 Project stage: Other ML13310B6341984-08-16016 August 1984 Application for Amend to License DPR-13,changing Tech Specs Re Max Reactor Coolant Activity,Leakage,Safety Injection Sys Hydraulic Valve Testing,Reactivity Anomalies & Miscellaneous Radioactive Matls Sources Project stage: Request ML13310B6371984-08-16016 August 1984 Proposed & Existing Tech Specs Re Max Reactor Coolant Activity,Leakage,Safety Injection Sys Hydraulic Valve Testing,Reactivity Anomalies & Miscellaneous Radioactive Matls Sources Project stage: Other ML13310B6691984-09-0404 September 1984 Revised Application to Amend Licenses DPR-13,NPF-10 & NPF-15,changing Tech Specs Re Offsite Organization & Radiation Instrumentation Setpoint Project stage: Request ML13310B6731984-09-0404 September 1984 Proposed Tech Spec Table 3.5.10-1 Re Radiation Instrument Alarm Setpoint & Figures 6.2.1.1,5.2-1 & 6.2-1 Re Offsite Organization Project stage: Other ML13310B6781984-09-0505 September 1984 Forwards Addl Info Re Proposed Change 127 to Tech Spec Table 3.5.7-1,in Response to 840723 Request Project stage: Request ML13310B6811984-09-0505 September 1984 Revised Proposed Change 127 to Tech Spec Table 3.5.7-1 Project stage: Request ML13330A4421984-09-0707 September 1984 Forwards Request for Addl Info Re Proposed Changes to Tech Specs Concerning Onsite Organization,Review Responsibilities & Control Room Command Function.Meeting Will Be Scheduled in Future Project stage: RAI ML13330A4591984-11-30030 November 1984 Application for Amend to License DPR-13,consisting of Rev 1 to Proposed Change 119 to Tech Specs Re Administrative Controls on Working Hours of Staff Job Classifications,Per NUREG/CR-1764 Project stage: Request ML13330A1671984-11-30030 November 1984 Rev 1 to Proposed Change 119 to Tech Specs,Revising Administrative Controls on Staff Working Hours by Job Classification Project stage: Request ML13324A5301984-12-27027 December 1984 Summary of 841211 Meeting W/Util Re Proposed Tech Spec Changes on Administrative Controls.List of Attendees Encl Project stage: Meeting ML13316A8031985-03-0606 March 1985 Forwards Amend 88 to License DPR-13 & Safety Evaluation. Amend Adds Administrative Guidance & Requirements Re Assignment of Overtime to Personnel Performing safety-related Activities Project stage: Approval ML13316A8051985-03-0606 March 1985 Amend 88 to License DPR-13,adding Administrative Guidance & Requirements Re Assignment of Overtime to Personnel Performing safety-related Activities Project stage: Other ML13316A8081985-03-0606 March 1985 Safety Evaluation Supporting Amend 88 to License DPR-13 Project stage: Approval ML13331A8031985-04-12012 April 1985 Forwards Responses to Questions Re Proposed Change 130 & Proposed Tech Spec Section 6.0, Administrative Controls. Onsite & Offsite Organization Charts Revised Project stage: Request ML13311A3851985-04-12012 April 1985 Rev 0 to Energy Balance Method Verification Project stage: Request ML13331A8181985-07-0101 July 1985 Revised Tech Spec Pages Delaying Implementation of 850412 Proposed Change 130 Revising Time Period for Submittal of Radioactive Effluent Release Rept from 60 to 90 Days Project stage: Request ML13331A8151985-07-0101 July 1985 Requests Delay in Implementation of Proposed Change 130 to Tech Specs,Revising Time Period for Submittal of Semiannual Radioactive Effluent Release Rept from 60 to 90 Days.Revised Tech Specs Encl Project stage: Request ML13331A8211985-07-31031 July 1985 Revised Tech Spec Section 6.15,allowing Major Changes to Radwaste Treatment Sys to Be Reported in Monthly Operating Rept Project stage: Other ML13331A8191985-07-31031 July 1985 Application to Amend License DPR-13,revising Tech Spec Section 6.15 to Allow Major Changes to Radwaste Treatment Sys to Be Reported in Monthly Operating Rept Project stage: Request ML20133A0631985-08-0202 August 1985 Proposed Tech Specs Extending Time Period for Submittal of Semiannual Radioactive Effluent Release Rept for 90 Days Project stage: Other ML13316A8641985-10-15015 October 1985 Forwards Amend 91 to License DPR-13 & Safety Evaluation. Amend Approves Tech Spec Revs Re Administrative Controls, Including Reporting Requirements,Min Shift Crew Composition & Offsite Organization Project stage: Approval ML13316A8661985-10-15015 October 1985 Amend 91 to License DPR-13,approving Tech Spec Revs Re Administrative Controls,Including Reporting Requirements,Min Shift Crew Composition & Offsite Organization Project stage: Other