ML13057A080
ML13057A080 | |
Person / Time | |
---|---|
Site: | Monticello |
Issue date: | 01/29/2013 |
From: | Mcneil D NRC/RGN-III/DRS/OLB |
To: | |
References | |
Download: ML13057A080 (1) | |
Text
OUTLINE SUBMISSION AND OPERATING TEST COMMENTS JPM Admin RO 1. Look at the parts marked non-critical. Shouldnt these be critical? Change Terminating Cue Determined the writeup was correct. Last 1
to examinee states he has button was the critical portion of the JPM.
completed his review of the proposed schedule.
Control Room JPM g.: Bulk D/W After validation, the JPM was replaced. NRC Temperature Manual Calculation, 2 determined the proposed JPM was an admin appears to be an admin JPM. Verify at JPM.
on-site validation.
Scenario 2, Event 4, a low condenser vacuum switch will fail with RPS failing to inset a 1/2 scram. The OATC will Replaced scenario event with an event need to insert a 1/2 scram and the CRS involving APRMs. This new event required 3
will address Technical Specifications. the SRO to insert a 1/2 scram so the RO could The SRO may not implement the get the required event.
action statement until the time clock has expired. Replace if necessary