IPRenewal NPEmails From: STROUD, MICHAEL D [MSTROUD@entergy.com]
Sent: Friday, July 22, 2011 3:46 PM To: Kuntz, Robert
Subject:
NL-11-074 Rev-6 (7-14-11) Response to RAI NRC LTR 6-15-11.doc Attachments: NL-11-074 Rev-6 (7-14-11) Response to RAI NRC LTR 6-15-11.doc
- Rob, See attached Word version of the July 14th letter. This inclydes the IPEC Commitment List.
Thanks Mike
<<NL11074 Rev6 (71411) Response to RAI NRC LTR 61511.doc>>
1
Hearing Identifier: IndianPointUnits2and3NonPublic_EX Email Number: 2774 Mail Envelope Properties (A79A58994C541C48BBCFB319610763CB08FB3A1A)
Subject:
NL-11-074 Rev-6 (7-14-11) Response to RAI NRC LTR 6-15-11.doc Sent Date: 7/22/2011 3:46:15 PM Received Date: 7/22/2011 3:46:36 PM From: STROUD, MICHAEL D Created By: MSTROUD@entergy.com Recipients:
"Kuntz, Robert" <Robert.Kuntz@nrc.gov>
Tracking Status: None Post Office: LITEXETSP002.etrsouth.corp.entergy.com Files Size Date & Time MESSAGE 190 7/22/2011 3:46:36 PM NL-11-074 Rev-6 (7-14-11) Response to RAI NRC LTR 6-15-11.doc 403008 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
Entergy Nuclear Northeast Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Tel (914) 788-2055 Fred Dacimo Vice President Operations License Renewal NL-11-074 July 14, 2011 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Response to Request for Additional Information (RAI)
Aging Management Programs Indian Point Nuclear Generating Unit Nos. 2 & 3 Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64
REFERENCE:
- 1. NRC Letter, Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Numbers 2 and 3, License Renewal Application, dated June 15, 2011
- 2. Entergy letter (NL-11-032), Response to Request for Additional Information (RAI) Aging Management Programs, dated March 28, 2011
Dear Sir or Madam:
Entergy Nuclear Operations, Inc is providing, in Attachment 1, the response to the reference 1 request for additional information (RAI). Attachment 2 provides the updated listing of regulatory commitments for license renewal.
If you have any questions, or require additional information, please contact Mr. Robert Walpole at 914-734-6710.
Docket Nos. 50-247 & 50-286 NL-11-074 Page 2 of 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on Sincerely, FRD/cbr
Attachment:
- 1. Response to Request for Additional Information (RAI), Aging Management Programs
- 2. IPEC List of Regulatory Commitments (Rev. 14) cc: Mr. William Dean, Regional Administrator, NRC Region I Mr. Sherwin E. Turk, NRC Office of General Counsel, Special Counsel Mr. Dave Wrona, NRC Branch Chief, Engineering Review Branch I Mr. John Boska, NRR Senior Project Manager Mr. Paul Eddy, New York State Department of Public Service NRC Resident Inspectors Office Mr. Francis J. Murray, Jr., President and CEO NYSERDA
ATTACHMENT 1 TO NL-11-074 LICENSE RENEWAL APPLICATION RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION (RAI)
AGING MANAGEMENT PROGRAMS ENTERGY NUCLEAR OPERATIONS, INC.
INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 & 3 DOCKET NOS. 50-247 AND 50-286
Docket Nos. 50-247 and 50-286 NL-11-074 Attachment 1 Page 2 of 15 INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION (RAI)
AGING MANAGEMENT PROGRAMS RAI 3.0.3.1.2-2
Background:
The response to RAI 3.0.3.1.2-1 dated March 28, 2011, proposed to manage the effects of aging for buried steel propane piping and tanks within the scope of license renewal by monitoring tank level. License renewal application (LRA) Section 2.3.3.15 states that the license renewal function of these components is to provide a pressure boundary. NUREG-1800, "Standard Review Plan for License Renewal" (SRP-LR), Rev. 1, Section A.1.2.3.4, item 2, states that a program based solely on detecting structure and component failure is not considered an effective aging management program for license renewal.
Issue:
In order to detect the effects of aging via a change in tank level, the license renewal pressure boundary function would already have had to fail (Le., leak). Consistent with the SRP-LR, this methodology should not be considered an effective aging management program.
Request:
Explain the basis for concluding that monitoring the propane tank level provides reasonable assurance that the license renewal pressure boundary function of the tank and piping is met.
Response for RAI 3.0.3.1.2-2 The carbon steel propane tanks and approximately fifty feet of carbon steel piping are in scope for license renewal due to their function of supporting 10 CFR 50.48 and Appendix R lighting requirements. There are two propane tanks supplying fuel to the one engine. They are not safety-related and do not contain environmentally hazardous materials. The direct visual inspections of buried safety-related and hazmat carbon steel piping being performed as discussed in the response to RAI 3.0.3.1.2-1 parts 1b and 1c for IP3 components will provide objective evidence of the condition of the propane piping and tanks since they are made of similar materials and are coated and exposed to similar soil conditions. These propane components have no unique characteristics that would require a specific inspection.
Observation of tank levels allows personnel to initiate corrective action to repair or replace a leaking tank, thereby providing reasonable assurance that the generator system will be available when called upon to perform its intended function. This is similar to the approach specified in NUREG-1801, Revision 2,Section XI.M41 for monitoring the integrity of fire system piping based on annual flow testing or monthly monitoring of jockey pump operation. The aging management approach for the carbon steel propane tanks and related piping is not based solely on detecting structure and component failure; but on detecting degradation such that corrective action can be effected prior to loss of system intended function. Therefore, monitoring the propane tank levels, in conjunction with opportunistic inspections of the propane piping and tanks and planned inspections of similar piping, provides reasonable assurance that the system intended function of the associated generator will be met consistent with the current licensing basis.
Docket Nos. 50-247 and 50-286 NL-11-074 Attachment 1 Page 3 of 15 RAI 3.0.3.1.2-3
Background:
The response to RAI 3.0.3.1.2-1 dated March 28, 2011, revised the number and frequency of buried pipe inspections and stated the number and frequency of soil testing to determine corrosivity of the soil in the vicinity of in-scope buried pipe.
Title 10 of the Code of Federal Regulations (10 CFR) 54.21(d) states, in part, that the final safety analysis report (FSAR) supplement must contain a summary description of the programs and activities for managing the effects of aging. SRP-LR 3.3.2.4, Rev. 1, states, in part, that the summary description of the programs and activities for managing the effects of aging for the period of extended operation in the FSAR Supplement should be sufficiently comprehensive such that later changes can be controlled by 10 CFR 50.59, and the description should contain information associated with the bases for determining that aging effects will be managed during the period of extended operation.
Issue:
The updated final safety analysis report (UFSAR) supplement does not reflect the planned number and frequency of buried in-scope piping inspections and soil testing to be conducted during the thirty-year period starting ten years prior to the period of extended operation.
Request:
Revise the UFSAR supplement to reflect the number and frequency of buried in-scope piping inspections and soil testing to be conducted during the 30-year period starting ten years prior to the period of extended operation, Response for RAI 3.0.3.1.2-3 Changes are shown as strikethroughs for deletions and underlines for additions.
A.2.1.5 Buried Piping and Tanks Inspection Program The Buried Piping and Tanks Inspection Program is a new program that includes (a) preventive measures to mitigate corrosion and (b) inspections to manage the effects of corrosion on the pressure-retaining capability of buried carbon steel, gray cast iron, and stainless steel components. Preventive measures are in accordance with standard industry practice for maintaining external coatings and wrappings. Buried components are inspected when excavated during maintenance. If trending within the corrective action program identifies susceptible locations, the areas with a history of corrosion problems are evaluated for the need for additional inspection, alternate coating, or replacement.
Prior to entering the period of extended operation, plant operating experience will be reviewed and multiple inspections will be completed within the past ten years. Additional periodic inspections will be performed within the first ten years of the period of extended operation.
