Forthcoming Meeting on with Pacific Gas and Electric to Discuss Digital Replacement of Process Protection System at Diablo Canyon, Units 1 and 2 & Pre-submittal of TSTF-493 Option B License Amendment Request (TAC ME7522-ME7523; ME8517-ME851
ML121350037
Person / Time
Site: Diablo Canyon  
(DPR-080, DPR-082)
Issue date: 05/15/2012
From: Joseph Sebrosky
Plant Licensing Branch IV
To: Markley M
Plant Licensing Branch IV
Sebrosky J, NRR/DORL/LPL4 301-415-1132
References
TAC ME7522, TAC ME7523, TAC ME8517, TAC ME8518
Download: ML121350037 (4)


Text

~""""'IW UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 15, 2012 MEMORANDUM TO: Michael T. Markley, Chief FROM:

SUBJECT:

DATE & TIME:

LOCATION:

PURPOSE:

CATEGORY 1:*

Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Joseph M. Sebrosky, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FORTHCOMING MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY (TAC NOS. ME7522, ME7523, ME8517, AND ME8518)

Thursday, June 28,2012 1 :00 p.m. - 4:00 p.m. EDT U.S. Nuclear Regulatory Commission (NRC)

One White Flint North Room 0-13G4 11555 Rockville Pike Rockville, Maryland The purpose of the meeting is to discuss the Technical Specification (TS) instrumentation and control setpoint changes that are being made to support Pacific Gas and Electric Company's (PG&E's) license amendment request submitted on October 26, 2011, to the NRC for the digital replacement of the process protection system portion of the reactor trip system and engineered safety features actuation system at Diablo Canyon Power Plant (DCPP), Unit Nos. 1 and 2. A second purpose of the meeting is for PG&E to discuss future plans for the submittal of an amendment request to implement a TS setpoint control program at DCPP, Unit Nos. 1 and 2, to allow relocation of the setpoints from the TSs to licensee control in accordance with Technical Specification Task Force (TSTF) change traveler TSTF-493 Option B.

This is a Category 1 Meeting. The public is invited to participate in this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

Proprietary information may be discussed at certain times during the meeting. These portions of the meeting will be closed to members of the public who have not been granted access to the information by the owner of the information.

Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings' (67 FR 36920), May 28, 2002.

M. Markley

- 2 PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC Pacific Gas & Electric W. Kemper, NRR K. Schrader, et al.

R. Stattel, NRR D. Rahn, NRR K. Bucholtz, NRR J. Sebrosky, NRR, et al.

Interested members of the public can participate in this meeting via a toll free audio teleconference. Please call the meeting contact listed below before Tuesday, June 26. 2012,4:30 p.m. (Eastern Daylight Time) to get the telephone number and the pass code.

MEETING CONTACT:

Joe Sebrosky, NRR 301-415-1132 joseph.sebrosky@nrc.gov The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print),

please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.

Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.

Docket Nos. 50-275 and 50-323

Enclosure:

Agenda cc w/encl: Distribution via Listserv

AGENDA FORTHCOMING MEETING WITH PACIFIC GAS AND ELECTRIC (PG&E) COMPANY AND U.S. NUCLEAR REGULATORY COMMISSION (NRC)

TO DISCUSS TECHNICAL SPECIFICATION INTRUMENTATION AND CONTROL SETPOINT LICENSE AMENDMENT REQUESTS FOR DIABLO CANYON POWER PLANT UNITS 1 AND 2 Thursday. June 28. 2012 1:00 p.m. -4:00 p.m. EDT Topic Time I

I ntrod uctions 1:00 p.m. -1:10 p.m.

Process Protection System Replacement License Amendment 1 :10 p.m. - 2:20 p.m.

Request (LAR)

  • Setpoint summary evaluation Westinghouse Setpoint methodology Evaluation of process protection system setpoints Use of expected bounding input values
  • Setpoint Calculations Westinghouse Setpoint methodology Development of input values i

Availability of setpoint calculations for NRC audit 2:20 p.m. - 2:30 p.m.

  • Public Questions PG&E's Plans for an LAR to Implement a Technical Specification (TS) 2:30 p.m. - 3:50 p.m.

Setpoint Control Program to Allow Relocation of the Setpoints from the

. TSs to Licensee Control in Accordance with Technical Specifications

  • Task Force (TSTF) Change Traveler TSTF-493, "Clarify Application of Setpoint Methodology for Limiting Safety System Settings," Option B
  • PG&E plans for submittal of an LAR for TSTF-493, Option B with Setpoint Control Program

Enclosure

M. Markley

- 2 PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC Pacific Gas & Electric W. Kemper, NRR K. Schrader, et al.

R. Stattel, NRR D. Rahn, NRR K. Bucholtz, NRR J. Sebrosky, NRR, et al.

Interested members of the public can participate in this meeting via a toll free audio teleconference. Please call the meeting contact listed below before Tuesday, June 26,2012,4:30 p.m. (Eastern Daylight Time) to get the telephone number and the pass code.

MEETING CONTACT:

Joe Sebrosky, NRR 301-415-1132 joseph.sebrosky@nrc.gov The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print),

please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.

Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.

Docket Nos. 50-275 and 50-323

Enclosure:

Agenda cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrDssStsb Resource RStatlel, NRR/DE/EICB LPL4 Reading RidsNrrLAJBurkhardt Resource DRahn, NRR/DE/EICB RidsAcrsAcnw _MaiICTR Resource RidsNrrPMDiabloCanyon Resource KBucholtz, NRR/DSS/STSB RidsNrrDeEicb Resource RidsOgcRp Resource WMaier, RIV RidsNrrDorl Resource RidsOpaMail Resource MMarkley, NRR RidsNrrDorlLpl4 Resource RidsRgn4MailCenter Resource MMcCoppin, EDO RIV RidsNrrDraAfpb Resource TWertz, NRR VDricks, OPA RIV RidsNrrDraApla Resource WKemper, NRRlDE/EICB ADAMS Accession No. ML121350037 NRR/DORULPL4/BC NRR/DORULPL4/LA OFFICE NRR/DORULPL4/PM JBurkhardt MMarkley NAME JSebrosky 5/15112 5115/12 5/15112

  • DATE OFFICIAL RECORD COpy