ML13316A8691985-10-15015 October 1985 Safety Evaluation Supporting Amend 91 to License DPR-13 Project stage: Approval ML13305A8901986-06-30030 June 1986 Rev 2 to Chemistry Procedure SO123-III-6.6, Diesel Fuel Oil Specs & Testing Requirements Project stage: Other ML20206U7991986-09-30030 September 1986 Revised Proposed Tech Spec Change PCN 192,in Response to Generic Ltr 84-15 Concerning Cold Fast Start Testing.Addl Justification Also Encl,Per 860814 Meeting Project stage: Meeting ML20207N5331987-03-0909 March 1987 Forwards Notice of Withdrawal of License Amend Request NPF-10/15-75 Proposing Amends to Licenses NPF-10 & NPF-15. Withdrawn Amend Proposed Revs to Tech Spec 4.8.1.1.2.c & Was Superseded by Util 860317 Application Project stage: Withdrawal ML20207N5801987-03-0909 March 1987 Notice of Withdrawal for License Amend Request NPF-10/15-75. Amend Proposed Revs to Licenses NPF-10 & NPF-15 Re Determination of Diesel Generator Operability When Fuel Oil Fails to Pass Test for Insolubles Project stage: Other ML20212R6281987-04-0909 April 1987 Amends 59 & 48 to Licenses NPF-10 & NPF-15,respectively, Reducing Frequency of Emergency Diesel Generator (EDG) Fast Starts,Revising Diesel Fuel Oil Surveillance & Reducing Number of EDG Tests Project stage: Other ML20212R6481987-04-0909 April 1987 Safety Evaluation Supporting Amends 59 & 48 to Licenses NPF-10 & NPF-15,respectively Project stage: Approval ML13316B0521988-08-0303 August 1988 Forwards Amend 105 to License DPR-13 & Safety Evaluation. Amend Incorporates Recent Organizational Changes & Reflects Recent 10CFR50 NRC Correspondence Requirements.Changes Re Onsite & Offsite Organization Charts Not Included Project stage: Approval ML13316B0561988-08-0303 August 1988 Safety Evaluation Supporting Amend 105 to License DPR-13 Project stage: Approval ML13316B0551988-08-0303 August 1988 Amend 105 to License DPR-13,revising Tech Specs to Be Consistent W/Recent Util Organizational Changes & Recent 10CFR50 NRC Correspondence Requirements Project stage: Other ML20205H6891988-10-18018 October 1988 Corrected Amends 68 & 57 to Licenses NPF-10 & NPF-15, Respectively,Deleting Onsite & Offsite Organization Charts & Revising Reporting Responsibility of Independent Safety Engineering Group & Nuclear Safety Group Project stage: Other ML13303B0311989-04-12012 April 1989 Advises That Proposed Change PCN-83 to Licenses NPF-10 & NPF-15,revising Section 6, Administrative Controls Withdrawn,In Response to Util Requests.Fr Notice of Withdrawal Will Be Prepared Project stage: Other ML13303B0911989-04-25025 April 1989 Forwards Notice of Withdrawal of 840307 Application for Amends to Licenses NPF-10 & NPF-15,revising Administrative Controls of Tech Specs to Reflect Changes in Util Organizational Structure Project stage: Withdrawal ML20245J6161989-04-25025 April 1989 Notice of Withdrawal of 840307 Application for Amends to Licenses NPF-10 & NPF-15,revising Tech Specs to Reflect Changes in Util Organizational Structure & to Incorporate New NRC Reporting Requirements Project stage: Withdrawal 1985-03-06
[Table View] |
Text
REGULATORY *ORMATION DISTRIBUTION SYS40 (RIDS)
ACCESSION NBR:8504160331 DCDATE: 85/04/12 NOTARIZED: NO DOCKET #
FACIL:50-206 San Onofre Nuclear Station, Unit 1, Southern Californ 05000206 50-361 San Onofre Nuclear Station, Unit 2, Southern Californ 05000361 50-362 San Onofre Nuclear Station, Unit 3, Southern Californ 05000362 AUTH.NAME AUTHOR AFFILIATION MEDFORD,M.O.
Southern California Edison Co, RECIP.NAME RECIPIENT AFFILIATION ZWOLINSKI,J.A.
Operating Reactors Branch 5
SUBJECT:
Forwards responses to questions re Proposed Change 130 &
proposed Tech Spec Section 6,0, "Administrative Controls."
Op te & offsite organization charts revised, DISTRIBUT N CODE: A0010
'OPIES RECEI D:LTR ENCL -.
SIZE L
TITLE: OR Submittal: General Distribution NOTES:J Hanchett Icy POR Documents. NRR/DL/SEP icy, 05000206 OL:03/27/67 J Hanchett icy POR Documents, ELD Chandler icy.
05000361 OL:02/16/82 J Hanchett icy POR Documents. ELD Chandler icy, 05000362 OL:11/15/82 RECIPIENT COPIES RECIPIENT
.COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL NRR ORB5 BC 01 7
l*
NRR LB3 BC 01 7
INTERNAL: ACRS 09 6
ADM/LFMB 1
ELD/HDS2 1
NRR/DE/MrEB 1
NRR/DL DIR 1
NRR/DL/0RAB 1
NRR/DL/TSRG 1
NRR ___METB 1
NRR/DSI/RAB 1
G IL 04 1
RGN5 1
EXTERNAL: EG&G BRUSKES 1
LPDR 03 2
20 NRC PDR 02 1
1 NSIC 05 1
It NOTES:
3 b
TOTAL NUMBER OF COPIES REQUIRED: LTTR 38 ENCL
Southern California Edison Company P. 0.
BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD. CALIFORNIA 91770 M.O.MEDFORD TELEPHONE MANAGER, NUCLEAR LICENSING (818) 302-1749 April 12, 1985 Director, Office of Nuclear Reactor Regulation Attention:
Mr. 3. A. Zwolinski, Chief Operating Reactors Branch No. 5 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:
Subject:
Docket Nos. 50-206, 50-361 and 50-362 Proposed Changes to Section 6.0, Administrative Controls San Onofre Nuclear Generating Station Units 1, 2 and 3
References:
- 1. Letter, W. A. Paulson, NRC, to K. P. Baskin, SCE, Proposed Technical Specification Changes on Administrative Controls, September 7, 1984
- 2. Letter, M. 0. Medford, SCE, to 3. A. Zwolinski, NRC, Revision to Proposed Change No. 146, April 10, 1984
- 3. Letter, J. A. Zwolinski, NRC, to Kenneth P. Baskin, SCE, Staff Overtime Requirements, March 16, 1985 Reference 1 provided us with NRC staff questions on our Proposed Change Nos. 130 for San Onofre Unit 1 and NPF-10/15-83 for San Onofre Units 2/3.
These proposed changes were submitted by our letters dated May 1, 1984 (Unit 1) and March 7, 1984 (Units 2 and 3).
In order to resolve the staff questions a meeting was held with the NRC staff on December 11, 1984. The meeting concluded that a complete resubmittal of the proposed changes, including any revisions agreed upon during the meeting, and a submittal of our responses to the staff questions is appropriate. Accordingly, provided as Enclosures 1 and 2 are our responses to the NRC staff questions presented at the December 11, 1984 meeting, and the proposed Section 6.0 Technical Specifications for San Onofre Units 1, 2 and 3 (Enclosures 3 and 4).
The proposed changes provided with the original submittals are denoted by a single line in the right hand column and any revisions since the original submittals, whether discussed in the meeting or not, are denoted by a double line in the right hand column.
In addition to the changes proposed in our responses to the staff questions, we have revised the OSRC quorum requirements, revised the onsite and offsite organization charts, renumbered the Unit 1 Section 6.0 to be consistent with the Units 2 and 3 numbering, and resolved some inconsistencies in San Onofre Unit 1 and San Onofre Units 2 and 3 reporting requirements.
8504160331 850412 PDR ADOCK 05000206 P
PDR
Mr. J.
April 12, 1985 Also included in the San Onofre Unit 1 proposed changes (Enclosure 3), are pages issued with Amendment No. 79, which require a change due to the renumbering of Section 6.9.3 to 6.9.2 and the new pages issued with Amendment 88. We also request that you delete San Onofre Unit 1, Section 6.12, Environmental Qualification, since the issuance of 10 CFR 50.49 supercedes this section. The new San Onofre Unit 1, Section 6.16 is inserted for the reasons identified in Reference 2.
The transfer of the Nuclear Audit and Review Committee (NARC) responsibilities to the Nuclear Safety Group (NSG) at San Onofre Unit 1 is described in Enclosure 1 and reflected in Enclosure 3. It should also be noted that the description of the Nuclear Control Board (NCB) responsibilities is also being removed from the San Onofre Unit 1 Technical Specifications.
However, it will continue to function in a manner similar to that described in the San Onofre Units 2 and 3 FSAR and will consist of the membership described therein.
As you know, Reference 3 forwarded Amendment No. 88 to Provisional Operating License No. DPR-13 for San Onofre Unit 1. Enclosure 4 proposes a similar revision to the San Onofre Units 2 and 3 Appendix A Technical Specifications. This revision should be found acceptable for the reasons stated in Reference 3 and is proposed in order to provide consistency of Section 6.0 Technical Specifications among San Onofre Unit 1, and San Onofre Units 2 and 3. The issuance of this proposed Section 6.2.2.f will require deletion of License Condition 2.C(19)b for San Onofre Unit 2 and a revision to the wording of 6.2.2.f for San Onofre Unit 3.
Based on our review of the Information included in Enclosures 3 and 4, there is no change to our previous conclusion stated in the applications dated May 1, 1984 (Unit 1) and March 7, 1984 (Units 2 and 3),
that these Proposed Changes do not constitute a significant hazards consideration. If you have any questions regarding the enclosed information, please let me know.
Very truly yours, Enclosures cc:
G. W. Knighton, Chief, Licensing Branch No. 3 Harry Rood, NRR Project Manager, San Onofre Units 2 and 3 W. A. Paulson, NRR Project Manager, San Onofre Unit 1 J. 0. Ward, California Department of Health Services F. R. Huey, USNRC Senior Resident Inspector, Units 1, 2 and 3
ENCLOSURE 1