IP2 will perform 20 direct visual inspections of buried piping during the 10 year period prior the PEO. IP2 will perform 14 direct visual inspections during each 10-year period of the PEO. Soil samples will be taken prior to the PEO and at least once every 10 years in the PEO. Soil will be tested at a minimum of two locations at least three feet below the surface near in-scope piping to determine representative soil conditions for each
Docket Nos. 50-247 and 50-286 NL-11-074 Attachment 1 Page 4 of 15 system. If test results indicate the soil is corrosive then the number of piping inspections will be increased to 20 during each 10-year period of the PEO.
The Buried Piping and Tanks Inspection Program will be implemented prior to the period of extended operation. This new program will be implemented consistent with the corresponding program described in NUREG-1801 Section XI.M34, Buried Piping and Tanks Inspection with the following modification.
The Buried Piping and Tanks Inspection Program will be modified based on operating experience to include a risk assessment of in-scope buried piping and tanks that includes consideration of the impacts of buried piping or tank leakage and of conditions affecting the risk for corrosion. The program will classify pipe segments and tanks as having a high, medium or low impact of leakage based on the safety class, the hazard posed by fluid contained in the piping and the impact of leakage on reliable plant operation. Corrosion risk will be determined through consideration of piping or tank material, soil resistivity, drainage, the presence of cathodic protection and the type of coating. Inspection priority and frequency for periodic inspections of the in-scope piping and tanks will be based on the results of the risk assessment. Inspections will be performed using qualified inspection techniques with demonstrated effectiveness, Inspections will begin prior to the period of extended operation.
A.3.1.5 Buried Piping and Tanks Inspection Program The Buried Piping and Tanks Inspection Program is a new program that includes (a) preventive measures to mitigate corrosion and (b) inspections to manage the effects of corrosion on the pressure-retaining capability of buried carbon steel, gray cast iron, and stainless steel components. Preventive measures are in accordance with standard industry practice for maintaining external coatings and wrappings. Buried components are inspected when excavated during maintenance. If trending within the corrective action program identifies susceptible locations, the areas with a history of corrosion problems are evaluated for the need for additional inspection, alternate coating, or replacement.
Prior to entering the period of extended operation, plant operating experience will be reviewed and multiple inspections will be completed within the past ten years. Additional periodic inspections will be performed within the first ten years of the period of extended operation.
IP3 will perform 14 direct visual inspections of buried piping during the 10 year period prior the PEO. IP3 will perform 16 direct visual inspections during each 10-year period of the PEO. Soil samples will be taken prior to the PEO and at least once every 10 years into the PEO. Soil will be tested at a minimum of two locations at least three feet below the surface near in-scope piping to determine representative soil conditions for each system. If test results indicate the soil is corrosive then the number of piping inspections will be increased to 20 during each 10-year period of the PEO.
The Buried Piping and Tanks Inspection Program will be implemented prior to the period of extended operation. This new program will be implemented consistent with the corresponding program described in NUREG-1801 Section XI.M34, Buried Piping and Tanks Inspection with the following modification.
The Buried Piping and Tanks Inspection Program will be modified based on operating experience to include a risk assessment of in-scope buried piping and tanks that includes consideration of the impacts of buried piping or tank leakage and of conditions affecting the risk for corrosion. The program will classify pipe segments and tanks as having a high, medium or low impact of leakage based on the safety class, the hazard posed by fluid contained in the piping and the impact of leakage on reliable plant operation. Corrosion risk will be determined through consideration of piping or tank material, soil resistivity, drainage, the presence of cathodic protection and the type of coating. Inspection priority and frequency for periodic inspections of the in-scope piping and tanks will be based on the results of the risk assessment. Inspections will be performed using qualified
Docket Nos. 50-247 and 50-286 NL-11-074 Attachment 1 Page 5 of 15 inspection techniques with demonstrated effectiveness, Inspections will begin prior to the period of extended operation.
RAI 3.0.3.1.10-3
Background:
By letter dated March 28, 2011, the applicant provided its response to RAI 3.0.3.1.10-1. Regarding its ASME Class 1 small bore socket weld inspection plan at IP2 during the extended period of operation, the applicant stated that it will perform volumetric examination of "at least ten socket welds" during each 10-year period
[interval1 of the period of extended operation" in Part 1 and Part 3 of the response. However, it also stated "ten socket welds" in Part 4 of the response.
Also regarding its socket weld inspection plan at IP2, the applicant stated that it will perform volumetric examination of "ten socket welds in 2012" in Part 1 and Part 4 of the response. However, it also stated "at least ten socket welds in 2012" in Part 3 of the response, Issue:
It is not clear to the staff whether the applicant intends to examine "ten" or "at least ten" socket welds during each 10-year interval of the period of extended operation. Based on I P2's plant specific operating experience, IP2 appears to have experienced five cases of socket weld failures. The staff's expectation is that a robust inspection program of socket welds is warranted and the inspection sampling should be sufficiently significant so that cracking, if exists, will be detected.
Request:
Justify the sampling adequacy for each 10-year period [interval] during the period of extended operation.
Response for RAI 3.0.3.1.10-3 The following supersedes the response for IP2 socket welds in the IPEC letter, NL-11-032, dated March 28, 2011.
IPEC will perform volumetric weld metal inspections on a sample of IP2 small-bore piping socket welds during the third period of the current (fourth) 10 year ISI interval. In addition, IPEC will perform twenty-five volumetric weld metal inspections of IP2 socket welds during each subsequent 10-year ISI interval. In lieu of volumetric examinations, destructive examinations may be performed, where one destructive examination may be substituted for two volumetric examinations.
The schedule for ASME Class 1 small-bore piping inspections is contained in the IP2 ISI Program. These new inspections will be added to the IP2 ISI Program, which is in the second period of the fourth ISI interval. ASME Code Section XI, IWB-2412(b)(2) specifies that when inspections are added in the second period of an ISI interval, then at least 25% of the required examinations shall be performed during the third period. Consistent with the direction in IWB-2412(b)(2), IPEC will perform seven volumetric inspections of socket welds (28% of the 25 new inspections per interval) during the third period of the fourth ISI interval, which ends in 2016. This schedule allows time for proper scheduling and contingency planning for the inspections to occur during scheduled refueling outages.
In approximately 38 years of operation, cracking has not been identified as the cause of leaks from small bore
Docket Nos. 50-247 and 50-286 NL-11-074 Attachment 1 Page 6 of 15 Class 1 socket welds. Rounded or pin hole defects caused three leaks, including the May 2010 leak, and mechanical damage caused a fourth. No cause was determined for the fifth leak which occurred in 1980, over 30 years ago. Inspections of the base metal near socket welds have found no significant degradation resulting from the effects of aging. Based on this IP2 operating experience, the addition of periodic inspections of 25 socket welds during each ISI interval provides reasonable assurance that the affected welds will remain capable of performing their intended function through the period of extended operation.
Commitment #46 Include in the IP2 ISI program that IPEC will perform twenty-five volumetric weld metal inspections of small-bore Class 1 socket welds each 10-year ISI interval scheduled as specified by IWB-2412 of the ASME Section XI Code. In lieu of volumetric examinations, destructive examinations may be performed, where one destructive examination may be substituted for two volumetric examinations.
UFSAR Changes Changes are shown with strikethroughs for deletions and underlines for additions.
A.2.1.17 Inservice Inspection - Inservice Inspection (ISI) Program The ISI Program is an existing program based on ASME Section XI Inspection Program B (Section XI, IWA-2432), which has 10-year inspection intervals. Every 10 years the program is updated to the latest ASME Section XI code edition and addendum approved in 10 CFR 50.55a.
The program consists of periodic volumetric, surface, and visual examination of components and their supports for assessment of sign of degradation, flaw evaluation, and corrective actions.
On March 1, 2007, IP2 entered the fourth ISI interval. The ASME code edition and addenda used for the fourth interval is the 2001 Edition with 2003 addenda.
IPEC will perform twenty-five volumetric weld metal inspections of small-bore Class 1 socket welds during each 10-year ISI interval scheduled as specified by IWB-2412 of the ASME Section XI Code. In lieu of volumetric examinations, destructive examinations may be performed, where one destructive examination may be substituted for two volumetric examinations.
The current program ensures that the structural integrity of Class 1, 2, and 3 systems and associated supports is maintained at the level required by 10 CFR 50.55a.
