NL-09-056, Reply to Request for Additional Information - Open Items

From kanterella
(Redirected from NL-09-056)
Jump to navigation Jump to search
Reply to Request for Additional Information - Open Items
ML091320338
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 05/01/2009
From: Dacimo F
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-09-056
Download: ML091320338 (49)


Text

Enteraiv Nuclear Northeast Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 SEntergy Buchanan, NY 10511-0249 Tel (914) 788-2055 Fred Dacimno Vice President License Renewal NL-09-056 May 1, 2009 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Entergy Nuclear Operations Inc.

Indian Point Nuclear Generating Unit Nos. 2 & 3 Docket Nos. 50-247 and 50-286 Reply to Request for Additional Information (RAI) -

Open Items Items

REFERENCES:

1. NRC Letter dated April 3, 2009, "Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application - Open Items"

Dear Sir or Madam:

Entergy Nuclear Operations, Inc is providing, in Attachment 1, Amendment #7 to the License Renewal Application for Indian Point 2 and Indian Point 3. The additional information requested in the referenced letter pertaining to NRC review of the License Renewal Application for Indian Point 2 and Indian Point 3 is provided in Attachment 2. The additional information provided in this transmittal provides clarifications and additional information to previously submitted information in response to staff questions. consists of Revision 8 to the list of regulatory commitments providing clarification on Commitment #11 (ISI program - lubrite sliding supports), Commitment #36 (additional core bore samples for Unit 2), and the addition of Commitment #39 (installation of fire suppression system in Unit 2 Auxiliary Feedwater Pump Room).

If you have any questions, or require additional information, please contact Mr. Robert Walpole at 914-734-6710.

NL-09-056 Docket Nos. 50-247 & 50-286 Page 2 of 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on FRD/dmt

Attachment:

1. License Renewal Application Amendment #7
2. IPEC RAI Clarification
3. IPEC Commitment List, Revision 8 cc: Mr. Samuel J. Collins, Regional Administrator, NRC Region I Mr. Sherwin E. Turk, NRC Office of General Counsel, Special Counsel Mr. Kenneth Chang, NRC Branch Chief, Engineering Review Branch I Mr. John Boska, NRR Senior Project Manager Mr. Paul Eddy, New York State Department of Public Service NRC Resident Inspector's Office Mr. Robert Callender, Vice President NYSERDA

ATTACHMENT 1 TO NL-09-056 LICENSE RENEWAL APPLICATION AMENDMENT #7 ENTERGY NUCLEAR OPERATIONS, INC.

INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 & 3 DOCKET NOS. 50-247 AND 50-286

NL-09-056 Attachment 1 Docket Nos. 50-247 & 50-286 Page 1 of 19 INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION AMENDMENT REQUEST FOR ADDITIONAL INFORMATION - OPEN ITEMS Follow-up RAI 1: Open Item 3.0.3.2.15-1 (Audit Question 359)

In Entergy Nuclear Operations, Inc. (Entergy) letter NL-08-169, dated November 6, 2008, "Additional Information Regarding License Renewal Application-Operating Experience Clarification," the applicant submitted a supplemental "clarification" describing its plan for implementing a permanent remediation of the Indian Point Nuclear Generating Unit No. 2 (IP2) refueling cavity leakage over the next three scheduled IP2 re-fueling outages (2010, 2012, 2014). In order to complete its review, the staff requests the following information:

a. In order for the staff to address the adequacy of the applicant's proposed monitoring method, the applicant is requested to provide additional information on the leakage path from the refueling cavity to the collection point lower in containment, as well as the leak flow-rate. In this regard, describe the leakage path and chemical composition of the leaking fluid, provide historical flow-rate values, and confirm whether or not any leakage enters the reactor cavity inside the primary shield wall. Provide the technical basis as to how the leakage path was determined, with a focus on water entering the reactor cavity.

Provide a sketch of containment and the refueling cavity which highlights the leakage path.

Response for Follow-up RAI 1 (a):

During the first refueling outage in 1976, leakage from the refueling cavity was observed coming from the reactorcavity. The originaldesigned temporary seal between the reactorvessel flange and the reactorcavity was not leak tight. The leakage collected in the reactorcavity pit sump and was pumped out. A plant modification was initiatedto use a new design seal, which resolved the problem. Leakage also occurred in the reactorvessel inlet and outlet blow out plugs and instrumentation wireways. Leakage through these paths has been minimized by improving sealing methods.

The leakages from the above sources were not from behind the reactorcavity liner and through concrete constructionjoints.

In 1993, it was determined that leakage from the refueling cavity was coming through the liner plates. This event initiateddetailed investigationsand corrective actions to stop the leakage. Unfortunately, the sealing methods have not fully resolved the leakage.

The suspect leakage path was determined by visual observation during and after filling the refueling cavity with water. Leakage is observed as the cavity is filled for refueling operations. Leakage starts as the cavity level reaches the 80 ft. elevation which is approximately50% cavity level. Leakage was observed initially from three significant areasassociated with refueling cavity construction (See Figure 1). Leakage from the refueling cavity collects in a drainage trench on the 46 ft elevation of containment inside the crane wall from where it flows to the containment sump.

NL-09-056 Attachment 1 Docket Nos. 50-247 & 50-286 Page 2 of 19 A small portion of the leakage from the refueling cavity enters the reactor cavity flowing down the interiorprimary shield walls to a sump located in the reactorcavity from where it is pumped to the containment sump. Leakage inside the reactorcavity has been primarilyattributedto non-liner leakage associated with reactorcavity seal and nozzle inspection box cover isolation issues.

The leaking fluid from the refueling cavity is mixed reactorcoolant and refueling water storage tank water with total estimated flow rates on the order of 3 to 7 gpm. No samples of the fluid flowing from the leaking areas have been analyzed for chemical composition. There has been no degradationof containment structuralsurfaces from this wetting as observed in the Structures Monitoring Program. Figures.1 through 4 are sketches of the containment area and the refueling,cavity which show the locations of the observed leakage.

b. The transmittal letter NL-08-169, dated November 6, 2008, states: 'There are no new commitments identified in this submittal." The applicant has previously taken a bore sample in the region of the leak, and has committed to take another sample prior to entering the period of extended operation. In absence of a formal commitment to remedy the source of leakage, the applicant's aging management program (AMP) should include a method to monitor for a degrading condition in the refueling cavity, and other structures and components that would be affected by the leakage, during the period of extended operation, or the applicant should explain how the structures monitoring program will adequately manage potential aging of this region during the period of extended operation.

Response for Follow-up RAI 1 (b):

As previously described in IPEC Letter NL-08-127 dated August 14, 2008, Audit Question 359, the refueling cavity is a robust structure, with thick walls and low stress levels when compared to the total structuralcapacity. Exposure to borated water has not resulted in identified degradationor reduction of structuralintegrity. Industry and IPEC operatingexperience for the past years has shown that concrete is not significantly affected by exposure to borated water. The refueling cavity is wet during the limited duration (approximately14 days) when it is filled and is dry during the subsequentperiod (approximately24 months) of normal power operations. Moisture remaining following drainingof the cavity would be dried up by the ambient temperaturesresulting from reactoroperation, thus long-term exposure to borated water that could cause significant degradationof the concrete and embedded reinforcement is not expected.

The method to monitor for a degradingcondition in the refueling cavity is routine visual inspection of accessibleconcrete surfaces under the Structures Monitoring Program accompaniedby an inspection of concrete that has been exposed to the intermittent borated water leakage for an extended period. The inspection is requiredby the formal commitment to do core bore samples in the upcoming outage in 2010 for concrete that has been exposed to the leaking borated water on an intermittentbasis for much of the life of the plant. If leakage occurs during the upcoming outage, IPEC will obtain a sample of leaking water at an exit point below the cavity and evaluate it for fluid composition.

NL-09-056 Attachment 1 Docket Nos. 50-247 & 50-286 Page 3 of 19 The results of the sample analysis will be evaluated to establish whether additionalaging management activity is necessary during the period of extended operation.-

Additionally core bore samples will be taken, if leakage is not stopped prior to the end of the first ten years of the period of extended operation (Reference Commitment #36).

Other structures and components that could be affected by the leakage that are not addressed under the Structures Monitoring Program would be evaluated under the Boric Acid Corrosion Program. As previously committed to in IPEC Letter NL-08-127, dated August 14, 2008, inspections and activities related to the identificationof leakage in the refueling cavity and its impact on the surrounding concrete will provide reasonable

  • assurancethat the associated.structures will remain capable of fulfilling their license renewal intended functions. The establishedsite operatingexperience review program ensures that any subsequent new industry or IPEC operating-experiencewill be incorporatedto ensure adequate management of potentialaging effects of this region during the period of extended operation.

Follow-up RAI 2: Open Item 3.0.3.2.15-2 (Audit Question 360)

In Entergy letter NL-08-169, dated November 6, 2008, the applicant submitted a supplemental "clarification" for the IP2 spent fuel pool pit walls, which provides a detailed description of (1) the design margins for the spent fuel pool concrete walls; and (2) the results of prior concrete core sample testing and rebar corrosion testing.

a. In Commitment 25, the applicant commits to sample for tritium in groundwater wells in close proximity to the IP2 spent fuel pool at least every three months to assess for potential indications of spent fuel pool leakage. This commitment does not describe what actions will be taken if leakage continues. If sampling indicates continued leakage, the applicant's AMP should include a method to determine if a degraded condition exists during the period of extended operation, or the applicant should explain how the Structures Monitoring Program will adequately manage potential aging of the inaccessible concrete of the IP2 spent fuel pool due to borated water leakage during the period of extended operation.

Response for Follow-up RAI 2 (a):

As indicatedin Entergy letter NL-08-127, dated August 14, 2008, Audit Question 360, degradationhas not been attributed to the effects of aging, but to poor construction and workmanship practicesduring initialconstruction activities. Consequently, future degraded conditionsare not expected.

