ML13274A661

From kanterella
Jump to navigation Jump to search

E-mail Re. Accepted for Review of Application to Modify Watts Bar Nuclear Plant Unit 1 Tech Spec 4.3.1 Spent Fuel Pool Criticality
ML13274A661
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 10/01/2013
From: Andrew Hon
Plant Licensing Branch II
To: James Shea
Tennessee Valley Authority
Hon A
References
TAC MF2515
Download: ML13274A661 (1)


Text

Hon. Andrew From: Hon, Andrew Sent: Tuesday, October 01,2013 4:07 PM To: Shea, Joseph W Uwshea@tva.gov)

Cc: Broaddus, Doug; Poole, Justin; Schrull, Edward Dustin (edschrull@tva.gov); Chen, Qiao Lynn; Jackson, Christopher

Subject:

Accepted for Review of Application to Modify Watts Bar Nuclear Plant Unit 1 Tech Spec 4.3.1 Spent Fuel Pool Criticality (TAC MF2515)

ADAMSAccessionNumber: ML13274A661 ADAMSVersionSeriesId: {F55 BEC24-EA5 D-4D9B-9CDA-C3C27 AD618D6}

Dear Mr. Shea,

By letter dated July 30,2013 (ADAMS NO. ML13213A018), TVA submitted the subject license amendment request for Watts Bar Unit-1. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

(ADAMS Accession No. ML13274A661 )

Andy Hon, PE Project Manager (Watts Bar Nuclear Unit-1)

Plant Licensing Branch 1/-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-8480 OWFN08E5 Mail Stop 08G-9a andrew.hon@nrc.gov 1