A.2.1.27 One-Time Inspection - Small Bore Piping Program The One-Time Inspection - Small Bore Piping Program is a new program applicable to small bore ASME Code Class 1 piping less than 4 inches nominal pipe size (NPS 4), which includes pipe, fittings, and branch connections. The ASME Code does not require volumetric examination of Class 1 small bore piping. The One-Time Inspection of ASME Code Class 1 Small Bore Piping Program will manage cracking through the use of volumetric examinations.
The program will include a sample selected based on susceptibility, inspectability, dose considerations, operating experience, and limiting locations of the total population of ASME Code Class 1 small bore piping locations butt welds. Small bore piping socket welds are periodically inspected and therefore are not included in this program.
Docket Nos. 50-247 and 50-286 NL-11-074 Attachment 1 Page 7 of 15 When evidence of an aging effect is revealed by a one-time inspection, evaluation of the inspection results will identify appropriate corrective actions.
The inspections will be performed prior to the period of extended operation. This new program will be implemented consistent with the corresponding program described in NUREG-1801,Section XI.M35, One-Time Inspection of ASME Code Class I Small-Bore Piping.
Docket Nos. 50-247 and 50-286 NL-11-074 Attachment 1 Page 8 of 15 RAI B.0.4-1
Background:
Pursuant to 10 CFR 54.21 (a}(3), a license renewal applicant is required to demonstrate that the effects of aging on structures and components subject to an aging management review are adequately managed so that their intended functions will be maintained consistent with the current licensing basis for the period of extended operation. Section 3.0.1 of NUREG-1800, "Standard Review Plan for Review of license Renewal Applications for Nuclear Power Plants" Revision 1 (SRP-LR), defines an aging management review as the identification of the materials, environments, aging effects, and aging management programs (AMPs) credited for managing the aging effects. In turn, SRP-LR Section A.1.2.3 defines an acceptable AMP as consisting of ten elements, including Element 10, "Operating Experience."
In addition, 10 CFR 54.21(d) requires the application to contain a FSAR supplement. This supplement must contain a summary description of the programs and activities for managing the effects of aging and the evaluation of time-limited aging analyses for the period of extended operation.
The Indian Point Nuclear Generating Units 2 and 3 license renewal application (LRA), Section B.O.4, provides a general description of how the applicant operating experience was gathered and considered in preparing the LRA. This section also states that, "Site procedures require reviews of site and relevant industry OE [operating experience] as the site continues operation through the license renewal period."
Issue:
Although LRA Section 8.0.4 states that operating experience will be reviewed in the future, it does not fully describe the details of how the applicant will use future operating experience to ensure that the AMPs will remain effective for managing the aging effects during the period of extended operation. Also, it is not clear as to which AMPs will be updated based on these operating experience reviews. In addition, the LRA does not state whether new AMPs will be developed, as necessary. Further, LRA Section B.O.4 does not provide the staff reasonable assurance that ongoing operating experience reviews will continue to inform AMP updates for license renewal.
Request:
Describe in detail the programmatic activities that will be used to continually identify aging issues, evaluate them, and, as necessary, enhance the AMPs or develop new AMPs for license renewal. In this description, address the following:
Describe the sources of plant-specific and industry operating experience that are monitored on an ongoing basis to identify potential aging issues. Indicate whether these plant-specific sources require monitoring: corrective action program, system health reports, licensee event reports (LERs), and the results of inspections performed under the AMPs. Similarly, indicate whether these industry sources require monitoring: vendor recommendations, revisions to industry standards on which the AMPs are based, LERs from other plants, NRC Bulletins, Generic Letters, Regulatory Issue Summaries, Information Notices, Regulatory Guides, license Renewal Interim Staff Guidance, and revisions to NUREG-1801, "Generic Aging Lessons Learned (GALL) Report." Describe the criteria used to classify a particular piece of information as aging related and outline the training provided to plant personnel so that they can adequately make such classifications.
Docket Nos. 50-247 and 50-286 NL-11-074 Attachment 1 Page 9 of 15 Describe how the identified aging issues are further evaluated to determine their potential impact on the plant aging management activities. Indicate whether the affected structures and components and their materials, environments, aging effects, aging mechanisms, and AMPs are identified and documented consistent with the methods used to prepare the LRA Describe how the results of AMP inspections are considered to adjust the frequency of future inspections, establish new inspections, and ensure an adequate depth and breadth of component, material, environment, and aging effect combinations.
Describe the records of these evaluations and indicate whether they are maintained in an auditable and retrievable form.
Describe the process and criteria used to ensure that the identified enhancements are implemented in a timely manner.
Describe the administrative controls over these programmatic activities.
Provide a summary description of these activities for the UFSAR supplement required by 10 CFR 54.21(d). If enhancements for license renewal are necessary, also provide the updates for the UFSAR supplement.
If such an operating experience program is determined to be unnecessary, provide a detailed explanation of the bases for this determination.
Response for RAI B.0.4-1 As stated in LRA Section B.0.4, site procedures require reviews of site and relevant industry OE as the site continues operation through the license renewal period. These procedures implement two existing programs that monitor, on an ongoing basis, industry and plant-specific operating experience that includes, but is not limited to, operating experience related to the effects of aging on in-scope structures and components. These programs are the Operating Experience Program and the Corrective Action Program. The evaluations completed under these two programs ensure that aging management programs continue to be effective in managing the aging effects for which they are credited.
Description of the Operating Experience Program (OEP)
The OEP implements the requirements of NRC NUREG-0737, Clarification of TMI Action Plan Requirements,Section I.C.5, and is consistent with guidance contained in INPO 10-006, Revision 1, Operating Experience (OE) Program and Construction Experience (CE) Program Descriptions and INPO 97-011, Guidelines for the Use of Operating Experience. As such, the OEP monitors industry operating experience.
Sources monitored under the OEP include the following.
NRC licensee event reports (LERs) from other plants NRC generic communications (Bulletins, Generic Letters, Regulatory Issue Summaries, Information Notices)
INPO Event Report (IER) documents NSSS Owners group reports vendor bulletins 10CFR Part 21 reports operating experience from other Entergy Nuclear sites Regulatory Guides, License Renewal Interim Staff Guidance, and revisions to industry standards are not monitored under the OEP because they are not sources of operating experience. These documents are lagging indicators typically issued in response to information provided in the OE documents discussed above.
Docket Nos. 50-247 and 50-286 NL-11-074 Attachment 1 Page 10 of 15 Incoming OE items are screened by a team of OE coordinators for impact on Entergy plants. A series of team meetings, inter-site conference calls, and condition review groups are used to ensure the proper consideration of OE documents.
Further documentation in the Corrective Action Program is required when the initial OEP evaluation identifies a condition adverse to quality, a non-conformance, the potential inoperability of any structures, systems or components, degraded equipment, or equipment not performing as expected or per design. Degraded equipment includes equipment degraded due to the effects of aging.
Issues with potential plant impact require the initiation of a written OEP review. Timely determination of plant impact is ensured by assigning due dates for OEP written reviews, not to exceed 90 days. Extensions past the due date require management approval. The result of an OEP written review can include enhancement of existing aging management programs or development of new aging management programs.
Issues with no impact (or only a small probability of impact) but considered to have informational value are sent to the appropriate departmental point of contact for review.
Description of the Corrective Action Program (CAP)
The CAP implements the requirements of 10 CFR 50, Appendix B, Criterion XVI. As such, the CAP is used to monitor plant-specific operating experience and industry operating experience that is relevant to the plant.
The CAP is entered upon identification of a condition adverse to quality, a non-conformance, the potential inoperability of any structures, systems or components, degraded equipment, or equipment not performing as expected or per design. Degraded equipment includes equipment degraded due to the effects of aging. Issues addressed in the CAP must include adverse conditions and conditions adverse to quality, and can include minor problems that may be precursors to more significant events. This includes a broad range of problems and areas for improvement.
Sources monitored under the CAP include the following.
licensee event reports (LERs) system health reports the results of inspections performed under plant programs results of the operating experience review program reports of assessments of the effectiveness of plant programs
Docket Nos. 50-247 and 50-286 NL-11-074 Attachment 1 Page 11 of 15 Under the CAP, conditions are coded to enable trending for the purpose of addressing broader programmatic or process weaknesses. Site management is responsible for ensuring that trend codes are provided for conditions assigned to their department. Aging-related trend code criteria include the following.