The method to determine if a degraded condition exists during the period of extended operation is continued monitoring for leakage by monitoring SFP level and monitoring ground water in the vicinity of the pool exterior walls for indicationsof pool leakage. The absence of leakage will indicate no degradedcondition exists. Leakage, if any, indicates potential degradation. If leakage is found, it will be evaluated under the corrective action program (i.e., Element 7 of the SMP). If sampling indicates that ground water contains constituents indicatingpool leakage then evaluation is requiredunder the corrective action program to assess the potential for degradationand determine appropriate corrective actions.An example of the aggressive corrective actions expected in response to identified leakage is found in the condition report described in response to

NL-09-056 Attachment 1 Docket Nos. 50-247 & 50-286 Page 4 of 19 Audit Question 360, Entergy Letter NL-08-127, dated August 14, 2008. Corrective actions for that condition included inspections of all accessible surfaces of the SFP liner, installationof monitoring wells in the vicinity, performance of UT examinations, bore samples, rebar inspections and inspections using remote camera technology.

As stated in the Statement of Consideration(SOC) for the license renewal rule, "Given the Commission's ongoing obligation to oversee the safety and security of operating reactors,issues that are relevant to currentplant operation will be addressedby the existing regulatoryprocess within the present license term rather than deferred until the time of license renewal." Since.the issue of SFP leakage is currently being addressed by the existing licensingand regulatoryprocessi that processprovides reasonable assurancethat appropriatecorrective actions will be taken during the current license term, Those actions will continue as appropriatethrough the period of extended operation.

b. The second paragraph on page 2 of Attachment 1 of the clarification letter dated November 6, 2008, states in part: "[I]ittle or no corrosion-was observed in the rebar except at a location in the wall where spalling had occurred exposing rebar to the elements. Analysis of the rust particles showed high chloride content and low boron concentration indicating that rainwater was the primary cause of the observed corrosion." The staff requests the applicant to identify any Unit 2 and Unit 3 operating experience related to rebar corrosion, in light of the chloride content in rainwater, and identify the likely source for the high chloride content, in the rainwater. Additionally, the applicant is requested to explain whether and how the AMP is adequate to address this environment and the related potential aging effects to ensure there is no loss of intended function during the period of extended operation....

..Response for Follow-up RAI 2 (b): - -

The original 1993 consultantanalysis associatedwith the degradedconcrete area speculated that the likely source for the high chloride content was condensation of chloride laden air (chlorides from the brackish Hudson River water) on the outer surface of the poolwall. It has since been concluded that the chloride source was-likely associated with the use of rock salt or storage of chemicals or materialsinthe area.

Studies of the chloride content in rain water and ground water do not support the levels that were found in 1993. Studies typically show the nationalaverage of chlorides in rain water to be a maximum of 1.0 to 1.5 parts per million (PPM) with values inland approaching0.2 PPM. The NationalAtmospheric Deposition Program(NAPD), Hudson Valley location West Pointstation, located upriver from the plant, chloride data from 1983 to 2007 shows values from 0. 18 to 0.66 PPM. This is significantly lower than the values initially reportedand does not support the supposition that chlorides originated from rainwater. No IP operatingexperience has linked high chlorides in rainwaterto corrosionof embedded rebar. The pool wall was repairedeliminatingthe spent fuel pool rebarexposure to rainwater.

The aging management programsfor concrete exposed to the elements, the Structures Monitoring Programand the Containment ISI Program, are adequate to address this

NL-09-056 Attachment 1 Docket Nos. 50-247 & 50-286 Page 5 of 19 environment and the relatedpotentialaging effects to ensure there is no loss of intended function during the period of extended operation. Visual inspections performed under these programs have confirmed no loss of intended function due to aging effects. These programs will continue to monitor potential future degradationof the concrete cover that could result in exposure of the underlying rebar to the outdoor environment.

Minor degradationthat has been observed during these inspections has shown little change between inspections confirming the adequacy of the inspection frequency of the Structures Monitoring and ContainmentISI Programs.If rebardegradationis identified during future inspections (e.g., observation of concrete staining during visual inspection),

the condition will be evaluated in accordancewith the program requirements to ensure necessarycorrective actions are taken to prevent loss-of intended function.

Follow-up RAI 3: Open Item 3.0.3.3.2-1 (Audit Question 361)

In Entergy letter NL-08-169, dated November 6, 2008, the applicant submitted a supplemental "clarification" for Indian Point (IP) containment spalling, describing the design margins for the IP containment structures at the locations of existing concrete degradation. Based on its review of the information, the staff identified areas that need further clarification and/or additional information to complete its review as described below:

a. The clarification for the IP containment spalling states: "As the surface concrete is not credited for tensile strength of the structure, the spalling has no impact on the available margins." The strength margins identified appear to be based on the nominal rebar dimensions, without any consideration for rebar degradation due to exposure and potential loss of bond between the concrete and the rebar. Explain how the existing degradation and design margin will be-considered in performing periodic inspections to monitor degradation that would ensure that there is no loss of containment intended function during the period of extended operation.

Response for Follow-up RAI 3 (a):

As stated in Letter NL 169, dated November 6,. 2008, the existing surface concrete degradationand potential loss of bond between the concrete and the rebarhas no impact on the ability of containment to perform its intended function during the period of extended operation. The design margins in containment are such that loss of one bar in every 4.5 feet in the vertical direction would not impact the ability of containment to perform its intended function. The ISI-IWL inspections have confirmed that there has been no identified degradationthat could result in loss of function of the containment structure (rebarand concrete) due to aging effects. Localized surface rust has been observed at containmentareas where rebarhas been exposed, but these visual inspection results show no discernabledeviation of rebar dimensions from nominal. No degradation has been observed that indicates loss of bond for rebar that is not monitored directly.

As partof the IPEC corrective action program (i.e., program Element 7), if degradationis identified during inspections, the impact of the degradationon design margin will be evaluated to ensure that there has been no loss of containment intended function. .

Evaluations performed on containment associatedwith potentially degradedrebar (i.e.,

NL-09-056 Attachment 1 Docket Nos. 50-247 & 50-286 Page 6 of 19 localized surface degradation)have shown that loss of a number of reinforcingbars would have an insignificant effect on containmentstress margins and would not impact containment intended function. Degradationof the rebar,will be readily discernableas obvious changes in bar dimensions well before such degradation could progress to the point of challenging the availabledesign margins.

b. In the spent fuel pool discussion, in the letter dated November 6, 2008, the applicant stated: "[I]ittle or no corrosion was observed in the rebar except at a location in the wall where spalling had occurred exposing rebar to the elements. Analysis of the rust particles showed high chloride content and, low boron concentration indicating that rainwater was the primary cause of the observed corrosion." The applicant is requested to provide the technical basis for the adequacy of the 5-year IWL frequency of inspection of the degraded areas of the IP containments during the period of extended operation, considering the possibility of an increased site-specific corrosion rate of the exposed rebar on the containments. This should include results of prior inspections, including any available comparative photos showing the progression of degradation. -

Response for Follow-up RAI 3 (b):

The technical adequacy of the 5-year IWL frequency of inspection of the degradedareas of the IPEC containments has-been demonstratedby past inspection results. No detectable changes have occurred over the 5-year period between past inspections. The rate of degradationof the exposed rebarof the containments has-been imperceptible.

Documented inspection history for the first period IWL inspection began in 1999.

Photographstaken of exposed rebar in the most recent inspection.in 2009 were compared to photographstaken during the first IWL interval inspection in 2000 and a subsequent inspection in 2005. As can be seen from the photos in Figures5 through 7 corrosionof the exposed rebaris almost nonexistent with no noticeable change in appearance:over the years. Spalling is confined to a small area around the rebar with no noticeable cracking being present, which would indicate that the degradationis localized or has not progressedalong the length of the rebar creatingthe potential for more spalling. Therefore, based upon past and recent inspection, increasedcorrosion rates have not been identified and additionaldegradation,which could prevent the .

containmentfrom performingits intended function, would be readily-detectedby the established IWL inspections.

Follow-up RAI 4: Open Item 3.5-1 In Entergy letter NL-08-169, dated November 6, 2008, the applicant submitted a supplemental "clarification" to license renewal application (LRA) Section 3.5.2.2 related to the concrete mix design method and the durability of concrete used at IP. In the LRA the applicant claimed that concrete meets the specifications of ACI 318-63 and the intent of ACI 201.2R-77, Guide to Durable Concrete. As a result the applicant'claimed that several aging effects were not applicable to concrete. Based on its review of the information, the staff identified areas that need further clarification and/or additional information to determine that the applicant meets the cited ACI specifications such that further evaluation is not necessary as recommended by the GALL Report.

NL-09-056 Attachment 1 Docket Nos. 50-247 & 50-286 Page 7 of 19

a. In the clarification to LRA Section 3.5.2.2 (Part 1) on page 6 of Attachment 1 to letter NL-08-169, the applicant stated that it used Method 2 of Section 502 of ACI 318-63 by testing trial mixes to determine the water-cement ratios for the concrete mix design of the IP containments and other structures. In order for the staff to evaluate the quality and durability of concrete in IP structures that may be subject to degradation during the period of extended operation, the staff requests the applicant to define the water-cement ratio that was used at the time of construction. Additionally, to assist the staff in understanding the parameters related to concrete strength and durability during the period of extended operation, the applicant is requested to describe the methodology used to establish the required concrete compressive strength of 3000 psi for the containment and other safety-related concrete structures, in accordance with ACI 318-63, Method 2. The applicant is requested to provide a summary of the results of statistical analyses performed, if any, of the original concrete strength tests, including number of samples, raw strength values from the test, the mean, the standard deviation, and the original criterion (e.g., mean minus 1 standard deviation, coefficient of variation) used to confirm that the required compressive strength was achieved. The applicant is requested to provide this information for the IP containments and other safety-related IP Unit 2 and 3 concrete structures, including the refueling cavities and the spent fuel pools, to support the applicant's view that IP concrete meets the requirements of Method 2 in Section 502 of ACI 318-63 and the intent of ACI 201.2R-77.

Response for Follow-up RAI 4 (a):

Pour data samples taken during construction show water-to-cement ratio used at IPEC ranged from a low of 0.488 (equipment hatch area) to a high-of 0.611 (containmentel.

