ML13057A080

From kanterella
Jump to navigation Jump to search
2013 Monticello Nuclear Generating Plant Initial License Examination Outline and Operating Test Comments
ML13057A080
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 01/29/2013
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
References
Download: ML13057A080 (1)


Text

OUTLINE SUBMISSION AND OPERATING TEST COMMENTS JPM Admin RO 1. Look at the parts marked non-critical. Shouldnt these be critical? Change Terminating Cue Determined the writeup was correct. Last 1

to examinee states he has button was the critical portion of the JPM.

completed his review of the proposed schedule.

Control Room JPM g.: Bulk D/W After validation, the JPM was replaced. NRC Temperature Manual Calculation, 2 determined the proposed JPM was an admin appears to be an admin JPM. Verify at JPM.

on-site validation.

Scenario 2, Event 4, a low condenser vacuum switch will fail with RPS failing to inset a 1/2 scram. The OATC will Replaced scenario event with an event need to insert a 1/2 scram and the CRS involving APRMs. This new event required 3

will address Technical Specifications. the SRO to insert a 1/2 scram so the RO could The SRO may not implement the get the required event.

action statement until the time clock has expired. Replace if necessary