CA - This code is used to identify trends indicating a deviation from the licensing or design basis with respect either to design basis analysis (as the design is changed, plant aging occurs or new analysis techniques are employed) or an actual decrease in the margin between current operating parameters and the most limiting corresponding design parameter.
EO - This code is used to identify repeat equipment or system problems due to design, aging or obsolete components/parts or for unknown reasons that are not attributed to inadequate maintenance.
EV - This code is used to document issues concerning damage to plant buildings and structures. This includes aging issues such as roof leaks, cracks due to settling or similar problems.
Conditions are then evaluated and corrected. Evaluation includes consideration of the need for the adjustment of the frequency of future inspections, whether new or different inspections are needed, and whether the inspections include adequate depth and breadth of component, material, and environment combinations.
Engineering evaluation of age-related conditions is performed by engineering personnel who are trained and qualified to perform engineering evaluations.
Extent of condition reviews evaluate related operating experience to determine the scope of corrective actions.
Corrective actions can include enhancement of existing aging management programs or development of new aging management programs. For significant conditions adverse to quality, the cause of the condition is determined and corrective actions to preclude recurrence are implemented.
Timely implementation of identified enhancements is ensured through assignment of responsibility to specific site organizations for monitoring and reporting on the status of work completion. Prescribed guidelines are used to set the timeframe for implementation due dates. Designation of an enhancement as a long term corrective action (that is, an enhancement which cannot be implemented within this timeframe) requires approval of senior site management. Regular oversight of program enhancements that remain to be implemented is provided. A focused self-assessment of the CAP is performed on a regular basis.
Description of Elements Common to the OEP and the CAP The administrative controls for the review of operating experience provide a formal review and approval process.
IPEC procedures for the OEP and CAP under the current licensing basis will be maintained to require review of site and industry OE as the site continues operation through the license renewal period, as stated in LRA Section B.0.4. As such, revisions to the UFSAR supplement provided in LRA Appendix A are not required.
Docket Nos. 50-247 and 50-286 NL-11-074 Attachment 1 Page 12 of 15 RAI B.1.4-1
Background:
LRA Section B.1.4 states that the Boral Surveillance Program measures physical and chemical properties of sample coupons at specified intervals. Sufficiently detailed information as to the inspection and testing intervals, and how they account for plant-specific operating experience has not been provided 10 CFR 54.21(d) states, in part, that the FSAR supplement must contain a summary description of the program and the activities for managing the effects of aging. SRP-LR 3.3.2.4, Rev. 1, states that the summary description of the programs and activities for managing the effects of aging for the period of extended operation in the FSAR supplement should be sufficiently comprehensive such that later changes can be controlled by 10 CFR 50.59, and the description should contain information associated with the bases for determining that aging effects will be managed during the period of extended operation.
Issue:
The license renewal application description of the Boral Surveillance Program does not discuss the frequency of inspection and testing activities to be performed during the period of extended operation and how they will be adequate to manage the aging effects of loss of material and loss of neutron-absorbing capability.
Additionally, the UFSAR supplement does not reflect the planned number and frequency of inspections and testing.
Request:
- 1. State how often Boral inspection and testing activities will be conducted during the period of extended operation and. if the inspection and testing interval exceeds 10 years. explain why the frequency is adequate to manage the aging effects of loss of material and loss of neutron-absorbing capability.
- 2. Revise the UFSAR Supplement to reflect the number and frequency of inspections and testing to be conducted during the period of extended operation.
Docket Nos. 50-247 and 50-286 NL-11-074 Attachment 1 Page 13 of 15 Response for B.1.4-1
- 1. Boral inspection and testing activities are based on IPEC operating experience regarding the condition of the Boral and will be conducted during the period of extended operation at a frequency of at least once every 10 years.
A.3.1.3 Boral Surveillance Program The Boral Surveillance Program is an existing program that provides assurance the Boral neutron absorbers in the spent fuel racks maintain the validity of the criticality analysis in support of the rack design. The program relies on representative coupon samples mounted in surveillance assemblies located in the spent fuel pool to monitor performance of the absorber material without disrupting the integrity of the storage system.
Surveillance assemblies are removed from the spent fuel pool on a prescribed schedule and physical and chemical properties are measured. From this data, the stability and integrity of the Boral in the storage cells are assessed.
Boral inspection and testing activities are conducted at a frequency of at least once every 10 years.
Docket Nos. 50-247 and 50-286 NL-11-074 Attachment 1 Page 14 of 15 Clarification for RAI 3.1.2.2.13 Steam Generator Divider Plate and RAI 3.1.2.2.16 Tube-to-Tubesheet Issues.
Clarification of RAI 3.1.2.2.13-1 Changes are shown as strikethroughs for deletions and underlines for additions.
Response for RAI 3.1.2.2.13-1 Part 2 At IP2 the original Westinghouse Model 44 steam generators were replaced with Model 44F steam generators in 2000. At IP3 the original Westinghouse Model 44 steam generators were replaced with Model 44F steam generators in 1989.
The Electric Power Research Institute (EPRI) has extensively evaluated the foreign operating experience with divider plate cracking in their reports dated June 2007, November 2008, and December 2009, and concluded that a cracked divider plate in a Westinghouse Model F SG is not a safety concern, and does not affect the design of the adjacent pressure boundary components.
The industry plans are to study the potential for divider plate crack growth and develop a resolution to the concern through the EPRI Steam Generator Management Program (SGMP) Engineering and Regulatory Technical Advisory Group. This industry-lead effort is expected to begin in 2011 and be completed within two years.
Recognizing that the EPRI SGMP resolution of this issue is under development, Entergy will inspect all IPEC steam generators to assess the condition of the divider plate assembly. The examination technique used will be capable of detecting PWSCC in the steam generator divider plate assembly welds. The IP2 steam generator divider plate inspections will be completed within the first ten years of the PEO. The IP3 steam generator divider plate inspections will be completed prior to the end of the first refueling outage following the beginning of the PEO. (Commitment 41)
Clarification of RAI 3.1.2.2.16-1 Changes are shown as strikethroughs for deletions and underlines for additions.
Response for RAI 3.1.2.2.16-1 Part 2 lP3 replaced its steam generators in 1989. The tube-to-tubesheet welds have been in service approximately twenty two years. If Option 1 is not implemented, lP3 will implement Option 2 that includes tube-to-tubesheet weld inspections for PWSCC. For lP3 these inspections will be performed prior to the end of within the first 2 refueling outages following the the beginning of the PEO. (Commitment 42)
Docket Nos. 50-247 and 50-286 NL-11-074 Attachment 1 Page 15 of 15 Clarification for RAI 3.0.3.1.6 Inaccessible Medium-Voltage Cable Program.
IPEC letter number NL-11-032 dated March 28, 2011 revised LRA Section A.2.1.22 for IP2. This letter revises LRA section A.3.1.22 for IP3 as follows.
A.3.1.22 Non-EQ Inaccessible Medium-Voltage Cable Program The Non-EQ Inaccessible Medium-Voltage Cable Program is a new program that entails periodic inspections for water collection in cable manholes, and periodic testing of cables. In scope medium-voltage cables (cables with operating voltage from 2kV to 35kV) and low-voltage power cables (400 V to 2 kV) exposed to significant moisture and voltage will be tested at least once every ten six years to provide an indication of the condition of the conductor insulation. Test frequencies are adjusted based on test results and operating experience.
The inspection frequency for water collection is established and performed based on plant specific operating experience with cable wetting or submergence in manholes (i.e., the inspection is performed periodically based on water accumulation over time and event driven occurrences, such as heavy rain or flooding).
The program includes periodic inspections for water accumulation in manholes at least once every two-years (annually). Inspection frequency will be increased as necessary based on evaluation of inspection results.
The Non-EQ Inaccessible Medium-Voltage Cable Program will be implemented prior to the period of extended operation. This new program will be implemented consistent with the corresponding program described in NUREG-1801, Section Xl.E3, Inaccessible Medium-Voltage Cables Not Subject To 10 CFR 50.49 Environmental Qualification Requirements.