68') with an average ratio at the time of construction of 0.534: The method used to confirm the required concrete compressive strength of 3000 psi for the containment and other safety-related concrete structures, in accordancewith ACI 318-63, Method 2 is testing of actual field samples taken during construction. ACI documents state that strength and durabilityare primarilygoverned by water-to-cement (wic) ratio, and strength goes hand-in-hand with durability. The strength and durabilityare both based on the permeabilityof the concrete which is based on the distance between the cement particles,i.e. the closer the cement particles the stronger the concrete: Permeabilityis therefore a function of the w/c ratio, particlesize distribution (PSD), type of cement, type of aggregate,compaction and quality control. Relying on just one indicatorfor durability is not justified, which is why the ACI code uses it only as a first estimate based on the tables for determining strength and durability. The ACI documents recommend that the strength based on w/c ratio should be verified by trial batches to ensure the specified propertiesof the concrete are met. To confirm that the requiredcompressive strength was achieved, ACI 214.3R-88, "Simplified Version of the Recommended Practicefor Evaluation of Strength Test Results of Concrete"was used to develop a summary of the results of the originalconcrete strength tests. These results are based on raw strength values from the test samples to obtain the mean and the standarddeviation.

IPEC containmentand other safety-related structureswere design'ed for a minimum compressive strength of 3000 psi. A total pour of approximately 20,000 cubic yards was expected. Therefore, in order to ensure this design parameter was achieved, an average design margin of 15% above this minimum was also specified.

NL-09-056 Attachment 1 Docket Nos. 50-247 & 50-286 Page 8 of 19 Approximately 200 concrete test reports for concrete used in IP containment, refueling cavity and spent fuel pool area were reviewed. Air entrainment values rangedbetween 3.5 and 6.5%. Only a few of the test reports indicatedairentrainment higher than 6.0%.

Those values are acceptable based on the ACI 211.1-77 section 5.3.3 which shows that higher entrainment values up to 7% are acceptable for extreme exposure conditions, higher airentrainmentis generally better for durability. A primary concern for high air entrainmentis an accompanying reduction in concrete strength. As discussed in the following paragraph,the concrete used for IP containment, refueling cavity and spent fuel pool still exceeded the concrete design strength requirements in accordance with ACI 318-63 producing durable, low permeabilityconcrete.

Each concrete test report involved an average of 3 sample concrete cylinders for strength testing. No test cylinder strength under 3000 psi 28-day strength was observed. The compressive strength from these samples ranged from a low of 3436 psi (containment exterior wall el. 68'-73') to 5393 psi (containment ring area) with an extreme of 6410 psi (containment equipment hatch area): .The standarddeviation obtained from the samples reviewed was determined to be approximately 670 psi with an average or mean concrete compressive strength of approximately 4050 psi. Based on this actualconcrete test data, the required concrete compressive strength of 3000 psi for the containmentand other safety-relatedconcrete structures, in accordance with ACI 318-63, Method 2 was achieved with no sample below one standarddeviation from the mean. Although this identifies that IPEC concrete is of good quality, the credited programsin Appendix B of the application will confirm the absence of significant concrete aging effects.,

b. If the applicant is unable to provide the information requested in part (a) above, the applicant is requested to explain how the aging effects on concrete will be adequately managed and safety margins will be determined during the period of extended operation.

Response for Follow-up. RAI 4 (b):

No response required: The information requested in part.-(a) has-been provided.

Follow-up RAI 5: Open Item 3.5-2.

In Entergy letter NL-08-169, dated November 6, 2008, "Additional Information Regarding License Renewal Application-Operating Experience Clarification," the applicant submitted a supplemental "clarification" to LRA Section 3.5.2.2 (Part 3) for IP2 containment concrete and its ability to withstand local area temperatures up to 250-°F.

The staff has identified areas that need further clarification and/or additional information as discussed below:

a. Clearly explain the role of the air-to-air heat exchangers in cooling the concrete around the hot piping penetrations. Include the normal operating temperature of the concrete as well as the maximum concrete temperature assuming failure of the heat exchangers.

Response for Follow-up RAI 5 (a):

The air-to-airheat exchangers are discussed in IPEC 2 & 3 UFSAR Section 5.1.4.2.2 and Section 5.1.4 respectively. The function of the hot penetration cooling (HPC)

NL-09-056 I Attachment 1 Docket Nos. 50-247 & 50-286 Page 9 of 19 system is to provide a cooling medium that will limit the temperatureof the containment concrete surroundinga thermally hot penetratingline. Operatingprocedures require the system to be pla~ced in service whenever RCS temperature is > 150OF The HPC system comprises two separateand non-interconnectedsubsystems. Each subsystem is composed of 2 positive displacementblowers, valves, air-to-airheat exchangers and connectingpiping. Each of the subsystems blowers supplies airfrom outside the building to the air-to-airheat exchanger which cools the space between the process line insulationand the penetrationsleeve. The air-to-airheat exchanger is made by welding together one flat sheet on one embossed sheet of 10-gauge carbon steel. The embossment forms the coolant channels, through which the HPC system air passes. The unit is rolled into the form of a cylinder with an outside diameter of the penetration sleeve and inside diameter that allows placement over the outside of the pipe insulation (See-Figures8 and 9). A typical hot penetrationdetail is shown in IP2 andc3 UFSAR Fig 5.1-30 and 5.1-12 respectively.

There is one subsystem with two blowers for the main steam and feedwater-.

  • penetrations,and one subsystem with two blowers for the hot penetrationsin the radiologicalcontrolled area. Only one blower is needed in each subsystem. In the event that the operatingblower stops, an alarm is initiatedsignalingto put the other one in service and initiatecorrective actions:.

Specific system pressure values have been established, which may indicate a possible obstruction, such as a clogged filter or debris in the system. The operatorsmake daily rounds and would initiate corrective actions if unacceptablepressure values are observed.. Corrective actions may include replacementof filters, belts or silencers and blowing out of the heat exchangers,.if necessary. - ....

System reliability was assessedby a review of IPEC operatingexperience over the past nine years of operation of the HPC system. The review identified no instances of loss of cooling which resulted in excess temperatures on concrete. This review identified that four IP2 and nine IP3 condition reports had been initiated. .There were none that identified the cause as hot temperatureon concrete. Ten were initiated due to vibrations and belt noise and three were due to increasedmotor temperature.

Temperatures taken in 1994 around the IP2 main steam penetrationsover a period of eleven months during normal operationsindicate that concrete was exposed to a range of temperatures from a low of 1090F to a high of about 200OF with the highest temperature occurring during the summer months. Based upon design and actual operatingexperience, recommendationsof the NUREG 1801 (GALL) for concrete temperatureare satisfied.

Analyses have been performed to characterize the concrete temperatureresponse in the very unlikely event of system failure. To evaluate this scenario, IPEC performed a transientheat transferanalysis of containment hot piping penetrations. The results of the analysis indicatedthat in the improbable case that all cooling air would be lost to these penetrations,the surroundingconcrete temperature at the hottest penetration (main steam piping) would increase by about 80°F in approximately 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />. It is highly improbablethat cooling air would be lost for as much as 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> since the failure of any of the air blower drive motors is alarmedin the control room and operator

NL-09-056 Attachment 1 Docket Nos. 50-247 & 50-286 Page 10 of 19 daily walk downs would identify system deficiencies. Even if the adjoiningconcrete did reach temperatures of 250 - 300 0F, the strength of the structure would not be impaired for the following reasons.

1) No credit was taken for the tensile strength of the concrete around the penetrations.
2) These temperatures have substantiallyno effect on the strength of the penetrationsleeve or the reinforcingbar in the area of the penetration.
b. In the clarification to LRA Section 3.5.2.2 (Part 3) on page 7 of Attachment 1 to letter NL-08-169, the applicant stated that a 15% reduction of concrete strength-could be

--expected when reaching temperatures of 250 2 F and that concrete compressive strength tests-showed an actual strength more than 15% higher than design strength. Please provide the methodology used to arrive at the conclusion that the actual concrete strength is more than 15% greater than 3000 psi, (i.e., greater than 3450 psi). Provide a summary of the results, including number-of samples, raw strength values from the test, the mean, the standard deviation, and the original criterion (e.g., mean minus 1 standard deviation) used to confirm that the claimed strength was achieved. Explain how consideration was given to-the reduction in modulus of elasticity in the high temperature concrete evaluation.

Response for Follow-up RAI 5 (b):

The method used to arrive at the conclusion that the actualconcrete strength is at least 15% greaterthan 3000 psi, (i.e., greater than 3450 psi) is review of actual concrete test results. The results of concrete samples taken and tested during construction in accordancewith the requirementsrof ACI provide assurancethat the minimum design strength of 3000 psi was achieved. Actual test results show that the containment shell and internalconcrete,had an average compressive strength of 4050 psi as indicatedin Follow-up D-RAI 4: Open Item 3.5-1. No reduction in modulus of elasticity is expected for short term.exposure of concrete to temperaturesat or below 250°F Considerationof high temperatures effects on the modulus-of elasticity was evaluated during the high temperature concrete evaluation. ,A review of information gathered from industry literatureon effects of temperatureconcluded that concrete does not experience a significant reduction in elastic modulus due to exposure to temperatures less than 300°F. Based on this data, no reduction in strength or modulus of elasticity was determined in the evaluation.

c. If the applicant is unable to provide the information requested above, the applicant is requested to explain how the aging effects on concrete, due to high temperatures, will be adequately managed during the period of extended operation.

Response for Follow-up RAI 5 (c):

No response required. The information requested in parts (a) and (b) has been provided.

NL-09-056 Attachment 1 Docket Nos. 50-247 & 50-286 Page 11 of 19 General Floor Plan - Containment Bldg.

Elev. 46#-off Leak Location C 21.

Leak Location B 4 Leak Location A FIGURE 1

NL-09-056 Attachment 1 Docket Nos. 50-247 & 50-286 Page 12 of 19 eimrhwuM PQ M~UM AARN~nk?

FIGURE 2

NL-09-056 Attachment 1 Docket Nos. 50-247 & 50-286 Page 13 of 19 IPEC UNIT#2 REFUELING PDDL r~/.

