Request for Withholding Information from Public Disclosure, 10/26/11 Affidavit Executed by R. Shaffler, Invensys Operations Management, 11 V10 Tricon Documents
ML113340288
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/12/2011
From: Wang A
Plant Licensing Branch IV
To: Shaffer R
Invensys Operations Management
Lynch, S T, NRR/DORL/LPL4, 301-415-1524
References
TAC ME7522, TAC ME7523
Download: ML113340288 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 December 12, 2011 Mr. Roman Shaffer Project Manager Invensys Operations Management 26561 Rancho Parkway South Lake Forest, CA 92630

SUBJECT:

DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NOS.

ME7522 AND ME7523)

Dear Mr. Shaffer:

By letter dated October 26,2011 (993754-26T, Agencywide Documents Access and Management System (ADAMS) Accession No. ML11319A069), you submitted an affidavit dated October 26, 2011, requesting that information contained in the following documents be withheld from public disclosure pursuant to the Title 10 of the Code of Federal Regulations (10 CFR),

Part 2, Section 2.390:

(1)

Software Quality Assurance Plan (SQAP), Revision 0, 993754-1-801 (-P),

dated August 17, 2011 (2)

Regulatory Guide 1.152 Conformance Report, Revision 0, 993754-1-913(-P), dated September 6, 2011 (3)

DI&C-ISG-04 Conformance Report, Revision 0, 993754-1-912(-P), dated September 6, 2011 (4)

Software Development Plan (SDP), Revision 0, 993754-1-906(-P), dated August 17, 2011 (5)

Software Configuration Management Plan (SCMP), Revision 0, 993754-1-909(-P), August 16, 2011 (6)

Software Safety Plan (SSP), Revision 1, 993754-1-911 (-P). dated October 13, 2011 (7)

Software Integration Plan (SlntP), Revision 1, 993754-1-910(-P), dated October 14, 2011 (8)

Project Management Plan (PMP), Revision 1, 993754-1-905(-P), dated October 13, 2011 (9)

Software Validation and Verification Plan (SW), Revision 1, 993754-1-802(-P), dated October 13,2011 (10)

Validation Test Plan (VTP), Revision 0, 993754-1-813(-P), dated October 13, 2011 (11)

System Architecture Description (SAD), Revision 0, 993754-1-914(-P),

dated October 20,2011 Nonproprietary versions of these documents have been placed in the U.S. Nuclear Regulatory Commission's (NRC's) Public Document Room and added as a package to the NRC Library in ADAMS Accession No. ML113190392.

R. Shaffer

- 2 The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

a)

Information which discloses process, method, or apparatus, including supporting data and analyses, where prevention of its use by Invensys Operations Management's competitors without license or contract from Invensys constitutes a competitive economic advantage over other companies in the industry.

b}

Information, which if used by competitors, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, application, installation, assurance of quality, or licensing of a similar product.

c)

Information which reveals cost or price information, production capacities, budget levels, or commercial strategies of Invensys Operations Management, its customers, its partners, or its suppliers.

d)

Information which reveals aspects of past, present, or future Invensys Operation[s] Management customer-funded development plans or programs, of potential commercial value to Invensys.

e)

Information which discloses patentable subject matter for which it may be desirable to obtain patent protection.

f)

Information obtained through Invensys Operation[s] Management actions which could reveal additional insights into nuclear equipment qualification processes, customer applications, and regulatory proceedings, and which are not otherwise readily obtainable by a competitor.

We have reviewed your submittals in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review

R. Shaffer

- 3 this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-1445.

Sincerely, ae&Nt ~J WVl~t Alan B. Wang, Project Miln:ger Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323 cc:

Mr. John T. Conway Senior Vice President - Energy Supply and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant 77 Beale Street, Mail Code B32 San Francisco, CA 94105 Additional distribution via Listserv

R. Shaffer

-4 this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-1445.

Sincerely, IRA!

Alan B. Wang. Project Manager Plant licenSing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323 cc:

Mr. John T. Conway Senior Vice President - Energy Supply and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant 77 Beale Street, Mail Code B32 San Francisco, CA 94105 Additional distribution via Listserv DISTRIBUTION:

PUBLIC LPL4 R/F RidsAcrsAcnw_MailCTR Resource RidsNrrDorlLpl4 Resource RidsNrrLAJBurkhardt Resource RidsNrrPMDiabloCanyon Resource RidsOgcRp Resource RidsRgn4MailCenter Resource SLynch, NRR/DORLlLPL4 ADAMS Accession No. ML113340288 OFFICE NRRlLPL4/PM NRRlLPL4/PM NRRlLPL4/LA NRRlDE/EICB/BC NRRlLPL4IBC NRRlLPL4/PM NAME SLynch AWang JBurkhardt GWilson (RStattel for)

MMarkley AWang DATE 112/5/11 1215111 1215111 12nt11 12/9/11

~12111 OFFICIAL RECORD COpy