ATTACHMENT 2 TO NL-11-074 LICENSE RENEWAL APPLICATION IPEC LIST OF REGULATORY COMITMENTS Rev. 14 ENTERGY NUCLEAR OPERATIONS, INC.
INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 & 3 DOCKET NOS. 50-247 AND 50-286
NL-11-074 Attachment 2 Page 1 of 17 List of Regulatory Commitments Rev. 14 The following table identifies those actions committed to by Entergy in this document.
Changes are shown as strikethroughs for deletions and underlines for additions.
- COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION
/ AUDIT ITEM IP2: NL-07-039 A.2.1.1 1 Enhance the Aboveground Steel Tanks Program for September 28, A.3.1.1 IP2 and IP3 to perform thickness measurements of 2013 B.1.1 the bottom surfaces of the condensate storage tanks, city water tank, and fire water tanks once during the IP3:
first ten years of the period of extended operation.
December 12, Enhance the Aboveground Steel Tanks Program for 2015 IP2 and IP3 to require trending of thickness measurements when material loss is detected.
IP2: NL-07-039 A.2.1.2 2 Enhance the Bolting Integrity Program for IP2 and IP3 September 28, A.3.1.2 to clarify that actual yield strength is used in selecting 2013 B.1.2 materials for low susceptibility to SCC and clarify the prohibition on use of lubricants containing MoS2 for IP3: NL-07-153 Audit Items bolting.
December 12, 201, 241, The Bolting Integrity Program manages loss of 2015 270 preload and loss of material for all external bolting.
IP2: NL-07-039 A.2.1.5 3 Implement the Buried Piping and Tanks Inspection September 28, A.3.1.5 Program for IP2 and IP3 as described in LRA Section 2013 B.1.6 B.1.6.
NL-07-153 Audit Item This new program will be implemented consistent with IP3: 173 the corresponding program described in NUREG- December 12, 1801 Section XI.M34, Buried Piping and Tanks 2015 Inspection.
Include in the Buried Piping and Tanks Inspection NL-09-106 Program described in LRA Section B.1.6 a risk assessment of in-scope buried piping and tanks that NL-09-111 includes consideration of the impacts of buried piping or tank leakage and of conditions affecting the risk for corrosion. Classify pipe segments and tanks as having a high, medium or low impact of leakage based on the safety class, the hazard posed by fluid contained in the piping and the impact of leakage on reliable plant operation. Determine corrosion risk through consideration of piping or tank material, soil resistivity, drainage, the presence of cathodic protection and the type of coating. Establish inspection priority and frequency for periodic inspections of the in-scope piping and tanks based on the results of the risk assessment. Perform inspections using direct visual inspection. NL-11-032
NL-11-074 Attachment 2 Page 2 of 17
- COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION
/ AUDIT ITEM IP2: NL-07-039 A.2.1.8 4 Enhance the Diesel Fuel Monitoring Program to September 28, A.3.1.8 include cleaning and inspection of the IP2 GT-1 gas 2013 B.1.9 turbine fuel oil storage tanks, IP2 and IP3 EDG fuel oil NL-07-153 Audit items day tanks, IP2 SBO/Appendix R diesel generator fuel IP3: 128, 129, oil day tank, and IP3 Appendix R fuel oil storage tank December 12, 132, and day tank once every ten years.
2015 NL-08-057 491, 492, Enhance the Diesel Fuel Monitoring Program to 510 include quarterly sampling and analysis of the IP2 SBO/Appendix R diesel generator fuel oil day tank, IP2 security diesel fuel oil storage tank, IP2 security diesel fuel oil day tank, and IP3 Appendix R fuel oil storage tank. Particulates, water and sediment checks will be performed on the samples. Filterable solids acceptance criterion will be less than or equal to 10mg/l. Water and sediment acceptance criterion will be less than or equal to 0.05%.
Enhance the Diesel Fuel Monitoring Program to include thickness measurement of the bottom of the following tanks once every ten years. IP2: EDG fuel oil storage tanks, EDG fuel oil day tanks, SBO/Appendix R diesel generator fuel oil day tank, GT-1 gas turbine fuel oil storage tanks, and diesel fire pump fuel oil storage tank IP3: EDG fuel oil day tanks, EDG fuel oil storage tanks, Appendix R fuel oil storage tank, and diesel fire pump fuel oil storage tank.
Enhance the Diesel Fuel Monitoring Program to change the analysis for water and particulates to a quarterly frequency for the following tanks. IP2: GT-1 gas turbine fuel oil storage tanks and diesel fire pump fuel oil storage tank; IP3: Appendix R fuel oil day tank and diesel fire pump fuel oil storage tank.
Enhance the Diesel Fuel Monitoring Program to specify acceptance criteria for thickness measurements of the fuel oil storage tanks within the scope of the program.
Enhance the Diesel Fuel Monitoring Program to direct samples be taken and include direction to remove water when detected.
Revise applicable procedures to direct sampling of the onsite portable fuel oil contents prior to transferring the contents to the storage tanks.
Enhance the Diesel Fuel Monitoring Program to direct the addition of chemicals including biocide when the presence of biological activity is confirmed.
NL-11-074 Attachment 2 Page 3 of 17
- COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION
/ AUDIT ITEM IP2: NL-07-039 A.2.1.10 5 Enhance the External Surfaces Monitoring Program September 28, A.3.1.10 for IP2 and IP3 to include periodic inspections of 2013 B.1.11 systems in scope and subject to aging management review for license renewal in accordance with 10 CFR IP3:
54.4(a)(1) and (a)(3). Inspections shall include areas December 12, surrounding the subject systems to identify hazards to 2015 those systems. Inspections of nearby systems that could impact the subject systems will include SSCs that are in scope and subject to aging management review for license renewal in accordance with 10 CFR 54.4(a)(2).
IP2: NL-07-039 A.2.1.11 6 Enhance the Fatigue Monitoring Program for IP2 to September 28, A.3.1.11 monitor steady state cycles and feedwater cycles or 2013 B.1.12, perform an evaluation to determine monitoring is not NL-07-153 Audit Item required. Review the number of allowed events and 164 resolve discrepancies between reference documents and monitoring procedures.
Enhance the Fatigue Monitoring Program for IP3 to IP3:
include all the transients identified. Assure all fatigue December 12, analysis transients are included with the lowest 2015 limiting numbers. Update the number of design transients accumulated to date.
IP2: NL-07-039 A.2.1.12 7 Enhance the Fire Protection Program to inspect September 28, A.3.1.12 external surfaces of the IP3 RCP oil collection 2013 B.1.13 systems for loss of material each refueling cycle.
Enhance the Fire Protection Program to explicitly IP3:
state that the IP2 and IP3 diesel fire pump engine December 12, sub-systems (including the fuel supply line) shall be 2015 observed while the pump is running. Acceptance criteria will be revised to verify that the diesel engine does not exhibit signs of degradation while running; such as fuel oil, lube oil, coolant, or exhaust gas leakage.
Enhance the Fire Protection Program to specify that the IP2 and IP3 diesel fire pump engine carbon steel exhaust components are inspected for evidence of corrosion and cracking at least once each operating cycle.
Enhance the Fire Protection Program for IP3 to visually inspect the cable spreading room, 480V switchgear room, and EDG room CO2 fire suppression system for signs of degradation, such as corrosion and mechanica damage at least once every six months.
NL-11-074 Attachment 2 Page 4 of 17
- COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION
/ AUDIT ITEM IP2: NL-07-039 A.2.1.13 8 Enhance the Fire Water Program to include inspection September 28, A.3.1.13 of IP2 and IP3 hose reels for evidence of corrosion.
2013 B.1.14 Acceptance criteria will be revised to verify no NL-07-153 Audit Items unacceptable signs of degradation.
IP3: 105, 106 Enhance the Fire Water Program to replace all or test December 12, NL-08-014 a sample of IP2 and IP3 sprinkler heads required for 2015 10 CFR 50.48 using guidance of NFPA 25 (2002 edition), Section 5.3.1.1.1 before the end of the 50-year sprinkler head service life and at 10-year intervals thereafter during the extended period of operation to ensure that signs of degradation, such as corrosion, are detected in a timely manner.