95 FT EL.

VIEW iTI SDLJTHEAST AIND UP FIGURE 3

NL-09-056 Attachment 1 Docket Nos. 50-247 & 50-286 Page 14 of 19 IPEC UNIT #2 REFUELING PDOL LEAK LOCATION 'A' BIOLOGICAL SHIELD WALL LEAK LOCATION 'B' BOTTOM OF CONCRETE VIEW/ TDl NO1RTHWAEST A~ND UP FIGURE 4

NL-09-056 Attachment 1 Docket Nos. 50-247 & 50-286 Page 15 of 19 4-I'-2001) hidnt 2005 IWL Photo 2004) UWI. Photo:

2' H"' bng Caidvd uba~x.

op. C pniarn Ou'.1

ý,

FIGURE 5

NL-09-056 Attachment 1 Docket Nos. 50-247 & 50-286 Page 16 of 19

,2005INN"L Tuspections 4,-1-S-2009 fI'witi 2,000 fVWl- Photo:

FIGURE 6

NL-09-056 Attachment 1 Docket Nos. 50-247 & 50-286 Page 17 of 19

'200-5 AN- I in sI ectionls 4-I 5-2009 Pbom, 2000 IWI, Photo:

p~psd cadwed ariuk.

d anmIoo'fu lInefn J FIGURE 7

NL-09-056 Attachment 1 Docket Nos. 50-247 & 50-286 Page 18 of 19 CIO TYPICAL HOT PIPE PENETRATION CONTAINMENT WALL WCCPPS AIR IN COOLING AIR IN ,CONTAINMENT LINER EXPANSION JOINT INSULATION -WCCPPS CONN.

PIPE

-U I

END PLATE PIPE SLEEVE COOLING AIR C*

.AIR FLOW THRU TEST CON N. '

FIGURE 8

NL-09-056 Attachment 1 Docket Nos. 50-247 & 50-286 Page 19 of 19

,QII'? TO. ,AI/? I-.lEA T E,,CA-'6WN0t 1<'

,9/,R' 7-0qll J PCO

" U"L 5IZ67 X/. ..

Y,-c .1 R e 7 r$ -ý

  • tV~~APýQ_ . FULLZ SIZE

" .. SE" t 'AIBOSING FIGURE 9

ATTACHMENT 2 TO NL-09-056 IPEC RAI Clarifications ENTERGY NUCLEAR OPERATIONS, INC.

INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 & 3 DOCKET NOS. 50-247 AND 50-286

NL-09-056 Attachment 2 Docket Nos. 50-247 & 50-286 Page 1 of 10 INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION REQUEST FOR ADDITIONAL INFORMATION (RAI)

CLARIFICATION RAI 3.4.2-1 In LRA Section 3.4.2, the applicant summarizes its AMR results for the IP2 auxiliary feedwater pump room fire event. In the LRA, the applicant states that:

The components in the systems required to supply feedwater to the steam generators during the short duration of the fire event are in service at the time the event occurs or their availability is checked daily. Therefore, integrity of the systems and components required to perform post-fire intended functions for at least one hour is continuously confirmed by normal plant operation.;During the event these systems and components must continue to perform their intended functions to supply feedwater to the steam generators for a minimum of one hour.

Significant degradation that could threaten the performance of the intended functions will be apparent in the period immediately preceding the event and corrective action will be required to sustain continued operation. For the minimal one hour period that these systems would be required to provide make up to the steam generators, further aging degradation that would not have been apparent prior to the event is negligible.

Therefore, no aging effects are identified, and no Summary of Aging Management Review table is provided.

Section 54.21 (a)(1) of 10 CFR requires that for those systems, structures, and components within the scope of license renewal, as delineated in § 54.4, applicants must identify and list those structures and components subject to an aging management review. Additionally, Section 54.21 (a)(3), requires that for each structure and component identified in paragraph 54.21 (a)(1), applicants must demonstrate that the effects of aging will be adequately managed so that the intended function(s) will be maintained consistent with the CLB for the period of extended operation. Based on the information contained in the LRA, Entergy has not demonstrated that the effects of aging for passive, long-lived components within the systems credited for providing flow to the steam generators during the fire event will be adequately managed.

For those systems, or portions thereof, that are identified in response to RAI 2.3.4.5-2, part c, the staff requests that the applicant provide a list of passive, long-lived component types, material, environment, and aging effect combinations, and the programs that will be used to manage the aging effects.

NL-09-056 Attachment 2 Docket Nos. 50-247 & 50-286 Page 2 of 10 Response for RAI 3.4.2-1 As indicated in LRA section: 2.3.4.5, normal plant operation demonstrates the ability of secondary systems to supply feedwater to the steam generators. This includes the systems that function to supply feedwater to the steam generators in the unlikely event of a fire in the AFW pump room. The function of supporting safe shutdown in the event of a fire in the auxiliary feed pump room is confirmed on an ongoing basis since the required SSCs are performing their intended functions under design basis conditions during normal operation. Unlike the case for most safety-related equipment, the conditions under which these SSCs must perform their intended functions are the same conditions Under which they operate during the course of normal plant operations.

Performance of intended functions during normal plant operation demonstrates that the systems and components can perform those functions for one hour in the event of a fire in the auxiliary feedwater pump room.

The response to RAI 2.3A.4.5-2 describes the functions and flow paths of the systems credited for the AFW pump room fire event.

The following tables provide clarifyingdetails regarding the passive; long-lived component types, materials, environments, aging effects and programs for SSCs that support the AFW pump room fire event that were not already included, in scope and, STAMR for 10CFR54.4(a)(1) or (a)(2).

Clarification Response for RAI 3.4.2-1 The Entergy response provided above in letter NL-09-018 dated January 27, 2009 is superseded by the following new commitment.

Commitment #39 Install a fixed automatic fire suppression system in the IP2 Auxiliary Feedwater Pump Room prior to entering the period of extended operation for IP2.

This commitment will delete the requirement for IP2 to place' reliance on certain portions of the secondary plant systems for alternate secondary heat sink measures to cope with potential AFW Pump Room fire scenarios.

All of the tables that were provided in the January 27, 2009 letter are superseded by this commitment. The portions of the secondary systems that-are in scope for 10 CFR 54.4(a)(1) and (a)(2) are not changed.

NL-09-056 Attachment 2 Docket Nos. 50-247 & 50-286 Page 3 of 10 RAI-2.3A.4.5-2 (Unit 2)

In LRA Section 2.3.4.5 the applicant describes systems not described elsewhere in the application credited for mitigating the consequences of a Unit 2 fire event in the auxiliary feedwater (AFW) room. Each system listed has the following intended function: to support safe shutdown in the event of a fire in the auxiliary feed pump room (10 CFR 50.48) function in accordance 10 CFR 54.4(a)(3). The applicant states "no LRA drawings are provided based on the intended function of supporting safe shutdown in the event of a fire in the auxiliary feed pump room." However, the applicant states in LRA Section 2.2 that "[c]omponents subject to aging management review are highlighted on license renewal drawings, with the exception of components in scope for 10 CFR 54.4(a)(2)."

Since the structures and components that support mitigating the consequences of a fire event are in scope in accordance with 10 CFR 54.4(a)(3) and subject to an AMR in accordance with 10 CFR 54.21 (a)(1), then the components should have been highlighted on license renewal drawings. However, the applicant did not highlight the components or flowpaths needed to support this event. In addition, the applicant did not, in accordance with 10 CFR 54.21 (a)(1), identify and list the structures and components that are subject to an AMR. Therefore, based upon the information provided in the LRA, the staff was not able to verify which components are included in scope to perform the stated function and are subject to an AMR.

For each system identified in LRA Section 2.3.4.5, the staff requests the applicant to a) identify the system support function for the AFW pump room fire event, b) clearly identify the portions of'the systems' flow paths that support these functions that are subject to an AMR, and c) identify the portions of these flow paths that are not already in scope for 10 CFR 54.4(a)(1) or (a)(2).

Response for RAI-2.3A.4.5-2-(Unit-2)

Background

As discussed in section 2:3.4.5 of the LRA,ý a combination of secondary, systems and components are credited for one hour for supplying make up water through the main feedwater isolation valves to the steam generators during the AFW (Auxiliary Feedwater) pump room fire event (Fire Zone*23/Fire Area C). This is necessary because under the current licensing basis, plant personnel are assumed unable to re-enter the AFW pump room for one hour following onset of the fire.

A conservative assessment of systems that support this event was performed for license renewal. For example, the wash water system was included in scope even though the travelling screens may not require cleaning during the one hour duration of the event, and several sources of instrument air were also included though only one would be needed.

Feedwater may be supplied by the main feedwater pumps in combination with the condensate pumps or by the condensate pumps alone after steam pressure is decreased. License renewal scoping conservatively identified systems that are required for main feedwater pump operation or condensate pump operation since this provides the maximum operator flexibility in response to the event. As a result, many auxiliary systems were included such as the main condenser to support the main feedwater pump

NL-09-056 Attachment 2 Docket Nos. 50-247 & 50-286 Page 4 of 10 turbine exhaust, circulating water to support condenser cooling, and main feedwater pump supporting sub-systems such as lube oil and cooling water.

The response to RAI-3.4.2-1 includes a specific listing of the component types that were not already in scope and STAMR for 10 CFR 54.4(a)(1) or (a)(2).

Clarification for RAI-2.3A.4.5-2 (Unit 2)

The Entergy response provided above in letter NL-09-018 dated January 27, 2009 is superseded by new commitment #39 as listed above.

The portions of the secondary systems that are in scope for 10 CFR 54.4(a)(1) and (a)(2) are not changed.

The portions of the secondary systems on IP2 that were credited for the AFW pump room fire event are deleted from scope in accordance with Commitment #39....

RAI 3.0.3.3.4-1 LRA Table B-2 identifies AMP B.1.18, Inservice Inspection Program, as a plant-specific condition monitoring program for the applications. The.staff notes that Entergy has committed to enhance the "detection of aging effects" program element of the Inservice Inspection Program to revise the AMP to provide for periodic -visual inspections of lubrite sliding supports used in the steam generator supports-and reactor coolant pump (RCP) supports in order to confirm the absence of aging effects. Please specify (1) which aging effects and parameters will be monitored for by the visual examinations, (2) the types of visual examinations (e.g., VT-1, EVT-1, VT-2, or VT-3), (3) inspection frequency and sample size for the visual examination method that will be used to monitor for aging, (4) the acceptance criteria that will be used to evaluate the examination results, and (5) the corrective action or actions that will be implemented if the inspection results do not conform to the acceptance standard(s) for these components . * -

Response for RAI 3.0.3.3.4-1 The inservice inspection (ISI) program will employ visual inspections to confirm the absence of aging effects for steam generator (SG) and reactor coolant pump (RCP) lubrite sliding supports through the period of extended operation (PEO).

As described in LRA Section B.1.18, the ISI program is an existing program that encompasses requirements of ASME Code Section Xl, Subsection IWF for ASME Class 1, 2, 3, and MC supports. The ISI program will be enhanced prior to the PEO to include explicit provisions for periodic inspections of the lubrite sliding supports. No aging effects requiring management have been identified for lubrite, but monitoring the surface condition of accessible surfaces will confirm the absence of age-related degradation.

The inspections will be VT-3 visual examinations of SG and RCP lubrite sliding supports to determine their condition. The inspections will examine accessible surfaces of the lubrite and adjacent surfaces for wear or abnormal condition (surface roughness) that could potentially lead to lock-up or loss of function of-the support. The lubrite will be

NL-09-056 Attachment 2 Docket Nos. 50-247 & 50-286 Page 5 of 10 examined in conjunction with Code required examinations of the support as a whole.

The inspection frequency and sample size will be in accordance with the requirements of ASME Code Section XI, Subsection IWF. The supports must meet the acceptance standards described in IWF-3410(a), which includes no scoring or roughness on sliding surfaces. Any of the conditions described in IWF-3410(a) shall be corrected or evaluated for acceptance in accordance with IWF-3122.2 and IWF-3122.3, respectively. Corrective actions for this program will be administered under the site QA program which meets requirements of 10 CFR Part 50, Appendix B.

Clarification Response for RAI 3.0.3.3.4-1 The inservice inspection (ISI) program will employ visual- inspections to confirm the absence of aging effects for steam generator (SG) and reactor coolant pump (RCP) lubrite sliding supports through the period of extended operation (PEO).

As described in LRA Section B.1.18, the ISI program is an existing program that encompasses requirements of ASME Code Section Xl, Subsection IWF for ASME Class 1, 2, 3, and MC supports. No aging effects requiring management have been identified for lubrite, but monitoring the supports will confirm the absence of age-related degradation. The inspections will be VT-3 visual examinations of SG and RCP supports to determine their condition. The inspections will examine accessible surfaces of the supports for wear or abnormal condition (surface roughness) that could potentially lead to lock-up or loss of function of the support. The support structure attached to the lubrite will be examined in conjunction with Code required examinations of the support as a whole. The inspection frequency and sample size will be in accordance with the requirements of ASME Code Section X1, Subsection IWF. The supports must meet the acceptance standards described in IWF-3410(a), which includes no scoring or roughness on accessible sliding surfaces. Any of the-conditions described in IWF-341 0(a) shall be corrected or evaluated for acceptance in accordance with IWF-3122.2 and IWF-3122.3, respectively. Corrective actions for this program will be administered under the site QA program which meets requirements of 10 CFR Part 50, Appendix B.

Commitment Enhance the ISI Program for IP2 and IP3 to provide periodic inspections to confirm the absence of aging effects for lubrite sliding supports used in the steam generator and reactor coolant pump support systems.

With respect to Commitment 11, the ISI Program already provides for periodic inspections of the supports used in the steam generator and reactor coolant pump support systems. The program includes the supports that utilize lubrite sliding surfaces.

Visual inspection of those supports during the Spring 2009 refueling outage confirmed that the established inspections in accordance with ASME Code Section XI, Subsection IWF, already cover the accessible surfaces of the supports. Since the lubrite has no aging effects requiring management, the established ASME Section XI inspections provide reasonable assurance that the supports remain capable of performing their intended functions during the period of extended operation. Therefore, no commitment is necessary to enhance the ISI Program to address supports with lubrite sliding surfaces.

NL-09-056 Attachment 2 Docket Nos. 50-247 & 50-286 Page 6 of 10 Commitment #11 will be deleted.

LRA Appendix A changes (Changes are shown as strikethroughs for deletieos and underlines for additions)

A.2.1.17 Inservice Inspection - Inservice Inspection (ISI) Program, The ISI Program is an existing program based on ASME Section XI Inspection Program B (Section Xl, IWA-2432), which has 10-year inspection intervals. Every 10 years the program is updated to the latest ASME Section Xl code edition and addendum approved in 10 CFR 50.55a.

The program consists of periodic volumetric, surface, and visual examination of -

components and their supports for assessment of sign of degradation, flaw evaluation, and corrective actions.

On March 1, 2007, IP2 entered the fourth ISI interval.. The ASME code-edition and addenda used for the fourth interval is the 2001 Edition with 2003 addenda.

The ISI Prowram will be ,nhanRrdto inldthe follo'ing.

Revico appropriate procodures to provide poriodic Yicual inspectionS to confirmA the absonco of aging offocts for huri0te sliding supports used in the steam generator and reactor coolant pumFp support systems.

The current program ensures that the structural integrity of Class 1, 2, and 3 systems and associated supports is maintained at the level required by 10-CFR 50.55a.

A.3.1.17 Inservice Inspection - Inservice Inspection (ISI) Program.

The ISI Program is an existing program based on ASME Section Xi Inspection Program B (Section Xl, IWA-2432), which has ten-year inspection intervals. Every ten years the program is updated to the latest ASME Section Xl code edition and addendum approved in 10 CFR 50.55a.

The program consists of periodic volumetric, surface, and visual examination of components and their supports for assessment of signs of degradation, flaw evaluation, and corrective actions.

On July 21, 2000, IP3 entered the third ISI interval. The ASME code edition and addenda used for the third interval is the 1989 Edition with no addenda.

The IS! Program will be enhanRed to includethe followi.

  • Revise appropriate procGedures to periodic visual inGp ectiOn to con 9firm the'

-absenre.

of.aging effects foir Iubrito sliding supports used in the steam gener~atorc and reactor coolant pump support systems.

NL-09-056 Attachment 2 Docket Nos. 50-247 & 50-286 Page 7 of 10 The current program ensures that the structural integrity of Class 1, 2, and 3 systems and associated supports is maintained at the level required by 10 CFR 50.55a.

LRA Appendix B changes, (Changes are shown as strikethroughs for deletions and underlines for additions)

NL-09-056 Attachment 2 Docket Nos. 50-247 & 50-286 Page 8 of 10 B.1.18 Inservice Inspection Proaram Descriotion The Inservice Inspection (ISI) Program is an existing program that encompasses ASME Section Xlj Subsections IWA, IWB, IWC, IWD and IWF requirements..

Regulation 10 CFR 50.55a, imposes inservice inspection (ISI) requirements of ASME Code,Section XI, for Class 1, 2, and 3 pressure-retaining components, their integral attachments, and supports in light-water cooled power plants. Inspection, repair, and replacement of these components are covered in Subsections IWA, IWB, IWC, IWD, and IWF, respectively. The program includes periodic visual, surface, and volumetric examination and leakage tests of Class 1, 2, and 3 pressure-retaining components, their integral attachments and supports.

Inservice inspection of supports for ASME piping and components is addressed in Section XI, Subsection IWF. ASME Code Section XI, Subsection IWF constitutes an existing mandated program applicable to managing aging of ASME Class 1, 2, 3, and MC supports for license renewal.

The program uses nondestructive examination (NDE) techniques to detect and characterize flaws. Three different types of examinations are volumetric, surface, and visual. Volumetric examinations using methods such as radiographic, ultrasonic or eddy current examinations are used to locate surface and subsurface flaws. Surface examinations, such as magnetic particle or dye penetrant testing, are used to locate surface flaws.

4. Detection of Aging Effects The ISI Program manages cracking on subcomponents of the reactor vessel, as applicable, for carbon steel, nickel alloy, carbon steel with stainless steel cladding, and stainless steel components, including bolting, using NDE techniques specified in ASME Section XI, Subsection IWB examination category.

The ISI Program manages loss of material due to wear on reactor vessel internal subcomponents, as applicable, for nickel alloy and stainless steel clevis inserts, radial keys, core alignment pins, and head/vessel alignment pins using NDE techniques specified in ASME Section Xl, Subsection IWB examination categories.

The ISI Program manages cracking on reactor coolant system components, as applicable, for carbon steel, carbon steel with stainless steel cladding, stainless steel and cast austenitic stainless steel components, including bolting and support skirts, using NDE techniques specified in ASME Section XI, Subsection IWB examination categories. The Inservice Inspection Program also manages reduction of fracture toughness for valve bodies and pump casing made of cast austenitic stainless steel.

NL-09-056 Attachment 2 Docket Nos. 50-247 & 50-286 Page 9 of 10 The ISI Program manages cracking on steam generator system components, as applicable, for carbon steel, carbon steel with stainless steel cladding, and stainless steel components, using NDE techniques specified in ASME Section XI, Subsection IWB examination categories.

The ISI Program manages loss of material for ASME Class MC and Class 1, 2, and 3 piping and component supports and their anchorages and base plates'ý by visual 'examinationof components Using NDE techniques specified in ASME Section Xl, Subsection IWF examination categories.

No aging effects requiring management are identified for lubrite sliding supports. However, the Code required visual inspections of the supports under the ISI Program will confirm the absence of aging effects through the period of extended operation.