Enhance the Fire Water Program to perform wall thickness evaluations of IP2 and IP3 fire protection piping on system components using non-intrusive techniques (e.g., volumetric testing) to identify evidence of loss of material due to corrosion. These inspections will be performed before the end of the current operating term and at intervals thereafter during the period of extended operation. Results of the initial evaluations will be used to determine the appropriate inspection interval to ensure aging effects are identified prior to loss of intended function.
Enhance the Fire Water Program to inspect the internal surface of foam based fire suppression tanks.
Acceptance criteria will be enhanced to verify no significant corrosion.
NL-11-074 Attachment 2 Page 5 of 17
- COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION
/ AUDIT ITEM IP2: NL-07-039 A.2.1.15 9 Enhance the Flux Thimble Tube Inspection Program September 28, A.3.1.15 for IP2 and IP3 to implement comparisons to wear 2013 B.1.16 rates identified in WCAP-12866. Include provisions to compare data to the previous performances and IP3:
perform evaluations regarding change to test December 12, frequency and scope.
2015 Enhance the Flux Thimble Tube Inspection Program for IP2 and IP3 to specify the acceptance criteria as outlined in WCAP-12866 or other plant-specific values based on evaluation of previous test results.
Enhance the Flux Thimble Tube Inspection Program for IP2 and IP3 to direct evaluation and performance of corrective actions based on tubes that exceed or are projected to exceed the acceptance criteria. Also stipulate that flux thimble tubes that cannot be inspected over the tube length and cannot be shown by analysis to be satisfactory for continued service, must be removed from service to ensure the integrity of the reactor coolant system pressure boundary.
NL-11-074 Attachment 2 Page 6 of 17
- COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION
/ AUDIT ITEM IP2: NL-07-039 A.2.1.16 10 Enhance the Heat Exchanger Monitoring Program for September 28, A.3.1.16 IP2 and IP3 to include the following heat exchangers 2013 B.1.17, in the scope of the program.
NL-07-153 Audit Item Safety injection pump lube oil heat exchangers IP3: 52 December 12, RHR heat exchangers 2015 RHR pump seal coolers Non-regenerative heat exchangers Charging pump seal water heat exchangers Charging pump fluid drive coolers Charging pump crankcase oil coolers Spent fuel pit heat exchangers Secondary system steam generator sample coolers Waste gas compressor heat exchangers SBO/Appendix R diesel jacket water heat exchanger (IP2 only)
Enhance the Heat Exchanger Monitoring Program for IP2 and IP3 to perform visual inspection on heat exchangers where non-destructive examination, such as eddy current inspection, is not possible due to heat exchanger design limitations.
Enhance the Heat Exchanger Monitoring Program for IP2 and IP3 to include consideration of material-environment combinations when determining sample population of heat exchangers.
Enhance the Heat Exchanger Monitoring Program for IP2 and IP3 to establish minimum tube wall thickness for the new heat exchangers identified in the scope of the program. Establish acceptance criteria for heat exchangers visually inspected to include no indication of tube erosion, vibration wear, corrosion, pitting, NL-09-018 fouling, or scaling.
NL-09-056 11 Delete commitment.
NL-11-074 Attachment 2 Page 7 of 17
- COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION
/ AUDIT ITEM IP2: NL-07-039 A.2.1.18 12 Enhance the Masonry Wall Program for IP2 and IP3 September 28, A.3.1.18 to specify that the IP1 intake structure is included in 2013 B.1.19 the program.
IP3:
December 12, 2015 Enhance the Metal-Enclosed Bus Inspection Program IP2: NL-07-039 A.2.1.19 13 to add IP2 480V bus associated with substation A to September 28, A.3.1.19 the scope of bus inspected. 2013 B.1.20 NL-07-153 Audit Items Enhance the Metal-Enclosed Bus Inspection Program IP3: 124, for IP2 and IP3 to visually inspect the external surface December 12, NL-08-057 133, 519 of MEB enclosure assemblies for loss of material at 2015 least once every 10 years. The first inspection will occur prior to the period of extended operation and the acceptance criterion will be no significant loss of material.
Enhance the Metal-Enclosed Bus Inspection Program to add acceptance criteria for MEB internal visual inspections to include the absence of indications of dust accumulation on the bus bar, on the insulators, and in the duct, in addition to the absence of indications of moisture intrusion into the duct.
Enhance the Metal-Enclosed Bus Inspection Program for IP2 and IP3 to inspect bolted connections at least once every five years if performed visually or at least once every ten years using quantitative measurements such as thermography or contact resistance measurements. The first inspection will occur prior to the period of extended operation.
The plant will process a change to applicable site procedure to remove the reference to re-torquing connections for phase bus maintenance and bolted connection maintenance.
IP2: NL-07-039 A.2.1.21 14 Implement the Non-EQ Bolted Cable Connections September 28, A.3.1.21 Program for IP2 and IP3 as described in LRA Section 2013 B.1.22 B.1.22.
IP3:
December 12, 2015
NL-11-074 Attachment 2 Page 8 of 17
- COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION
/ AUDIT ITEM IP2: NL-07-039 A.2.1.22 15 Implement the Non-EQ Inaccessible Medium-Voltage September 28, A.3.1.22 Cable Program for IP2 and IP3 as described in LRA 2013 B.1.23 Section B.1.23.
NL-07-153 Audit item This new program will be implemented consistent with IP3: 173 the corresponding program described in NUREG- December 12, 1801 Section XI.E3, Inaccessible Medium-Voltage 2015 Cables Not Subject To 10 CFR 50.49 Environmental Qualification Requirements.
IP2: NL-07-039 A.2.1.23 16 Implement the Non-EQ Instrumentation Circuits Test September 28, A.3.1.23 Review Program for IP2 and IP3 as described in LRA 2013 B.1.24 Section B.1.24.
NL-07-153 Audit item This new program will be implemented consistent with IP3: 173 the corresponding program described in NUREG- December 12, 1801 Section XI.E2, Electrical Cables and 2015 Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Used in Instrumentation Circuits.
IP2: NL-07-039 A.2.1.24 17 Implement the Non-EQ Insulated Cables and September 28, A.3.1.24 Connections Program for IP2 and IP3 as described in 2013 B.1.25 LRA Section B.1.25.
NL-07-153 Audit item This new program will be implemented consistent with IP3: 173 the corresponding program described in NUREG- December 12, 1801 Section XI.E1, Electrical Cables and 2015 Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements.
IP2: NL-07-039 A.2.1.25 18 Enhance the Oil Analysis Program for IP2 to sample September 28, A.3.1.25 and analyze lubricating oil used in the SBO/Appendix 2013 B.1.26 R diesel generator consistent with oil analysis for other site diesel generators.
IP3:
Enhance the Oil Analysis Program for IP2 and IP3 to December 12, sample and analyze generator seal oil and turbine 2015 hydraulic control oil.
Enhance the Oil Analysis Program for IP2 and IP3 to formalize preliminary oil screening for water and particulates and laboratory analyses including defined acceptance criteria for all components included in the scope of this program. The program will specify corrective actions in the event acceptance criteria are not met.
Enhance the Oil Analysis Program for IP2 and IP3 to formalize trending of preliminary oil screening results as well as data provided from independent laboratories.
NL-11-074 Attachment 2 Page 9 of 17
- COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION
/ AUDIT ITEM IP2: NL-07-039 A.2.1.26 19 Implement the One-Time Inspection Program for IP2 September 28, A.3.1.26 and IP3 as described in LRA Section B.1.27.
2013 B.1.27 This new program will be implemented consistent with NL-07-153 Audit item the corresponding program described in NUREG- IP3: 173 1801,Section XI.M32, One-Time Inspection. December 12, 2015 IP2: NL-07-039 A.2.1.27 20 Implement the One-Time Inspection - Small Bore September 28, A.3.1.27 Piping Program for IP2 and IP3 as described in LRA 2013 B.1.28 Section B.1.28.
NL-07-153 Audit item This new program will be implemented consistent with IP3: 173 the corresponding program described in NUREG- December 12, 1801,Section XI.M35, One-Time Inspection of ASME 2015 Code Class I Small-Bore Piping.
IP2: NL-07-039 A.2.1.28 21 Enhance the Periodic Surveillance and Preventive September 28, A.3.1.28 Maintenance Program for IP2 and IP3 as necessary 2013 B.1.29 to assure that the effects of aging will be managed such that applicable components will continue to IP3:
perform their intended functions consistent with the December 12, current licensing basis through the period of extended 2015 operation.
IP2: NL-07-039 A.2.1.31 22 Enhance the Reactor Vessel Surveillance Program for September 28, A.3.1.31 IP2 and IP3 revising the specimen capsule withdrawal 2013 B.1.32 schedules to draw and test a standby capsule to cover the peak reactor vessel fluence expected IP3:
through the end of the period of extended operation.
December 12, Enhance the Reactor Vessel Surveillance Program for 2015 IP2 and IP3 to require that tested and untested specimens from all capsules pulled from the reactor vessel are maintained in storage.
IP2: NL-07-039 A.2.1.32 23 Implement the Selective Leaching Program for IP2 September 28, A.3.1.32 and IP3 as described in LRA Section B.1.33.
2013 B.1.33 This new program will be implemented consistent with NL-07-153 Audit item the corresponding program described in NUREG- IP3: 173 1801,Section XI.M33 Selective Leaching of Materials. December 12, 2015 IP2: NL-07-039 A.2.1.34 24 Enhance the Steam Generator Integrity Program for September 28, A.3.1.34 IP2 and IP3 to require that the results of the condition 2013 B.1.35 monitoring assessment are compared to the operational assessment performed for the prior IP3:
operating cycle with differences evaluated.
December 12, 2015
NL-11-074 Attachment 2 Page 10 of 17
- COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION
/ AUDIT ITEM Enhance the Structures Monitoring Program to IP2: NL-07-039 A.2.1.35 25 explicitly specify that the following structures are September 28, A.3.1.35 included in the program. 2013 B.1.36 Appendix R diesel generator foundation (IP3) NL-07-153 Appendix R diesel generator fuel oil tank vault IP3: Audit items (IP3) December 12, 86, 87, 88, Appendix R diesel generator switchgear and 2015 NL-08-057 417 enclosure (IP3) city water storage tank foundation condensate storage tanks foundation (IP3) containment access facility and annex (IP3) discharge canal (IP2/3) emergency lighting poles and foundations (IP2/3) fire pumphouse (IP2) fire protection pumphouse (IP3) fire water storage tank foundations (IP2/3) gas turbine 1 fuel storage tank foundation maintenance and outage building-elevated passageway (IP2) new station security building (IP2) nuclear service building (IP1) primary water storage tank foundation (IP3) refueling water storage tank foundation (IP3) security access and office building (IP3) service water pipe chase (IP2/3) service water valve pit (IP3) superheater stack transformer/switchyard support structures (IP2) waste holdup tank pits (IP2/3)
Enhance the Structures Monitoring Program for IP2 and IP3 to clarify that in addition to structural steel and concrete, the following commodities (including their anchorages) are inspected for each structure as applicable.
cable trays and supports concrete portion of reactor vessel supports conduits and supports cranes, rails and girders equipment pads and foundations fire proofing (pyrocrete)
HVAC duct supports jib cranes manholes and duct banks manways, hatches and hatch covers monorails
NL-11-074 Attachment 2 Page 11 of 17
- COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION
/ AUDIT ITEM new fuel storage racks sumps, sump screens, strainers and flow barriers Enhance the Structures Monitoring Program for IP2 and IP3 to inspect inaccessible concrete areas that are exposed by excavation for any reason. IP2 and IP3 will also inspect inaccessible concrete areas in environments where observed conditions in accessible areas exposed to the same environment indicate that significant concrete degradation is occurring.
Enhance the Structures Monitoring Program for IP2 and IP3 to perform inspections of elastomers (seals, gaskets, seismic joint filler, and roof elastomers) to identify cracking and change in material properties and for inspection of aluminum vents and louvers to identify loss of material.
Enhance the Structures Monitoring Program for IP2 and IP3 to perform an engineering evaluation of NL-08-127 Audit Item groundwater samples to assess aggressiveness of 360 groundwater to concrete on a periodic basis (at least once every five years). IPEC will obtain samples from at least 5 wells that are representative of the ground water surrounding below-grade site structures and perform an engineering evaluation of the results from those samples for sulfates, pH and chlorides.
Additionally, to assess potential indications of spent fuel pool leakage, IPEC will sample for tritium in groundwater wells in close proximity to the IP2 spent fuel pool at least once every 3 months.
Enhance the Structures Monitoring Program for IP2 and IP3 to perform inspection of normally submerged concrete portions of the intake structures at least once every 5 years. Inspect the baffling/grating partition and support platform of the IP3 intake structure at least once every 5 years.
Enhance the Structures Monitoring Program for IP2 and IP3 to perform inspection of the degraded areas Audit Item of the water control structure once per 3 years rather 358 than the normal frequency of once per 5 years during the PEO.
NL-11-074 Attachment 2 Page 12 of 17
- COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION
/ AUDIT ITEM Enhance the Structures Monitoring Program to include more detailed quantitative acceptance criteria NL-11-032 for inspections of concrete structures in accordance with ACI 349.3R, Evaluation of Existing Nuclear Safety-Related Concrete Structures prior to the period of extended operation (PEO).
IP2: NL-07-039 A.2.1.36 26 Implement the Thermal Aging Embrittlement of Cast September 28, A.3.1.36 Austenitic Stainless Steel (CASS) Program for IP2 2013 B.1.37 and IP3 as described in LRA Section B.1.37.
NL-07-153 Audit item This new program will be implemented consistent with IP3: 173 the corresponding program described in NUREG- December 12, 1801,Section XI.M12, Thermal Aging Embrittlement 2015 of Cast Austenitic Stainless Steel (CASS) Program.
IP2: NL-07-039 A.2.1.37 27 Implement the Thermal Aging and Neutron Irradiation September 28, A.3.1.37 Embrittlement of Cast Austenitic Stainless Steel 2013 B.1.38 (CASS) Program for IP2 and IP3 as described in LRA NL-07-153 Audit item Section B.1.38.
IP3: 173 This new program will be implemented consistent with December 12, the corresponding program described in NUREG- 2015 1801 Section XI.M13, Thermal Aging and Neutron Embrittlement of Cast Austenitic Stainless Steel (CASS) Program.
IP2: NL-07-039 A.2.1.39 28 Enhance the Water Chemistry Control - Closed September 28, A.3.1.39 Cooling Water Program to maintain water chemistry of 2013 B.1.40 the IP2 SBO/Appendix R diesel generator cooling NL-08-057 Audit item system per EPRI guidelines.
IP3: 509 Enhance the Water Chemistry Control - Closed December 12, Cooling Water Program to maintain the IP2 and IP3 2015 security generator and fire protection diesel cooling water pH and glycol within limits specified by EPRI guidelines.
IP2: NL-07-039 A.2.1.40 29 Enhance the Water Chemistry Control - Primary and September 28, B.1.41 Secondary Program for IP2 to test sulfates monthly in 2013 the RWST with a limit of <150 ppb.
IP2: NL-07-039 A.2.1.41 30 For aging management of the reactor vessel internals, September 28, A.3.1.41 IPEC will (1) participate in the industry programs for 2011 investigating and managing aging effects on reactor internals; (2) evaluate and implement the results of IP3:
the industry programs as applicable to the reactor December 12, internals; and (3) upon completion of these programs, 2013 but not less than 24 months before entering the period of extended operation, submit an inspection plan for reactor internals to the NRC for review and approval.
NL-11-074 Attachment 2 Page 13 of 17
- COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION
/ AUDIT ITEM IP2: NL-07-039 A.2.2.1.2 31 Additional P-T curves will be submitted as required September 28, A.3.2.1.2 per 10 CFR 50, Appendix G prior to the period of 2013 4.2.3 extended operation as part of the Reactor Vessel Surveillance Program.