F=RhalRGQl*glj'*ll+. TRhe ISI Dr,*,*am will he Fevie,; oa~÷,-.. d pe,,;l,

,riedliG, visull

p-t-i*onrAto crnfirm the abs6ono of aging  ; of, eq ir Iut f"
  • ffofr*-t g supp*r4s used inthe steam gcnr6ator and- ro-acrAe coo-lant pump s~upporFts. The- 1SI program will be cnhanccd prior to thc PEG to include cxplicit proVisions forF periodic inspoctions of the lubrito sliding supports. No aging offocts requrn management have boon idontified for lubrite, but mon;,itring the ur'fa condition of accessible surfaces wA~ill cofim.he absonce of age rolatod degradationR. The inspections will be VT- 3 visual examinations of SG and ROP lubito* sliding supports to dete rmin their coRditi.*R The Oistons Will

.... n accessible surfaces of the lubrito and adjacen"t surfac*.. for w...a. o abnormnal condition (surface roughness) that co9uld potentially load to loc up orh los-eof f.n..i. o.f t... support. The lubFit1 wil9"l be exami-n,.ed iR GoGnjuntion with Code required examinationS of the support as a whole. The inspection frequeney and sample size will be in accorFdance with the reureet - 4of ASMAAE Code Section Xl, Subsection IWF=. The supports utme h acceptaRne staRdaFrG described in IAWF 3410(a), - Whieh lu no oring or rou~ghness on sliding surfaces. Any of the con-d-itionsG d-escribed in W 3410(a) shall be correcte-d-orF ev4aluated for acceptanGe in accrdaneMAIwit IWE 3422.2 and IWI 3122.3, respectively. CGoreGtive actions fGo thi programI will be administered under the site QA programn which meets requirements of 10 CER Part 50, Appendix B.

NL-09-056 Attachment 2 Docket Nos. 50-247 & 50-286 Page 10 of 10 Enhanomeibet noP AN oIiownc eRnancmn DCiocmn TPAl rior 10AF~AmoP AcicT PXTQflciPc epe~atien. None AtWrOWtn -*Af.,cld Enhancemcnte

4. Dotection of Aging Effot Roviso apprate procoduroc to pr6vio poriodic visual ieotoet ofr h abeRen of aging offoctsfo lubrito Gliding suoppot6 used in,the stoaFm g6nrqator and reactor coolant pum~p Gupport System

ATTACHMENT 3 TO NL-09-056 IPEC Commitment List, Revision 8.

ENTERGY NUCLEAR OPERATIONS, INC.

INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 & 3 DOCKET NOS. 50-247 AND 50-286

NL-09-056 Attachment 3 Docket Nos. 50-247 & 50-286 Page 1 of 15 List of Regulatory Commitments Rev. 8 The following table identifies those actions committed to by Entergy in this document.

Changes are shown as strikethroughs for deletions and underlines for additions.

COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION

/ AUDIT ITEM Enhance the Aboveground Steel Tanks Program for IP2: NL-07-039 A.2.1.1 perform thickness measurements of IP2 and IP3 toth2otm September 28, A.3.1.1 pom013 B.1.1 the bottom surfaces of the condensate storage tanks, city water tank, and fire water tanks once during the IP3:

first ten years of the period of extended operation. December 12, Enhance the Aboveground Steel Tanks Program for 2015 IP2 and IP3 to require trending of thickness I measurements when material loss is detected.

2 Enhance the Bolting Integrity Program for IP2 and IP3 IP2: NL-07-039 A.2.1.2 to clarify that actual yield strength is used in selecting eptember 28, A.3.1.2 materials for low susceptibility to SCC and clarify the prohibition on use of lubricants containing MoS 2 for IP3: NL-07-153 Audit Items bolting. December 12, 201,241, The Bolting Integrity Program manages loss of 2015 270 1 preload and loss of material for all external bolting.

3 Implement the Buried Piping and Tanks Inspection IP2: NL-07-039 A.2.1.5 Program for IP2 and IP3 as described in LRA Section September 28, A.3.1.5 B.1.6. 2013 B.1.6 NL-07-153 Audit Item This new program will be implemented consistent with IP3: 173 the corresponding program described in NUREG- December 12, 1801 Section XI.M34, Buried Piping and Tanks 015 Inspection. _

NL-09-056 Attachment 3 Docket Nos. 50-247 & 50-286 PaQe 2 of 15 COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION

/ AUDIT ITEM 4 Enhance the Diesel Fuel Monitoring Program to IP2: NL-07-039 A.2.1.8 include cleaning and inspection of the IP2 GT-1 gas September 2013 28,

-B.1 A.3.1.8

.9 NL-07-153 Audit items turbine fuel Qil storage tanks, IP2 and IP3 EDG fuel oil day tanks, IP2 SBO/Appendix R diesel generator fuel 153 129, oil day tank, and IP3 Appendix R fuel oil storage tank I mP3: -128, 129, and day tank once every ten years. 2015 NL-08-057 491,492, Enhance the Diesel Fuel Monitoring Program to 510 include quarterly sampling and analysis of the IP2 SBO/Appendix R diesel generator fuel oil day tank, IP2 security diesel fuel oil storage tank', IP2 security diesel fuel oil day tank, and IP3 Appendix R fuel oil storage tank. Particulates, water and sediment checks will be performed on the samples. Filterable solids acceptance criterion will be less than or equal to 10mg/I. Water and sediment acceptance criterion will be less than or equal to 0.05%.

Enhance the Diesel Fuel Monitoring Program to include thickness measurement of the bottom of the following tanks once every ten years. IP2: EDG fuel oil storage tanks, EDG fuel oil day tanks, SBO/Appendix R diesel generator fuel oil day tank, GT-1 gas turbine fuel oil storage tanks, and diesel fire pump fuel oil storage tank; IP3: EDG fuel oil day tanks, EDG fuel oil storage tanks, Appendix R fuel oil storage tank, and diesel fire pump fuel oil storage tank.

Enhance the Diesel Fuel Monitoring Program to change the analysis for water and particulates to a quarterly frequency for the following tanks. IP2: GT-1 gas turbine fuel oil storage tanks and diesel fire pump fuel oil storage tank; IP3: Appendix R fuel oil day tank and diesel fire pump fuel oil storage tank.

Enhance the Diesel Fuel Monitoring Program to specify acceptance criteria for thickness measurements of the fuel oil storage tanks within the scope of the program.

Enhance the Diesel Fuel Monitoring Program to direct samples be taken and include direction to remove water when detected.

Revise applicable procedures to direct sampling of the onsite portable fuel oil contents prior to transferring the contents to the storage tanks.

Enhance the Diesel Fuel Monitoring Program to direct the addition of chemicals including biocide when the presence of biological activity is confirmed.

NL-09-056 Attachment 3 Docket Nos. 50-247 & 50-286 Page 3 of 15 COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION

/ AUDIT ITEM Enhance the External Surfaces Monitoring Program 1P2: NL-07-039 A.2.1.10 5

for IP2 and IP3 to include periodic inspections of September 28, A.3.1.10 013 B.1.11 systems in scope and subject to aging management review for license renewal in accordance with 10 CFR IP3:

54.4(a)(1) and (a)(3). Inspections shall include areas December 12, surrounding the subject systems to identify hazards to 015 those systems. Inspections of nearby systems that could impact the subject systems will include SSCs that are in scope and subject to aging management review for license renewal in accordance with 10 CFR 54.4(a)(2).

6 Enhance the Fatigue Monitoring Program for IP2 to IP2: NL-07-039 A.2.1.11 monitor steady state cycles and feedwater cycles or September 28, A.3.1.11 013 B.1 12, perform an evaluation to determine monitoring is not required. Review the number of allowed events and NL-07-153 Audit Item 164 resolve discrepancies between reference documents and monitoring procedures.

Enhance the Fatigue Monitoring Program for IP3 to IP3:

include all the transients identified. Assure all fatigue December 12, analysis transients are included with the lowest 2015 limiting numbers. Update the number of design transients accumulated to date.

Enhance the Fire Protection Program to inspect SP2: NL-07-039 A.2.1.12 7

externalsurfaces of the IP3 RCP oil collection 2013 B.1.13 systems for loss of material each refueling cycle.

Enhance the Fire Protection Program to explicitly IP3:

state that the IP2 and IP3 diesel fire pump engine December 12, sub-systems (including the fuel supply line) shall be 015 observed while the pump is running. Acceptance criteria will be revised to verify that the diesel engine does not exhibit signs of degradation while running; such as fuel oil, lube oil, coolant, or exhaust gas leakage.

Enhance the Fire Protection Program to specify that the IP2 and IP3 diesel fire pump engine carbon steel exhaust components are inspected for evidence of corrosion and cracking at least once each operating cycle.

Enhance the Fire Protection Program for IP3 to visually inspect the cable spreading room, 480V switchgear room, and EDG room C02 fire suppression system for signs of degradation, such as corrosion and mechanical damage at least once every six months.

NL-09-056 Attachment 3 Docket Nos. 50-247 & 50-286 Paae 4 of 15

  1. COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION

/ AUDIT ITEM IP2: NL-07-039 A.2.1.13 8 Enhance the Fire Water Program to include inspection of IP2 and IP3 hose reels for evidence of corrosion. September 28, A.3.1.13 Acceptance criteria will be revised to verify no 2013 B.1.14 NL-07-153 Audit Items unacceptable signs of degradation, 1P3: 105,106 Enhance the Fire Water Program to replace all or test December 12, NL-08-014 a sample of IP2 and IP3 sprinkler heads required for 2015 10 CFR 50.48 using guidance of NFPA 25 (2002 edition), Section 5.3.1.1.1 before the end of the 50-year sprinkler head service life and at 10-year intervals thereafter during the extended period of operation to ensure that signs of degradation, such as corrosion, are detected in a timely manner.

Enhance the Fire Water Program to perform wall thickness evaluations of IP2 and IP3 fire protection piping on system components using non-intrusive techniques (e.g., volumetric testing) to identify evidence of loss of material due to corrosion. These inspections will be performed before the end of the current operating term and at intervals thereafter during the period of extended operation. Results of the initial evaluations will be used to determine the appropriate inspection interval to ensure aging effects are identified prior to loss of intended function.

Enhance the Fire Water Program to inspect the internal surface of foam based fire suppression tanks.

Acceptance criteria will be enhanced to verify no J

sianificant corrosion.

- I I I

NL-09-056 Attachment 3 Docket Nos. 50-247 & 50-286 Page 5 of 15 COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION I I _I / AUDIT ITEM Enhance the Flux Thimble Tube Inspection Program IP2: NL-07-039 A.2.1.15 9

September 28, A.3.1.15 for IP2 and IP3 to implement comparisons to wear 2013 B.1.16 rates identified in WCAP-12866. Include provisions to compare data to the previous performances and IP3:

perform evaluations regarding change to test.