IP3:
December 12, 2015 As required by 10 CFR 50.61(b)(4), IP3 will submit a IP3: NL-07-039 A.3.2.1.4 32 plant-specific safety analysis for plate B2803-3 to the December 12, 4.2.5 NRC three years prior to reaching the RTPTS 2015 NL-08-127 screening criterion. Alternatively, the site may choose to implement the revised PTS rule when approved.
IP2: NL-07-039 A.2.2.2.3 33 At least 2 years prior to entering the period of September 28, A.3.2.2.3 extended operation, for the locations identified in LRA 2011 4.3.3 Table 4.3-13 (IP2) and LRA Table 4.3-14 (IP3), under NL-07-153 Audit item the Fatigue Monitoring Program, IP2 and IP3 will IP3: 146 implement one or more of the following:
December 12, NL-08-021 (1) Consistent with the Fatigue Monitoring Program, 2013 Detection of Aging Effects, update the fatigue usage calculations using refined fatigue analyses to determine valid CUFs less than 1.0 when accounting Complete NL-10-082 for the effects of reactor water environment. This includes applying the appropriate Fen factors to valid CUFs determined in accordance with one of the following:
- 1. For locations in LRA Table 4.3-13 (IP2) and LRA Table 4.3-14 (IP3), with existing fatigue analysis valid for the period of extended operation, use the existing CUF.
- 2. Additional plant-specific locations with a valid CUF may be evaluated. In particular, the pressurizer lower shell will be reviewed to ensure the surge nozzle remains the limiting component.
- 3. Representative CUF values from other plants, adjusted to or enveloping the IPEC plant specific external loads may be used if demonstrated applicable to IPEC.
- 4. An analysis using an NRC-approved version of the ASME code or NRC-approved alternative (e.g., NRC-approved code case) may be performed to determine a valid CUF.
(2) Consistent with the Fatigue Monitoring Program, Corrective Actions, repair or replace the affected locations before exceeding a CUF of 1.0.
NL-11-074 Attachment 2 Page 14 of 17
- COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION
/ AUDIT ITEM April 30, 2008 NL-07-078 2.1.1.3.5 34 IP2 SBO / Appendix R diesel generator will be installed and operational by April 30, 2008. This Complete NL-08-074 committed change to the facility meets the requirements of 10 CFR 50.59I(1) and, therefore, a license amendment pursuant to 10 CFR 50.90 is not required.
IP2: NL-08-127 Audit Item 35 Perform a one-time inspection of representative September 28, 27 sample area of IP2 containment liner affected by the 2013 1973 event behind the insulation, prior to entering the extended period of operation, to assure liner degradation is not occurring in this area.
Perform a one-time inspection of representative IP3:
sample area of the IP3 containment steel liner at the December 12, juncture with the concrete floor slab, prior to entering 2015 the extended period of operation, to assure liner degradation is not occurring in this area.
Any degradation will be evaluated for updating of the NL-09-018 containment liner analyses as needed.
IP2: NL-08-127 Audit Item 36 Perform a one-time Inspection and evaluation of a September 28, 359 sample of potentially affected IP2 refueling cavity 2013 concrete prior to the period of extended operation.
The sample will be obtained by core boring the refueling cavity wall in an area that is susceptible to exposure to borated water leakage. The inspection will include an assessment of embedded reinforcing steel.
Additional core bore samples will be taken, if the NL-09-056 leakage is not stopped, prior to the end of the first ten years of the period of extended operation.
A sample of leakage fluid will be analyzed to NL-09-079 determine the composition of the fluid. If additional core samples are taken prior to the end of the first ten years of the period of extended operation, a sample of leakage fluid will be analyzed.
IP2: NL-08-127 Audit Item 37 Enhance the Containment Inservice Inspection (CII-September 28, 361 IWL) Program to include inspections of the 2013 containment using enhanced characterization of degradation (i.e., quantifying the dimensions of noted IP3:
indications through the use of optical aids) during the December 12, period of extended operation. The enhancement 2015 includes obtaining critical dimensional data of degradation where possible through direct measurement or the use of scaling technologies for photographs, and the use of consistent vantage points for visual inspections.
NL-11-074 Attachment 2 Page 15 of 17
- COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION
/ AUDIT ITEM IP2: NL-08-143 4.2.1 38 For Reactor Vessel Fluence, should future core September 28, loading patterns invalidate the basis for the projected 2013 values of RTpts or CVUSE, updated calculations will be provided to the NRC.
IP3:
December 12, 2015 NL-09-079 39 Deleted IP2: NL-09-106 B.1.6 40 Evaluate plant specific and appropriate industry September 28, B.1.22 operating experience and incorporate lessons learned 2013 B.1.23 in establishing appropriate monitoring and inspection B.1.24 frequencies to assess aging effects for the new aging IP3: B.1.25 management programs. Documentation of the December 12, B.1.27 operating experience evaluated for each new program 2015 B.1.28 will be available on site for NRC review prior to the B.1.33 period of extended operation.
B.1.37 B.1.38 IP2: NL-11-032 N/A 41 IPEC will perform an inspection of steam generators Prior to for both units to assess the condition of the divider September 28, plate assembly. The examination technique used will 2023 be capable of detecting PWSCC in the steam generator divider plate assemblies associated welds.
IP3: Prior to NL-11-074 The IP2 steam generator divider plate inspections will December 12, be completed within the first ten years of the period of 2025 extended operation (PEO). The IP3 steam generator Prior to the end divider plate inspections will be completed within the of the first first refueling outage following the beginning of the refueling outage PEO.
following the beginning of the PEO
NL-11-074 Attachment 2 Page 16 of 17
- COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION
/ AUDIT ITEM NL-11-032 N/A 42 IPEC will develop a plan for each unit to address the potential for cracking of the primary to secondary pressure boundary due to PWSCC of tube-to-tubesheet welds.
Each plan will consist of two options.
Option 1 (Analysis) IP2:
IPEC will perform an analytical evaluation redefining Prior to the pressure boundary in which the tube-to-tubesheet September 28, weld is no longer included and, therefore, is not 2023 required for reactor coolant pressure boundary function. The redefinition of the reactor coolant IP3: Prior to pressure boundary will be submitted as part of a December 12, license amendment request requiring approval from 2025 the NRC.
Option 2 (Inspection)
IP2: Prior to NL-11-074 IPEC will perform a one-time inspection of a Between March representative number of tube-to-tubesheet welds in 2020 and March each steam generator to determine if PWSCC 2024 cracking is present. If weld cracking is identifies:
- a. The condition will be resolved through repair IP3: Prior to the or engineering evaluation to justify continued end of Within the service, as appropriate, and first 2 refueling outages
- b. An ongoing monitoring program will be following the established to perform routine tube-to- beginning of the tubesheet weld inspections for the remaining PEO.
life of the steam generators.
IP2: NL-11-032 4.3.3 43 IPEC will review design basis ASME Code Class 1 Prior to fatigue evaluations to determine whether the September 28, NUREG/CR-6260 locations that have been evaluated 2023 for the effects of the reactor coolant environment on fatigue usage are the limiting locations for the IP2 and IP3: Prior to IP3 configurations. If more limiting locations are December 12, identified, the most limiting location will be evaluated 2025 for the effects of the reactor coolant environment on fatigue usage.
IPEC will use the NUREG/CR-6909 methodology in the evaluation of the limiting locations consisting of nickel alloy, if any.
NL-11-074 Attachment 2 Page 17 of 17
- COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION
/ AUDIT ITEM Within 60 days NL-11-032 N/A 44 IPEC will include written explanation and justification of issuance of of any user intervention in future evaluations using the the renewed WESTEMS Design CUF module.
operating license.
Within 60 days NL-11-032 N/A 45 IPEC will not use the NB-3600 option of the of issuance of WESTEMS program in future design calculations until the renewed the issues identified during the NRC review of the operating program has been resolved.
license.
IP2: NL-11-032 N/A 46 Include in the IP2 ISI Program that IPEC will perform Prior to twenty-five volumetric weld metal inspections of ten September 28, NL-11-074 socket welds in 2012 and of at least ten socket welds 2013 during each 10-year ISI interval scheduled as specified by IWB-2412 of the ASME Section XI Code during period of the period of extended operation.
In lieu of volumetric examinations, destructive examinations may be performed, where one destructive examination may be substituted for two volumetric examinations.