December 12, frequency and scope.

2015 Enhance the Flux Thimble Tube Inspection Program for IP2 and IP3 to specify the acceptance criteria as outlined in WCAP-12866 or other plant-specific values based on evaluation of previous test results.

Enhance the Flux Thimble Tube Inspection Program for IP2 and IP3 to direct evaluation and performance of corrective actions based on tubes that exceed or are projected to exceed the acceptance criteria. Also stipulate that flux thimble tubes that cannot be inspected over the tube length and cannot be shown by analysis to be satisfactory for continued service, must be removed from service to ensure the integrity of the reactor coolant system pressure boundary.

NL-09-056 Attachment 3 Docket Nos. 50-247 & 50-286 Page 6 of 15 COMMITMENT IMPLEMENTATIONI SOURICE RELATED SCHEDULE LRA SECTION I_ I I / AUDIT ITEM IP2: NL-07-039 A.2.1.16 10 Enhance the Heat Exchanger Monitoring Program for A.3.1.16 September 28, IP2 and IP3 to include the following heat exchangers 2013 B.1.17, in the scope of the program.

NL-07-153 Audit Item

  • Safety injection pump lube oil heat exchangers IP3: 52 December 12,
  • RHR heat exchangers 2015
  • RHR pump seal coolers Non-regenerative heat exchangers.
  • Charging pump seal water heat exchangers
  • Charging pump fluid drive coolers
  • Charging pump crankcase oil coolers
  • Spent fuel pit heat exchangers
  • Waste gas compressor heat exchangers
  • SBO/Appendix R diesel jacket water heat exchanger (IP2 only)

Enhance the Heat Exchanger Monitoring Program for IP2 and IP3 to perform visual inspection on heat exchangers where non-destructive examination, such as eddy current inspection, is not possible due to heat exchanger design limitations.

Enhance the Heat Exchanger Monitoring Program for IP2 and IP3 to include consideration of material-environment combinations when determining sample population of heat exchangers.

Enhance the Heat Exchanger Monitoring Program for IP2 and IP3 to establish minimum tube wall thickness for the new heat exchangers identified in the scope of the program. Establish acceptance criteria for heat exchangers visually inspected to include no indication of tube erosion, vibration wear, corrosion, pitting, NL-09-018 foulina. or scalina.

11 Delete commitment. W--- NL-07-03 A.2.1.17 EnRhano the S Program for 1122 and 1123 to prido 201348 pcrfiodic visual inlspoction to confirmn the abscncc Of NL-O07-& Aui4-i ete aging cffcctc forF lubrite slimding supports ucod in theo .6 steam generator and reactor coolant PUMP support DeebF, NL-09-056 systemR& ____5

NL-09-056 Attachment 3 Docket Nos. 50-247 & 50-286 Paae 7 of 15 COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION

/ AUDIT ITEM IP2: NL-07-039 A.2.1.18 12 Enhance the Masonry Wall Program for IP2 and IP3 Sp t b 28, A.3.1.18 to specify that the IP1 intake structure is included in September 28, 2013 B.1.19 the program.

IP3:

December 12, k015 Enhance the Metal-Enclosed Bus Inspection Program IP2: NL-07-039 A.2.1.19 13 to add IP2 480V bus associated with substation A to September 28, A.3.1.19 the scope of bus inspected. 2013 B.1.20 NL-07-153 Audit Items Enhance the Metal-Enclosed Bus Inspection Program IP3: 124, for IP2 and IP3 to visually inspect the external surface December 12, NL-08-057 133, 519 of MEB enclosure assemblies for loss of material at 2015 least once every 10 years. The first inspection will occur prior to the period of extended operation and the acceptance criterion will be no significant loss of material.

Enhance the Metal-Enclosed Bus Inspection Program to add acceptance criteria for MEB internal visual inspections to include the absence of indications of dust accumulation on the bus bar, on the insulators, and in the duct, in addition to the absence of indications of moisture intrusion into the duct.

Enhance the Metal-Enclosed Bus Inspection Program for IP2 and IP3 to inspect bolted connections at least once every five years if performed visually or at least once every ten years using quantitative measurements such as thermography or contact resistance measurements. The first inspection will occur prior to the period of extended operation.

The plant will process a change to applicable site procedure to remove the reference to "re-torquing" connections for phase bus maintenance and bolted connection maintenance.

IP2: NL-07-039 A.2.1 .21 A.2.1.21 14 Implement the Non-EQ Bolted Cable Connections SePtb 28, Program for IP2 and IP3 as described in LRA Section eptember 28, A.3.1.21 2013 B. 1.22 B.1.22.

IP3:

December 12, 12015

NL-09-056 Attachment 3 Docket Nos. 50-247 & 50-286 Page 8 of 15 COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION

/ AUDIT ITEM 15 Implement the Non-EQ Inaccessible Medium-Voltage IP2:

Sptb NL-07-039 N8, A.2.1.22 A.3.1.22 Cable SectionProgram for IP2 and IP3 as described in LRA B.1 .23.203B13 2013 B.1.23 NL-07-153 Audit item This new program will be implemented consistent with IP3: 173 the corresponding program described in NUREG- December 12, 1801 Section XI.E3, Inaccessible Medium-Voltage 2015 Cables Not Subject To 10 CFR 50.49 Environmental Qualification Requirements. _-

1P2: NL-07-039 A.2.1 .23 16 Implement the Non-EQ Instrumentation Circuits Test A.2.1.23 Review Program for IP2 and IP3 as described in LRA September 28, A.3.1.23 Section B.1.24. 2013 B.1.24 NL-07-153 Audit item This new program will be implemented consistent with IP3: 173 the corresponding program described in NUREG- December 12, 1801 Section XI.E2, Electrical Cables and 2015 Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Used in Instrumentation Circuits.

17 Implement the Non-EQ Insulated Cables and 1P2: NL-07-039 A.2.1.24 Connections Program for IP2 and IP3 as described in September 28, A.3.1.24 LRA Section B.1.25. 2013 B.1.25 NL-07-153 Audit item This new program will be implemented consistent with IP3: 173 the corresponding program described in NUREG- December 12, 1801 Section XI.E1, Electrical Cables and 2015 Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements..

18 Enhance the Oil Analysis Program for IP2 to sample SP2: NL-07-039 A.2.1.25 and analyze lubricating oil used in the SBO/Appendix September 28, A.3.1.25 R diesel generator consistent with oil analysis for other site diesel generators. IP3:

Enhance the Oil Analysis Program for IP2 and IP3 to December 12, sample and analyze generator seal oil and turbine 2015 hydraulic control oil.

Enhance the Oil Analysis Program for IP2 and IP3 to formalize preliminary oil screening for water and particulates and laboratory analyses including defined acceptance criteria for all components included in the scope of this program. The program will specify corrective actions in the event acceptance criteria are not met.

Enhance the Oil Analysis Program for IP2 and IP3 to formalize trending of preliminary oil screening results as well as data provided from independent laboratories.

NL-09-056 Attachment 3 Docket Nos. 50-247 & 50-286 Page 9 of 15 COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION

/ AUDIT ITEM 19 Implement the One-Time Inspection Program for IP2 eP2: NL-07-039 A.2.1.26 and IP3 as described in LRA Section B.1.27. September 28, A.3.1.26 2013 B.1.27 This new program will be implemented consistent with NL-07-153 Audit item the corresponding program described in NUREG- IP3: 173 1801,Section XI.M32, One-Time Inspection. December 12, 2_015 IP2: NL-07-039 A.2.1.27 20 Implement the One-Time Inspection - Small Bore September 28.. A.3.1.27 Piping Program for IP2 and IP3 as described in LRA Se013 B.1.28 Section B.1.28. 03B12 NL-07-153 Audit item This new program will be implemented consistent with IP3: 173 the corresponding program described in NUREG- December 12, 1801,Section XI.M35, One-Time Inspection of ASME 2015 Code Class I Small-Bore Piping.

21 Enhance the Periodic Surveillance and Preventive IP2: NL-07-039 A.2.1.28 Maintenance Program for IP2 and IP3 as necessary September 28, A.3.1.28 to assure that the effects of aging will be managed 013 B.1.29 such that applicable components will continue to lP3:

perform their intended functions consistent with the December 12, current licensing basis through the period of extended 2015 operation.

IP2: NL-07-039 A.2.1.31 22 Enhance the Reactor Vessel Surveillance Program for A.2.1.31 IP2 and IP3 revising the specimen capsule withdrawal September 28, A.3.1.31 schedules to draw and test a standby capsule to 013 cover the peak reactor vessel fluence expected DP3:

through the end of the period of extended operation.

December 12, Enhance the Reactor Vessel Surveillance Program for 015 sP2 and sP3 to require that tested and untested specimens from all capsules pulled from the reactor vessel are maintained in storage.  :

23 Implement the Selective Leaching Program for IP2 1P2: NL-07-039 A.2.1.32 and IP3 as described in LRA Section B.1.33. September 28, A.3.1.32 2013 B.1.33 This new program will be implemented consistent with NL-07-153 Audit item the corresponding program described in NUREG- IP3: 173 1801,Section XI.M33 Selective Leaching of Materials. December 12, 2015

NL-09-056 Attachment 3 Docket Nos. 50-247 & 50-286 Paqe 10 of 15 COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION

/ AUDIT ITEM 24 Enhance the Steam Generator Integrity Program for 1P2: NL-07-039 A.2.1.34 IP2 and IP3 to require that the results of the condition September 28, A.3.1.34 monitoring. assessment are compared to.the 013 B.1.35 operational assessment performed for the prior IP3:

operating cycle with differences evaluated.

December 12, 2015 Enhance the Structures Monitoring Program to IP2: NL-07-039 A.2.1.35 25 explicitly specify that the following structures are September 28, A.3.1.35 included in the program. 2013 B.1.36

  • Appendix R diesel generator foundation (IP3) NL-07-153 IP3: Audit items
  • Appendix R diesel generator fuel oil tank vault December 12, 86, 87, 88, (IP3) 2015 NL-08-057 417
  • Appendix R diesel generator switchgear and enclosure (IP3)
  • city water storage tank foundation
  • condensate storage tanks foundation (IP3)
  • containment access facility and annex (IP3)
  • discharge canal (IP2/3)
  • fire pumphouse (IP2)

" fire protection pumphouse (IP3)

  • fire water storage tank foundations (IP2/3)
  • gas turbine 1 fuel storage tank foundation

" maintenance and outage building-elevated passageway (IP2)

  • new station security building (IP2)

" nuclear service building (IP1)

  • primary water storage tank foundation (IP3)

" refueling water storage tank foundation (IP3)

  • security access and office building (IP3)

" service water valve pit (IP3)

  • superheater stack
  • transformer/switchyard support structures (IP2)
  • waste holdup tank pits (IP2/3)

Enhance the Structures Monitoring Program for IP2 and IP3 to clarify that in addition to structural steel and concrete, the following commodities (including their anchorages) are inspected for each structure as applicable.

0 cable trays and supports

NL-09-056 Attachment 3 Docket Nos. 50-247 & 50-286 Paae 11 of 15 COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION

/ AUDIT ITEM

  • concrete portion of reactor vessel supports
  • conduits and supports
  • cranes, rails and girders
  • equipment pads and foundations
  • fire proofing (pyrocrete) -

" HVAC duct supports

  • jib cranes
  • manholes and duct banks

" manways, hatches and hatch covers

  • monorails

" new fuel storage racks

  • sumps, sump screens, strainers and flow barriers Enhance the Structures Monitoring Program for IP2 and IP3 to inspect inaccessible concrete areas that are exposed by excavation for any reason. IP2 and IP3 will also inspect inaccessible concrete areas in environments where observed conditions in accessible areas exposed to the same environment indicate that significant concrete degradation is occurring.

Enhance the Structures Monitoring Program for IP2 and IP3 to perform inspections of elastomers (seals, gaskets, seismic joint filler, and roof elastomers) to identify cracking and change in material properties and for inspection of aluminum vents and louvers to identify loss of material.

Enhance the Structures Monitoring Program for IP2 NL-08-127 Audit Item and IP3 to perform an engineering evaluation of 360 groundwater samples to assess aggressiveness of groundwater to concrete on a periodic basis (at least once every five years). IPEC will obtain samples from at least 5 wells that are representative of the ground water surrounding below-grade site structures and perform an engineering evaluation of the results from those samples for sulfates, pH and chlorides.

Additionally, to assess potential indications of spent fuel pool leakage, IPEC will sample for tritium in groundwater wells in close proximity to the IP2 spent fuel pool at least once every 3 months.

Enhance the Structures Monitoring Program for IP2 and IP3 to perform inspection of normally submerged concrete portions of the intake structures at least once

NL-09-056 Attachment 3 Docket Nos. 50-247 & 50-286 Page 12 of 15 COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION

/ AUDIT ITEM every 5 years. Inspect the baffling/grating partition and support platform of the IP3 intake structure at least once every 5 years.

Enhance the Structures Monitoring Program for IP2 and IP3 to perform inspection of the degraded areas Audit Item of the water control structure once per 3 years rather 358 than the normal frequency of once per 5 years during the PEO.

1P2: NL-07-039 A.2.1 .36 Implement the Thermal Aging Embrittlement of Cast A.2.1.36 26 Austenitic Stainless Steel (CASS) Program for IP2 September 28, 1.3 and IP3 as described in LRA Section B.1.37. NL-07-153 Audit item This new program will be implemented consistent with IP3: 173 the corresponding program described in NUREG- December 12, 1801,Section XI.M12, Thermal Aging Embrittlement 2015 of Cast Austenitic Stainless Steel (CASS) Program.

Implement the Thermal Aging and Neutron Irradiation IP2: NL-07-039 A.2.1.37 27 A.3.1.37 Embrittlement of Cast Austenitic Stainless Steel September 01328, B. 1.38 in LRA 013 (CASS) Program for IP2 and IP3 as described NL-07-153 Audit item Section B.1.38.

IP3: 173 This new program will be implemented consistent with December 12, the corresponding program described in NUREG- 2015 1801 Section XI.M13, Thermal Aging and Neutron Embrittlement of Cast Austenitic Stainless Steel (CASS) Program.

Enhance the Water Chemistry Control - Closed IP2: NL-07-039 A.2.1.39 28 water chemistry of September 28, A.3.1.39 Cooling Water Program to maintain cooling 2013 .1.40 the IP2 SBO/Appendix R diesel generator IP3: 509 system per EPRI guidelines.

Enhance the Water Chemistry Control - Closed December 12, Cooling Water Program to maintain the IP2 and IP3 015 security generator and fire protection diesel cooling water pH and glycol within limits specified by EPRI guidelines.

29 Enhance the Water Chemistry Control - Primary and IP2: NL-07-039 A.2.1.40 September 28, B.1.41 Secondary Program for IP2 to test sulfates monthly in 013 the RWST with a limit of <150 ppb.

NL-09-056 Attachment 3 Docket Nos. 50-247 & 50-286 Page 13 of 15

  1. COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION

/ AUDIT ITEM 30 For aging management of the reactor vessel internals, P2: NL-07-039 A.2.1.41 IPEC will (1) participate in the industry programs for September 28, A.3.1.41 investigating and managing aging effects on reactor internals; (2) evaluate and implement the results of P&

the industry programs as applicable-to the reactor December 12, internals; and (3) upon completion of these programs, 013 but not less than 24 months before entering the period of extended operation, submit an inspection plan for reactor internals to the NRC for review and approval.

31 Additional P-T curves will be submitted as required P2: NL-07-039 A.2.2.1.2 per 10 CFR 50, Appendix G prior to the period of September 28, A.3.2.1.2 extended operation as part of the Reactor Vessel 013 4.2.3 Surveillance Program. IP3:

December 12, 2015 32 As required by 10 CFR 50.61 (b)(4), IP3 will submit a IP3: . NL-07-039 A.3.2.1.4 plant-specific safety analysis for plate B2803-3 to the December 12, 4.2.5 NRC three years prior to reaching the RTPTS 2015 NL-08-127 screening criterion. Alternatively, the site may choose to implement the revised PTS rule when approved.

NL-09-056 Attachment 3 Docket Nos. 50-247 & 50-286 Paae 14 of 15 COMMITMENT IMPLEMENTATION SOURCE I RELATED SCHEDULE LRA SECTION I I _ I / AUDIT ITEM IP2: NL-07-039 A.2.2.2.3 33 At least 2 years prior to entering the period of September 28, A.3.2.2.3 extended operation, for the locations identified in LRA 2011 4.3.3 Table 4.3-13 (IP2) and LRA Table 4.3-14 (IP3), under NL-07-153 Audit item the Fatigue Monitoring Program, IP2 and IP3 will IP3: 146 implement one or more of-the following:

December 12, NL-08-021 (1) Consistent with the Fatigue Monitoring Program, 2013 Detection of Aging Effects, update the fatigue usage calculations using refined fatigue analyses to determine valid CUFs less than-1.0 when accounting for the effects of reactor water environment. This includes applying the appropriate Fen factors to valid CUFs determined in accordance with one of the following:

1. For locations in LRA Table 4.3-13 (IP2) and LRA Table 4.3-14 (IP3), with existing fatigue analysis valid for the period of extended operation, use the existing CUF.
2. Additional plant-specific locations with a valid CUF may be evaluated. In particular, the pressurizer lower shell will be reviewed to ensure the surge nozzle remains the limiting component.
3. Representative CUF values from other plants, adjusted to or enveloping the IPEC plant specific external loads may be used if demonstrated applicable to IPEC.
4. An analysis using an NRC-approved version of the ASME code or NRC-approved alternative (e.g., NRC-approved code case) may be performed to determine a valid CUF.

(2) Consistent with the Fatigue Monitoring Program, Corrective Actions, repair or replace the affected locations before exceeding a CUF of 1.0.

34 IP2 SBO / Appendix R diesel generator will be April 30, 2008 NL-07-078 2.1.1.3.5 installed and operational by April 30, 2008. This Complete NL-08-074 committed change to the facility meets the requirements of 10 CFR 50.59(c)(1) and, therefore, a license amendment pursuant to 10 CFR 50.90 is not required.

NL-09-056 Attachment 3 Docket Nos. 50-247 & 50-286 Page 15 of 15 COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION

/ AUDIT ITEM 35 Perform a one-time inspection of representative IP2: NL-08-127 Audit Item September 28, 27 sample area of IP2 containment liner affected by the 1973 event behind the insulation, prior to entering the 013 extended period of operation, to assure liner degradation is not occurring in this area.

Perform a one-time inspection of representative IP3:

sample area of the IP3 containment steel liner at the December 12, juncture with the concrete floor slab, prior to entering 2015 the extended period of operation, to assure liner degradation is not occurring in this area.

Any degradation will be evaluated forupdating of the NL-09-018 containment liner analyses as needed.

IP2: NL-08-127 Audit Item 36 Perform a one-time Inspection and.evaluation of a Sptb 28, 359 sample of potentially affected IP2 refueling cavity September 28, 359 concrete prior to the period of extended operation. 2013 The sample will be obtained by core boring the refueling cavity wall in an area that is susceptible to exposure to borated water leakage. The inspection will include an assessment of embedded reinforcing steel.

Additional core bore samples will be taken, if the NL-09-056 leakage is not stopped, prior to the end of the first ten years of the period of extended operation.

37 Enhance the Containment Inservice Inspection (CII- IP2: NL-08-127 Audit Item IWL) Program to include inspections of the September 28, 361 containment using enhanced characterization of 013 degradation (i.e., quantifying the dimensions of noted IP3:

indications through the use of optical aids) during the December 12, period of extended operation. The enhancement 015 includes obtaining critical dimensional data of degradation where possible through direct measurement or the use of scaling technologies for photographs, and the use of consistent vantage points for visual inspections.

IP2: NL-08-143 4.2.1 38 For Reactor Vessel Fluence, should future core loading patterns invalidate the basis for the projected September 28, values of RTpts or CrUSE, updated calculations will 013 be provided to the NRC. IP3: