ML100670655

From kanterella
Jump to navigation Jump to search
AN2-2009-08-Draft Written Exam
ML100670655
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 08/07/2009
From: Brian Larson
Operations Branch IV
To:
Entergy Operations
References
Download: ML100670655 (120)


Text

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1610 Rev: 2 Rev Date: 3/17/2009 3:22:05 QID #: 1 Author: Coble Lic Level: R Difficulty: 3 Taxonomy: H Source: NRC Exam Bank 0027 Search 000008K301 10CFR55: 41.5 / 41.10 / 45.6 / 45 Safety Function 3 System

Title:

Pressurizer (PZR) Vapor Space Accident (Relief System Number 008 K/A AK3.01 Tier: 1 Group: 1 RO Imp: 3.7 SRO Imp: 4.4 L. Plan: A2LP-RO-ELOCA OBJ 14

Description:

Knowledge of the reasons for the following responses as they apply to the Pressurizer Vapor Space Accident: - Why PZR level may come back on scale if RCS is saturated Question:

Given the following: QID use History

  • The reactor has tripped and safety injection has actuated.
  • The RCS has a stuck open Pressurizer Safety valve. RO SRO
  • The RCS has rapidly depressurized to saturation conditions during the cooldown.
  • Pressurizer level initially dropped below zero and now has risen to 46% and is rising rapidly. 2003 Which one (1) of the following characterizes the relationship between indicated pressurizer level and 2005 RCS inventory and the reason for these conditions? 2006 A. Level is NOT an accurate indication of inventory. The cold calibrated pressurizer level 2008 channels indicate high during high temperature, low pressure conditions. 2009 B. Level is an accurate indication of inventory. Voiding would occur first in the pressurizer Audit Exam History steam space due to the higher temperature of the pressurizer walls.

2009 C. Level is NOT an accurate indication of inventory. Reactor vessel voiding may result in a rapidly rising pressurizer level.

D. Level is an accurate indication of inventory. RCP flow would sweep any voids from the RCS to the pressurizer steam space and out the safety.

Answer:

C. Level is NOT an accurate indication of inventory. Reactor vessel voiding may result in a rapidly rising pressurizer level.

Notes:

A is true but its contribution to a false level is not significant in this event and the level instruments are density compensated to prevent this. B is incorrect because voiding would occur in the top of the reactor vessel head first. D is incorrect because RCPs would be secured for the above saturated conditions.

References:

2202.003 Rev 10, Section 3, Step 11 (Loss of Coolant Accident).

2202.010 Rev 11, Attachment 9, Void Elimination (Standard Attachments).

Lesson Plan A2LP-RO-ELOCA Rev 6, Obi 14: Given a LOCA event and a set of plant conditions, determine if voiding has occurred during a cooldown.

Historical Comments:

Used on the 2005 NRC Exam Form ES-401-5 Written Exam Question Worksheet 1

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1611 Rev: 0 Rev Date: 3/18/2009 11:09:4 QID #: 2 Author: Coble Lic Level: R Difficulty: 3 Taxonomy: H Source: New Search 000009A209 10CFR55: 41.7 / 41.10 / 43.5 / 45 Safety Function 3 System

Title:

Small Break LOCA System Number 009 K/A EA2.09 Tier: 1 Group: 1 RO Imp: 2.8 SRO Imp: 3.3 L. Plan: A2LP-RO-CCW OBJ 13

Description:

Ability to determine and interpret the following as they apply to a small break LOCA: - Low-pressure SWS activity monitor Question:

With the plant at 100% full power, which one of the following radiation monitors would indicate QID use History a small inter-system LOCA starting to develop from the RCS?

A. The in service Containment Atmospheric Monitors (CAMS) RO SRO B. Loop 1 Service Water return from the SDC Heat Exchanger Radiation Monitor 2003 C. Loop 2 Service Water return from the Containment Cooling Coils Radiation Monitor 2005 2006 D. Loop 2 Component Cooling Water Radiation Monitor 2008 2009 Audit Exam History 2009 Answer:

D. Loop 2 Component Cooling Water Radiation Monitor Notes:

Distracter A is wrong because these monitors sample the Containment Atmosphere for small RCS leaks that develop directly from the RCS piping to the Containment Atmosphere.

Distracter B is incorrect because there is no SW flow through this HX at 100% power.

Distracter C is incorrect because this monitor would not see an RCS inter-system leak, only one that has pressurized the containment atmosphere.

D is correct because any leak from a RCP cooling HX or the Letdown HX would be detected at full power as soon as the leak started to develop.

References:

STM 2-43, CCW System, Section 2.5 and 4.0.

STM 2-62 Rev 15, Radiation Monitoring System, Sections 2.2.2, 2.2.3, 2.2.7.3, and 2.2.12.

Lesson Plan A2LP-RO-CCW Rev. 3 Objective 13: Describe an Interfacing System LOCA (ISLOCA) and describe the method used to protect against an ISLOCA used at ANO Unit 2.

Historical Comments:

New Question for 2009 NRC Exam Form ES-401-5 Written Exam Question Worksheet 2

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1612 Rev: 0 Rev Date: 10/31/2004 QID #: 3 Author: Coble Lic Level: R Difficulty: 3 Taxonomy: H Source: NRC Exam Bank 0486 Search 000011K101 10CFR55: 41.8 / 41.10 / 45.3 Safety Function 3 System

Title:

Large Break LOCA System Number 011 K/A EK1.01 Tier: 1 Group: 1 RO Imp: 4.1 SRO Imp: 4.4 L. Plan: A2LP-RO-ELOCA OBJ 11

Description:

Knowledge of the operational implications of the following concepts as they apply to the Large Break LOCA: - Natural circulation and cooling, including reflux boiling Question:

Given the following conditions: QID use History

  • The plant experienced a Loss of Coolant Accident (LOCA) and has tripped.
  • A plant cooldown is in progress.
  • RCS Thot indicates 553°F and rising. 2003
  • RCS Tcold indicates 520°F and lowering.
  • RCS Average CET Temperatures indicate 565°F. 2005
  • RCS Pressure is 1100 psia and lowering. 2006
  • RVLMS level 7 and below are WET 2008 2009 Based on the above conditions, the method of RCS heat removal would be:

Audit Exam History A. Reflux Boiling natural circulation cooling.

2009 B. Subcooled nucleate boiling heat removal.

C. Single Phase Natural Circulation cooling.

D. Once through cooling with HPSI and ECCS Vents.

Answer:

A. Reflux Boiling natural circulation cooling.

Notes:

Distracter B is incorrect because the fluid is saturated not subcooled.

Distracter C is incorrect due to CET and Thot being greater than 10°F out from each other and also Margin To Saturation is less than 30°F.

Distracter D is incorrect, this action would only be taken if SG levels dropped to < 70 inches wide range which is well below 30% Narrow Range in the SGs.

Answer A is the only method available to remove RCS heat at this time.

References:

GFES PWR Thermodynamics Rev. 2 Chapter 8 Thermal Hydraulics. Objective 26 and section on Determination of Natural Circulation Flow.

EOP 2203.003 Rev. 10 , LOCA, Section 3, Step 6 Lesson Plan A2LP-RO-ELOCA Rev. 6 OBJ 10: Given a LOCA event and a set of plant conditions, determine if Natural Circulation has been established in at least one loop.

A2LP-RO-ELOCA Rev. 6 OBJ 11: Given a LOCA event and a set of plant conditions, describe the conditions required to be met if Natural Circulation conditions can not be confirmed.

Form ES-401-5 Written Exam Question Worksheet 3

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Historical Comments:

Used on the 2005 NRC Exam Form ES-401-5 Written Exam Question Worksheet 4

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1613 Rev: 0 Rev Date: 3/18/2009 1:02:49 QID #: 4 Author: Coble Lic Level: R Difficulty: 3 Taxonomy: H Source: IH bank OPS2-9730 Modified Search 000015K210 10CFR55: 41.7 / 45.7 Safety Function 4 System

Title:

017 Reactor Coolant Pump (RCP) Malfunction System Number 015 K/A AK2.10 Tier: 1 Group: 1 RO Imp: 2.8 SRO Imp: 2.8 L. Plan: A2LP-RO-RCP OBJ 8

Description:

Knowledge of the interrelations between the Reactor Coolant Pump Malfunctions and the following: - RCP indicators and controls Question:

The plant is at 100% operation with the following data being observed on "A" Reactor Coolant QID use History Pump (RCP).

  • Middle Seal Pressure - 2200 psia RO SRO
  • Upper Seal Pressure - 2160 psia
  • Vapor Seal pressure - 60 psia 2003 Based on these conditions, which seal (s) have failed? 2005 2006 A. Lower seal only.

2008 B. Lower and Middle seals. 2009 C. Lower, Middle and Upper seals. Audit Exam History D. Lower and Upper seals. 2009 Answer:

B. Lower and Middle seals.

Notes:

A is incorrect because 2 seals have failed - lower and middle.

C is incorrect because only 2 seals have failed not three.

D is incorrect because the upper seal has not failed.

References:

OP 2203.025 Rev. 12 RCP Emergencies, Step 5, Attachment B and Attachment D.

Lesson Plan A2LP-RO-RCP Rev. 1 Objective 8: Evaluate a given set of plant conditions and appropriate reference material, determine what actions should be taken for any RCP emergency.

Historical Comments:

Has not been used on an NRC Exam Form ES-401-5 Written Exam Question Worksheet 5

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1614 Rev: 0 Rev Date: 3/18/2009 1:53:04 QID #: 5 Author: Coble Lic Level: R Difficulty: 2 Taxonomy: F Source: New Search 000022K305 10CFR55: 41.5 / 41.10 / 45.6 / 45 Safety Function 2 System

Title:

Loss of Reactor Coolant Makeup System Number 022 K/A AK3.05 Tier: 1 Group: 1 RO Imp: 3.2 SRO Imp: 3.4 L. Plan: A2LP-RO-EAOP OBJ 26

Description:

Knowledge of the reasons for the following responses as they apply to the Loss of Reactor Coolant Makeup: - Need to avoid plant transients Question:

Given the following: QID use History

  • The plant is at 100% full power.
  • The Loss of Charging AOP 2203.036 has been entered due to gas binding of the Suction Path. RO SRO During the time it takes to vent and restore the Charging system to service, why does reactor power, 2003 temperature and pressure need to be maintained as stable as possible.

2005 A. To prevent hydrogen from coming out of solution and adding to the gas binding problem. 2006 B. To allow Letdown to restore Pressurizer level within the 100% power operating limits. 2008 2009 C. To minimize the contraction of RCS inventory during any potential RCS cooldown.

Audit Exam History D. To prevent the degradation of RCP seals due to a loss of charging seal injection flow.

2009 Answer:

C. To minimize the contraction of RCS inventory during any potential RCS cooldown.

Notes:

A is incorrect because the suction source for the charging pumps is the VCT which is not affected by changes in RCS pressure and temperature.

B is incorrect because Letdown will be isolated along with securing of Charging pumps in this condition.

D is incorrect because seal injection for RCPs is not aligned to the seals at full power.

C is correct because any transient will lower power causing the RCS to potentially shrink and empty the Pressurizer causing a loss of PZR heaters and spray causing a loss of Pressure Control

References:

OP 2203.036 Rev. 8, Loss of Charging AOP, Steps 3, 8.G and 18.

Lesson Plan A2LP-RO-EAOP Rev. 12, Objective 26: Discuss the Mitigation strategy, Entry Conditions, applicable industry events, Instructions and Exit Conditions (as per AOP and Tech Guide) of OP 2203.036, Loss Of Charging.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 6

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1615 Rev: 0 Rev Date: 10/5/2004 QID #: 6 Author: Coble Lic Level: R Difficulty: 3 Taxonomy: H Source: NRC Exam Bank 0455 Search 0000262244 10CFR55: 41.10 / 43.5 / 45.12 Safety Function 8 System

Title:

Loss of Component Cooling Water (CCW) System Number 026 K/A 2.2.44 Tier: 1 Group: 1 RO Imp: 4.2 SRO Imp: 4.4 L. Plan: A2LP-RO-EAOP OBJ 29

Description:

Equipment Control - Ability to interpret control room indications to verify the status and operation of a system, and understand how operator actions and directives affect plant and system conditions.

Question:

While at 100% power, CCW is isolated to the RCPs. QID use History The decision to quickly restore CCW to containment is based on a RCP controlled bleedoff temperature indication of less than ______ °F. If above this limit, then CCW should be restored slowly to cooldown RO SRO the RCP seals at less than ______ °F per hour.

2003 A. 100; 180 2005 2006 B. 100; 100 2008 C. 180; 180 2009 D. 180; 100 Audit Exam History 2009 Answer:

D. 180; 100 Notes:

Maintaining a cooldown rate of less than 100°F per hour if greater than 180°F seal temperature will prevent thermal shocking the RCP seals and prevents a potential LOCA condition.

Distracters A and B have incorrect bleedoff temperature limits.

Distracters A and C has incorrect cooldown limits.

References:

Standard Attachment 21 of OP 2202.010 Rev. 11 Lesson Plan A2LP-RO-EAOP Rev. 12 OBJ. 29, Discuss the Mitigation strategy, Entry Conditions, Instructions and Exit Conditions (as per AOP and Tech Guide) of OP 2203.039, Inadvertent CIAS.

Historical Comments:

Used on the 2005 NRC Exam Form ES-401-5 Written Exam Question Worksheet 7

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1616 Rev: 0 Rev Date: 3/19/2009 1:05:55 QID #: 7 Author: Coble Lic Level: R Difficulty: 2 Taxonomy: F Source: IH Bank 02699 OPSCOMMON Search 000027K103 10CFR55: 41.8 / 41.10 / 45.3 Safety Function 3 System

Title:

Pressurizer Pressure Control (PZR PCS) Malfun System Number 027 K/A AK1.03 Tier: 1 Group: 1 RO Imp: 2.6 SRO Imp: 2.9 L. Plan: ASLP-RO-TM003 OBJ 11

Description:

Knowledge of the operational implications of the following concepts as they apply to Pressurizer Pressure Control Malfunctions: - Latent heat of vaporization/condensation Question:

The plant is shut down with the following pressurizer conditions: QID use History

  • Pressurizer liquid temperature: 587°F.
  • Pressurizer vapor temperature: 587°F RO SRO
  • Pressurizer pressure: 1,400 psia
  • The in-service Pressurizer spray valve fails open. 2003
  • When the spray valve is subsequently closed, Pressurizer Pressure is 1200 psia 2005 At this point the pressurizer bulk liquid temperature will have 2006 A. risen due to evaporation of liquid. 2008 2009 B. risen due to condensation of vapor.

Audit Exam History C. lowered due to evaporation of liquid.

2009 D. lowered due to condensation of vapor.

Answer:

C. lowered due to evaporation of liquid.

Notes:

A and B are incorrect because the liquid temperature is in a P-Sat/T-Sat condition and will lower as pressure is reduced.

D is incorrect because condensation will only occur if pressure is raised.

References:

PWR GFES Thermodynamics Chapter 3 Rev. 2 Steam.

Lesson Plan ASLP-RO-TM003 Rev. 2, Steam, Objectives 8 and 11: Apply saturated and superheated steam tables in solving liquid-vapor problems. Define the following terms:

a. Latent heat of vaporization.

Historical Comments:

This question has not been used on a NRC exam.

Form ES-401-5 Written Exam Question Worksheet 8

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1617 Rev: 0 Rev Date: 3/19/2009 1:33:42 QID #: 8 Author: Coble Lic Level: R Difficulty: 4 Taxonomy: H Source: New Search 0000292236 10CFR55: 41.10 / 43.2 / 45.13 Safety Function 1 System

Title:

Anticipated Transient Without Scram (ATWS) System Number 029 K/A 2.2.36 Tier: 1 Group: 1 RO Imp: 3.1 SRO Imp: 4.2 L. Plan: A2LP-RO-DSS OBJ 2

Description:

Equipment Control - Ability to analyze the effect of maintenance activities, such as degraded power sources, on the status of limiting conditions for operations.

Question:

Given the following: QID use History

  • A plant startup is in progress and currently at 3% power and steady.
  • Electrical Supply bus 2Y3 feeder breaker fails open and the 2Y3 bus is de-energized. RO SRO
  • After troubleshooting, maintenance says it will take 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to restore bus 2Y3.

2003 How does this loss of power affect the limiting conditions for operations of the Diverse Scram System (DSS)? 2005 2006 A. These conditions will not affect the limiting conditions for operations for DSS because 2Y3 does not supply power to the DSS. 2008 2009 B. These conditions will not affect the limiting conditions for operations for DSS because the system is not required in this mode. Audit Exam History C. The DSS is required to be operable in this mode so plant power should be reduced to 2009 Mode 3 within the next 60 minutes.

D. The DSS is required to be operable in this mode so plant power should be reduced to Mode 2 within the next 60 minutes.

Answer:

B. These conditions will not affect the limiting conditions for operations for DSS because the system is not required in this mode.

Notes:

A is incorrect because 2Y3 does supply power to the DSS.

B is correct because DSS is only required to be operable in MODE 1 and these are MODE 2 conditions.

C and D are incorrect because the DSS is not required to be operable at this time so no action is required.

References:

STM 2-63-1 Rev. 1, DSS, Section 2.0 and 3.0 Lesson plan A2LP-RO-DSS Rev.6, Objectives 2 and 11: Describe the commitment made by ANO to the NRC concerning DSS. List the power supplies to the DSS logic cabinet 2C409 and the DSS contactor panels 2C407/408.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 9

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1618 Rev: 0 Rev Date: 6/2/1998 QID #: 9 Author: Hatman Lic Level: R Difficulty: 2 Taxonomy: F Source: NRC Exam Bank 0139 Search 000038K302 10CFR55: 41.5 / 41.10 / 45.6 / 45 Safety Function 3 System

Title:

Steam Generator Tube Rupture (SGTR) System Number 038 K/A EK3.02 Tier: 1 Group: 1 RO Imp: 4.4 SRO Imp: 4.5 L. Plan: A2LP-RO-ESGTR OBJ 4

Description:

Knowledge of the reasons for the following responses as they apply to the SGTR: - Prevention of secondary PORV cycling Question:

Which one of the following states the basis for lowering RCS T-hot less than 535°F prior to isolating QID use History the Steam Generator with a tube rupture?

A. Prevents lifting Steam Generator (SG) safety valves on the isolated SG. RO SRO B. Corresponds to a secondary side pressure of 1078 psig, the SG safety valves lift setpoint. 2003 C. Minimize primary inventory loss by stabilizing at a high SG pressure. 2005 2006 D. Minimize any dilution of the RCS when primary pressure is decreased to below the isolated SG pressure. 2008 2009 Audit Exam History 2009 Answer:

A. Prevents lifting Steam Generator (SG) safety valves on the isolated SG.

Notes:

B is incorrect because 535°F corresponds to a ~ 925 psia.

C is incorrect because this is not the basis for the 535°F but is a goal of the EOP.

D is incorrect because the goal is to minimize the leakage from the RCS to the secondary not from the secondary to the primary.

References:

OP 2202.004 SGTR EOP Rev. 9 Step 11.

TG 2202.004 SGTR Tech Guide Rev. 9 Step 11 Lesson Plan A2LP-RO-ESGTR Rev. 5 Objective 4: State the purpose of cooling down the Reactor Coolant System (RCS) to less than 535oF hot leg temperature Historical Comments:

Used on the 1998 NRC exam Form ES-401-5 Written Exam Question Worksheet 10

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1619 Rev: 0 Rev Date: 1/10/2002 QID #: 10 Author: Coble Lic Level: R Difficulty: 3 Taxonomy: F Source: NRC Exam Bank 0334 Search 0000542406 10CFR55: 41.10 / 43.5 / 45.13 Safety Function 4 System

Title:

Loss of Main Feedwater (MFW) System Number 054 K/A 2.4.6 Tier: 1 Group: 1 RO Imp: 3.7 SRO Imp: 4.7 L. Plan: A2LP-RO-ELOSF OBJ 5

Description:

Emergency Procedures/Plan - Knowledge of EOP mitigation strategies.

Question:

Given the following plant conditions: QID use History

  • Plant was operating at 100% Power.
  • AFW Pump 2P75 is OOS for Pump bearing replacement. RO SRO
  • Both Main Feedwater Pumps tripped on low suction pressure.
  • EFW Pump 2P7B fails to start. 2003
  • CRS has completed SPTAs and diagnosed entry into 2202.006, Loss of Feedwater. 2005
  • All other components operate as designed. 2006 Given these conditions, the crew should: 2008 2009 A. Secure all running RCPs to minimize the amount of heat input into the RCS.

Audit Exam History B. Maintain two (2) RCPs running with one in each loop to balance SG heat removal.

2009 C. Cooldown and depressurize the RCS to maximize margin to saturation.

D. Maximize steam generator blowdown to increase the heat removal rate from the RCS.

Answer:

A. Secure all running RCPs to minimize the amount of heat input into the RCS.

Notes:

With no feedwater available, the SG inventory would be rapidly depleted with the 4 MW of heat input to the RCS per RCP. The ORP for Loss of Feedwater directs securing of all RCPs thus preventing a more rapid loss of SG inventory due to this heat input.

B is incorrect because two RCPs are left running.

C is incorrect because this would deplete Steam Generator inventory with no means to replace it.

D is incorrect because this would also deplete Steam Generator inventory with no means to replace it.

References:

OP 2202.006, Loss of Feedwater ORP, Step 5.A OP 2202.006, Loss of Feedwater ORP, Step 6 Lesson plan A2LP-RO-ELOSF, Objective 5: Analyze a set of plant conditions, during a loss of feedwater event, and determine if adequate RCS heat removal exists and the actions required to restore RCS heat removal if ii is inadequate Historical Comments:

Used on the 2002 NRC Exam Form ES-401-5 Written Exam Question Worksheet 11

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1620 Rev: 0 Rev Date: 3/20/2009 12:31:4 QID #: 11 Author: Coble Lic Level: R Difficulty: 2 Taxonomy: F Source: New Search 000055A105 10CFR55: 41.7 / 45.5 / 45.6 Safety Function 6 System

Title:

Loss of Offsite and Onsite Power (Station Black System Number 055 K/A EA1.05 Tier: 1 Group: 1 RO Imp: 3.3 SRO Imp: 3.6 L. Plan: A2LP-RO-ED125 OBJ 7

Description:

Ability to operate and/or monitor the following as they apply to a Station Blackout: - Battery, when approaching fully discharged Question:

Given the following: QID use History

  • The plant has been shutdown due to loss of offsite power (LOOP).
  • Station Blackout conditions exist and all attempts to restore AC power to the safety RO SRO buses have failed.
  • The Vital DC batteries are discharging at their normal rated capacity. 2003 If NO loads are removed from the batteries, the maximum expected duration of available DC power 2005 would be ______ hours before the batteries would be fully discharged. 2006 A. 2 2008 2009 B. 4 Audit Exam History C. 6 2009 D. 8 Answer:

D. 8 Notes:

The vital batteries (2D11 and 2D12) are each rated as follows:

2064 amp hours over an eight hour discharge.

This rating is designed to last for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> during a discharge to 105 VDC. The ratings are at a nominal cell temperature of 77°F.

References:

STM 2-32-5, 125 VDC Electrical Distribution, Rev. 15 Section 2.4 Lesson Plan A2LP-RO-ED125 Rev. 6 Objective 7: Describe the operation and ratings of the following: Batteries 2D11 and 2D12 Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 12

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1621 Rev: 0 Rev Date: 3/20/2009 12:50:0 QID #: 12 Author: Coble Lic Level: R Difficulty: 3 Taxonomy: H Source: New Search 000056K103 10CFR55: 41.8 / 41.10 / 45.3 Safety Function 6 System

Title:

Loss of Offsite Power System Number 056 K/A AK1.03 Tier: 1 Group: 1 RO Imp: 3.1 SRO Imp: 3.4 L. Plan: A2LP-RO-ELOOP OBJ 5

Description:

Knowledge of the operational implications of the following concepts as they apply to Loss of Offsite Power: - Definition of subcooling: use of steam tables to determine it Question:

Given the following plant conditions: QID use History

  • Reactor is in Mode 3 due to a loss of offsite power.
  • RCS pressure is 2000 psia and slowly rising. RO SRO
  • Tcold is 550°F and constant.
  • Thot is 588°F and slowly lowering. 2003
  • Average CET temperature is 597°F.
  • Steam Generator "A" & "B" levels are 26% NR and slowly rising. 2005 2006 Currently the amount of subcooling margin is ______ °F and natural circulation conditions ________

satisfied at this time. 2008 2009 A. 39; are NOT Audit Exam History B. 39; are 2009 C. 48; are NOT D. 48; are Answer:

B. 39; are Notes:

The subcooled margin must be determined from the steam tables and is 39°F if using CET temperatures (Hottest Temperature). During natural circulation CET subcooling should be used to determine if adequate subcooling exists. The CETs do not rely on loop flow (as do the RTDs) for detecting fluid conditions adjacent to the core and would therefore be the most accurate indication of core temperature. The subcooling margin would be 48°F if Thot is used instead of CET temp. All the other criteria for proper natural circulation are met. Thus B is correct and A, C and D are incorrect.

References:

OP2202.007, LOOP, Rev 9, Step 24 STM 2-73, Saturation Margin Monitor Rev. 3, Section 4.3 Lesson Plan A2LP-RO-ELOOP Rev. 7 Objective 5: Given a set of plant conditions determine if the conditions for Natural Circulation are being met during the Loss Of Offsite Power optimal recovery EOP.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 13

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1622 Rev: 0 Rev Date: 3/20/2009 3:03:52 QID #: 13 Author: Coble Lic Level: R Difficulty: 2 Taxonomy: H Source: New Search 000057A105 10CFR55: 41.7 / 45.5 / 45.6 Safety Function 6 System

Title:

Loss of Vital AC Electrical Instrument Bus System Number 057 K/A AA1.05 Tier: 1 Group: 1 RO Imp: 3.2 SRO Imp: 3.4 L. Plan: A2LP-RO-NI OBJ 4

Description:

Ability to operate and/or monitor the following as they apply to the Loss of Vital AC Instrument Bus: - Backup instrument indications Question:

Given the following plant conditions: QID use History

  • Plant is in Mode 2 performing a reactor startup.
  • CEA Regulating Group "P" is currently 65 inches withdrawn RO SRO
  • Reactor power is currently 1.0 E-8% power
  • 120 Vital AC Electrical Bus 2RS1 is inadvertently de-energized. 2003 Which ONE of the following sets of instruments should be used to monitor the status of the reactor? 2005 2006 A. Startup Channel Number 1 and Excore Log Safety Channel A.

2008 B. Startup Channel Number 2 and Excore Log Safety Channel A. 2009 C. Startup Channel Number 1 and Excore Log Safety Channel B. Audit Exam History D. Startup Channel Number 2 and Excore Log Safety Channel B. 2009 Answer:

D. Startup Channel Number 2 and Excore Log Safety Channel B.

Notes:

Channel A Log Safety Power indications and Startup Channel Number 1 indications are powered from 2RS1 so they would not have power but Channel B Log Safety Power indications and Startup Channel Number 2 indications are powered from Vital AC instrument bus 2RS2 and would provide the needed backup instrument indications.

This would make distracters A, B, and C incorrect.

References:

STM 2-67-1, Rev 8, Excore Nuclear Instrumentation, Section 2.3.1.

Lesson Plan A2LP-RO-NI, Rev 11, Excore Nuclear Instrumentation, Objectives 4 and 6:Describe the components, operation, and outputs of the start-up channels. Describe components, operations, and outputs of the Safety Channels.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 14

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1623 Rev: 0 Rev Date: 3/27/2009 10:42:1 QID #: 14 Author: Coble Lic Level: R Difficulty: 3 Taxonomy: H Source: New Search 000058A202 10CFR55: 41.7 / 41.10 / 43.5 / 45 Safety Function 6 System

Title:

Loss of DC Power System Number 058 K/A AA2.02 Tier: 1 Group: 1 RO Imp: 3.3 SRO Imp: 3.6 L. Plan: A2LP-RO-EAOP OBJ 27

Description:

Ability to determine and interpret the following as they apply to the Loss of DC Power: - 125V dc bus voltage, low/critical low, alarm Question:

Given the following: QID use History

  • The plant is at full power.
  • The CRS has entered Loss of 125 VDC AOP 2203.037 due to a loss of 2D01.
  • The Reactor has not tripped. 2003
  • The CRS has given direction to place ALL PPS points on the appropriate PPS channel (s) in bypass. 2005 2006 Which ONE of the following would be the appropriate PPS channel (s) to bypass?

2008 A. PPS Channel 1 AND PPS Channel 2. 2009 B. PPS Channel 1 OR PPS Channel 3. Audit Exam History C. PPS Channel 3 AND PPS Channel 4. 2009 D. PPS Channel 2 OR PPS Channel 4.

Answer:

B. PPS Channel 1 OR PPS Channel 3.

Notes:

Battery 2D01 supplies 125 VDC bus power to RPS channels 1 and 3 (Red 'A' Train). Interlocks in the PPS system only allow bypassing points on one RPS channel only to ensure the appropriate PPS trip logic is still valid. Distracter A is incorrect because it attempts to bypass more than one PPS channel and 2D01 does not supply power to Channel 2. Distracter C is incorrect because it attempts to bypass more than one PPS channel and 2D01 does not supply power to Channel 4. Distracter D is incorrect because 2D01 does not supply power to PPS Channel 2 or 4.

References:

AOP 2203.037, Loss of 125 VDC , Rev. 6 Section 2 Step 5.

Tech Guide 2203.037, Loss of 125 VDC , Rev. 6 Section 2 Step 5.

Annunciator Corrective Action (ACA) 2203.012A Alarm 2K01 A-10.

Lesson Plan A2LP-RO-EAOP Rev. 12, Objective 27: Discuss the Mitigation strategy, Entry Conditions, applicable industry events, Instructions and Exit Conditions (as per AOP and Tech Guide) of OP 2203.037, Loss Of 125VDC.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 15

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1624 Rev: 0 Rev Date: 3/27/2009 11:23:4 QID #: 15 Author: Coble Lic Level: R Difficulty: 3 Taxonomy: H Source: New Search 000062A103 10CFR55: 41.7 / 45.5 / 45.6 Safety Function 4 System

Title:

Loss of Nuclear Service Water System Number 062 K/A AA1.03 Tier: 1 Group: 1 RO Imp: 3.6 SRO Imp: 3.6 L. Plan: A2LP-RO-SWACW OBJ 11

Description:

Ability to operate and/or monitor the following as they apply to the Loss of Nuclear Service Water (SWS): - SWS as a backup to the CCWS Question:

Given the following plant conditions: QID use History

  • The plant is 10 minutes post trip from full power operation.
  • RCS pressure is 1800 psia and lowering. RO SRO
  • Both SG Pressures just went below 750 psia.
  • Containment Pressure is 14.7 psia and steady. 2003
  • All 4 RCPs are running.

2005 Which ONE of the following actions will restore the heat sink for the RCP Heat Exchangers? 2006 A. Override and Restore CCW to RCPs. 2008 2009 B. Override and Restore SW to ACW.

Audit Exam History C. Override and Restore SW to CCW.

2009 D. Override and Restore SW Returns to the Lake.

Answer:

C. Override and Restore SW to CCW.

Notes:

Service Water (SW) provides the heat sink for the Component Cooling Water system which provides cooling for the RCPs. On a MSIS which will be received by the low Steam Generator (SG) pressures, SW will be isolated to the CCW Heat Exchanger. EOPs for ESD will direct restoration of SW to the CCW system to ensure RCP cooling during the event.

Distracter A is incorrect because CCW has not been isolated to the RCPs because there is no CIAS.

Distracter B would be an action directed by the EOP but only to restore cooling to Turbine Cooling HXs thus is incorrect.

Distracter D is incorrect because SW returns to the Lake or Emergency Cooling Pond will allow the RCP system to be cooled as long as the SW supply to the CCW HX is restored.

References:

EOP 2202.005, Excess Steam Demand (ESD), Rev. 9 Step 8 H.

Tech Guide 2202.005 Rev. 9 Step 8.

STM 2-42, Service Water and Auxiliary Cooling Water Systems, Rev. 28, Section 3.5.12. and Drawing of the SW system.

Lesson Plan A2LP-RO-SWACW Rev. 14 Objective 11: Given a set of plant conditions, describe the response of the Service Water/Auxiliary Cooling Water systems to ANY ESFAS actuation.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 16

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1625 Rev: 0 Rev Date: 3/27/2009 4:25:04 QID #: 16 Author: Coble Lic Level: R Difficulty: 3 Taxonomy: H Source: New Search 000077K206 10CFR55: 41.4 / 41.5 / 41.7 / 41. Safety Function 6 System

Title:

Generator Voltage and Electric Grid Disturbanc System Number 077 K/A AK2.06 Tier: 1 Group: 1 RO Imp: 3.9 SRO Imp: 4.0 L. Plan: A2LP-RO-EAOP OBJ 18

Description:

Knowledge of the interrelations between Generator Voltage and Electric Grid Disturbances and the following: - Reactor power Question:

Given the following: QID use History

  • The plant is at full power at 250 EFPD and Arkansas is under a tornado watch.
  • Unit 1 is shutdown for a refueling outage.
  • The system dispatcher calls the control room to let them know that the Pleasant Hill 2003 500 KV transmission line has been removed from service due to tornado damage.
  • The Grid has become unstable and 500 KV Voltage has risen to 525 KV. 2005
  • The system dispatcher orders the control room to reduce generator load to 2006 900 MW immediately.
  • The CBOT lowers Generator load to 900 MW using the turbine load pot. 2008
  • No other operator action has been taken. 2009 When condition stabilizes, Reactor Power will be ___________ than before the grid disturbance and Audit Exam History RCS Tave will be __________ than before the grid disturbance.

2009 A. lower; higher B. lower; lower C. higher; lower D. higher, higher Answer:

A. lower; higher Notes:

Based on the reduction of load on the turbine and loss of steam flow, RCS Tcold should rise and at 250 EFPD, the negative Moderator temperature coefficient should cause Reactor Power to lower. This would make A the correct answer and the others incorrect.

References:

NOP 2107.001, Electrical System Operation, Rev. 70, Section 17.0.

AOP 2203.024, Loss of Turbine Load, Rev. 7 Step 2.0 Tech Guide 2203.024, Rev.7, Step 2.0.

Lesson Plan A2LP-RO-EAOP Rev. 12, Objective 18: Discuss the Mitigation strategy, Entry Conditions, applicable industry events, Instructions and Exit Conditions (as per AOP and Tech Guide) of OP 2203.024, Loss Of Turbine Load.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 17

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1626 Rev: 0 Rev Date: 10/4/2004 QID #: 17 Author: Coble Lic Level: R Difficulty: 3 Taxonomy: F Source: NRC Exam Bank 0451 Search 00CE02K201 10CFR55: 41.7 / 45.7 Safety Function 1 System

Title:

Reactor Trip Recovery System Number E02 K/A EK2.1 Tier: 1 Group: 1 RO Imp: 3.3 SRO Imp: 3.7 L. Plan: A2LP-RO-CVENT OBJ 18

Description:

Knowledge of the interrelations between the (Reactor Trip Recovery) and the following: -

Components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features Question:

Given the following: QID use History

  • The plant has tripped from 100% Power
  • RCS Pressure is 1700 psia and dropping RO SRO
  • Containment pressure is 19.3 psia and rising. 2003 What equipment status would the Control Room Operators expect to see when checking Containment 2005 Cooling (CC) Fan operations? 2006 A. Chilled Water isolated by CCAS signal, 3 CC fans running, Service Water 2008 aligned, and bypass dampers Open. 2009 B. Chilled Water isolated by CIAS signal, all CC fans running, Service Water Audit Exam History aligned, and bypass dampers Open .

2009 C. Chilled Water aligned for cooling, 3 CC fans running, Service Water isolated, and bypass dampers Closed, D. Chilled Water aligned for cooling, all CC fans running, Service Water aligned, bypass dampers Closed.

Answer:

B. Chilled Water isolated by CIAS signal, all CC fans running, Service Water aligned, and bypass dampers Open .

Notes:

Distracter A is incorrect because Containment Chill Water isolations are actuated closed by CIAS and the bypass dampers would be Open.

Distracter C is incorrect because Chill Water isolation would have been closed by the CIAS.

Distracter D is incorrect because the bypass dampers should be Open.

References:

EOP 2202.001, Standard Post trip Actions, Rev. 9, Contingency Action 9.A.2.

STM 2-09, Containment Cooling and Purge Systems, Rev. 16, Section 10.2.1 Lesson Plan A2LP-RO-CVENT Rev. 4, Objective 18: Describe the emergency operation of the Containment Building Ventilation System.

Historical Comments:

Used on the 2005 NRC Exam Form ES-401-5 Written Exam Question Worksheet 18

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1627 Rev: 0 Rev Date: 3/27/2009 5:20:13 QID #: 18 Author: Coble Lic Level: R Difficulty: 4 Taxonomy: H Source: New Search 00CE05A202 10CFR55: 41.7 / 41.10 / 43.5 / 45 Safety Function 4 System

Title:

Excess Steam Demand System Number E05 K/A EA2.2 Tier: 1 Group: 1 RO Imp: 3.4 SRO Imp: 4.2 L. Plan: A2LP-RO-EESD OBJ 5

Description:

Ability to determine and interpret the following as they apply to the (Excess Steam Demand): -

Adherence to appropriate procedures and operation within the limitations in the facility's license and amendments Question:

Consider the following for an ESD event in progress: QID use History

  • 'A' SG pressure is 800 psia and slowly rising RO SRO
  • 'B' SG pressure is 20 psia and stable
  • RCS pressure is 1500 psia and slowly rising 2003
  • Pressurizer level is 35% and slowly rising
  • Containment temperature is 233 °F and lowering 2005
  • Average CET temperature is 480 °F and rising 2006
  • SG 'A' level is 25% Narrow Range and steady.
  • SG 'B' level is 30 inches Wide Range and lowering. 2008 2009 Concerning HPSI termination, which of the following statements is TRUE and what action needs to be taken? Audit Exam History A. HPSI termination criteria satisfied; raise steaming rate from 'A' SG. 2009 B. HPSI termination criteria satisfied; lower steaming rate from 'A' SG.

C. HPSI termination criteria NOT satisfied; raise steaming rate from 'A' SG.

D. HPSI termination criteria NOT satisfied; lower steaming rate from 'A' SG.

Answer:

C. HPSI termination criteria NOT satisfied; raise steaming rate from 'A' SG.

Notes:

Distracters A and B are incorrect because HPSI termination is not satisfied because there is a harsh containment environment with temperature above 200°F, thus PZR level has to be above 50% to satisfy HPSI termination criteria. Distracter D is incorrect because RSC temperature and pressure are rising which means post cooldown conditions are now present and the operator needs to raise the steaming rate on the intact steam generator to prevent pressurized thermal shock of the RCS.

References:

EOP 2202.005, Excess Steam Demand, Rev. 9, Note prior to Step 1, Steps 19 and 20.

Lesson Plan A2LP-RO-EESD, Excess Steam Demand, Rev. 5, Objective 4: Given a set of plant conditions during an ESD, determine the actions necessary to maintain post-cooldown RCS temperature and pressure and Objective 5: Given a set of plant conditions during an ESD, determine if HPSI termination criteria is satisfied.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 19

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1628 Rev: 1 Rev Date: 3/30/2009 12:58:3 QID #: 19 Author: Hatman Lic Level: R Difficulty: 3 Taxonomy: H Source: NRC Exam Bank 0163 Search 000001A205 10CFR55: 41.7 / 41.10 / 43.5 / 45 Safety Function 1 System

Title:

Continuous Rod Withdrawal System Number 001 K/A AA2.05 Tier: 1 Group: 2 RO Imp: 4.4 SRO Imp: 4.6 L. Plan: ASLP-RO-RXT11 OBJ 3

Description:

Ability to determine and interpret the following as they apply to the Continuous Rod Withdrawal: - Uncontrolled rod withdrawal, from available indications Question:

The plant was at steady state and now the following plant conditions exist: QID use History

  • No operator actions have been taken.
  • Power level is 80% and rising. RO SRO
  • Tave is rising.
  • Containment pressure and temperature are normal. 2003
  • Pressurizer pressure and level are rising.
  • All systems are in their normal mode. 2005 2006 Which of the following can cause these conditions?

2008 A. Continuous rod withdrawal. 2009 B. Partial loss of feedwater heating. Audit Exam History C. Steam leak outside containment. 2009 D. Slow closure of an MSIV Answer:

A. Continuous rod withdrawal.

Notes:

B is incorrect because a loss of Feedwater heating will cause a power rise and an RCS temperature drop.

C is incorrect because a steam leak will cause a power rise and an RCS Temperature drop.

D is incorrect because an MSIV closure will cause an RCS temperature rise and a power drop.

A is the only option that would cause both a power rise and a temperature rise as given in the plant conditions..

References:

GP PWR Reactor Theory Chapter 5 Control Rods Rev. 2, Control Rod Effects on Neutron Flux.

Lesson Plan ASLP-RO-RXT11 Rev. 2 Objective 3: Predict the direction of change in reactor power for a change in control rod position.

Historical Comments:

Used on the 2000 NRC Exam Form ES-401-5 Written Exam Question Worksheet 20

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1629 Rev: 0 Rev Date: 3/30/2009 2:04:11 QID #: 20 Author: Coble Lic Level: R Difficulty: 2 Taxonomy: F Source: New Search 000003K205 10CFR55: 41.7 / 45.7 Safety Function 1 System

Title:

Dropped Control Rod System Number 003 K/A AK2.05 Tier: 1 Group: 2 RO Imp: 2.5 SRO Imp: 2.8 L. Plan: A2LP-RO-CEDM OBJ 8

Description:

Knowledge of the interrelations between the Dropped Control Rod and the following: - Control rod drive power supplies and logic circuits Question:

Given the following at full power: QID use History

  • Both CEA MG Sets are in service with TCB 9 closed.

RO SRO Which ONE of the following combinations of actuated PPS trip paths relays would cause the CEAs to drop into the core? 2003 A. Trip Path K1 and Trip Path K2 2005 2006 B. Trip Path K2 and Trip Path K3 2008 C. Trip Path K3 and Trip Path K4 2009 D. Trip Path K4 and Trip Path K5 Audit Exam History 2009 Answer:

B. Trip Path K2 and Trip Path K3 Notes:

Any combination of K1 and K3 or K4 (OR) K2 and K3 or K4 will cause CEAs to loose power and CEAs to drop into the core. (Refer to the STM Drawing). Thus B is the correct answer and the others are incorrect.

References:

STM 2-02, CEDM Control System, Rev. 18, Power supply figure to CEDM Bus 2C70 and 2C71.

Lesson Plan A2LP-RO-CEDM Rev. 11 Objective 8. From memory draw a one-line diagram of the CEDMCS electrical distribution from the MG Sets to the cabinets 2C-70 and 2C71.

Historical Comments:

Has not been used on any previous NRC Exams.

Form ES-401-5 Written Exam Question Worksheet 21

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1630 Rev: 0 Rev Date: 10/6/2004 QID #: 21 Author: Blanchard Lic Level: R Difficulty: 2 Taxonomy: F Source: NRC Exam Bank 460 Search 0000322128 10CFR55: 41.7 Safety Function 7 System

Title:

Loss of Source Range Nuclear Instrumentation System Number 032 K/A 2.1.28 Tier: 1 Group: 2 RO Imp: 4.1 SRO Imp: 4.1 L. Plan: A2LP-RO-NI OBJ 5

Description:

Conduct of Operations - Knowledge of the purpose and function of major system components and controls.

Question:

Given the following conditions: QID use History

  • The plant is in Mode 6 with core alterations in progress.
  • A complete Station Blackout occurs due to severe weather. RO SRO
  • Directions are given to secure core alterations.

2003 Which of the following indications would be an available and accurate monitor to detect changes in core reactivity if core alterations are not secured properly? 2005 2006 A. All 4 log power meters on 2C03.

2008 B. Refueling Bridge portable area radiation monitor. 2009 C. Containment low range radiation monitors. Audit Exam History D. Boron Dilution Monitors 1 and 2 on 2C09. 2009 Answer:

D. Boron Dilution Monitors 1 and 2 on 2C09.

Notes:

The student should have knowledge of the power supplies to the source range nuclear instrumentation which feed the input for the boron dilution monitors which monitor source range counts during refueling. This is their major function. Distracter A would be available but not accurate to detect small changes in core reactivity due to the log scale. Distracter B and C would not be available due to not being powered from an Vital AC inverter supplied from DC batteries. Answer D is powered from Vital 120 VAC which is powered from the station batteries.

References:

STM 2-67-1, Excore Nuclear Instrumentation, Section 2.3.

A2LP-RO-NI, Nuclear Instrumentation, OBJ 5, Describe the operation and indications of the Boron Dilution Monitors.

Historical Comments:

Question was used on the 2005 NRC Exam.

Form ES-401-5 Written Exam Question Worksheet 22

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1631 Rev: 0 Rev Date: 4/1/2009 8:46:27 QID #: 22 Author: Coble Lic Level: R Difficulty: 2 Taxonomy: H Source: New Search 000036A103 10CFR55: 41.7 / 45.5 / 45.6 Safety Function 8 System

Title:

Fuel Handling Incidents System Number 036 K/A AA1.03 Tier: 1 Group: 2 RO Imp: 3.5 SRO Imp: 3.9 L. Plan: A2LP-RO-FH OBJ 4

Description:

Ability to operate and/or monitor the following as they apply to the Fuel Handling Incidents: -

Reactor building containment evacuation alarm enable switch Question:

The following plant conditions exist: QID use History

  • Mode 6 with core on load in progress.
  • The control room receives a report that as a spent fuel assembly was being RO SRO inserted into the core, the refueling machine started moving on its own.
  • A lot of bubbles are rising around the fuel assemblies in the Core. 2003
  • Containment Low Range Rad Monitors on the 404 elevation are indicating a large rise in radiation. 2005 2006 Which of the following actions should be performed for the given conditions?

2008 A. Sound the Containment Evacuation alarm on 2C22 by taking the 2009 Evacuation Warning Handswitch, 2HS-EVAC, to CNTMT AUX.

Audit Exam History B. Sound the Containment Evacuation alarm on 2C14 by taking the Evacuation Warning Handswitch, 2HS-EVAC, to CNTMT AUX. 2009 C. Sound the Containment Evacuation alarm on 2C22 by taking the Evacuation Warning Handswitch, 2HS-EVAC, to CNTMT.

D. Sound the Containment Evacuation alarm on 2C14 by taking the Evacuation Warning Handswitch, 2HS-EVAC, to CNTMT.

Answer:

C. Sound the Containment Evacuation alarm on 2C22 by taking the Evacuation Warning Handswitch, 2HS-EVAC, to CNTMT.

Notes:

The Plant/Containment Evacuation alarm switch is located on panel 2C22 (which is next to the radiation monitoring panel 2C25) and has four positions: OFF, CNTMT, CNTMT AUX, and PLANT which will sound the alarms in the Containment, Containment Auxiliary Building, and the General Plant respectively. Distracters A and B are incorrect because they have the switch placed in CNTMT AUX. Distracters B and D are incorrect because the switch is not located on 2C14.

References:

NOP 2502.001, Refueling Shuffle, Rev. 37, Attachment M, Refueling Accident, Step 2.5.6.

NOP 2105.016, Radiation Monitoring and Evacuation System, Rev. 26, Attachment D Step 2.0.

Lesson Plan A2LP-RO-FH, Rev. 1, Objective 4: Given a fuel handling evolution or condition, determine the correct response.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 23

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1632 Rev: 0 Rev Date: 4/1/2009 9:50:24 QID #: 23 Author: Coble Lic Level: R Difficulty: 3 Taxonomy: H Source: New Search 000051A202 10CFR55: 41.7 / 41.10 / 43.5 / 45 Safety Function 4 System

Title:

Loss of Condenser Vacuum System Number 051 K/A AA2.02 Tier: 1 Group: 2 RO Imp: 3.9 SRO Imp: 4.1 L. Plan: A2LP-RO-EAOP OBJ 14

Description:

Ability to determine and interpret the following as they apply to the Loss of Condenser Vacuum: - Conditions requiring reactor and/or turbine trip Question:

The plant was at full power in the middle of August when the following occurred: QID use History

  • Circulating Water Pump 2P3A tripped and its associated discharge valve went closed. RO SRO
  • Current plant power is 93% and Condenser Pressure is 7.2 inches of HgA. 2003 Which ONE of the following actions should be taken? (Reference Provided) 2005 2006 A. Trip the Reactor and perform the Standard Post Trip Actions.

2008 B. Trip the Main Turbine and perform actions for Loss of Turbine Load. 2009 C. Verify all ADVs in AUTO and open the Upstream ADV isolation valves. Audit Exam History D. Verify Both Condenser Vacuum Pumps running and vacuum lowering. 2009 Answer:

A. Trip the Reactor and perform the Standard Post Trip Actions.

Notes:

The Available Atmospheric Dump Valve Capacity is only 22% during normal condition and can be made up to 44% if operator action is taken to open the upstream ADV isolation valves. 93% power is well above the available ADV capacity and vacuum has exceeded the 7 inches of Hg Absolute threshold for a reactor/plant trip. Distracter B is incorrect because tripping the turbine would only be a viable option if plant power were within ADV capacity. Distracter C is incorrect because aligning upstream ADVs would only be a viable option if plant power were within ADV capacity. Distracter D would be the goal to restore vacuum but vacuum has already exceeded the tripping requirement thus is incorrect.

AOP 2203.019, Loss of Condenser Vacuum, Rev. 8, Attachment 'A' Backpressure Limits should be provided as a reference for this question.

References:

AOP 2203.019, Loss of Condenser Vacuum, Rev. 8, Step 7.A Contingency Action.

AOP 2203.019, Loss of Condenser Vacuum, Rev. 8, Attachment 'A' Backpressure Limits.

Lesson Plan A2LP-RO-EAOP, Rev. 12, Objective 14: Discuss the Mitigation strategy, Entry Conditions, Instructions and Exit Conditions (as per AOP and Tech Guide) of OP 2203.019, Loss Of Condenser Vacuum.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 24

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1633 Rev: 0 Rev Date: 11/1/2004 QID #: 24 Author: Coble Lic Level: R Difficulty: 3 Taxonomy: F Source: NRC Exam Bank 0503 Search 0000602127 10CFR55: 41.7 Safety Function 9 System

Title:

Accidental Gaseous Radwaste Release System Number 060 K/A 2.1.27 Tier: 1 Group: 2 RO Imp: 3.9 SRO Imp: 4.0 L. Plan: A2LP-RO-RWST OBJ 4.c.8

Description:

Conduct of Operations - Knowledge of system purpose and/or function.

Question:

Given the following: QID use History

  • The plant is at full power
  • A gaseous radwaste release from Gas Decay Tank 2T-18A is in progress. RO SRO
  • An inadvertent electrical signal causes both Radwaste Exhaust Fans (2VEF8A/B) to stop.

2003 Which of the following actions should occur to prevent an accidental gaseous radwaste release without dilution air flow? 2005 2006 A. Release flow will be diverted back to the in service Gas Decay Tank 2T-18B or 2T-18C.

2008 B. Waste Gas Decay Tanks Discharge to Vent Plenum Valve 2CV-2428 will automatically close. 2009 C. The WCO will be sent to locally close Release Path Isolation Needle Valve 2GZ-15. Audit Exam History D. The control room will manually close Waste Gas Decay Tanks Discharge Isolation 2CV-2428. 2009 Answer:

B. Waste Gas Decay Tanks Discharge to Vent Plenum Valve 2CV-2428 will automatically close.

Notes:

2CV-2428 is the release path isolation and is interlocked to close if there are no exhaust ventilation fans operating to prevent an accidental buildup of gas in the Aux Building since the release path goes to the suction of these fans and now there will be no dilution flow. Distracter A is an available path but is not available because the Gas compressors are normally shutdown. Distracter C is an option but the path will already be isolated. Distracter D is an option but the path will already be isolated.

References:

STM 2-54, Gaseous Radwaste System, Section 2.8 Lesson Plan A2LP-RO-RWST, Rev. 6, Objective 4.c.8,: Describe the following Radwaste System Components and Instrumentation: Gaseous Rad Waste System: Waste Gas Discharge Flow path Isolation 2CV-2428.

Historical Comments:

Used on the 2005 NRC Exam.

Form ES-401-5 Written Exam Question Worksheet 25

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1634 Rev: 0 Rev Date: 4/1/2009 3:18:50 QID #: 25 Author: Coble Lic Level: R Difficulty: 2 Taxonomy: F Source: New Search 000074K305 10CFR55: 41.5 / 41.10 / 45.6 / 45 Safety Function 4 System

Title:

Inadequate Core Cooling System Number 074 K/A EK3.05 Tier: 1 Group: 2 RO Imp: 4.2 SRO Imp: 4.5 L. Plan: A2LP-RO-ELOCA OBJ 3

Description:

Knowledge of the reasons for the following responses as they apply to the Inadequate Core Cooling: - Activating the HPI system Question:

Given the following: QID use History

  • The plant was tripped from full power due to lowering RCS pressure.
  • Pressurizer level is 12% and lowering rapidly.
  • RCS pressure is 1575 psia and lowering rapidly. 2003
  • Containment pressure is 24.7 psia and rising rapidly.
  • Containment Low Range radiation monitors are rising. 2005 2006 Which of the following is the MAIN reason for activating the High Pressure Safety Injection (HPSI) pumps during these conditions? 2008 2009 A. To provide adequate core Shutdown Margin (SDM) during the RCS depressurization.

Audit Exam History B. To provide adequate RCS subcooling during and after initial RCS depressurization.

2009 C. To restore RCS pressure control by refilling the pressurizer during depressurization D. To restore RCS inventory control when RCS pressure goes below HPSI shut off head.

Answer:

D. To restore RCS inventory control when RCS pressure goes below HPSI shut off head.

Notes:

HPSI pumps will be actuated on the ensuing SIAS based on low RCS pressure. HPSI pumps will be needed to restore RCS inventory after the RCS pressure drops below ~1450 psia shutoff head of the pumps.. Distracter A is incorrect because all the CEAs inserted on the trip and reactivity control and shutdown margin are met.

Distracter B is incorrect because subcooling will be lost during the LOCA and cannot be regained without isolating the leak. Distracter C is incorrect because the pressurizer will refill and potentially allow RCS pressure control to be restored but the main reason for HPSI injection is to keep the core covered to provide for adequate cooling of the core during a large break LOCA.

References:

EOP 2202.003, Loss of Coolant Accident, Rev. 10 Step 5 EOP TG 2202.002, Loss of Coolant Accident, Rev. 10 Step 5 EOP 2202.003, Loss of Coolant Accident, Rev. 10, Page 49, Major Recovery Strategies for LOCA.

Lesson Plan A2LP-RO-ELOCA, Rev. 6 Objective 3: Discuss each of the 6 Major strategy steps used in the LOCA EOP.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 26

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1635 Rev: 0 Rev Date: 9/17/2001 QID #: 26 Author: Blanchard Lic Level: R Difficulty: 3 Taxonomy: H Source: NRC Exam Bank 314 Search 00CA11K201 10CFR55: 41.7 / 45.7 Safety Function 4 System

Title:

RCS Overcooling System Number A11 K/A EK2.1 Tier: 1 Group: 2 RO Imp: 3.2 SRO Imp: 3.4 L. Plan: A2LP-RO-ESPTA OBJ 11

Description:

Knowledge of the interrelations between the (RCS Overcooling) and the following: -

Components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features Question:

Given the following conditions: QID use History

  • Reactor tripped, SIAS, CCAS, CIAS, CSAS and MSIS have actuated.
  • RCS Pressure is 1475 psia and dropping. RO SRO
  • 'A' SG pressure is 900 psia and dropping slowly.
  • 'B' SG pressure is 200 psia and dropping rapidly. 2003
  • All non-vital electrical busses are deenergized.
  • All other systems are operating as designed. 2005 2006 Which of the following correctly describes how RCS temperature will be maintained post SG blowdown?

2008 A. Depressurize the RCS and allow HPSI injection flow to cool the RCS. 2009 B. Open the SDBCS Upstream ADV and throttle the Upstream ADV isolation on 'A' SG. Audit Exam History C. Open the SG blowdown valves on 'A' SG and maintain SG level with 'A' EFW pump. 2009 D. Bypass 'A' MSIV and open a SDBCS bypass valve to the condenser.

Answer:

B. Open the SDBCS Upstream ADV and throttle the Upstream ADV isolation on 'A' SG.

Notes:

Distracter A is incorrect due to HPSI filling the PZR and taking the RCS solid.

Distracter C is incorrect due to the required large volume of water usage to feed and bleed a SG to remove decay heat with this method and ADV available.

Distracter B is incorrect due to no circulating water available on LOOP.

References:

EOP 2202.001, SPTAs, Rev. 9 Contingency Action 8.E.1 EOP TG 2202.001, SPTAs, Rev. 9 Step 8 (page 21 of 44)

Lesson Plan A2LP-RO-ESPTA, Rev.8, Objective 11: Describe the major actions taken during the performance of SPTA and the basis for each.

Historical Comments:

Used on the 2002 NRC Exam Form ES-401-5 Written Exam Question Worksheet 27

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1636 Rev: 0 Rev Date: 4/1/2009 5:00:14 QID #: 27 Author: Coble Lic Level: R Difficulty: 4 Taxonomy: H Source: New Search 00CE09K101 10CFR55: 41.8 / 41.10 / 45.3 Safety Function 4 System

Title:

Functional Recovery System Number E09 K/A EK1.1 Tier: 1 Group: 2 RO Imp: 3.4 SRO Imp: 3.7 L. Plan: A2LP-RO-EFRP OBJ 3

Description:

Knowledge of the operational implications of the following concepts as they apply to the (Functional Recover): - Components, capacity, and function of emergency systems Question:

Given the following conditions: QID use History

  • Plant tripped due to a loss of offsite power.
  • Pressurizer pressure 1600 psia and stable. 2003
  • RCS Tcold is 525°F and stable
  • Both Steam Generator levels 85 inches wide range indication and dropping. 2005 2006 If Feedwater cannot be restored to the Steam Generators, the _____________ will be used to mitigate this event when ________ Steam Generator levels drop below _______ inches to allow HPSI injection 2008 flow to the RCS. 2009 A. ECCS Vents; both; 70 Audit Exam History B. PZR Vents; one; 70 2009 C. ECCS Vents; one; 60 D. PZR Vents; both; 60 Answer:

A. ECCS Vents; both; 70 Notes:

A determination must be made first as to which EOP procedure is applicable. With 2 EOP events in progress, the Functional Recovery Procedure (FRP) would apply. The Loss of Feed Water EOP requires Once Through Cooling if a single SG goes below 70 inches WR but the FRP requires both SG to go below 70 inches WR prior to using Once Through Cooling. The ECCS Vents must be used because their Capacity (3 inch pipe) is large enough to get RCS pressure below the shutoff head of the HPSI Pumps (1450 psia). The PZR Vents (1 inch line with a 1/4 inch orifice) will not lower pressure enough to allow HPSI flow. Distracter B is incorrect because it uses PZR vents and only requires one SG below 70 inches.

Distracter C is incorrect because it requires only one SG below the limit and the level limit should be 70 vice 60 inches. Distracter D is incorrect because it uses the PZR vents and the level limit is 60 vice 70 inches.

References:

EOP 2202.009, Functional Recovery, Rev. 9, HR-2 SG Heat Sink with SIAS, Step 45 EOP 2202.009, Functional Recovery, Rev. 9, HR-3 Once Through Cooling, Step 1. K & L.

EOP TG 2202.009, Functional Recovery, Rev. 9, for the above steps.

Lesson Plan A2LP-RO-EFRP, Rev. 3 Objective 3: Describe the use and sections of the FRP to include Floating Steps.

Form ES-401-5 Written Exam Question Worksheet 28

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 29

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1637 Rev: 0 Rev Date: 4/2/2009 9:51:08 QID #: 28 Author: Coble Lic Level: R Difficulty: 3 Taxonomy: H Source: New Search 003000K503 10CFR55: 41.5 / 45.7 Safety Function 4 System

Title:

Reactor Coolant Pump System (RCPS) System Number 003 K/A K5.03 Tier: 2 Group: 1 RO Imp: 3.1 SRO Imp: 3.5 L. Plan: A2LP-RO-MTS OBJ 11

Description:

Knowledge of the operational implications of the following concepts as they apply to the RCPS: -

Effects of RCP shutdown on T-ave., including the reason for the unreliability of T-ave. in the shutdown loop Question:

Given the following: QID use History

  • The plant was tripped from full power due a Main Turbine trip.
  • Just After the trip RCS Tcold is 546°F. RO SRO
  • Just after the trip RCS Thot is 548°F.
  • 15 minutes after the trip, a loss of offsite power occurs. 2003
  • All systems operate as designed.

2005 Based on these conditions, RCS Tave will __________ and the reason we use Core Exit 2006 Thermocouples (CETs) for calculation of Margin to Saturation (MTS) is

_____________________________________________________________________. 2008 2009 A. lower; CETs are always used since they are the most accurate indications of core temperature.

Audit Exam History B. lower; lower flow past the RCS Thot and Tcold RTDs could cause an error in MTS calculation.

2009 C. rise; CETs are always used since they are the most accurate indications of core temperature.

D. rise; lower flow past the RCS Thot and Tcold RTDs could cause an error in MTS calculation.

Answer:

D. rise; lower flow past the RCS Thot and Tcold RTDs could cause an error in MTS calculation.

Notes:

RCS Tcold will be maintained relatively constant after RCPs are secured due to the Steam Bypass system maintaining SG pressures at 1000 psia in automatic. RCS Thot will rise significantly due to establishing natural circulation flow therefore RCS Tave will rise. Normally the hottest Thot, Tcold, or CET temperature is compared to PZR pressure to determine MTS with RCPs running. With no RCPs running, lower flow past the loop RTDs will provide a less accurate MTS calculation. Distracters A and B are incorrect because Tave will rise. Distracters A and C are incorrect because we do not always use CETs.

References:

STM 2-33, Steam Dump and Bypass Control System, Rev. 12, Section 2.3.2.

STM 2-73, Saturation Margin Monitor, Rev. 3 Section 4.3.

NOP 2105.012, RCS Saturation Monitor Calculator Operation, Rev. 8, Step 5.2.

Lesson Plan A2LP-RO-MTS, Rev. 9, Objective 11: Describe the purpose of the limits and precautions associated with 2105.012, RCS Saturation Margin Calculator Operations.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 30

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1638 Rev: 0 Rev Date: 9/17/2001 QID #: 29 Author: Coble Lic Level: R Difficulty: 3 Taxonomy: H Source: NRC Exam Bank 0348 Search 004000K117 10CFR55: 41.2 to 41.9 / 45.7 to 4 Safety Function 1 System

Title:

Chemical and Volume Control System (CVCS) System Number 004 K/A K1.17 Tier: 2 Group: 1 RO Imp: 3.4 SRO Imp: 3.4 L. Plan: A2LP-RO-PZR OBJ 9/10

Description:

Knowledge of the physical connections and/or cause-effect relationships between the CVCS and the following systems: - PZR Question:

The plant status is as follows: QID use History

  • Reactor power is 72% and stable.
  • Tave = Tref at 570°F. RO SRO
  • Pressurizer Level indicates 49%.
  • Pressurizer Level Controller is in Remote Auto. 2003
  • Letdown Flow Controller is in Automatic.
  • All three Charging Pump hand switches are in Automatic. 2005
  • Charging Pump Selector switch is in the "B & C" position. 2006 The correct alignment regarding the status of Charging and Letdown for this condition would be: 2008 (Reference Provided) 2009 A. Three (3) Charging Pumps will be running with maximum letdown flow Audit Exam History B. Two (2) Charging Pumps will be running with maximum letdown flow 2009 C. Three (3) Charging Pumps will be running with minimum letdown flow D. Two (2) Charging Pumps will be running with minimum letdown flow Answer:

C. Three (3) Charging Pumps will be running with minimum letdown flow Notes:

Distracters B and D are wrong because the level deviation between the actual pressurizer level and the pressurizer level setpoint for the above stated conditions is ~ 6%. This would start both backup charging pumps along with the running lead Pump A for a total of 3 running charging pumps. A would be wrong because the level deviation would also make the letdown flow controller output go to its minimum automatic control level output to attempt to raise Pressurizer level.

This question will require 2102.004 Attachments C and E to be used as a reference.

References:

STM 2-3-1, Rev 13, PZR Pressure and Level Control, Sections 3.2.4, through 3.2.9 2103.005, Rev 41, Pressurizer Operations, Steps 6.8 and 6.9 2102.004, Rev 41, Power Operations, Attachments C and E Lesson Plan A2-LP-RO-PZR, Rev. 3 Objectives 9 and 10: Explain the following for the automatic operation of the Coolant Charging Pumps with a change in PZR level and Explain the following for the operation of the Letdown Flow Control Valve with PZR level changing.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 31

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Used on the 2002 NRC Exam Form ES-401-5 Written Exam Question Worksheet 32

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1639 Rev: 0 Rev Date: 4/2/2009 11:22:57 QID #: 30 Author: Coble Lic Level: R Difficulty: 3 Taxonomy: H Source: New Search 005000K603 10CFR55: 41.7 / 45.7 Safety Function 4 System

Title:

Residual Heat Removal System (RHRS) System Number 005 K/A K6.03 Tier: 2 Group: 1 RO Imp: 2.5 SRO Imp: 2.6 L. Plan: A2LP-RO-SDC OBJ 4

Description:

Knowledge of the effect of a loss or malfunction of the following will have on the RHRS: - RHR heat exchanger Question:

Given the following: QID use History

  • The plant has been Shutdown for a refueling outage.
  • The last 2 RCPs have been secured. 2003 If Instrument Air is lost to the SDC Temperature Control Valve 2CV-5093 and SDC Flow Control 2005 Valve 2CV-5091, which of the following would be the correct response of the SDC system. 2006 A. SDC flow would lower and RCS heat removal would rise. 2008 2009 B. SDC Flow would lower and RCS heat removal would lower.

Audit Exam History C. SDC flow would rise and RCS heat removal would rise.

2009 D. SDC flow would rise and RCS heat removal would lower.

Answer:

D. SDC flow would rise and RCS heat removal would lower.

Notes:

A loss of Instrument Air will cause the SDC flow control valve to fail open and the SDC temperature control valve (outlet of the SDC HX) to fail closed. This will raise the SDC flow bypassing the SDC HX which will reduce the amount of heat removal from the RCS. Distracters A and B are incorrect because SDC flow will rise.

Distracters A and C are incorrect because the RCS heat removal will lower.

References:

STM 2-14, SDC System, Rev. 8, Sections 2.5, 2.6 and Figure on page 48.

Lesson plan A2LP-RO-SDC, Rev. 11, Objective 4: Given a set of off-normal SDC system parameters for selected evolutions: Determine potential causes AND actions necessary to correct.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 33

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1640 Rev: 0 Rev Date: 10/12/2004 QID #: 31 Author: Coble Lic Level: R Difficulty: 3 Taxonomy: F Source: NRC Exam Bank 0475 Search 006000K103 10CFR55: 41.2 to 41.9 / 45.7 to 4 Safety Function 2 System

Title:

Emergency Core Cooling System (ECCS) System Number 006 K/A K1.03 Tier: 2 Group: 1 RO Imp: 4.2 SRO Imp: 4.3 L. Plan: A2LP-RO-ECCS OBJ 6

Description:

Knowledge of the physical connections and/or cause-effect relationships between the ECCS and the following systems: - RCS Question:

Given the following conditions: QID use History

  • An unisolable 500 gpm LOCA has occurred.
  • RCS pressure is 750 psia and lowering. RO SRO
  • RWT level is 5.8% on all indicators.
  • All components are actuated and operate as designed. 2003 Which of the following components is maintaining the RCS inventory safety function? 2005 2006 A. High Pressure Safety Injection Pumps through their open injection MOVs.

2008 B. Safety Injection Tanks through their associated outlet isolations. 2009 C. Low Pressure Safety Injection Pumps through their open injection MOVs. Audit Exam History D. Normal Charging Pumps through their associated RCS loop isolations. 2009 Answer:

A. High Pressure Safety Injection Pumps through their open injection MOVs.

Notes:

Distracter B is incorrect because RCS Pressure is above SIT pressure.

Distracter C is incorrect because LPSI pumps trip on RAS caused by Low RWT level <6%.

Distracter D is incorrect because Charging pump capacity is not enough to ensure RCS inventory in a large break LOCA.

References:

EOP 2202.003, LOCA EOP, Rev. 10, Safety Function Status Check Step 3, RCS Inventory Control.

STM 2-05, ECCS, Rev. 20, Section 1.1 and Figure on page 50 A2LP-RO-ECCS, Rev. 10, Objective 6: Describe the function, construction, and operation of ECCS system components including tanks, pumps, and valves; pump capacities and ratings; tank capacities; and associated area cooling systems.

Historical Comments:

Used on the 2005 NRC Exam Form ES-401-5 Written Exam Question Worksheet 34

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1641 Rev: 0 Rev Date: 4/2/2009 2:34:22 QID #: 32 Author: Jim Wright Lic Level: R Difficulty: 2 Taxonomy: F Source: NRC Exam Bank 1520 Modified Search 007000K401 10CFR55: 41.7 Safety Function 5 System

Title:

Pressurizer Relief Tank/Quench Tank System ( System Number 007 K/A K4.01 Tier: 2 Group: 1 RO Imp: 2.6 SRO Imp: 2.9 L. Plan: A2LP-RO-RCS OBJ 25

Description:

Knowledge of PRTS design feature(s) and/or interlock(s) which provide for the following: -

Quench tank cooling Question:

Given the following: QID use History

  • The plant is at 100% power with indications of a Pressurizer Safety Valve leaking.
  • Annunciator 2K10-F4, "QUENCH TANK TEMPERATURE HIGH " has actuated. RO SRO During the quench tank feed and bleed to cool the tank, the makeup water source to the quench tank 2003 will come from the ___________ and the Quench Tank will be drained to the _________________.

2005 A. Reactor Makeup Water Tank; Reactor Drain Tank 2006 B. Boric Acid Makeup Tank ; Containment Sump 2008 2009 C. Boric Acid Makeup Tank ; Reactor Drain Tank Audit Exam History D. Reactor Makeup Water Tank; Containment Sump 2009 Answer:

A. Reactor Makeup Water Tank; Reactor Drain Tank Notes:

Makeup water to the reactor drain tank can only be aligned from the reactor makeup water tank, no other source exists. The quench tank can be aligned to drain to the RDT through 2CV-4692. It cannot be aligned to drain to the Containment sump unless a tank relief opens or rupture disc ruptures.

References:

NOP 2103.007 Rev. 19 Section 7.1/7.2 STM 2-03, RCS Rev. 18 Section 2.3 Quench Tank A2LP-RO-RCS Rev. 20 Reactor Coolant System Objective 25 Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 35

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1642 Rev: 0 Rev Date: 4/2/2009 2:18:22 QID #: 33 Author: Coble Lic Level: R Difficulty: 3 Taxonomy: H Source: New Search 008000A101 10CFR55: 41.5 / 45.5 Safety Function 8 System

Title:

Component Cooling Water System (CCWS) System Number 008 K/A A1.01 Tier: 2 Group: 1 RO Imp: 2.8 SRO Imp: 2.9 L. Plan: A2LP-RO-CCW OBJ 12

Description:

Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the CCWS controls including: - CCW flow rate Question:

Given the following: QID use History

  • The plant is at 100% power.
  • The Instrument Air (IA) supply to the Letdown Temperature Control Valve is 2003 inadvertently isolated and the valve fails open.

2005 With no operator action, which ONE of the following would be the correct RCS Tave/Plant Power 2006 response to the loss of IA and the reason for this response.

2008 A. Tave and Plant Power would rise due to excessive Letdown flow through the Letdown HX. 2009 B. Tave and Plant Power would lower due to excessive CCW flow through the Letdown HX. Audit Exam History C. Tave and Plant Power would rise due to excessive CCW flow through the Letdown HX. 2009 D. Tave and Plant Power would lower due to excessive Letdown flow through the Letdown HX..

Answer:

C. Tave and Plant Power would rise due to excessive CCW flow through the Letdown HX.

Notes:

A loss of IA to the Letdown Temperature Control Valve will cause the valve to fail open causing a large rise in CCW flow to the Letdown HX. This in turn will lower the Letdown fluid temperature entering the Letdown Demineralizer/IX which will remove additional boron from the Letdown fluid causing a dilution of the VCT/RCS. This will cause RCS Tave to rise. Since the Main Turbine is on the load limit pot (set position on the control valves), RCS Tave rising will cause steam pressure to rise and more steam flow to the turbine causing Plant power to rise above 100% which is our licensed limit. Distracters A and D are incorrect because CCW flow will rise due to the loss of IA. Distracters B and D are incorrect because RCS Tave and Plant Power will rise.

References:

STM 2-43, CCW System, Rev. 12, Section 3.2.17.

PWR GP Components Chapter 4 Demineralizers and Ion Exchangers - Temperature (Page 12 below equation 4-9).

Lesson Plan A2LP-RO-CCW, Rev. 3, Objective 12: List the loads supplied by CCW to include fail position of any flow control valves. Lesson Plan ASLP-RO-CMP07, Rev. 2 PWR GP Components Chapter 4 Demineralizers and Ion Exchangers, Objective 28: Describe the effect of temperature on saturated ion exchangers.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 36

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1643 Rev: 0 Rev Date: 4/2/2009 4:22:09 QID #: 34 Author: Jim Wright Lic Level: R Difficulty: 2 Taxonomy: F Source: New Search 010000K402 10CFR55: 41.7 Safety Function 3 System

Title:

Pressurizer Pressure Control System (PZR PCS) System Number 010 K/A K4.02 Tier: 2 Group: 1 RO Imp: 3.0 SRO Imp: 3.4 L. Plan: A2LP-RO-PZR OBJ 3

Description:

Knowledge of PZR PCS design feature(s) and/or interlock(s) which provide for the following: -

Prevention of uncovering PZR heaters Question:

Given the following: QID use History

  • Unit 2 has a small break LOCA in progress.
  • Pressurizer Proportional Heaters Bank #1 and #2 are in Automatic. RO SRO
  • Backup Heater Bank #1 handswitch is in On.

2003 When Pressurizer level drops to ________________________ to prevent uncovering the heaters.

2005 A. 30%, all PZR HTRs will be de-energized except BU HTR Bank #1 2006 B. 30%, all PZR HTRs will be de-energized 2008 2009 C. 29%, all PZR HTRs will be de-energized except BU HTR Bank #1 Audit Exam History D. 29%, all PZR HTRs will be de-energized 2009 Answer:

D. 29%, all PZR HTRs will be de-energized Notes:

A. is incorrect because 30% is the reset value for pressurizer heater low level cutout on rising level and all PZR heaters will be deenergized.

B. is incorrect because 30% is the reset value for pressurizer heater low level cutout on rising level.

C. is incorrect because all heater will deenergize without exception even though the low level interlock is correctly stated at 29%

References:

STM 2-03-1 Rev.13 Pressurizer Pressure and Level Control Section 2.2.4 and 2.2.5 NOP 2103.005 Change 29 Section 6.0 Setpoints and Interlocks.

Lesson Plan A2LP-RO-PZR Rev.3 Pressurizer Pressure and Level Control System. Objective 3: Explain the following for the Pressurizer Heaters: The low level interlock associated with the PZR Heaters.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 37

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1644 Rev: 0 Rev Date: 4/2/2009 3:27:44 QID #: 35 Author: Coble Lic Level: R Difficulty: 2 Taxonomy: H Source: New Search 010000A401 10CFR55: 41.7 / 45.5 to 45.8 Safety Function 3 System

Title:

Pressurizer Pressure Control System (PZR PCS) System Number 010 K/A A4.01 Tier: 2 Group: 1 RO Imp: 3.7 SRO Imp: 3.5 L. Plan: A2LP-RO-PZR OBJ 4

Description:

Ability to manually operate and/or monitor in the control room: - PZR spray valve Question:

When operating a Pressurizer Spray valve in MANUAL, the AMBER light above the control switch QID use History being ON indicates the valve is approximately ________ Open and when the RED light above the control switch is the only light ON, the spray valve is _____________.

RO SRO A. 40%; 100% Closed 2003 B. 40%; 100% Open 2005 C. 25%; 100% Closed 2006 D. 25%; 100% Open 2008 2009 Audit Exam History 2009 Answer:

B. 40%; 100% Open Notes:

The PZR Spray valve will start to come open automatically when PZR pressure rises to 25 psia above setpoint but the amber light comes on when the valve is approximately 40% open. The Red light and Green light will be on when the valve is intermediate but when the valve is full 100% open, the red light will be the only light on.

Distracters A and C are incorrect because the red light indicates 100% open. Distracters C and D are incorrect because the amber light indicates 40% open.

References:

STM 2-03-01, PZR Pressure and Level Control, Rev. 13, Section 2.2.6 and 2.3.

Lesson Plan A2LP-RO-PZR, Rev. 3 Objective 4: Explain the following concerning the operation of the Pressurizer Spray Valve: Automatic Operation and Manual Operation.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 38

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1645 Rev: 0 Rev Date: 4/2/2009 4:38:20 QID #: 36 Author: Coble Lic Level: R Difficulty: 2 Taxonomy: F Source: New Search 012000K201 10CFR55: 41.7 Safety Function 7 System

Title:

Reactor Protection System System Number 012 K/A K2.01 Tier: 2 Group: 1 RO Imp: 3.3 SRO Imp: 3.7 L. Plan: A2LP-RO-RPS OBJ 5

Description:

Knowledge of bus power supplies to the following: - RPS channels, components, and interconnections Question:

Which of the following channels of PPS bistables have auctioneered power supplies from multiple 120 QID use History Volt Vital AC buses 2RS1 through 2RS4?

A. Channels A and B RO SRO B. Channels A and C 2003 C. Channels B and C 2005 2006 D. Channels B and D 2008 2009 Audit Exam History 2009 Answer:

C. Channels B and C Notes:

Auctioneered power supplies were removed from RPS channels A and D during the Steam Generator replacement outage due to a single failure scenario identified in Condition Report 2-96-0293. (See STM 2-63 Section 4.1.1 provided). Distracters A and B are incorrect because channel A does not have auctioneered power supplies. Distracter D is incorrect because channel D does not have auctioneered power supplies.

References:

STM 2-63, RPS, Rev. 9, Sections 4.1 and 4.1.1 and Figures on pages 56 and 57.

Lesson Plan A2LP-RO-RPS Rev. 9, Objective 5: Describe the power supplies to the Reactor Protection System.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 39

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1646 Rev: 0 Rev Date: 4/6/2009 2:48:19 QID #: 37 Author: Coble Lic Level: R Difficulty: 2 Taxonomy: H Source: New Search 0130002244 10CFR55: 41.10 / 43.5 / 45.12 Safety Function 2 System

Title:

Engineered Safety Features Actuation System ( System Number 013 K/A 2.2.44 Tier: 2 Group: 1 RO Imp: 4.2 SRO Imp: 4.4 L. Plan: A2LP-RO-ESFAS OBJ 2

Description:

Equipment Control - Ability to interpret control room indications to verify the status and operation of a system, and understand how operator actions and directives affect plant and system conditions.

Question:

The following conditions exist: QID use History

  • PZR pressure is 1575 psia. RO SRO
  • SG pressures are (SG"A") 1025 psia, (SG"B") 1000 psia.
  • SG levels are (SG"A") 46% NR, (SG"B") 35% NR 2003 Which of the following ESF signals should be actuated and what manual operator action should 2005 be taken in the SGTR EOP to minimize any release to the atmosphere? 2006 A. SIAS; Override SW to ACW 2008 2009 B. SIAS; Override SW to CCW Audit Exam History C. EFAS; Override SW to ACW 2009 D. EFAS; Override SW to CCW Answer:

A. SIAS; Override SW to ACW Notes:

PZR pressure is below the SIAS setpoint and SG level is above the EFAS setpoint so SIAS should be actuated and not EFAS. SW is restored to ACW to ensure cooling to the condenser vacuum pumps so that we can maintain a condenser vacuum to allow steaming to the condenser vice to the atmosphere. SW is restored to CCW to ensure cooling to RCP seals.

Distracter "B" is incorrect because restoring SW to CCW is not to minimize steaming to the atmosphere Distracter "C" is incorrect because EFAS will not actuate until 22.2% NR SG level.

Distracter "D" is incorrect because restoring SW to CCW is not to minimize steaming to the atmosphere and EFAS will not actuate until 22.2% NR SG level.

References:

EOP 2202.004, SGTR, Rev. 9, Step 7.H Contingency Action.

EOP TG 2202.004, SGTR, Rev. 9, Step 7 STM 2-70, ESF System Rev 14, Table on Page 8 Lesson Plan A2LP-RO-ESFAS,ESF System Rev. 11 Objective 2: List the ESFAS actuations. Include for each actuation. Inputs required for actuation signal. Setpoints for each actuation input parameter.

Reason for each system actuation.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 40

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1647 Rev: 0 Rev Date: 4/7/2009 10:44:47 QID #: 38 Author: Coble Lic Level: R Difficulty: 3 Taxonomy: H Source: NRC Exam Bank 0104 Modified Search 013000K502 10CFR55: 41.5 / 45.7 Safety Function 2 System

Title:

Engineered Safety Features Actuation System ( System Number 013 K/A K5.02 Tier: 2 Group: 1 RO Imp: 2.9 SRO Imp: 3.3 L. Plan: A2LP-RO-ESFAS OBJ

Description:

Knowledge of the operational implications of the following concepts as they apply to the ESFAS: - Safety system logic and reliability Question:

An EFAS 2 signal will be present and feeding the 'B' Steam Generator for which of the following QID use History indications? (consider each answer separately).

A. SG "A" Level = 20% NR & Press = 700 psia SG "B" Level = 21.5% NR & Press = 700 psia. RO SRO B. SG "A" Level = 20% NR & Press = 575 psia SG "B" Level = 26% NR & Press = 700 psia. 2003 C. SG "A" Level = 20% NR & Press = 400 psia SG "B" Level = 15% NR & Press = 200 psia. 2005 2006 D. SG "A" Level = 20% NR & Press = 375 psia SG "B" Level = 18% NR & Press = 500 psia.

2008 2009 Audit Exam History 2009 Answer:

D. SG "A" Level = 20% NR & Press = 375 psia SG "B" Level = 18% NR & Press = 500 psia.

Notes:

An EFAS 1 or EFAS 2 will be generated on a low SG level signal of 22.2% NR level but will reset if level rises to >25% NR. This will stop feed to the respective SG. Also with a low SG pressure at less than 751 psia, the EFAS logic will stop feeding the SGs until it can determine the intact SG by looking at the differential pressure between the two. The SG with a DP of 90 psid higher than the other will open the feed valves feeding the intact SG and close the ruptured SG feed valves. Distracter A is incorrect because SG Pressure is less than 751 psia but no SG has a DP from the other so neither SG will be fed. Distracter B is incorrect because level in the B SG is not low enough to imitate feed. Distracter C is incorrect because the A SG is the one with the high DP not B SG. Answer D is correct because the DP is higher on B SG with a low level.

References:

STM 2-19-2, EFW System, Rev. 29, Section 2.3.3.1 STM 2-70 ESFAS, Rev. 14 Section 4.9.1 and Figure on Page 79.

Lesson Plan A2LP-RO-ESFAS, Rev. 11 Objective 2: List the ESFAS actuations, including :

Inputs required for actuation signal. Setpoints for each actuation parameter. Reason for each actuation and Objective 8: Discuss the differences between the typical ESFAS system flow path, and the signal for

Emergency Feed Historical Comments:

Original Question was used on the 1998 NRC Exam Form ES-401-5 Written Exam Question Worksheet 41

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1648 Rev: 0 Rev Date: 4/7/2009 1:39:05 QID #: 39 Author: Coble Lic Level: R Difficulty: 4 Taxonomy: H Source: New Search 022000A402 10CFR55: 41.7 / 45.5 to 45.8 Safety Function 5 System

Title:

Containment Cooling System (CCS) System Number 022 K/A A4.02 Tier: 2 Group: 1 RO Imp: 3.2 SRO Imp: 3.1 L. Plan: A2LP-RO-CVENT OBJ 19

Description:

Ability to manually operate and/or monitor in the control room: - CCS pumps Question:

Given the following: QID use History

  • Unit 2 is at normal full power operation in the middle of a summer afternoon.
  • Containment Cooling Fans 2VSF-1A, 2VSF-1B AND 2VSF-1D are in service. RO SRO Which one of the following alarms would be the MOST DIRECT confirmation of a loss or malfunction 2003 of the containment cooling water supply pump.

2005 A. Annunciator 2K06 H-7 "CNMT CLG COILS A/B SW FLOW LOW". 2006 B. Annunciator 2K12 A-7 "CCW LOOP 2 FLOW LO". 2008 2009 C. Annunciator 2K13 B-4 "CONTAINMENT COOLING COILS WATER FLOW LOW".

Audit Exam History D. Annunciator 2K13 C-2 "CHILLED WATER FLOW LOW".

2009 Answer:

C. Annunciator 2K13 B-4 "CONTAINMENT COOLING COILS WATER FLOW LOW".

Notes:

At normal full power, cooling water for the CCS coils is supplied from Main Chilled Water pump. Service water will only supply the CCS fans on a SIAS or MSIS accident. CCW supplies cooling to RCPs only in Containment. Distracter A is incorrect because this alarm is only active during an SIAS or MSIS. Distracter B is incorrect because CCW does not cool the CCS coolers. Distracter D is incorrect because this alarm will come in on loss of flow in Main Chill Water, Aux Extension Chill Water, or Control Room Chill Water Systems so this alarm could indicate a loss of a pump that does not supply the containment coolers. C is correct because this alarm only comes in on low chill water flow to the containment cooling coils which is the cooling medium at 100% power.

References:

STM 2-09, Containment Cooling and Purge System, Rev. 16, Section 2.1 and 2.2.

Annunciator Corrective Action 2203.012F Window 2K06 H-7 "CNMT CLG COILS A/B SW FLOW LOW".

Annunciator Corrective Action 2203.012L Window 2K12 A-7 " CCW LOOP 2 FLOW LO". Annunciator Corrective Action 2203.012M Window 2K13 B-4 " CONTAINMENT COOLING COILS WATER FLOW LOW". Annunciator Corrective Action 2203.012M Window 2K13 C-2 "CHILLED WATER FLOW LOW".

Lesson Plan A2LP-RO-CVENT Rev. 4 Objective 19:Describe the Alarms associated with the Containment Ventilation Systems and based on given plant conditions, determine the correct course of action to take.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 42

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1649 Rev: 0 Rev Date: 4/7/2009 4:44:09 QID #: 40 Author: Coble Lic Level: R Difficulty: 3 Taxonomy: H Source: NRC Exam Bank 0483 Modified Search 022000A201 10CFR55: 41.5 / 43.5 / 45.3 / 45. Safety Function 5 System

Title:

Containment Cooling System (CCS) System Number 022 K/A A2.01 Tier: 2 Group: 1 RO Imp: 2.5 SRO Imp: 2.7 L. Plan: A2LP-RO-CVENT OBJ 15

Description:

Ability to (a) predict the impacts of the following malfunctions or operations on the CCS and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: - Fan motor over-current Question:

Consider the following: QID use History

  • Unit 2 is at normal full power operation in the middle of a summer afternoon. RO SRO
  • The CTMT BLDG CLG FANS C/D TROUBLE alarm comes in and locks in 2003 solid when acknowledged.
  • All indicating lights on the 2VSF-1D are extinguished. 2005
  • The Inside AO reports that the thermal overloads on the 2VSF-1D Supply Breaker 2B63 J2 2006 appear to be tripped and will not reset.
  • Containment pressure and temperature has risen to 15.7 psia and 118°F. 2008 2009 Based on these conditions, which of the following will ensure compliance with the Containment Internal Pressure and Temperature Technical Specification action 3.6.1.4 to prevent a shutdown? Audit Exam History (Reference Provided) 2009 A. Containment Cooling Fan 2VSF-1C automatically starts and Containment temperature and pressure must be restored to within TS limits within 30 minutes.

B. Manually start Containment Cooling Fan 2VSF-1C and Containment temperature and pressure must be restored within TS limits within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

C. Manually start Containment Cooling Fan 2VSF-1C and Containment temperature and pressure must be restored within TS limits within 30 minutes.

D. Containment Cooling Fan 2VSF-1C automatically starts and Containment temperature and pressure must be restored to within TS limits within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

Answer:

B. Manually start Containment Cooling Fan 2VSF-1C and Containment temperature and pressure must be restored within TS limits within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

Notes:

Distracter A is incorrect because the Containment Cooling Fans only get an auto start signal on a Containment Cooling Actuation signal not low air flow and the time limit is one hour. Distracter C is incorrect because the TS limit is one hour. Distracter D is incorrect because the Containment Cooling Fans only get an auto start signal on a Containment Cooling Actuation signal not low air flow Provide a copy of TS 3.6.1.4 Figure 3.6-1 as a reference.

References:

Form ES-401-5 Written Exam Question Worksheet 43

Data for 2009 NRC RO/SRO Exam 18-Jun-09 STM 2-09, Containment Cooling and Purge Systems, Sections 2.8, and 2.10.1.

TS 3.6.1.4, Containment Internal Pressure and Temperature with Figure 3.6-1 Annunciator Corrective Action 2203.012E Window 2K05 J-7 "CNMT BLDG CLG FANS C/D TROUBLE.

Lesson Plan A2LP-RO-CVENT Rev. 4 Objective 3: Describe the construction and operation of the Containment Cooling Units and OBJ. 15, Describe the conditions required to satisfy the TS LCOs and TRM TROs associated with the Containment Ventilation System including the basis for each LCO/TRO.

Historical Comments:

Original Question Used on the 2005 NRC Exam Form ES-401-5 Written Exam Question Worksheet 44

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1650 Rev: 0 Rev Date: 4/9/2009 4:00:28 QID #: 41 Author: Coble Lic Level: R Difficulty: 2 Taxonomy: F Source: IH Exam Bank Unit 2 10091 Modified Search 026000K302 10CFR55: 41.7 / 45.6 Safety Function 5 System

Title:

Containment Spray System (CSS) System Number 026 K/A K3.02 Tier: 2 Group: 1 RO Imp: 4.2 SRO Imp: 4.3 L. Plan: A2LP-RO-SPRAY OBJ 2

Description:

Knowledge of the effect that a loss or malfunction of the CSS will have on the following: -

Recirculation spray system Question:

Consider the following: QID use History

  • The reactor has tripped due to a LOCA.
  • Containment Pressure peaked at 49 psia and is trending down. RO SRO
  • Four Containment Cooling Units are in operation in the emergency mode.
  • All other ECCS components are operating as designed. 2005 2006 One hour later, the conditions are as follows:

2008

  • Containment Pressure is 34 psia and lowering. 2009
  • Four Containment Cooling Units are in operation in the emergency mode.
  • After 45 minutes of operation Containment Spray pump, 2P-35A tripped due to a short Audit Exam History in the motor.
  • All other ECCS components are operating as designed. 2009 Considering the above conditions, all Containment Safety Functions ________satisfying the design basis requirements because ________________________________________________?

A. are NOT; containment pressure has NOT been reduced to within 10 psia of the CSAS reset value.

B. are; four containment cooling units are sufficient to remove the energy in the containment.

C. are NOT; a containment spray pump is required to be running following a RAS for iodine removal.

D. are, containment pressure has been reduced by greater than 10 psia from the peak pressure.

Answer:

C. are NOT; a containment spray pump is required to be running following a RAS for iodine removal.

Notes:

4 Containment fan coolers will remove 100% of the Design Heat addition to the Containment on the DBA LOCA or 2 Trains of Containment Spray will remove the same amount of heat. However, the Spray system is still needed to recirculate fluid through the chemical baskets in the containment basement to raise the PH of the fluid to help remove the radioactive gaseous iodine from the Containment Atmosphere to meet the design basis of the Containment Heat Removal System.

Distracters A and D are incorrect because there is no requirement in the design basis that requires pressure to be with 10 psid of the setpoint or reduced by 10 psia from the peak pressure.

References:

Form ES-401-5 Written Exam Question Worksheet 45

Data for 2009 NRC RO/SRO Exam 18-Jun-09 STM 2-08, Containment Spray System Rev. 20 Section 1.3.

Lesson Plan A2LP-RO-SPRAY: Objective 2 Given a set of plant conditions determine if the Containment Heat Removal System is satisfying its design bases.

Historical Comments:

This question has not been used on any previous NRC Exam Form ES-401-5 Written Exam Question Worksheet 46

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1651 Rev: 0 Rev Date: 4/9/2009 5:11:39 QID #: 42 Author: Coble Lic Level: R Difficulty: 2 Taxonomy: F Source: New Search 039000K304 10CFR55: 41.7 / 45.6 Safety Function 4 System

Title:

Main and Reheat Steam System (MRSS) System Number 039 K/A K3.04 Tier: 2 Group: 1 RO Imp: 2.5 SRO Imp: 2.6 L. Plan: A2LP-RO-MFPTC OBJ 10

Description:

Knowledge of the effect that a loss or malfunction of the MRSS will have on the following: -

MFW pumps Question:

Given the following: QID use History

  • The plant is at full power.
  • The Main Steam Supply Valve to MFW Pump Turbine 2K-2A, 2CV-0320 goes closed. RO SRO Which one of the following would be the correct response of the MFW pumps and the 2003 final plant conditions with no operator action.

2005 A. The 'A' MFW Pump would go to zero speed and the plant would be in mode 3. 2006 B The 'A' MFW Pump speed would not change and the plant would be at full power. 2008 2009 C. The 'A' MFW Pump would go to zero speed and the plant would be at ~ 90% power.

Audit Exam History D. The 'B' MFW Pump speed would rise to compensate and the plant would be at full power.

2009 Answer:

B The 'A' MFW Pump speed would not change and the plant would be at full power.

Notes:

Main Steam is aligned to the MFW pump turbine to be used for startup and low power conditions when the Reheat steam supply is not available. At full power, the Reheat Steam supply is operating the MFW pump turbines through the low pressure control valve. Distracters A and C are incorrect because the speed would remain the same. Distracter D is incorrect because the B MFW pump speed will not need to rise to compensate.

References:

STM 2-19-1, MFW Pump and Turbine Control System, Rev. 17, Sections 6.3.and 6.4. and figure on page 84.

STM 2-15, SG and Main Steam System, Rev. 11 Section 2.0 - 1st paragraph on page 5 Lesson Plan A2LP-RO-MFPTC, Rev. 4 Objective 10: Describe the purpose, construction and operation of the following control system components: Low Pressure Stop Valves (2CV-0330 /350) Low Pressure Control Valves (2CV-0331 / 0351) High Pressure Stop Valves (2CV-0316A / 0321A) High Pressure Control Valves (2CV-0331 / 0351)

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 47

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1652 Rev: 0 Rev Date: 4/13/2009 10:29:2 QID #: 43 Author: Coble Lic Level: R Difficulty: 2 Taxonomy: F Source: New Search 059000K419 10CFR55: 41.7 Safety Function 4 System

Title:

Main Feedwater (MFW) System System Number 059 K/A K4.19 Tier: 2 Group: 1 RO Imp: 3.2 SRO Imp: 3.4 L. Plan: A2LP-RO-FWCD OBJ 14

Description:

Knowledge of MFW System design feature(s) and/or interlock(s) which provide for the following: - Automatic feedwater isolation of MFW Question:

Which one of the following ESFAS actuation will cause the Main Feedwater Isolation (Block) Valves to QID use History automatically close?

A. SIAS RO SRO B. CCAS 2003 C. EFAS 2005 2006 D. CSAS 2008 2009 Audit Exam History 2009 Answer:

D. CSAS Notes:

The MFWIVs are safety related valves that will automatically close upon receipt of a Main Steam Isolation Signal (MSIS) or a Containment Spray Actuation Signal (CSAS) from the Engineered Safety Features Actuation System (ESFAS).

References:

STM 2-19, Main Feedwater System, Rev. 11, Section 1.2 (2nd Page) and Section 2.7.

Lesson Plan A2LP-RO-FWCD, Rev. 7, Objective 14: Describe the interlocks and automatic actuations of the following Feedwater System components: Main Feedwater Isolation Valves (2CV-1023-2, 1073-2, 1024-1 &

1074-1)

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 48

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1653 Rev: 0 Rev Date: 4/13/2009 10:53:5 QID #: 44 Author: Coble Lic Level: R Difficulty: 2 Taxonomy: F Source: New Search 059000A303 10CFR55: 41.7 / 45.5 Safety Function 4 System

Title:

Main Feedwater (MFW) System System Number 059 K/A A3.03 Tier: 2 Group: 1 RO Imp: 2.5 SRO Imp: 2.6 L. Plan: A2LP-RO-FWCD OBJ 14

Description:

Ability to monitor automatic operation of the MFW System, including: - Feedwater pump suction flow pressure Question:

At full power, if the Main Feedwater Pump suction pressure drops below ______ psig, the standby QID use History Condensate pump will automatically start and if Main Feedwater Pump suction pressure drops below

______ psig, the Main feedwater pumps will trip. (assume all time delays have been completed and any associated logic has been satisfied) RO SRO A. 425; 325 2003 B. 450; 300 2005 2006 C. 425; 350 2008 D. 450; 375 2009 Audit Exam History 2009 Answer:

A. 425; 325 Notes:

The standby Condensate Pump will start if suction pressure drops below 425 psig but a warning alarm will sound at 450 psig. The MFW Pumps will trip if pressure continues to drop below 325 psig on 2 out of 3 pressure sensing switches after a 30 second time delay.

References:

STM 2-19, MFW System, Rev. 11, Section 3.2 Lesson Plan A2LP-RO-FWCD, Rev. 7, Objective 14: Describe the interlocks and automatic actuations of the following Feedwater System components: Main Feedwater Pumps (2P-1A/B) and Objective 6: Describe the interlocks and automatic actuations of the following components:

Condensate pumps Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 49

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1654 Rev: 0 Rev Date: 4/13/2009 2:06:59 QID #: 45 Author: Coble Lic Level: R Difficulty: 3 Taxonomy: H Source: New Search 061000K502 10CFR55: 41.5 / 45.7 Safety Function 4 System

Title:

Auxiliary / Emergency Feedwater (AFW) Syste System Number 061 K/A K5.02 Tier: 2 Group: 1 RO Imp: 3.2 SRO Imp: 3.6 L. Plan: A2LP-RO-ESPTA OBJ 11

Description:

Knowledge of the operational implications of the following concepts as they apply to the AFW System: - Decay heat sources and magnitude Question:

Given the following: QID use History

  • The plant has tripped due to a loss of Off Site Power.
  • The plant had been at 100% power for the last 100 days. RO SRO
  • SPTAs are in progress.
  • SG A level is 8% NR and SG B level is 7% NR. 2003
  • All EFW components actuated as designed.

2005 Which ONE of the following combinations of EFW flow would be the MINIMUM required to meet the 2006 RCS Heat Removal Safety Function just after the trip? (assume no recirculation flow) 2008 A. A SG 150 gpm; B SG 150 gpm 2009 B. A SG 315 gpm; B SG 155 gpm Audit Exam History C. A SG 211 gpm; B SG 275 gpm 2009 D. A SG 250 gpm; B SG 260 gpm Answer:

C. A SG 211 gpm; B SG 275 gpm Notes:

With SG level less than 10% Narrow Range, total EFW flow post trip from 100% power with at least a 30 day history at 100% power is required to greater than 485 gpm. Answer C is 486 gpm total. Distracter A and B do not meet the minimum but may have to start out at 150 gpm to each SG in certain EOPs under loss of feed conditions. Distracter D is more than the minimum required.

References:

EOP 2202.001, SPTAs, Rev. 9, Contingency Action Step 8 A.2.

EOP TG 2202.001, SPTAs, Rev. 9 Step 8, RCS Heat Removal, Step 8.

Lesson Plan A2LP-RO-ESPTA, Rev. 8, Objective 11: Describe the major actions taken during the performance of SPTAs and the basis for each.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 50

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1655 Rev: 0 Rev Date: 4/13/2009 2:52:02 QID #: 46 Author: Coble Lic Level: R Difficulty: 4 Taxonomy: H Source: New Search 062000A103 10CFR55: 41.5 / 45.5 Safety Function 6 System

Title:

A.C. Electrical Distribution System System Number 062 K/A A1.03 Tier: 2 Group: 1 RO Imp: 2.5 SRO Imp: 2.8 L. Plan: A2LP-RO-ED480 OBJ 7

Description:

Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the A.C. Distribution System controls including: - Effect on instrumentation and controls of switching power supplies Question:

Consider the following: QID use History

  • Unit 2 is at full power.
  • Electrical Loads transfer to offsite as designed.
  • Red Vital 480V Bus (2B5) is reading 426 VAC (lowest reading). 2003
  • Green Vital 480V Bus (2B6) is reading 441 VAC (lowest reading).
  • No Operator Action is taken. 2005 2006 One minute after these conditions are established, what would be the status of the Emergency Diesel Generators? 2008 2009 A. Both Emergency Diesels would be running and neither of the Emergency Diesels would have its output breaker Closed. Audit Exam History B. Both Emergency Diesels would be running but only the Red Emergency Diesel Generator 2009 (2DG1) would have its output breaker Closed.

C. Only the Red Emergency Diesel Generator (2DG1) would start and it would be running with its output breaker Open.

D. Only the Red Emergency Diesel Generator (2DG1) would start and it would be running with its output breaker Closed.

Answer:

D. Only the Red Emergency Diesel Generator (2DG1) would start and it would be running with its output breaker Closed.

Notes:

The millstone relays actuate at 429.6 plus or minus 6.4 volts AC and are designed to protect the vital AC buses from low offsite voltage. They are designed to strip the vital buses from offsite and then the respective diesel will start on undervoltage on the bus will be re-energized from the respective diesel. There is also a Green (B Train) millstone relay that would start the B Diesel and power up the Green Vital AC buses if actuated. In this case only the A (red) train bus is energized since its millstone relay is the only one actuated.

References:

T.S 3.3.2.1 Table 3.3-4 Item 7b.

STM 2-32-1, Rev. 13, 480 VAC Distribution System, Section 2.2.2, Bus Protection Relays.

Lesson Plan A2LP-RO-ED480, Rev. 3 Objective 7: Explain the following for a 480V Load Center Bus:

Millstone Relays on 480V Vital Buses 2B5 and 2B6 and the sequence of events for a Millstone Event Form ES-401-5 Written Exam Question Worksheet 51

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Historical Comments:

Bank: 1656 Rev: 0 Rev Date: 4/13/2009 3:47:17 QID #: 47 Author: Coble Lic Level: R Difficulty: 2 Taxonomy: F Source: New Search 0630002127 10CFR55: 41.7 Safety Function 6 System

Title:

D.C. Electrical Distribution System System Number 063 K/A 2.1.27 Tier: 2 Group: 1 RO Imp: 3.9 SRO Imp: 4.0 L. Plan: A2LP-RO-ED125 OBJ 1

Description:

Conduct of Operations - Knowledge of system purpose and/or function.

Question:

Which ONE of the following would be a function of 125 VDC Green Electrical Bus 2D02? QID use History A. Provide DC power input to the PMS Inverter 2Y25.

RO SRO B. Provide DC power to EFW Pump 2P-7A governor control.

2003 C. Provide DC power input to the SPDS Inverter 2Y26.

2005 D. Provide DC control power to Vital 4160 VAC Electrical Bus 2A3 2006 2008 2009 Audit Exam History 2009 Answer:

B. Provide DC power to EFW Pump 2P-7A governor control.

Notes:

The turbine driven EFW pump 2P-7A has DC power to its governor controls so that the pump would be operable during a station blackout condition. This DC power comes from the green train "B" DC bus 2D24 which receives its power from the Green DC Bus 2D01. PMS Inverter 2Y25 gets its DC power from the Red train DC Bus 2D01. SPDS Inverter gets its DC power from the black train (non-safety) DC Bus 3D03. Vital Red Train 4160 VAC Bus 2A3 gets its control power from the Red DC Train Bus 2D01.

References:

STM 2-19-2, EFW System, Rev. 29, Sections 2.1 and 2.1.1.6.

STM 2-32-5, 125 VDC Electrical Distribution, Rev. 15, section 1.1 and figure on page 22.

Lesson plan A2LP-RO-ED125, 125 VDC Electrical Distribution, Rev. 6. Objective 1 Describe the Function of the 125 VDC Distribution System. (Obj. 1)

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 52

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1657 Rev: 0 Rev Date: 4/13/2009 4:33:27 QID #: 48 Author: Coble Lic Level: R Difficulty: 2 Taxonomy: H Source: IH Exam Bank OPS2-6884 Search 063000A301 10CFR55: 41.7 / 45.5 Safety Function 6 System

Title:

D.C. Electrical Distribution System System Number 063 K/A A3.01 Tier: 2 Group: 1 RO Imp: 2.7 SRO Imp: 3.1 L. Plan: A2LP-RO-ED125 OBJ 6

Description:

Ability to monitor automatic operation of the D.C. Electrical System, including: - Meters, annunciators, dials, recorders, and indicating lights Question:

Consider the following: QID use History

  • The plant is at full power.
  • Green Vital Electrical DC Bus 2D02 voltage is 130V DC RO SRO
  • Battery Charger 2D32A load is 135 amps.
  • The Green Vital Battery 2D12 Disconnect is now opened by maintenance personnel without 2003 letting the Control Room staff know ahead of time.

2005 Given these conditions, the ____________________ alarm would annunciate in the Control Room 2006 and the Battery Charger load would _______________________ due to the loss of the battery.

2008 A. 2D02 undervoltage; rise significantly 2009 B. 2D02 undervoltage; stay approximately the same Audit Exam History C. Battery NOT Available; rise significantly 2009 D. Battery NOT Available; stay approximately the same Answer:

D. Battery NOT Available; stay approximately the same Notes:

As long as the Battery charger has AC input, then the battery charger is supplying the loads on the Green DC busses and the battery is acting as a backup. Disconnecting the battery from the bus in this case would result in a "Not Available" alarm only and no change in amps/load.

References:

STM 2-32-5, 125 VDC Electrical Distribution, Rev. 15, sections 2.3, 2.4,and 3.0 and figure on page 22. Lesson plan A2LP-RO-ED125, 125 VDC Electrical Distribution, Rev. 6. Objective 6: Describe the operation of the following Battery Chargers: The Battery Chargers associated with 2D01 and 2D02 and Objective 7 Describe the operation and ratings of the following: Battery Disconnect and Fuses for 2D01 and 2D02.

Historical Comments:

Never been used on a NRC Exam Form ES-401-5 Written Exam Question Worksheet 53

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1658 Rev: 0 Rev Date: 4/13/2009 4:32:17 QID #: 49 Author: Coble Lic Level: R Difficulty: 3 Taxonomy: H Source: IH Exam Bank OPS2-6461 Modified Search 064000A401 10CFR55: 41.7 / 45.5 to 45.8 Safety Function 6 System

Title:

Emergency Diesel Generator (ED/G) System System Number 064 K/A A4.01 Tier: 2 Group: 1 RO Imp: 4.0 SRO Imp: 4.3 L. Plan: A2LP-RO-EDG OBJ 2/6

Description:

Ability to manually operate and/or monitor in the control room: - Local and remote operation of the ED/G Question:

Consider the following: QID use History

  • Unit 2 is at normal full power operation.
  • All other systems and components function as designed.
  • Assume NO operator action. 2005 2006 Given these conditions 2DG1 would be ______________ and 2DG2 would be _________________.

2008 A. shutdown; running at NO load 2009 B. running at NO load; shutdown Audit Exam History C. running at NO load; running at NO load 2009 D. shutdown; shutdown Answer:

A. shutdown; running at NO load Notes:

Both EDG will be sent a start signal on an SIAS when RCS pressure drops below 1650 psia. However, with the output breaker for 2DG1 (152-308) in PTL this start signal cannot energize the air start solenoids for 2DG1 therefore it will not start. 2DG2 will start but since the supply breaker from offsite 152-409 has not tripped and is still supplying power to the 4160 safety bus 2A4, then 2DG2 will be running unloaded.

References:

Alarm Corrective Action (ACA) 2203.012U, EDG1 NOT AVAILABLE, Rev. 18, Step 1.2 STM 2-31, EDGs, Rev. 26, Section 3.2.1 and 3.3.1. Also Figures on pages 121 and 128.

Lesson Plan A2LP-RO-EDG, Rev. 10, Objectives 2: Explain the operation of the Engine Start Circuit and 6:

Explain the operation of the Emergency Diesel Generator output breaker.

Historical Comments:

This question has not been used on any previous NRC Exams.

Form ES-401-5 Written Exam Question Worksheet 54

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1659 Rev: 0 Rev Date: 4/16/2009 2:57:05 QID #: 50 Author: Coble Lic Level: R Difficulty: 3 Taxonomy: H Source: New Search 064000K608 10CFR55: 41.7 / 45.7 Safety Function 6 System

Title:

Emergency Diesel Generator (ED/G) System System Number 064 K/A K6.08 Tier: 2 Group: 1 RO Imp: 3.2 SRO Imp: 3.3 L. Plan: A2LP-RO-EDG OBJ 12

Description:

Knowledge of the effect of a loss or malfunction of the following will have on the ED/G System: - Fuel oil storage tanks Question:

Given the following at full power: QID use History

  • 2DG1 is currently tied to the grid and is consuming 2.2 gallons of fuel oil each minute. RO SRO
  • Fuel oil transfer pump 2P-16A is running filling 2DG1 Day Tank 2T-30A.
  • At 500 gallons in 2T-30A, 2P-16A breaker trips open on thermal overload and fuel oil flow stops. 2003
  • NO operator action is taken.

2005 Based on these conditions, approximately how long can 2DG1 continue to operate at the current load 2006 until the T.S. Minimum Day Tank Volume is reached?

2008 A. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 2009 B. 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> Audit Exam History C. 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 2009 D. 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> Answer:

B. 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> Notes:

The T.S. Minimum Day Tank Volume is 300 gallons. 500 -300 gallons divided by 2.2 gpm is equal to 90.9 minutes or ~ 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.

References:

T.S 3.8.1.1 part b.

STM 2.31, EDGs Rev. 26, Sections 2.3.3, 2.3.4, 2.3.5, and 2.3.6.

Lesson Plan A2LP-RO-EDG, Rev. 10 Objective 12 Explain the Technical Specifications associated with the Emergency Diesel Generators. (Obj 12)

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 55

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1660 Rev: 0 Rev Date: 6/30/1998 QID #: 51 Author: Hatman Lic Level: R Difficulty: 2 Taxonomy: F Source: NRC Exam Bank 0092 Search 073000K301 10CFR55: 41.7 / 45.6 Safety Function 7 System

Title:

Process Radiation Monitoring (PRM) System System Number 073 K/A K3.01 Tier: 2 Group: 1 RO Imp: 3.6 SRO Imp: 4.2 L. Plan: A2LP-RO-RWST OBJ 9

Description:

Knowledge of the effect that a loss or malfunction of the PRM System will have on the following: - Radioactive effluent releases Question:

With an inoperable Liquid Radwaste Discharge Radiation Monitor (2RITS-2330), all of the following QID use History are required to perform a discharge from the Waste Condensate Tanks EXCEPT:

A. Perform an independent verification of proper Unit 1 Circ Water flow. RO SRO B. Perform an independent verification of discharge valve lineup. 2003 C. Perform an independent verification of release rate calculation. 2005 2006 D. Obtain and analyze independent samples from the Waste Condensate Tank.

2008 2009 Audit Exam History 2009 Answer:

A. Perform an independent verification of proper Unit 1 Circ Water flow.

Notes:

Per the Offsite Dose Calculation Manual, Rev. 16, Limitation L2.1.1 Table 2.1-1 Action 1, with an inoperable rad monitor, effluent releases may be resumed provided that prior to initiating a release: a. At least two independent samples are analyzed; and b. At least two technically qualified members of the Facility Staff independently verify the release rate computer input data; and c. At least two technically qualified members of the Facility Staff independently verify the discharge valve lineup.

References:

NOP 2104.014, (LRW & BMS Operations) Rev 48, Supplement 1, Steps 1.5, 2.3 & 2.8 and Supplement 2, Step 12.0.

Offsite Dose Calculation Manual, Rev. 16, Limitation L2.1.1 Table 2.1-1 Action 1 Lesson Plan A2LP-RO-RWST Rev. 6, Objective 9: Describe the Technical Specifications and Offsite Does Calculation Manual Requirements associated with the following Radwaste Systems: Liquid Rad Waste System Historical Comments:

Question was used on the 1998 NRC Exam Form ES-401-5 Written Exam Question Worksheet 56

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1661 Rev: 0 Rev Date: 4/16/2009 10:30:1 QID #: 52 Author: Coble Lic Level: R Difficulty: 3 Taxonomy: H Source: New Search 076000A202 10CFR55: 41.5 / 43.5 / 45.3 / 45. Safety Function 4 System

Title:

Service Water System (SWS) System Number 076 K/A A2.02 Tier: 2 Group: 1 RO Imp: 2.7 SRO Imp: 3.1 L. Plan: A2LP-RO-SWACW OBJ 15

Description:

Ability to (a) predict the impacts of the following malfunctions or operations on the SWS and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: - Service water header pressure.

Question:

Given the following: QID use History

  • The plant is at full power.
  • The WCO call the control room and informs them of a large SW leak just upstream of the Loop 2 ESF Supply Header Isolation Valve 2CV-1406-2 2005
  • The CRS enters the Loss of Service Water AOP 2203.022. 2006 Based on the actions in the AOP, what would be the status of the Service Water System and the correct 2008 contingency action to take? 2009 A. Loop 2 SW and ACW isolated; start a plant down power and take the Main Turbine off line. Audit Exam History B. Loop 2 SW and CCW HX cooling isolated; trip the Reactor/Turbine and secure all 4 RCPs. 2009 C. Loop 2 SW isolated, place Emergency Diesel 2DG2 Engine Start Handswitch in Pull to Lock.

D. Loop 2 and Cooling Tower Make up isolated; commence a rapid plant shutdown to mode 3.

Answer:

C. Loop 2 SW isolated, place Emergency Diesel 2DG2 Engine Start Handswitch in Pull to Lock.

Notes:

Based on the steps in the procedure, the actions taken would isolate Loop 2 SW only and the swing pump would be started to supply ACW (Turbine Loads) and CCW cooling would still be available from Loop 1 SW. The SW returns to the lake and Cooling Tower would not be affected. The plant would not need to reduce power or trip. The only action would be to protect safety related equipment on Loop 2 SW. The major load that could be damaged without cooling water is the #2 Emergency Diesel.

References:

ACA 2203.012E Alarm A-6, "SW HEADER LOOP 2 PRESS LO", Rev. 32.

STM 2-42, SWACW, Rev. 28, Figure on Page 81.

AOP 2203.022, Loss of SW, Rev. 10, Steps 3, and 6.C Contingency Action 7.

Lesson Plan A2LP-RO-SWACW, Rev. 14, Objective 15: Given a set of plant conditions and appropriate reference material, determine the cause of an alarm associated with the Service Water System or the Auxiliary Cooling Water system and the corrective actions necessary to be taken.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 57

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1662 Rev: 0 Rev Date: 4/16/2009 4:12:20 QID #: 53 Author: Coble Lic Level: R Difficulty: 2 Taxonomy: F Source: New Search 078000K201 10CFR55: 41.7 Safety Function 8 System

Title:

Instrument Air System (IAS) System Number 078 K/A K2.01 Tier: 2 Group: 1 RO Imp: 2.7 SRO Imp: 2.9 L. Plan: A2LP-AO-IA OBJ 4

Description:

Knowledge of bus power supplies to the following: - Instrument air compressor Question:

Which of the following are the power supplies to the Instrument Air Compressors 2C-27A and 2C-27B? QID use History A. Vital 480 Volt Load Centers 2B5 and 2B6.

RO SRO B. Non-Vital 480 Volt Load Centers 2B7 and 2B8.

2003 C. Vital 480 Volt Motor Control Centers 2B54 and 2B64.

2005 D. Non-Vital 480 Volt Load Centers 2B1 and 2B2. 2006 2008 2009 Audit Exam History 2009 Answer:

D. Non-Vital 480 Volt Load Centers 2B1 and 2B2.

Notes:

2C-27A is powered from 480V AC Load Center 2B1 and 2C-27B is powered from 480V AC Load Center 2B2.

References:

STM 2-48, IA System, Rev. 11, Section 2.1 and figure on page 50.

Lesson Plan A2LP-AO-IA, Rev. 13, Objective 4: State the purpose, construction, and principle of operation of the Instrument Air Compressors.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 58

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1663 Rev: 0 Rev Date: 4/21/2009 9:31:00 QID #: 54 Author: Coble Lic Level: R Difficulty: 3 Taxonomy: H Source: NRC Exam Bank 0495 Modified Search 103000A205 10CFR55: 41.5 / 43.5 / 45.3 / 45. Safety Function 5 System

Title:

Containment System System Number 103 K/A A2.05 Tier: 2 Group: 1 RO Imp: 2.9 SRO Imp: 3.9 L. Plan: A2LP-RO-TS OBJ 4b

Description:

Ability to (a) predict the impacts of the following malfunctions or operations on the Containment System and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: - Emergency Containment Entry .

Question:

Given the following: QID use History

  • The plant is at full power
  • On 2C343-1 Detector 1-4-4-T, the South Containment Cable Spreading Areas is in Alarm
  • The Shift Manager has determined that an immediate emergency Containment entry is required 2003 to access the potential fire in Containment.
  • The Containment entry is made and it is determined that a false alarm has occurred. 2005
  • When exiting Containment, the Personnel Hatch air lock door interlocks fail 2006 allowing both doors to be opened at the same time.

2008 Based on the given conditions and in accordance with Technical Specifications which one of the 2009 following actions is required to be taken?

Audit Exam History A. Verify at least one Personnel Hatch air lock door is Operable and Closed within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

2009 B. Verify the interlock for the Personnel Hatch air lock doors is Operable within 30 minutes.

C. Commence placing the plant in Hot Standby conditions within the next 30 minutes.

D. Start the Containment Purge and verify a negative pressure in Containment within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

Answer:

A. Verify at least one Personnel Hatch air lock door is Operable and Closed within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

Notes:

Containment Integrity is lost when the interlock on the doors failed. This requires Containment integrity to be restored in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> in Mode 1 per TS 3.6.1.1.

TS 3.6.1.3 allows closing of one operable air lock door to restore Containment integrity.

Distracter B is incorrect because TS 3.6.1.3 allows 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to restore the interlock to Operable Status.

Distracter C is incorrect because TS 3.6.1.3 allows closing of one operable air lock door to restore Containment integrity instead of a plant shutdown or the plant shutdown can be started later than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> as long as hot standby is achieved in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

Distracter D is incorrect because Containment Purge is not allowed in this mode.

References:

TS 3.6.1.1, Primary Containment Integrity, Amendment 269 TS 3.6.1.3, Containment Air Locks, Amendment 175 T.S Definition 1.8, Containment Integrity, Amendment 157 STM 2-13, Containment Building Rev. 14, Sections 4.3.2 and 4.3.2.1 Lesson Plan A2LP-RO-TS, OBJ. 4.b, From memory, discuss the LCOs and actions statements for all LCOs with Form ES-401-5 Written Exam Question Worksheet 59

Data for 2009 NRC RO/SRO Exam 18-Jun-09 action statements less than or equal to one hour.

A2LP-WCO-CBLDG, OBJ. 23 List the components required to be OPERABLE to satisfy the Containment Related System LCOs.

Historical Comments:

Original Question was used on the 2005 NRC Exam Form ES-401-5 Written Exam Question Worksheet 60

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1664 Rev: 0 Rev Date: 5/21/2009 1:46:15 QID #: 55 Author: Coble Lic Level: R Difficulty: 3 Taxonomy: H Source: New Search 1030002123 10CFR55: 41.10 / 43.5 / 45.2 / 45 Safety Function 5 System

Title:

Containment System System Number 103 K/A 2.1.23 Tier: 2 Group: 1 RO Imp: 4.3 SRO Imp: 4.4 L. Plan: A2LP-RO-ELOCA OBJ 6

Description:

Conduct of Operations - Ability to perform specific system and integrated plant procedures during all modes of plant operation.

Question:

Consider the following: QID use History

  • Unit 2 has tripped from full power due to a Large break LOCA
  • RCS Pressure is 52 psia and slowly lowering RO SRO
  • Containment pressure is 47 psia and slowly lowering
  • RWT Level has been 5.7% for about 20 minutes 2003
  • There are indications of rising radiation in containment 2005 Given these conditions the minimum required Containment Spray Header flow would be 2006

____________ and this required flow is based on _____________.

2008 A. 2000 gpm; providing adequate flow through the reactor core 2009 B. 1875 gpm; providing adequate flow through the reactor core Audit Exam History C. 2000 gpm; cooling containment and associated components 2009 D. 1875 gpm; cooling containment and associated components Answer:

C. 2000 gpm; cooling containment and associated components Notes:

A flow of greater than 1875 should be verified prior to Recirculation Actuation Signal (RAS) conditions (< 6%

in the RWT) but after the RAS, the Spray pump mini recircs isolations close and flow should be verified at >

2000 gpm. The spray flow cools the containment and the water in the Containment Sump which the HPSI pumps uses to cool the core. Distracters B and D are incorrect because of the lower flow. Distracters A and B are incorrect because the spray pumps are not providing the flow through the core.

References:

EOP 2202.003 LOCA, Rev. 10, Section 1 Step 16.E and Section 3 Step 21 C.

EOP Tech Guide 2202.003 LOCA, Rev. 10, Section 3 Step 21 Lesson Plan A2LP-RO-ELOCA, Rev. 6, Objective 6:Given a set of plant conditions during a LOCA, demonstrate understanding of the LOCA EOP and ability to use the LOCA EOP to control the plant Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 61

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1665 Rev: 0 Rev Date: 4/21/2009 11:03:1 QID #: 56 Author: Coble Lic Level: R Difficulty: 2 Taxonomy: F Source: New Search 001000K205 10CFR55: 41.7 Safety Function 1 System

Title:

Control Rod Drive System System Number 001 K/A K2.05 Tier: 2 Group: 2 RO Imp: 3.1 SRO Imp: 3.5 L. Plan: A2LP-RO-CEDM OBJ 8

Description:

Knowledge of bus power supplies to the following: - M/G sets Question:

Given the following conditions: QID use History

  • A manual reactor trip is attempted and the reactor does NOT trip after depressing ALL the manual trip pushbuttons including DSS. RO SRO
  • A SPTA contingency action requires the power supply to the CEDM MG Sets to be de-energized. 2003 Which ONE of the following will accomplish this action from the control room? 2005 2006 A. Open 480V Load Center 2B5 and 2B6 feeder breakers (2B-512 and 2B-612).

2008 B. Open 480V Load Center 2B7 and 2B8 feeder breakers (2B-712 and 2B-812). 2009 C. Open 480V MCC 2B31 and 2B41 feeder breakers (2B-321 and 2B-421). Audit Exam History D. Open 480V MCC 2B71 and 2B81 feeder breakers (2B-732 and 2B-823). 2009 Answer:

B. Open 480V Load Center 2B7 and 2B8 feeder breakers (2B-712 and 2B-812).

Notes:

Unit 2 De-energizing 2B7 and 2B8 will de-energize power to the CEDM MG Sets which will cause a loss of Power to the CEA drives which will cause them to Scram the Reactor. Distracters A, C, and D are incorrect because they will not de-energize the CEA Drives to cause a Scram.;

References:

EOP 2202.001, SPTAs, Rev. 9, Step 3 Contingency Action A. 2.a.

STM 2-02, CEDMCS, Rev. 18, Section 5.2 and Figure on page 82..

Lesson Plan A2LP-RO-CEDM, Rev. 11, Objective 8: From memory draw a one-line diagram of the CEDMCS electrical distribution from the MG Sets to the cabinets 2C-70 and 2C71.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 62

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1666 Rev: 0 Rev Date: 4/21/2009 3:13:02 QID #: 57 Author: Coble Lic Level: R Difficulty: 3 Taxonomy: H Source: New Search 014000K406 10CFR55: 41.7 Safety Function 1 System

Title:

Rod Position Indication System (RPIS) System Number 014 K/A K4.06 Tier: 2 Group: 2 RO Imp: 3.4 SRO Imp: 3.7 L. Plan: A2LP-RO-CPC OBJ 17

Description:

Knowledge of RPIS design feature(s) and/or interlock(s) which provide for the following: -

Individual and group misalignment Question:

During an approach to criticality in Manual Sequential (MS) Mode a CEA Withdrawal Prohibit QID use History (CWP) will stop subgroup misalignment if one subgroup within a regulating group is deviated by

_______________________________ and will stop an individual CEA deviation within a subgroup if a CEA is deviated by ________________________________. RO SRO A. 4.95 inches as detected by CPCs; 5.0 inches as detected by CEACs 2003 B. 5.0 inches as detected by CPCs; 4.95 inches as detected by CEACs 2005 2006 C. 4.95 inches as detected by CEACs; 5.0 inches as detected by CPCs 2008 D. 5.0 inches as detected by CEACs; 4.95 inches as detected by CPCs 2009 Audit Exam History 2009 Answer:

A. 4.95 inches as detected by CPCs; 5.0 inches as detected by CEACs Notes:

A CEA Withdrawal Prohibit, CWP, will stop subgroup misalignment if one subgroup within a regulating group is deviated by 4.95 inches as detected by CPC target rods and will stop an individual CEA deviation within a subgroup if a CEA is deviated by 5.0 inches as detected by CEACs.

References:

ACA 2203.012J, Annunciator 2K10 Corrective Actions, Rev 35, Window 2K10-B1.

STM 2-02, CEDMCS, Rev 18 Section 8.2 STM 2-65-1, Core Protection Calculator System, Rev 13, Section 2.4.3.

Lesson Plan A2LP-RO-CPC, Rev. 12, Objective 17: List the conditions that will cause a CEA Withdrawal Prohibit (CWP).

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 63

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1667 Rev: 0 Rev Date: 4/22/2009 9:48:08 QID #: 58 Author: Coble Lic Level: R Difficulty: 2 Taxonomy: H Source: New Search 016000A402 10CFR55: 41.7 / 45.5 to 45.8 Safety Function 7 System

Title:

Non-Nuclear Instrumentation System (NNIS) System Number 016 K/A A4.02 Tier: 2 Group: 2 RO Imp: 2.7 SRO Imp: 2.6 L. Plan: A2LP-RO-FWCS OBJ 13

Description:

Ability to manually operate and/or monitor in the control room: - Recorders Question:

Consider the following: QID use History

  • Unit 2 is at 50% power during a power ascension
  • The Red and Blue pen on the 'A' SG Narrow Range Level Recorder (2LR-1033/1034) is indicating 66%. 2003
  • The Red and Blue pen on the 'B' SG Narrow Range Level Recorder (2LR-1133/1134) is indicating 64%. 2005 2006 Based on these conditions, the Level Deviation alarm for the 'A' SG on 2K03 __________ be in and the Level Deviation alarm for the 'B' SG on 2K03 __________ be in. 2008 2009 A. would; would NOT Audit Exam History B. would NOT; would 2009 C. would; would D. would NOT; would NOT Answer:

B. would NOT; would Notes:

The SG Narrow Range Setpoint changes from 60% level to 70 % level based on approximately 25% Turbine first stage pressure. At 50 % power, the Main turbine will be on line and would already be above 25% turbine first stage pressure so SG level setpoint would be 70% instead of 60%. The level deviation alarm comes in when actual SG level as indicated on the recorders deviates by more than 5% from setpoint.

'A' SG level has only deviated 4% from setpoint so its deviation alarm would not be in. 'B' SG level has deviated 6% from setpoint so its alarm should be in.

References:

STM 2-69, FWCS, Rev. 9 Section 2.3.7 and 4.2 ACA 2203.012C, Rev. 26, Alarm for Window 2K03 H-3, Level Deviation.

Lesson Plan A2LP-RO-FWCS. Rev. 12: Discuss the alarms associated with the FWCS.

Historical Comments:

This Question has never been used on a NRC Exam Form ES-401-5 Written Exam Question Worksheet 64

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1668 Rev: 0 Rev Date: 4/22/2009 11:35:1 QID #: 59 Author: Coble Lic Level: R Difficulty: 2 Taxonomy: F Source: New Search 017000K601 10CFR55: 41.7 / 45.7 Safety Function 7 System

Title:

In-Core Temperature Monitor (ITM) System System Number 017 K/A K6.01 Tier: 2 Group: 2 RO Imp: 2.7 SRO Imp: 3.0 L. Plan: A2LP-RO-ICI OBJ 6

Description:

Knowledge of the effect of a loss or malfunction of the following will have on the ITM System components: - Sensors and detectors Question:

There are 42 Core Exit Thermocouples (CETs) at the top of each incore instrument. QID use History If some of the incore instruments and their associated CET were to fail, how many CET indications must be left to monitor the core temperature during post accident conditions and not require a T.S LCO RO SRO entry.

2003 A. Greater than 75% of 42 or 32 total CETs available..

2005 B. At least 6 CETs per core quadrant available. 2006 C. At least 2 CETs per core quadrant available. 2008 2009 D. Greater than 19% of 42 or 8 total CETs available.

Audit Exam History 2009 Answer:

C. At least 2 thermocouples per core quadrant available.

Notes:

Post Accident TS. 3.3.3.6 requires 2 CETs per core quadrant or Action 1 LCO will be applicable. The SAR requires 75% of all incore instruments to be operable and at least enough incore instruments to provide 6 tilt estimates; however, these are not TS requirements nor requirements for the CETs. If 2CETs are available per core quadrant then 8 total would be available which is 19% of 42. Distracter D is incorrect because the 8 could all be in one quadrant which would not meet the T.S.

References:

T. S 3.3.3.6, Post Accident Monitoring, Table 3.3-10, Amendment 255 STM 2-67-2, Incore Flux Monitoring System, Rev. 4, Sections 2.1 and 5.0.

Lesson Plan A2LP-RO-ICI, Rev. 11, Objective 6: Explain the applicable Operating requirements and surveillances for the Incore Flux Monitoring System as described in the SAR.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 65

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1669 Rev: 0 Rev Date: 4/22/2009 1:38:50 QID #: 60 Author: Coble Lic Level: R Difficulty: 2 Taxonomy: H Source: New Search 028000A102 10CFR55: 41.5 / 45.5 Safety Function 5 System

Title:

Hydrogen Recombiner and Purge Control Syste System Number 028 K/A A1.02 Tier: 2 Group: 2 RO Imp: 3.4 SRO Imp: 3.7 L. Plan: A2LP-RO-CONH2 OBJ 13

Description:

Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the HRPS controls including: - Containment pressure.

Question:

Given the following: QID use History

  • The plant has tripped due to a Loss of Coolant Accident.
  • Currently Containment temperature is 178°F. RO SRO
  • Containment Pressure is currently 23 psia.
  • Prior to the accident, Containment temperature was 115°F. 2003
  • Prior to the accident, Containment pressure was 14.6 psia.
  • Hydrogen Recombiner 2M-55A has been started for hydrogen control. 2005 2006 Once 2M-55A is warmed up, which of the following would be the power requirement for these conditions.? (Reference Provided) 2008 2009 A. 65 MW Audit Exam History B. 66 MW 2009 C. 65 KW D. 66 KW Answer:

C. 65 KW Notes:

Based on a pre-LOCA containment temperature of 115°F and a post LOCA pressure of 23 psia, the Recombiner Power Requirement will be 65 KW.

Provide 2104.044 Attachment F as a reference.

References:

NOP 2104.044, Containment Hydrogen Control Operations, Rev. 31, Step 9.1.13 and Attachment F.

Lesson Plan A2LP-RO-CONH2 Rev. 3, Objective 13: From memory, describe the operation of the hydrogen recombiner system Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 66

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1670 Rev: 0 Rev Date: 4/23/2009 8:33:43 QID #: 61 Author: Jim Wright Lic Level: R Difficulty: 3 Taxonomy: F Source: New Search 034000A303 10CFR55: 41.7 / 45.5 Safety Function 8 System

Title:

Fuel Handling Equipment System (FHES) System Number 034 K/A A3.03 Tier: 2 Group: 2 RO Imp: 2.9 SRO Imp: 3.3 L. Plan: A2LP-RO-NI OBJ 5

Description:

Ability to monitor automatic operation of the Fuel Handling System, including: - High flux at shutdown Question:

Given the following plant condition: QID use History

  • Unit 2 is in Mode 6 with a core reload in progress.
  • Source range neutron flux monitor #1 indication has failed low and is declared inoperable. RO SRO Which of the following is required to comply with technical specifications ? 2003 A. Core alterations may continue because technical specifications only require one channel 2005 of visible indication of source range monitoring to be operable. 2006 B. Core alterations may NOT continue because technical specifications require two channels 2008 of visible indication of source range monitoring to be operable. 2009 C. Core alterations may continue because technical specifications require only one channel Audit Exam History of source range monitoring operable with audible counts available.

2009 D. Core alterations may NOT continue because technical specifications require two channels of source range monitoring operable with audible counts available on both.

Answer:

B. Core alterations may not continue because technical specifications require two channels of visible indication of source range monitoring to be operable.

Notes:

Technical Specification 3.9.2 requires 2 visual and 1 audible indication of neutron flux levels available to the control room crew during core alterations. Distracters A and C are correct because two channels are required to be operable to move fuel. Distracter D is incorrect because audible counts are only required on one channel.

References:

Technical Specification 3.9.2 LCO NOP 2502.001, Refueling Shuffle, Revision 37, Step 6.20 Lesson Plan A2LP-RO-NI, Nuclear Instrumentation, Rev. 11 Objective 5: Describe the operation and indications of the Boron Dilution Monitors. Lesson Plan A2LP-RO-TS, Rev. 11 Objective 4b: From memory, discuss the LCOs and actions statements for all LCOs with action statements less than or equal to one hour.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 67

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1671 Rev: 0 Rev Date: 2/7/2000 QID #: 62 Author: Hatman Lic Level: R Difficulty: 3 Taxonomy: H Source: NRC Exam Bank 0261 Search 045000K301 10CFR55: 41.7 / 45.6 Safety Function 4 System

Title:

Main Turbine Generator (MT/G) System System Number 045 K/A K3.01 Tier: 2 Group: 2 RO Imp: 2.9 SRO Imp: 3.2 L. Plan: A2LP-RO-SDBCS OBJ 19

Description:

Knowledge of the effect that a loss or malfunction of the MT/G System will have on the following: - Remainder of the plant Question:

With no operator action, which of the following sets of parameters match plant response for a turbine QID use History trip from 50% Reactor Power?

A. Reactor tripped, Tave approximately 545°F. RO SRO B. Reactor tripped, Tave approximately 562°F. 2003 C. Reactor power approximately 50%, Tave approximately 545°F. 2005 2006 D. Reactor power approximately 50%, Tave approximately 562°F.

2008 2009 Audit Exam History 2009 Answer:

D. Reactor power approximately 50%, Tave approximately 562°F.

Notes:

Available Steam Dump capacity on Unit 2 in a normal line up is approximately 50%. Therefore on a trip from 50% power, the Steam Dumps should be able to maintain the reactor online at ~50% power. Tave should be higher than no load Tave of 545°F and should be ~562°F at 50% power.

References:

NOP 2102.004, Power Operation, Rev. 41, Attachment C, RCS Temperature verses Reactor Power.

STM 2-23, SDBCS, Rev. 12, Section 1.2 Lesson Plan A2LP-RO-SDBCS, Rev. 11, Objective 19: With regards to the SDBCS, describe the normal system parameter values expected during various plant operating modes.

Historical Comments:

Question was used on the 2000 NRC exam.

Form ES-401-5 Written Exam Question Worksheet 68

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1672 Rev: 0 Rev Date: 4/22/2009 4:19:24 QID #: 63 Author: Coble Lic Level: R Difficulty: 3 Taxonomy: H Source: New Search 068000A202 10CFR55: 41.5 / 43.5 / 45.3 / 45. Safety Function 9 System

Title:

Liquid Radwaste System (LRS) System Number 068 K/A A2.02 Tier: 2 Group: 2 RO Imp: 2.7 SRO Imp: 2.8 L. Plan: A2LP-RO-RWST OBJ 6.b.3

Description:

Ability to (a) predict the impacts of the following malfunctions or operations on the Liquid Radwaste System and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: - Lack of tank recirculation prior to release.

Question:

Given the following: QID use History

  • Unit 2 is at normal full power operation.
  • Unit 1 has 3 Circulating Water (CW) pumps operating. RO SRO
  • Liquid Waste Condensate Tank 2T-21A release has just started at 50 gpm.
  • Annunciator 2K11 C-10 "PROC LIQUID RADIATION HI/LO" come in. 2003
  • A check of BMS/LRW Radiation Monitor 2RE-2330 shows a rising radiation trend prior to the annunciator coming in. 2005
  • The setpoint of BMS/LRW Radiation monitor 2RE-2330 was exceeded. 2006 Which one of the following conditions could have caused this rise in activity and what action 2008 should be taken? 2009 A. Unit 1 secured a CW pump reducing dilution flow; secure the release until adequate Audit Exam History CW flow is established.

2009 B. The radiation monitor setpoint was set too high prior to the release; reset the radiation monitor to the correct setpoint and restart release.

C. The 2T-21A tank was not adequately recirculated prior to chemistry sample; secure the release and obtain a new sample after adequate recirc time.

D. The 2T-21A discharge pump recirculation valve, 2LRW-32A was inadvertently opened; throttle the recirculation valve closed until activity lowers.

Answer:

C. The 2T-21A tank was not adequately recirculated prior to chemistry sample; secure the release and obtain a new sample after adequate recirc time.

Notes:

Inadequate recirc time could cause the sample results to be in error and predict a lower activity in the tank than actually exist at the time of the release which would drive the Alarm setpoint to be set too low. Distracter A is incorrect because only 2 CW pumps on Unit One are required for a release because 2 provide enough dilution flow. Also this change in flow is downstream of the radiation monitor and would not be seen by the monitor.

Distracter B is incorrect because if the setpoint is set higher than required, the release alarm would not come in.

Distracter D is incorrect because throttling open the recirc valve would lower process flow and actually lower activity at the monitor.

References:

Form ES-401-5 Written Exam Question Worksheet 69

Data for 2009 NRC RO/SRO Exam 18-Jun-09 NOP 2104.014, LRW and BMS Operations. Rev. 48, Step 29 and Supplement 1 Step 1.8.

Chemistry procedure 2607.009, Sampling the 2T-21A/B Tank, Rev. 9, Step 7.3.

STM 2-52, LRW/BMS, Rev. 14, Drawing on Page 36.

Lesson Plan A2LP-RO-RWST, Radwaste Systems, Rev. 6, Objective 6.a.1: Describe the following tasks associated with the radioactive waste operating procedures: Perform a Waste Condensate Tank 2T-21A/B Release.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 70

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1673 Rev: 0 Rev Date: 4/23/2009 9:42:19 QID #: 64 Author: Coble Lic Level: R Difficulty: 3 Taxonomy: H Source: New Search 0750002128 10CFR55: 41.7 Safety Function 8 System

Title:

Circulating Water System System Number 075 K/A 2.1.28 Tier: 2 Group: 2 RO Imp: 4.1 SRO Imp: 4.1 L. Plan: A2LP-RO-CWS OBJ 2

Description:

Conduct of Operations - Knowledge of the purpose and function of major system components and controls.

Question:

Given the following: QID use History

RO SRO If the Circulating Water cooling tower basin rises above its current setpoint of 80%, then the Service Water Squeeze Valve, 2CV-1460, will __________ to provide __________ Service Water 2003 makeup flow to the Circulating Water cooling tower.

2005 A. open; less 2006 B. close; more 2008 2009 C. open; more Audit Exam History D. close; less 2009 Answer:

A. open; less Notes:

The position of 2CV 1460 determines the back pressure on the service water and auxiliary cooling water return headers, and thus the flow of service water and auxiliary cooling water to the circulating water cooling tower basin. When 2CV 1460 is open minimum makeup flow is directed to the cooling tower basin. When the squeeze valve is throttled closed, the back pressure on the service water return header rises. This causes water from the return header to divert to the cooling tower basin if service water valve 2CV-1540 is open.

References:

STM 2-40-1, CWS, Rev. 24, Section 2.1.6.

STM 2-42, Service Water System, Rev. 28, Figure on page 61.

Lesson Plan A2LP-RO-CWS, Rev. 8, Objective 2: Describe the operation of the CWS cooling tower including de-icing, bypassing, and makeup.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 71

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1674 Rev: 0 Rev Date: 4/23/2009 11:03:4 QID #: 65 Author: Coble Lic Level: R Difficulty: 3 Taxonomy: F Source: New Search 086000K504 10CFR55: 41.5 / 45.7 Safety Function 8 System

Title:

Fire Protection System (FPS) System Number 086 K/A K5.04 Tier: 2 Group: 2 RO Imp: 2.9 SRO Imp: 3.5 L. Plan: ASLP-FP-ELEC OBJ 1.2

Description:

Knowledge of the operational implications of the following concepts as they apply to the Fire Protection System: - Hazards to personnel as a result of fire type and methods of protection Question:

Given the following: QID use History

  • Unit 2 is in a refueling outage.
  • A report comes in from the fire brigade leader that a Class 'C" fire is in progress on the RO SRO 372 elevation in containment.

2003 What kind of hazards exist to the personnel during this fire and which action can be taken to reduce this hazard? 2005 2006 A. Smoke inhalation from burning trash; evacuate the containment building.

2008 B. Intense heat from burning oil; align fire water to the containment building. 2009 C. Potential electrocution; de-energized the applicable power supply to containment. Audit Exam History D. Flying sparks from burning metal; evacuate the local area on the 372 elevation. 2009 Answer:

C. Potential electrocution; de-energized the applicable power supply to containment.

Notes:

There are 2 480 Volt MCC electrical buses on the 372 elevation in containment (2B71 and 2B81). A class C fire would be in one of those buses as they are the only major electrical components on that elevation. A trash fire is a Class A fire. Oil is a Class B fire and burning metal is a Class D fire.

References:

STM 2-32-3, 480 Volt Distribution System, Rev. 13, Table 2 on page 42.

Lesson Plan ASLP-FP-ELEC, Fighting Electrical Fires.Rev.2, Objectives 1.2: Discuss the hazards associated with fires involving energized electrical equipment and cables and 1.4: Describe the actions necessary to control a Class "C" Fire.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 72

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1675 Rev: 0 Rev Date: 4/28/2009 9:20:15 QID #: 66 Author: Coble Lic Level: R Difficulty: 2 Taxonomy: F Source: New Search 1940012115 10CFR55: 41.10 / 45.12 Safety Function System

Title:

Generic System Number GENERIC K/A 2.1.15 Tier: 3 Group: 1 RO Imp: 2.7 SRO Imp: 3.4 L. Plan: ASLP-RO-OPSPR OBJ 4.e.1

Description:

Conduct of Operations - Knowledge of administrative requirements for temporary management directives, such as standing orders, night orders, Operations memos, etc.

Question:

Which one of the following contains the Reactor Coolant Pumps (RCPs) that have Operational Decision QID use History Making Issues (ODMIs) associated with them and the correct trigger point that would cause further action to be taken?

RO SRO A. RCPs 2P-32A and 2P-32B; High Seal DP 2003 B. RCPs 2P-32B and 2P-32C; Low Seal DP 2005 C. RCPs 2P-32C and 2P-32D; High Controlled Bleed off Flow 2006 D. RCPs 2P-32A and 2P-32C; Low Controlled Bleed off Flow 2008 2009 Audit Exam History 2009 Answer:

B. RCPs 2P-32B and 2P-32C; Low Seal DP Notes:

RCPs B and C have degraded seals during this current operating cycle. The lower seal on 2P-32B and the middle seal on 2P-32C. The ODMIs are like standing orders to take further action is the seals continue to degrade. Normal Seal DP is around 700 psid for each seal. Currently the DP across the degraded seals are 575 to 650 psid. The ODMIs establishes 300 psid as a trigger point to take further action above monitoring. There are programmable alarms set in the control room that will come in if the trigger point is reached on either pump.

References:

ODMI Procedure EN-OP-111, Rev. 1 Purpose 1.

ODMIs for 2P-32B Rev. 1 and 2P-32C Rev. 2.

EN-OP-115, Conduct of Operations, Rev. 6, Attachment 9.1, Beginning of Shift Brief Checklist - Review all current Operations Shift Standing Orders.

Lesson Plan ASLP-RO-OPSPR Rev. 11, Objective 4.e.1 Describe the requirements associated with:

Shift Turnovers and Relief.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 73

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1676 Rev: 0 Rev Date: 4/28/2009 4:34:18 QID #: 67 Author: Coble Lic Level: R Difficulty: 2 Taxonomy: F Source: IH Exam Bank OPS2-10632 Modified Search 1940012118 10CFR55: 41.10 / 45.12 / 45.13 Safety Function System

Title:

Generic System Number GENERIC K/A 2.1.18 Tier: 3 Group: 1 RO Imp: 3.6 SRO Imp: 3.8 L. Plan: ASLP-RO-OPSPR OBJ 4.e.3

Description:

Conduct of Operations - Ability to make accurate, clear, and concise logs, records, status boards, and reports.

Question:

Given the following: QID use History

  • The plant is at full power.
  • An ECCS pump becomes inoperable. RO SRO Which ONE of the following contains all of the required information that should be included when 2003 making entries onto the Plant/Safety System Status Board in the Control Room?

2005 A. Component name/number, component status, date and time, initials of person making entry. 2006 B. Component name/number, date and time, last name of the CRS, plant power level. 2008 2009 C. Plant power level, component name/number, last name of the CRS, date of TS entry.

Audit Exam History D. Component status, plant power level, initials of person making entry, component name/number.

2009 Answer:

A. Component name/number, component status, date and time, initials of person making entry.

Notes:

Entries on Plant/Safety System Status Board should be brief, but contain all of the following:

Component name/number. Component status (isolated, bypassed, etc.) and associated LCO time clock if applicable. WR/WO/CR number as applicable. Date/Time, if in TS/TRM/ODCM/AOT time clock (Time not required if time clock does not apply. Initials of person making the entry.

References:

COPD-001 Operations Expectations and Standards, Rev. 38, Step 12.1.7.

Lesson Plan ASLP-RO-OPSPR, OPS Admin Procedures, Rev. 11, Objective 4.e.3: Describe the requirements associated with: Use of Status Boards Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 74

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1677 Rev: 0 Rev Date: 4/29/2009 9:11:33 QID #: 68 Author: Coble Lic Level: R Difficulty: 2 Taxonomy: F Source: New Search 1940012207 10CFR55: 41.10 / 43.3 / 45.13 Safety Function System

Title:

Generic System Number GENERIC K/A 2.2.7 Tier: 3 Group: 1 RO Imp: 2.9 SRO Imp: 3.6 L. Plan: ASLP-RO-PRCON OBJ 15

Description:

Equipment Control - Knowledge of the process for conducting special or infrequent tests.

Question:

Which one of the following evolutions requires a Infrequently Performed Test or Evolution (IPTE) brief QID use History prior to conducting and also list the appropriate management oversight for the IPTE?

A. Turbine Generator Valve Stroke Test offline; The onshift Shift Manager RO SRO B. Beginning of cycle Reactor Startup from outage; The onshift Shift Manager 2003 C. Turbine Generator Valve Stroke Test online; Assistant OPS Manager 2005 2006 D. Mid cycle Reactor Startup from post trip; Assistant OPS Manager 2008 2009 Audit Exam History 2009 Answer:

D. Mid cycle Reactor Startup from post trip; Assistant OPS Manager Notes:

A Reactor Startup at any point in the cycle requires a IPTE to be performed. The Valve stroke surveillance is a quarterly and thus does not meet the infrequent requirement. The definition of senior line management in the IPTE procedure is someone senior to the shift manager (he/she is considered senior line management at all other times) These Senior Line Managers are designated by a letter from the GMPO to be the IPTE representatives.

References:

Procedure EN-OP-116, IPTEs, Rev. 2 Section 3.0 Steps 3 and 5. Also Attachment 9.1, Designation letter from the GMPO on who can be the Senior Line Manager for the brief.

OP-2102.016, Reactor Startup Procedure, Rev. 13, Note above step 7.32.

OP-2106.009, Supplement 3, Rev. 51, Turbine Generator Valve Stroke Test, Section 1.0.

Lesson Plan, ASLP-RO-PRCON, Describe the mandatory requirements for any activity designated as an Infrequently Performed Test or Evolution.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 75

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1678 Rev: 0 Rev Date: 4/29/2009 11:19:5 QID #: 69 Author: Coble Lic Level: R Difficulty: 2 Taxonomy: F Source: New Search 1940012221 10CFR55: 41.10 / 43.2 Safety Function System

Title:

Generic System Number GENERIC K/A 2.2.21 Tier: 3 Group: 1 RO Imp: 2.9 SRO Imp: 4.1 L. Plan: ASLP-RO-OPSPR OBJ 4.j.2.h

Description:

Equipment Control - Knowledge of pre- and post-maintenance operability requirements.

Question:

Given the following: QID use History

  • The plant is at full power.

2003 Prior to performing maintenance on 2CV-1503-1, the valve should be ________________________

and after maintenance on 2CV-1503-1, the valve should be _____________stroked to ensure operability 2005 with the new packing. 2006 A. isolated and tagged out; manually 2008 2009 B. placed on the backseat; electrically Audit Exam History C. placed on the backseat; manually 2009 D. isolated and tagged out; electrically Answer:

D. isolated and tagged out; electrically Notes:

2CV-1503-1 is an electrical MOV butterfly isolation valve and cannot be back seated to isolate the packing. All MOVs are required to be stroked electrically after maintenance to verify operability.

References:

OP 1015.001, Conduct of Operations, Rev.72. Note above Step 11.2 STM 2-42, Service Water, Rev. 28, Section 3.5.8.

Lesson Plan ASLP-RO-OPSPR, OPS Admin Procedures, Rev. 11, Objective 4.j.2.h: Steps taken to restore MOV to operable status following maintenance.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 76

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1679 Rev: 0 Rev Date: 4/29/2009 1:18:59 QID #: 70 Author: Coble Lic Level: R Difficulty: 2 Taxonomy: F Source: New Search 1940012223 10CFR55: 41.7 / 41.10 / 43.2 / 45 Safety Function System

Title:

Generic System Number GENERIC K/A 2.2.23 Tier: 3 Group: 1 RO Imp: 3.1 SRO Imp: 4.6 L. Plan: ASLP-RO-OPSPR OBJ 4.d.1

Description:

Equipment Control - Ability to track Technical Specification limiting conditions for operations.

Question:

Given the following: QID use History

  • The plant is at full power at 0900 on dayshift.
  • Charging Pump 2P36C is tagged out for cracked plunger block replacement. RO SRO
  • Charging Pump 2P-36A has been declared inoperable for maintenance to perform pulsation damper checks prior to the upcoming quarterly surveillance. 2003
  • Total estimated time prior to returning pump back to operable status is 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

2005 Which one of the following list the required documentation needed to track the Technical Requirements 2006 for Operation (TRO) entry and exit for this maintenance?

2008 A. Inoperable Equipment Checklist, Station Log entry, and a Status Board entry. 2009 B. Station Log entry, LCO Tracking Record, and a Status Board entry. Audit Exam History C. LCO Tracking Record , Station Log entry, and an Inoperable Equipment Checklist. 2009 D. Status Board entry, Station Log entry, and a TRO tracking Record.

Answer:

A. Inoperable Equipment Checklist, Station Log entry, and a Status Board entry.

Notes:

These condition would require an entry into TRM 3.1.2.4, Charging Pumps. A LCO Tracking Record is required for any TS, TRM, ODCM, or Fire Spec entry that is expected to last more than a shift (12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />). An Inoperable Equipment Checklist, Station Log entry, and a Status Board update are required for all TS, TRM, ODCM, or Fire Spec entries. This evolution will last less than a shift so no LCO Tracking Record is required.

TRO tracking records are not used.

References:

T.S. 3.1.2.4, Charging Pumps.

OP 1015.001, Conduct of Operations, Rev.72. Step 8.1.2 6th bullet and step 8.1.3.C.

COPD-001 Operations Expectations and Standards, Rev. 38, Step 12.1.9.

Lesson Plan ASLP-RO-OPSPR, OPS Admin Procedures, Rev. 11, Objective 4.d.1/2/3: Describe the Operating Logs and Records taken by Operations Personnel, Describe the Narrative Logs maintained by Operations and Describe the actions and occurrences that are required to be recorded in the Station and Control Room logs.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 77

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1680 Rev: 0 Rev Date: 3/12/2000 QID #: 71 Author: Woolf Lic Level: R Difficulty: 3 Taxonomy: H Source: NRC Exam Bank 0297 Search 1940012304 10CFR55: 41.12 / 43.4 / 45.10 Safety Function System

Title:

Generic System Number GENERIC K/A 2.3.4 Tier: 3 Group: 1 RO Imp: 3.2 SRO Imp: 3.7 L. Plan: ASLP-RO-RADP OBJ 14

Description:

Radiological Controls - Knowledge of radiation exposure limits under normal or emergency conditions.

Question:

Plant conditions are: QID use History

  • Plant has been shutdown for refueling.
  • Acid reducing chemistry has created a large RCS crud burst. RO SRO
  • Whole body general area dose rates are 3 Rem/hr in the "B" ESF Room.

2003 A female WCO who is NOT declared pregnant with complete exposure records is assigned to align the "B" SDC train for decay heat removal. This job is expected to take 30 minutes. 2005 2006 The WCO has a radiation history of 1000 mrem exposure for this year.

2008 Which of the following statements is correct for the additional dose that will be received by 2009 performing this system alignment with the above conditions?

Audit Exam History A. WCO will NOT exceed routine annual ANO Admin whole body (TEDE) limits for radiation workers. 2009 B. WCO will NOT exceed routine annual ANO Admin whole body (TEDE) limits for female radiation workers.

C. WCO will exceed annual Federal whole body (TEDE) limits for this female radiation workers.

D. WCO will exceed routine annual ANO Admin whole body (TEDE) limits for radiation workers.

Answer:

D. WCO will exceed routine annual ANO Admin whole body (TEDE) limits for radiation workers.

Notes:

Radiation history of 1000 mrem shows that WCO is a radiation worker with limits the same as males.

A is incorrect because the TEDE ANO Routine Admin limit is 2 Rem/yr for rad workers. Total exposure after this job would be 2.5 Rem.

B is incorrect because the ANO Routine Admin limits are the same for Female rad worker who is not pregnant and rad worker.

C is incorrect because Federal limits are 5 Rem/yr..

D is correct because the additional dose is 1500 mrem which is added to 1000 mrem to make 2500 mrem which exceeds the admin limit of 2.0 Rem/yr.

References:

Procedure RP-201, Rev. 2, Dosimetry Administration, Step 5.3 [3]

Lesson Plan ASLP-RO-RADP, Rev. 5, Radiation Protection, OBJ. 14, Define the ANO Administrative Exposure Limits.

Form ES-401-5 Written Exam Question Worksheet 78

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Historical Comments:

Last used on the 2005 NRC exam.

Bank: 1681 Rev: 0 Rev Date: 4/29/2009 3:16:08 QID #: 72 Author: Coble Lic Level: R Difficulty: 3 Taxonomy: H Source: New Search 1940012311 10CFR55: 41.11 / 43.4 / 45.10 Safety Function System

Title:

Generic System Number GENERIC K/A 2.3.11 Tier: 3 Group: 1 RO Imp: 3.8 SRO Imp: 4.3 L. Plan: A2LP-RO-EAOP OBJ 15

Description:

Radiological Controls - Ability to control radiation releases.

Question:

Given the following plant conditions: QID use History

  • Plant is operating at 100% power.
  • Chemistry reports that RCS activity has risen to 66 micro curies/gram RO SRO DOSE EQUVALENT I-131.

2003 Which one of the following states the required action(s) for this condition?

2005 A. Restore RCS activity to within limits within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or go to HOT STANDBY in case of a SGTR. 2006 B. Be in at least HOT STANDBY within six hours to limit offsite dose in case of a SGTR. 2008 2009 C. Trip the Reactor, reduce RCS T-hot to less then 535°F and isolate Steam Generators.

Audit Exam History D. Verify DOSE EQUIVALENT I-131 is less than the limit once every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by sampling RCS.

2009 Answer:

B. Be in at least HOT STANDBY within six hours to limit offsite dose in case of a SGTR.

Notes:

Distracter A is incorrect because T.S 3.4.8 does not allow a time period to restore RCS activity to below the limit when activity is > 60 micro curies/gram. T.S 3.4.8 requires the plant to be in Hot Standby in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> when the 60 micro curies/gram activity threshold is reached. Distracter C is incorrect in this case but would be the required action to take if indications of a SGTR were present. Distracter D is incorrect because the limit of 60 micro curies/gram has been reached but would be a correct action prior to 60 micro curies/gram activity.

References:

T.S 3.4.8, RCS Specific Activity, Amendment 282.

AOP 2203.020, High RCS Activity, Rev. 10, Step 4.

Lesson Plan A2LP-RO-EAOP, Rev. 12, Objective 15: Discuss the Mitigation strategy, Entry Conditions, Instructions and Exit Conditions (as per AOP and Tech Guide) of OP 2203.020, High Activity In The RCS.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 79

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1682 Rev: 0 Rev Date: 4/29/2009 5:29:52 QID #: 73 Author: Coble Lic Level: R Difficulty: 3 Taxonomy: H Source: New Search 1940012312 10CFR55: 41.12 / 45.9 / 45.10 Safety Function System

Title:

Generic System Number GENERIC K/A 2.3.12 Tier: 3 Group: 1 RO Imp: 3.2 SRO Imp: 3.7 L. Plan: A2LP-RO-FH OBJ 4

Description:

Radiological Controls - Knowledge of radiological safety principles pertaining to licensed operator duties, such as containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, aligning filters, etc.

Question:

Given the following: QID use History

  • Unit 2 is in Mode 6 with a fuel off-load in progress.
  • Containment Purge is in the continuous ventilating mode. RO SRO
  • The SRO in charge of refueling notifies the Control Room that an incident has caused damage to a spent fuel assembly in the Containment building. 2003
  • Airborne activity is rising in Containment 2005 Based on the responsibilities of a licensed operator, which one of the following would be the FIRST 2006 action for the control room to take as far as the health and safety of the public is concerned?

2008 A. Ensure Containment Closure is set. 2009 B. Ensure Containment Evacuated. Audit Exam History C. Verify Containment Purge is secured. 2009 D. Verify Containment Fan coolers secured.

Answer:

C. Verify Containment Purge is secured.

Notes:

Verify Containment Purge is secured after a fuel handling accident in Containment is the first action direction that the Control Room is given per the Refueling Shuffle procedure Attachment M, Refueling Accident, Step 2.5.1. This will prevent most activity from leaving the Containment and affecting the larger population outside of Containment. It is also the quickest action to take. Setting Containment Closure is directed from the Control room but is not performed by the control room and takes up to 30 minutes. Evacuation is also an action to take but affects fewer people than securing purge thus is directed later in the Attachment M. Securing Containment Fans is not a directed action and could cause activity to be higher if secures due to the filtering of the air in Containment.

References:

NOP 2502.001, Refueling Shuffle, Rev. 37, Attachment M, Refueling Accident, Step 2.5.1.

Lesson Plan A2LP-RO-FH, Rev. 1, Objective 4: Given a fuel handling evolution or condition, determine the correct response.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 80

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1683 Rev: 0 Rev Date: 4/30/2009 2:06:41 QID #: 74 Author: Coble Lic Level: R Difficulty: 2 Taxonomy: F Source: New Search 1940012406 10CFR55: 41.10 / 43.5 / 45.13 Safety Function System

Title:

Generic System Number GENERIC K/A 2.4.6 Tier: 3 Group: 1 RO Imp: 3.7 SRO Imp: 4.7 L. Plan: A2LP-RO-EFRP OBJ 2

Description:

Emergency Procedures/Plan - Knowledge of EOP mitigation strategies.

Question:

During the implementation of the Functional Recovery Procedure, all the following safety functions are QID use History Jeopardized.

Which one of the following safety functions should be addressed FIRST by the crew? RO SRO A. RCS Inventory Control 2003 B Maintenance of Vital Auxiliaries 2005 2006 C. RCS Pressure Control 2008 D. Containment Isolation 2009 Audit Exam History 2009 Answer:

B Maintenance of Vital Auxiliaries Notes:

The safety functions in order of priority are 1. Reactivity Control 2. Vital DC Auxiliaries 3. Vital AC Auxiliaries 4.RCS Inventory Control 5.RCS Pressure Control 6. RCS & Core Heat Removal 7. CNTMT Isolation 8.CNTMT Temp. & Pressure Control 9. CNTMT Combustible Gas Control Jeopardized Safety functions are addressed first in order of priority from safety function 1 through 9.

Maintenance of Vital Auxiliaries would be the highest priority safety function in the list above and should be addressed first.

References:

EOP 2202.009, Functional Recovery Procedure (FRP), Rev. 9, Entry Section Steps 13 and 14 and Success Path Tracking Page.

Lesson Plan A2LP-RO-EFRP, Rev. 3, Objective 2: Describe the Safety Functions checked by FRP.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 81

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1684 Rev: 0 Rev Date: 4/30/2009 2:53:50 QID #: 75 Author: Coble Lic Level: R Difficulty: 2 Taxonomy: F Source: NRC Exam Bank 8 Modified Search 1940012426 10CFR55: 41.10 / 43.5 / 45.12 Safety Function System

Title:

Generic System Number GENERIC K/A 2.4.26 Tier: 3 Group: 1 RO Imp: 3.1 SRO Imp: 3.6 L. Plan: ASLP-FP-ELEC OBJ 1.3

Description:

Emergency Procedures/Plan - Knowledge of facility protection requirements, including fire brigade and portable fire fighting equipment usage.

Question:

Given the following: QID use History

  • A small fire has started due to burning insulation inside breaker cubicle 2B52-A4.
  • Power to the breaker cannot be interrupted. RO SRO With the exception of the Fire Brigade Leader, which one of the following describes the makeup of the 2003 Fire Brigade Members for this event and the best type of extinguisher to use on this fire.

2005 A. Unit 1 Operators; CO2 extinguisher 2006 B. Unit 1 Operators; H2O extinguisher 2008 2009 C. Unit 2 Operators; CO2 extinguisher Audit Exam History D. Unit 2 Operators; H2O extinguisher 2009 Answer:

A. Unit 1 Operators; CO2 extinguisher Notes:

The three members of the fire brigade that report to the Leader come from the unaffected unit thus distracters C and D are incorrect. Breaker cubicle 2B52-A4 is on Unit 2. CO2 should be used over H2O due to the increased shock hazard potential from the water. thus distracters B and D are incorrect.

References:

NOP 1015.007, Fire Brigade Organization and Responsibilities, Rev. 19 Section 6.1 and 6.2..

Lesson Plan ASLP-FP-INTRO, Introduction to Fire Protection, Rev. 9, Objective 2: Explain which personnel make-up the Fire Brigade, and describe their duties and responsibilities.

Lesson Plan ASLP-FP-ELEC, Fighting Electrical Fires, Rev. 2, Objective 1.3: Describe the types of extinguishing agents and equipment that can be used effectively on Class C Fires.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 82

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1685 Rev: 0 Rev Date: 5/6/2009 2:20:56 QID #: 76 Author: Coble Lic Level: S Difficulty: 3 Taxonomy: F Source: New Search 0000072445 10CFR55: 41.10 / 43.5 / 45.3 / 45 Safety Function 1 System

Title:

Reactor Trip - Stabilization System Number 007 K/A 2.4.45 Tier: 1 Group: 1 RO Imp: 4.1 SRO Imp: 4.3 L. Plan: A2LP-RO-EAOP OBJ 28

Description:

Emergency Procedures/Plan - Ability to prioritize and interpret the significance of each annunciator or alarm.

Question:

Given the following: QID use History

  • The plant is at full power.
  • There are indications of a rising RCS leak. RO SRO
  • Annunciator 2K11 J-8 " RATE OF CHANGE HI" is locked in. 2003
  • Current RCS leak rate is 50 gpm.

2005 Which of the following is the correct action to take and list the correct implementing procedure? 2006 A. Commence a Plant Shutdown; AOP 2203.016, Excess RCS Leakage. 2008 2009 B. Commence a Plant Shutdown; AOP 2203.038, Primary to Secondary Leakage.

Audit Exam History C. Trip the Reactor and perform SPTAs; EOP 2202.003, Loss of Coolant Accident.

2009 D. Trip the Reactor and perform SPTAs; EOP 2202.004, Steam Generator Tube Rupture.

Answer:

D. Trip the Reactor and perform SPTAs; EOP 2202.004, Steam Generator Tube Rupture.

Notes:

These alarms along with indications of a RCS leak provide indications form the N16 Main Steam line radiation monitors of activity in the secondary from the RCS. The Alarm response procedure refers the SRO to the Primary to Secondary Leakage AOP which has a contingency step that directs tripping of the reactor if RCS leakage exceeds the capacity of one charging pump which is 44 gpm. Distracters A and C list the wrong implementing procedure but correct action to take if those procedures were applicable. Distracter B list the first implementing procedure entered but ultimately the EOP would be the guiding procedure based on this leak rate and alarms.

References:

Annunciator 2K11 K-8 "TROUBLE LKRT HI", Rev. 35.

Annunciator 2K11 J-8 " RATE OF CHANGE HI, Rev. 35 AOP 2203.038, Primary to Secondary Leakage, Rev. 10, Entry Conditions and Floating Step 12.

EOP 2202.004, Steam Generator Tube Rupture, Rev. 9 Entry Conditions.

AOP 2203.016, Excess RCS Leakage, Rev. 13, Entry Conditions.

Lesson Plan A2LP-RO-EAOP, Rev. 12, Objective 28: Discuss the Mitigation strategy, Entry Conditions, applicable industry events, Instructions and Exit Conditions of OP 2203.038, Primary To Secondary Leakage.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 83

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1686 Rev: 0 Rev Date: 1/4/2005 QID #: 77 Author: Coble Lic Level: S Difficulty: 4 Taxonomy: H Source: NRC Exam Bank 0548 Search 000025A204 10CFR55: 41.7 / 41.10 / 43.5 / 45 Safety Function 4 System

Title:

Loss of Residual Heat Removal System (RHRS) System Number 025 K/A AA2.04 Tier: 1 Group: 1 RO Imp: 3.3 SRO Imp: 3.6 L. Plan: A2LP-RO-EAOP OBJ 22

Description:

Ability to determine and interpret the following as they apply to the Loss of Residual Heat Removal System: - Location and isolability of leaks Question:

Given the following: QID use History

  • 'A' SDC Loop was placed in service 5 minutes ago with a normal system lineup.
  • PZR level is 37% and dropping RO SRO
  • RCS temperature is 280°F and constant.
  • PZR pressure is 260 psia and dropping 2003
  • RWT level is rising slowly
  • VCT level is constant. 2005
  • Hold Up Tank (2T-12) levels are constant. 2006 Based on these conditions, the correct procedure to enter would be the ________________and the RCS 2008 draining would be stopped by closing _____________________. 2009 A. Lower Mode Functional Recovery EOP; 2P-60A Normal LPSI Recirc Valve (2CV-5123-1) Audit Exam History B. Lower Mode Functional Recovery EOP; Letdown Divert Valve (2CV-4826) 2009 C. Loss of Shutdown Cooling AOP; 2P-60A Normal LPSI Recirc Valve (2CV-5123-1)

D. Loss of Shutdown Cooling AOP; Letdown Divert Valve (2CV-4826)

Answer:

C. Loss of Shutdown Cooling AOP; 2P-60A Normal LPSI Recirc Valve (2CV-5123-1)

Notes:

The entry conditions for Loss of Shutdown cooling are met since there is an unexplained loss of RCS inventory.

The leak is going through the 'A' LPSI Recirc valve that should have been closed when the SDC loop was placed in service. Distracter A and B are incorrect because RCS temperature is above the 275°F entry limit for the lower mode functional procedure. Distracter B is also incorrect since selected Hold Up tank 2T12 level is constant thus the leak is not going through the Divert Valve. Distracter D is incorrect since selected Hold Up tank 2T12 level and VCT levels are constant thus the leak is not going through the Divert Valve.

References:

STM 2-14, SDC System, Rev. 8, Figure on page 48.

NOP 2104.004, Shutdown Cooling System, Rev. 39, Step 7.13.1.B AOP 2203.029, Loss of SDC, Rev. 13. Entry Conditions and Contingency Step 4.A EOP 2202.011, Lower Mode Functional Recovery. Rev. 5, Entry Conditions.

Lesson Plan A2LP-RO-EAOP, Rev. 12, Abnormal Operating Procedure, Objective 22, Discuss the Mitigation strategy, Entry Conditions, applicable industry events, Instructions and Exit Conditions of OP 2203.029, Loss of Shutdown Cooling.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 84

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Used on the 2005 NRC Exam.

Form ES-401-5 Written Exam Question Worksheet 85

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1687 Rev: 0 Rev Date: 5/14/2009 9:23:08 QID #: 78 Author: Coble Lic Level: S Difficulty: 4 Taxonomy: H Source: NRC Exam Bank 0282 Modified Search 000040A201 10CFR55: 41.7 / 41.10 / 43.5 / 45 Safety Function 4 System

Title:

Steam Line Rupture System Number 040 K/A AA2.01 Tier: 1 Group: 1 RO Imp: 4.2 SRO Imp: 4.7 L. Plan: A2LP-RO-EESD OBJ 3

Description:

Ability to determine and interpret the following as they apply to the Steam Line Rupture: -

Occurrence and location of a steam line rupture from pressure and flow indications Question:

Given the following plant conditions: QID use History

  • Ten (10) minutes post trip from full power.
  • Pressurizer pressure is 1400 psia and lowering. RO SRO
  • Containment Temperature and Pressure are normal and stable 2006
  • All ESFAS signals and components have actuated as designed.
  • The only operator actions taken are those directed by the SPTA procedure. 2008 2009 Which of the following would be the correct procedure to diagnose after SPTAs, and the correct action to take for the given conditions? Audit Exam History A. EOP 2205.005, Excess Steam Demand; Close MSIVs (2CV-1010-1 and 2CV-1060-2). 2009 B. EOP 2205.005, Excess Steam Demand; Close Main Steam to EFW Pump 2P-7A (2CV-1000-1 and 2CV-1050-2).

C. AOP 2203.001, RCS Overcooling; Close MSIVs (2CV-1010-1 and 2CV-1060-2).

D. AOP 2203.001, RCS Overcooling; Close Main Steam to EFW Pump 2P-7A (2CV-1000-1 and 2CV-1050-2).

Answer:

B. EOP 2205.005, Excess Steam Demand; Close Main Steam to EFW Pump 2P7A 2CV-1000-1 and 2CV-1050-2.

Notes:

Below 751 psia in the SGs, a Main Steam Isolation signal would have already closed the MSIVs. The only common line upstream of the MSIVs that would equally affect the SG pressures after the MSIS ESFAS signal would be the line to the steam driven EFW pump. During diagnostics with an MSIS, the chart will direct entry into the Excess Steam Demand procedure if SG pressure are less than 800 psia. If no MSIS is present and SG pressures are less than 950 psia than RCS Overcooling should be entered. Distracters C and D are incorrect because SG pressure are less than 800 psia and MSIS is present. Distracters A and C are incorrect because MSIVs should have automatically closed on the MSIS.

References:

EOP 2202.010, Standard Attachments, Rev. 11, Exhibit 8, Diagnostic Actions.

EOP 2202.005, Excess Steam Demand, Rev. 9, Steps 13 and 16.

Lesson Plan A2LP-RO-EESD, Rev. 5, Given a set of plant conditions during an ESD, determine which SG is Form ES-401-5 Written Exam Question Worksheet 86

Data for 2009 NRC RO/SRO Exam 18-Jun-09 most affected by the event.

Historical Comments:

Original question was used on the 2000 NRC Exam.

Form ES-401-5 Written Exam Question Worksheet 87

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1688 Rev: 0 Rev Date: 5/14/2009 11:17:4 QID #: 79 Author: Coble Lic Level: S Difficulty: 4 Taxonomy: H Source: New Search 0000582420 10CFR55: 41.10 / 43.5 / 45.13 Safety Function 6 System

Title:

Loss of DC Power System Number 058 K/A 2.4.20 Tier: 1 Group: 1 RO Imp: 3.8 SRO Imp: 4.3 L. Plan: A2LP-RO-ELOSF OBJ 1/3

Description:

Emergency Procedures/Plan - Knowledge of operational implications of EOP warnings, cautions, and notes.

Question:

Given the following plant conditions at full power : QID use History

  • The plant has experienced a loss of Green DC Bus 2D02.
  • Subsequently a complete Loss of Offsite Power (LOOP) trips the plant. RO SRO
  • SPTAs are entered and all required actions are taken.
  • EFW pump 2P-7B starts on EFAS signal then trips on motor overload. 2003

2005 Which of the following procedures should be entered after SPTAs and which of the following actions 2006 can be taken FROM the CONTROL ROOM to mitigate this event?

2008 A. EOP 2202.006, Loss of Feedwater; Tie AACG to 4160 VAC Bus 2A1 and commence feeding 2009 SGs with AFW Pump 2P-75 at less than 150 gpm.

Audit Exam History B. EOP 2202.007, Loss of Offsite Power; Tie AACG to 4160 VAC Bus 2A4 and commence feeding SGs with EFW Pump 2P-7A at less than 150 gpm. 2009 C. EOP 2202.006, Loss of Feedwater; Tie AACG to 4160 VAC Bus 2A4 and commence feeding SGs with EFW Pump 2P-7A at full EFW flow.

D. EOP 2202.007, Loss of Offsite Power; Tie AACG to 4160 VAC Bus 2A1 and commence feeding SGs with AFW Pump 2P-75 at full AFW flow.

Answer:

A. EOP 2202.006, Loss of Feedwater; Tie AACG to 4160 VAC Bus 2A1 and commence feeding SGs with AFW Pump 2P-75 at less than 150 gpm.

Notes:

The loss of Green DC will cause the steam driven EFW pump 2P-7A to overspeed and trip and thus is not available. The loss of Green DC will also prevent the 'B' Green Train Emergency Diesel from starting and supplying power to green vital bus 2A4. The loss of Offsite power along with the trip of EFW pump 2P-7B leaves no feedwater available. The Diagnostic flow chart will direct implementing the Loss of Feedwater EOP even if a LOOP has occurred since all optimum EOPs have steps to address a LOOP. A caution in the Loss of Feed EOP States: Feed to an impacted SG should be maintained less than 150 gpm until SG level rises or flow has been maintained for greater than 5 minutes. An impacted SG is one that is less than 49% level. Distracter B and C are incorrect because 2P-7A is not available. Distracters C and D are incorrect because feed flow should be limited to less than 150 gpm with SG levels less than 49%.

References:

EOP 2202.010, Standard Attachments, Rev. 11, Exhibit 8, Diagnostic Actions.

EOP 2202.006, Loss of Feedwater, Rev. 6, Caution above Step 13.E.

Lesson Plan A2LP-RO-ELOSF, Rev. 4, Objective 1 and 3: Analyze a set of plant conditions, and determine if Form ES-401-5 Written Exam Question Worksheet 88

Data for 2009 NRC RO/SRO Exam 18-Jun-09 the entry conditions for the Loss of Feedwater EOP exist and Analyze a set of plant conditions, during a loss of feedwater event, and determine the actions necessary to restore feedwater flow to the Steam Generators.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 89

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1689 Rev: 0 Rev Date: 5/14/2009 12:53:4 QID #: 80 Author: Coble Lic Level: S Difficulty: 3 Taxonomy: F Source: New Search 000065A201 10CFR55: 41.7 / 41.10 / 43.5 / 45 Safety Function 8 System

Title:

Loss of Instrument Air System Number 065 K/A AA2.01 Tier: 1 Group: 1 RO Imp: 2.9 SRO Imp: 3.2 L. Plan: A2LP-RO-EAOP OBJ 16

Description:

Ability to determine and interpret the following as they apply to the Loss of Instrument Air: -

Cause and effect of low-pressure instrument air alarm Question:

Given the following plant conditions: QID use History

  • The following event occurs on Unit 2 at 100% Power.
  • The CBOT reports that Instrument Air (IA) Header Pressure is 53 psig and dropping.
  • Unit 1 reports that their IA Header Pressure is 59 psig and also dropping. 2003 Which of the following is the required procedure to implement mitigating actions for these conditions 2005 and the correct course of action? 2006 A. AOP 2203.021, Loss of Instrument Air; Close the cross-connect valves with Unit 1 to prevent 2008 a loss of IA on Unit 1. 2009 B. AOP 2203.021, Loss of Instrument Air; Open the cross-connect valves with Unit 1 to prevent Audit Exam History a loss of IA on Unit 2.

2009 C. EOP 2202.001 SPTAs; Close the cross-connect valves with Unit 1 to prevent a loss of IA on Unit 1.

D. EOP 2202.001 SPTAs; Open the cross-connect valves with Unit 1 to prevent a loss of IA on Unit 2.

Answer:

A. AOP 2203.021, Loss of Instrument Air; Close the cross-connect valves with Unit 1 to prevent a loss of IA on Unit 1.

Notes:

With Unit 2 undergoing a Loss of Instrument Air event, under normal circumstances Unit 1 instrument air should be capable of supplying Unit 2. If a pipe rupture exists on Unit 2, it is possible that Unit 1 IA will not be able to supply both units. If Unit 1 (unaffected unit/IA supplier) IA pressure drops to less than 60 psig, the units IA should be split out as Unit 1 is now being threatened. The Loss Of IA AOP will be entered for these condition and tripping the plant and entering SPTAs is only directed in the AOP if IA header pressure on Unit 2 drops below 35 psig. Distracters C and D are incorrect because there is specific guidance on when to enter SPTAs (35 psig) and those conditions are not present. Distracters B and D are incorrect because the units normally have IA cross connected to supply the other in case of a leak/rupture.

References:

AOP 2203.021, Loss of IA, Rev. 11, Entry Conditions and Steps 2, 3, 4, and 5.

Tech Guide 2203.021, Loss of IA, Rev. 11, Steps 2, 3, and 4.

Lesson Plan A2LP-RO-EAOP, Rev. 12, Objective 16: Discuss the Mitigation strategy, Entry Conditions, Instructions and Exit Conditions (as per AOP and Tech Guide) of OP 2203.021, Loss Of Instrument Air.

Form ES-401-5 Written Exam Question Worksheet 90

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 91

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1690 Rev: 0 Rev Date: 5/14/2009 2:24:02 QID #: 81 Author: Coble Lic Level: S Difficulty: 4 Taxonomy: H Source: New Search 00CE062123 10CFR55: 41.10 / 43.5 / 45.2 / 45 Safety Function 4 System

Title:

Loss of Feedwater System Number E06 K/A 2.1.23 Tier: 1 Group: 1 RO Imp: 4.3 SRO Imp: 4.4 L. Plan: A2LP-RO-EFRP OBJ 1/2

Description:

Conduct of Operations - Ability to perform specific system and integrated plant procedures during all modes of plant operation.

Question:

Given the following plant conditions at full power: QID use History

  • The plant is tripped due to power > 100% and rising rapidly. RO SRO
  • Pressurizer Pressure is 1625 psia and dropping during SPTAs.
  • RCS T-hot is 520°F and dropping during SPTAs. 2003
  • An electrical bus 2A1 lockout alarm actuates during SPTAs. 2006
  • Containment Pressure is 26 psia and rising during SPTAs.
  • Emergency Feedwater Pump 2P-7A, over speeds and cannot be reset during SPTAs. 2009
  • All other components operate as designed.

Audit Exam History Following completion of the Standard Post Trip Actions (SPTA's), which of the following procedures should be entered and which of the following concerns should be addressed to prevent core damage? 2009 A. EOP 2202.005, Excess Steam Demand; restoring power to electrical bus 2A3.

B. EOP 2202.006, Loss of Feedwater; restoring RCS Margin to Saturation (MTS) to > 30°F.

C. EOP 2202.010, Functional Recovery; restoring power to electrical bus 2A3.

D. EOP 2202.010, Functional Recovery; restoring RCS Margin to Saturation (MTS) to > 30°F.

Answer:

C. EOP 2202.010, Functional Recovery; restoring power to electrical bus 2A3.

Notes:

Based on these conditions, there are indications of an excess steam demand with no feedwater available. Vital 4160 bus 2A3 will be de-energized due to 2DG1 OOS and Bus 2A1 lockout. Containment Pressure > 23.3 will initiate CSAS which will trip out the Main Feedwater and Condensate Pumps. A loss of Bus 2A1 will also make the AFW pump inoperable. With these 2 events in progress, the Functional Recovery procedure should be entered and a Feedwater pump should be started ASAP to address the RCS and Core heat removal Safety Function.. Electrical Bus 2A3 supplies power to EFW pump 2P-7B which is the only Feedwater pump available.

Margin to Saturation will not be an issue with these conditions. Distracters A, B, C are incorrect because there are 2 events in progress.

References:

EOP 2202.010, Standard Attachments, Rev. 11, Exhibit 8, Diagnostic Actions.

EOP 2202.009, Functional Recovery Procedure (FRP), Rev. 09, Entry Conditions and Step 11.F.1.

Lesson Plan A2LP-RO-EFRP, Rev. 3, Objectives 1 and 2: Describe the purpose of the FRP and when it should Form ES-401-5 Written Exam Question Worksheet 92

Data for 2009 NRC RO/SRO Exam 18-Jun-09 be used and Describe the Safety Functions checked by FRP.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 93

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1691 Rev: 0 Rev Date: 5/14/2009 4:39:30 QID #: 82 Author: Coble Lic Level: S Difficulty: 4 Taxonomy: H Source: New Search 000037A206 10CFR55: 41.7 / 41.10 / 43.5 / 45 Safety Function 3 System

Title:

Steam Generator (S/G) Tube Leak System Number 037 K/A AA2.06 Tier: 1 Group: 2 RO Imp: 4.3 SRO Imp: 4.5 L. Plan: A2LP-RO-EAOP OBJ 28

Description:

Ability to determine and interpret the following as they apply to the Steam Generator Tube Leak: - S/G tube failure Question:

Given the following at full power: QID use History

  • These indications have been rising from 75 GPD to these levels over the past hour.

2005 Which one of the following is correct concerning Technical Specification (TS) 3.4.6.2 RCS Leakage 2006 and also lists the correct action to take?

2008 A. TS 3.4.6.2 would NOT apply; Enter AOP 2203.038, Primary to Secondary Leakage and 2009 commence a plant shutdown due to a tube leak.

Audit Exam History B. TS 3.4.6.2 would apply; Enter AOP 2203.038, Primary to Secondary Leakage and commence a plant shutdown due to a tube leak. 2009 C. TS 3.4.6.2 would NOT apply; Continue to monitor for a SG tube leak or failure and commence a plant shutdown if leakage exceeds the limits..

D. TS 3.4.6.2 would apply; Trip the Reactor and enter EOP 2202.004, Steam Generator Tube Rupture after SPTAs due to a tube failure.

Answer:

B. TS 3.4.6.2 would apply; Enter AOP 2203.038, Primary to Secondary Leakage and commence a plant shutdown due to a tube leak.

Notes:

RCS leakage through the 'B' SG is approximately 0.2 gpm which is well below the trip criteria for a Steam Generator Tube Rupture (44 gpm) thus the Primary to Secondary Leakage AOP would be applicable in this case and would direct a plant shutdown. T.S 3.4.6.2 limit for SGs is 150 gallons per day primary to secondary leakage through ANY ONE steam generator thus the TS would apply. Distracters A and C are incorrect because the TS would apply. Distracters C and D are incorrect because the leak does not meet the trip criteria but does meet shutdown criteria.

References:

Technical Specification (TS) 3.4.6.2 RCS Leakage, Amendment # 280.

AOP 2203.038, Primary to Secondary Leakage, Rev. 10, Entry Conditions, Floating Step 12, Step 18 and Attachment 'A' Action Two.

Lesson Plan A2LP-RO-EAOP, Rev. 12, Objective 28: Discuss the Mitigation strategy, Entry Conditions, applicable industry events, Instructions and Exit Conditions of OP 2203.038, Primary To Secondary Leakage.

Form ES-401-5 Written Exam Question Worksheet 94

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 95

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1692 Rev: 0 Rev Date: 5/15/2009 11:24:0 QID #: 83 Author: Jim Wright Lic Level: S Difficulty: 4 Taxonomy: H Source: NRC Exam Bank 606 Modified Search 0000592441 10CFR55: 41.10 / 43.5 / 45.11 Safety Function 9 System

Title:

Accidental Liquid Radwaste Release System Number 059 K/A 2.4.41 Tier: 1 Group: 2 RO Imp: 2.9 SRO Imp: 4.6 L. Plan: ASLP-RO-EPLAN OBJ 7

Description:

Emergency Procedures/Plan - Knowledge of the emergency action level thresholds and classifications.

Question:

Given the following: QID use History

  • The plant is at full power.
  • Unit 2 is transferring resin from 2T13 Spent Resin Storage Tank to a cask in the train bay. RO SRO
  • While removing water from the cask, a hose ruptures releasing 400 gallons of highly contaminated water into a nearby storm drain that drains directly to Lake Dardanelle. 2003
  • Chemistry is notified to take lake water samples at the site boundary and perform a dose assessment. 2005
  • Chemistry determines that the release has exceeded the ODCM limits by a factor of 11. 2006 Which of the following would be the REQIURED actions to take? (Reference Provided) 2008 2009 A. Declare a NUE, complete 1903.011 ATT. 1, and notify the State within 15 minutes.

Audit Exam History B. Declare an Alert, complete 1903.011 ATT. 2, and notify the State within 15 minutes.

2009 C. Declare a NUE, complete 1903.011 ATT. 1, and notify the NRC within 15 minutes.

D. Declare an Alert,, complete 1903.011 ATT. 2, and notify the NRC within 15 minutes.

Answer:

B. Declare an Alert, complete 1903.011 ATT. 2, and notify the State within 15 minutes.

Notes:

Question will require OP 1903.010 and OP 1903.011 to be provided as a reference.

Greater than the ODCM limits would be a NUE call but greater than 10 times the ODCM limit would be an ALERT call. State and local agencies are required to be notified within 15 minutes of the E-plan Call. The NRC will be notified as soon as possible but is required to be notified within one hour.

Distracters A and C are incorrect because an dose assessment indicates ODCM limits are at the ALERT level.

Distracters C and D are incorrect because notifications are required to be made in 15 minutes to the State.

References:

EPLAN procedure 1903.010 Pages 13 and 14 (Situation 3)and Page 21 Step 5.2 (Rev 42).

EPLAN procedure 1903.011 Pages 1 and 17 (Rev 31)

Lesson Plan ASLP-RO-EPLAN, Rev. 1, Objective 7: Using references, discuss the requirements for classifying and upgrading, downgrading, and terminating an emergency including any time limitations that may apply.

Historical Comments:

Original Question was used on the 2006 NRC Exam Form ES-401-5 Written Exam Question Worksheet 96

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1693 Rev: 0 Rev Date: 5/15/2009 9:39:19 QID #: 84 Author: Coble Lic Level: S Difficulty: 3 Taxonomy: H Source: NRC Exam Bank 1571 Modified Search 000068A205 10CFR55: 41.7 / 41.10 / 43.5 / 45 Safety Function 8 System

Title:

Control Room Evacuation System Number 068 K/A AA2.05 Tier: 1 Group: 2 RO Imp: 4.2 SRO Imp: 4.3 L. Plan: A2LP-RO-EAOP OBJ 10

Description:

Ability to determine and interpret the following as they apply to the Control Room Evacuation: -

Availability of heat sink Question:

Given the following: QID use History

  • A confirmed fire has developed in the Cable Spreading Room (elevation 372).
  • The carpet in the Unit 2 Control Room "At The Controls Area" is getting very warm. RO SRO Which procedure should be entered AND which action should be taken to ensure an adequate heat sink 2003 with a feed source is available for plant cooldown after a Reactor Trip?

2005 A. Enter 2203.049, Fires in Areas Affecting Safe Shutdown; Ensure Main Feedwater (MFW) 2006 system is in Reactor Trip Override (RTO) prior to leaving the Control Room.

2008 B. Enter 2203.049, Fires in Areas Affecting Safe Shutdown; Trip the MFW Pumps, Start both 2009 Emergency Feedwater (EFW) pumps from the Remote Shutdown Panel 2C-80.

Audit Exam History C. Enter 2203.014, Alternate Shutdown; Ensure Main Feedwater system is in Reactor Trip Override (RTO) prior to leaving the Control Room. 2009 D. Enter 2203.014, Alternate Shutdown; Trip the Main Feedwater Pumps, Start both EFW pumps by actuating EFAS prior to leaving the Control Room.

Answer:

D. Enter 2203.014, Alternate Shutdown; Trip the Main Feedwater Pumps, Start both EFW pumps by actuating EFAS prior to leaving the Control Room.

Notes:

The alternate shutdown procedure is written to address a fire in a set of specific areas as addressed in its entry conditions. The fires in areas affecting safe shutdown procedure is used when the areas listed in its entry section have a severe fire. These are areas other than the ones listed in the Alternate Shutdown Procedure. In this case the Reactor and Main Feedwater pumps will be tripped by the Reactor Operators then EFAS will be actuated by the Shift Manager or STA while every one else is evacuating. Distracters A, and B are incorrect because the implementing procedure is incorrect. Distracters A and C are incorrect because the MFW pumps will be tripped. Distracter B is incorrect because the EFW pumps cannot be operated from the remote shutdown panel.

References:

OP 2204.014, Alternate Shutdown, Rev. 23, Entry Conditions and then Section 1 Steps 1, 5, and Note above step 8. Then step 18.

OP 2203.049, Fires In Areas Affecting Safe Shutdown, Rev. 7, Entry Conditions.

Lesson Plan A2LP-RO-EAOP, Rev. 12, Objective 10: Discuss the Mitigation strategy, Entry Conditions, Instructions and Exit Conditions (as per AOP and Tech Guide) of OP 2203.014, Alternate Shutdown.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 97

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Original Question was used on the 2008 NRC exam.

Form ES-401-5 Written Exam Question Worksheet 98

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1694 Rev: 0 Rev Date: 5/15/2009 1:53:14 QID #: 85 Author: Coble Lic Level: S Difficulty: 4 Taxonomy: H Source: New Search 0000692446 10CFR55: 41.10 / 43.5 / 45.3 / 45 Safety Function 5 System

Title:

Loss of Containment Integrity System Number 069 K/A 2.4.46 Tier: 1 Group: 2 RO Imp: 4.2 SRO Imp: 4.2 L. Plan: A2LP-RO-ELOCA OBJ 4

Description:

Emergency Procedures/Plan - Ability to verify that the alarms are consistent with the plant conditions.

Question:

Given the following Conditions: QID use History

  • The plant was tripped due to low RCS pressure 10 minutes ago.
  • RCS pressure is 1150 psia and dropping rapidly RO SRO
  • Containment Pressure is 27 psia and rising.
  • CNTMT Spray Pump 2P-35A Breaker is closed.
  • Containment and Aux Building radiation levels are rising. Audit Exam History Which of the following is the correct procedure to enter following SPTAs and also contains the correct 2009 action to take for the above conditions to protect Containment integrity?

A. EOP 2202.010, Functional Recovery; Keep 2P-35A running and Close 2CV-5612-1 using Handswitch 2HS-5612-1 on 2C17.

B. EOP 2202.010, Functional Recovery; Secure 2P-35A, Close 2CV-5612-1 using CLOSE Contactors inside its associated breaker cubicle then open the breaker.

C. EOP 2202.003, Loss of Coolant Accident; Keep 2P-35A running and Close 2CV-5612-1 using Handswitch 2HS-5612-1 on 2C17.

D. EOP 2202.003, Loss of Coolant Accident; Secure 2P-35A, Close 2CV-5612-1 using CLOSE Contactors inside its associated breaker cubicle then open the breaker.

Answer:

D. EOP 2202.003, Loss of Coolant Accident; Secure 2P-35A, Close 2CV-5612-1 using CLOSE Contactors inside its associated breaker cubicle then open the breaker.

Notes:

These plant conditions are indications of a medium break LOCA with no other event in progress so only the LOCA EOP needs to be implemented and not the Functional. The Annunciator Corrective action is where the direction for taking action on a failed Containment Spray train is located and will be implemented along with the EOP. The direction is to secure the pump and locally close the isolation valve using the breaker close contactors. Distracters A and C are incorrect because the isolation valve cannot be closed using the control room handswitch with a CSAS signal present. Distracters A and B are incorrect because of the incorrect implementing procedure.

Form ES-401-5 Written Exam Question Worksheet 99

Data for 2009 NRC RO/SRO Exam 18-Jun-09

References:

EOP 2202.010, Standard Attachments, Rev. 11, Exhibit 8, Diagnostic Actions.

EOP 2202.003, Loss of Coolant Accident, Rev 10. Entry Conditions Annunciator 2K06 E-1 "A SPRAY HDR FLOW LO" ACA Rev. 32, Step 2.3.

STM 2-08, Containment Spray System, Rev. 20, Section 3.6.1.

Lesson Plan A2LP-RO-ELOCA, Rev. 6, Objective 4: Given a set of plant conditions, determine if the required Entry Conditions exist to enter the LOCA EOP.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 100

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1695 Rev: 0 Rev Date: 5/15/2009 4:20:17 QID #: 86 Author: Coble Lic Level: S Difficulty: 4 Taxonomy: H Source: New Search 006000A207 10CFR55: 41.5 / 43.5 / 45.3 / 45. Safety Function 2 System

Title:

Emergency Core Cooling System (ECCS) System Number 006 K/A A2.07 Tier: 2 Group: 1 RO Imp: 2.8 SRO Imp: 3.1 L. Plan: A2LP-RO-TS OBJ 3

Description:

Ability to (a) predict the impacts of the following malfunctions or operations on the ECCS and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: - Loss of heat tracing Question:

Given the following: QID use History

  • The plant is at full power in the middle of January.
  • Outside ambient air temperature is 10°F. RO SRO
  • Heat Tracing (HT) Panel 2C322 has lost power.
  • This panel supplies the NaOH Tank, the CSTs (2T41A/B) and RWT level transmitter 2003 sensing lines.
  • RWT water temperature is 58°F. 2005
  • RWT level is reading 98% on all level instruments. 2006 If ALL the RWT sensing lines were to freeze, which one of the following would be the correct T.S LCO 2008 action to implement and the correct action to take? 2009 A. T.S 3.0.3, LCOs for Operation and Surveillance Requirements; Thaw the lines out using an Audit Exam History alternate heating source or initiate a shutdown to Hot Standby within one hour.

2009 B. T.S 3.3.2.1, ESFAS Instrumentation; Place the inoperable channels for these level transmitters in bypass and/or trip within one hour.

C. T.S. 3.5.4, ECCS - Refueling Water Tank; Thaw the lines out using an alternate heating source or initiate a shutdown to Hot Standby within one hour.

D. T.S. 3.5.2, ECCS - ECCS Subsystems for Tave > 300°F; Place the inoperable channels for these level transmitters in bypass and/or trip within one hour.

Answer:

A. T.S 3.0.3, LCOs for Operation and Surveillance Requirements; Thaw the lines out using an alternate heating source or initiate a shutdown to Hot Standby within one hour.

Notes:

If all the sensing lines on the RWT were to freeze, then none of the HPSI or Spray Trains would be able to swap over to the containment sump on a low RWT level thus T.S 3.0.3 would apply. Distracter B and D are incorrect because 4 channels of ESFAS are affected and interlock prevent bypassing and/or tripping more than 2 channels thus these also list the incorrect T.S. Distracter C is incorrect because there is still appropriate volume in the tank and the tank heaters are still keeping the solution temperature within the T.S. allowed range.

References:

STM 2-08, Containment Spray System, Rev. 20, Section 3.1.4.

NOP 2106.032, Unit 2 Freeze Protection, Rev. 19, Att. A Step 2.6 and Att. C Page 1.

T.S. LCO 3.0.3 Amendment 283.

T.S. 3.3.2.1 Amendment 189 Action b, Table 3.3 6.b and Action 11.

Form ES-401-5 Written Exam Question Worksheet 101

Data for 2009 NRC RO/SRO Exam 18-Jun-09 T.S. 3.5.2 Amendment 255.

T.S 3.5.4 Amendment 244.

Lesson Plan A2LP-RO-TS,Rev. 10, Objective 3: Discuss sections 3.0 & 4.0, technical specification applicability.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 102

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1696 Rev: 0 Rev Date: 5/15/2009 5:58:25 QID #: 87 Author: Jim Wright Lic Level: S Difficulty: 4 Taxonomy: H Source: New Search 012000A201 10CFR55: 41.5 / 43.5 / 45.3 / 45. Safety Function 7 System

Title:

Reactor Protection System System Number 012 K/A A2.01 Tier: 2 Group: 1 RO Imp: 3.1 SRO Imp: 3.6 L. Plan: A2LP-RO-RPS OBJ 5

Description:

Ability to (a) predict the impacts of the following malfunctions or operations on the RPS and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: - Faulty bistable operation Question:

Given the following: QID use History

  • Unit 2 is at 100% power.
  • 2RS-1 is deenergized due to a ground fault. RO SRO
  • Pressurizer pressure channel 2PT-4624-3 Pressurizer pressure transmitter fails low.
  • No operator action has been taken. 2003 What is the current mode of plant operation and what procedure should be referenced first as a result of 2005 the given failures? 2006 A. Mode 3 , EOP-2202.002 Reactor Trip Recovery 2008 2009 B. Mode 1, AOP-2203.037 Loss of 125 VDC.

Audit Exam History C. Mode 3 , EOP-2202.001 Standard Post Trip Actions 2009 D. Mode 1, NOP-2105.001 CPC/CEAC Operations.

Answer:

C. Mode 3 , EOP-2202.001 Standard Post Trip Actions Notes:

Distracter A is incorrect because Reactor Trip Recovery would be reference only after being directed by standard post trip actions.

Distracters B and D are not correct because the reactor would trip for the given conditions.

References:

AOP Technical Guide 2203.037 Loss of 125VDC Technical Guidelines page 2 of 69 (Rev 6).

STM 2-63 Reactor Protective System Pages 33,34,35 and 46 (Rev. 9)

Lesson Plan A2LP-RO-RPS, Rev. 9) Objective (5) and (8): Describe the power supplies to the Reactor Protection System and Describe the operation of the Reactor Protection System.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 103

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1697 Rev: 0 Rev Date: 5/15/2009 6:01:50 QID #: 88 Author: Jim Wright Lic Level: S Difficulty: 4 Taxonomy: H Source: New Search 0390002411 10CFR55: 41.10 / 43.5 / 45.13 Safety Function 4 System

Title:

Main and Reheat Steam System (MRSS) System Number 039 K/A 2.4.11 Tier: 2 Group: 1 RO Imp: 4.0 SRO Imp: 4.2 L. Plan: A2LP-RO-STEAM OBJ 3

Description:

Emergency Procedures/Plan - Knowledge of abnormal condition procedures.

Question:

Given the following plant conditions: QID use History

  • S/U #2 Transformer is out of service for maintenance.
  • The plant has tripped from 100% power. RO SRO
  • S/U #3 Transformer sustains a fault and is locked out.
  • RCS pressure is 2100 psia and slowly dropping.
  • Steam Generator pressure is 935 psia and slowly dropping in both SGs. 2005 2006 Which ONE of the following actions should be taken to prevent further pressure reduction and which event should be diagnosed based on current plant conditions 2008 2009 A. Close the MSR 2nd stage reheat isolations valves in SPTAs; EOP 2202.007 Loss of Offsite Power. Audit Exam History B. Close the MSIVs in SPTAs; EOP 2202.007 Loss of Offsite Power. 2009 C. Close the MSR 2nd stage reheat isolations valves in SPTAs; EOP 2202.005 Excess Steam Demand.

D. Close the MSIVs in SPTAs; EOP 2202.005 Excess Steam Demand.

Answer:

B. Close the MSIVs in SPTAs; Loss of Offsite Power EOP 2202.007.

Notes:

A and C are incorrect, the MSR 2nd stage reheat isolations valves fail as is on Loss of Power and cannot be closed from the control room. Excess steam demand is not correct because MSIS has not actuated and S/G pressure is not less than 800psia. D is incorrect because MSIS has not actuated and S/G pressure is not less than 800psia.

References:

EOP-2202.001 Standard Post Trip Actions, Rev 9, Steps 4 D/E and Step 8 E.3.

EOP 2202.010, Standard Attachments, Rev. 11, Exhibit 8, Diagnostic Actions.

EOP OP 2202.007, LOOP EOP, Rev.9, Entry Conditions.

STM 2-16, Rev. 7, Section 3.3.1.2 and figure on page 17 Lesson Plan A2LP-RO-STEAM, Rev.14, Objective 3: Describe the construction and operation of the Reheat Steam System - The configuration of the Moisture Separator Reheaters during accident scenarios.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 104

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1698 Rev: 0 Rev Date: 5/16/2009 2:41:02 QID #: 89 Author: Coble Lic Level: S Difficulty: 4 Taxonomy: H Source: NRC Bank 0361 Modified Search 061000A203 10CFR55: 41.5 / 43.5 / 45.3 / 45. Safety Function 4 System

Title:

Auxiliary / Emergency Feedwater (AFW) Syste System Number 061 K/A A2.03 Tier: 2 Group: 1 RO Imp: 3.1 SRO Imp: 3.4 L. Plan: A2LP-RO-EFW OBJ 10

Description:

Ability to (a) predict the impacts of the following malfunctions or operations on the AFW System and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: - Loss of dc power Question:

Given the following plant conditions: QID use History

  • Plant is operating at 100% power.
  • 125 VDC Panel 2D26 supply breaker trips open due to a fault on the bus. RO SRO
  • 10 minutes later, the plant trips due to a breaker fault on one RCP.
  • A lockout on SU #3 Transformer occurs when the turbine trips. 2003
  • Both SG pressures have stabilized at 1050 psia.
  • All systems operate as designed under these conditions. 2006 Which of the following would be the response of the Emergency Feedwater System and which procedure 2008 should be diagnosed after SPTAs? 2009 A. 2P-7A automatically starts and feeds both SG's; EOP 2202.002, Reactor Trip Recovery. Audit Exam History B. 2P-7B automatically starts and feeds both SG's; EOP 2202.002, Reactor Trip Recovery. 2009 C. 2P-7A automatically starts and feeds both SG's; AOP 2203.013, Natural Circulation Operations.

D. 2P-7B automatically starts and feeds both SG's; AOP 2203.013, Natural Circulation Operations.

Answer:

D. 2P-7B automatically starts and feeds both SG's; AOP 2203.013, Natural Circulation Operations.

Notes:

A loss of the 2D26 bus would prevent the normally closed upstream discharge MOVs (2CV 1076-2 and 2CV 1026-2) from the 2P-7A EFW pump from opening so no flow would come from the 2P-7A pump. Both AC powered MOVs on the discharge of the 2P-7B (2CV 1075-1 and 2CV 1025-1) would come open providing a flow path through the downstream MOVs to provide flow to both steam generators. A SU #3 Transformer lockout will cause a loss of both 6900 KV electrical busses which will cause a loss of all RCPs but power will still be available to one non vital 4160 VAC bus and both vital 4160 VAC busses. The plant will be in Natural Circulation conditions with no other events in progress. The SRO should determine that the Vital AC (6900 KV Busses) and Core Heat Removal (No RCPs) Safety functions are not met thus Reactor Trip Recovery will not apply and should transition to the Natural Circulation Operations. Distracters A and C are incorrect because 2P7A will not feed either SG. Distracters A and B are incorrect because safety function are not met thus this is not an uncomplicated trip.

References:

Form ES-401-5 Written Exam Question Worksheet 105

Data for 2009 NRC RO/SRO Exam 18-Jun-09 EFW STM 2-19-2, Rev. 29, Sections 2.3.3, 2.3.3.1, 2.3.3.2,; and Figure on page 36.

EOP 2202.01, SPTAs, Rev. 9, Steps 4.D and 7.A.

EOP 2202.010, Standard Attachments, Rev. 11, Exhibit 8, Diagnostic Actions.

AOP 2203.013, Natural Circulation Operations, Entry Conditions.

EOP 2202.002, Reactor Trip Recovery, Entry Conditions.

Lesson Plan A2LP-RO-EFW, Rev. 11, OBJ. 10: Describe the operation of the EFW system during a:

loss of Green DC event.

Lesson Plan A2LP-RO-EAOP, Rev. 12, Objective 9: Discuss the Mitigation strategy, Entry Conditions, applicable industry events, Instructions and Exit Conditions (as per AOP and Tech Guide) of OP 2203.013, Natural Circulation Historical Comments:

Original Question used on the 2002 NRC Exam.

Form ES-401-5 Written Exam Question Worksheet 106

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1699 Rev: 0 Rev Date: 5/16/2009 5:24:45 QID #: 90 Author: Coble Lic Level: S Difficulty: 4 Taxonomy: H Source: New Search 0780002236 10CFR55: 41.10 / 43.2 / 45.13 Safety Function 8 System

Title:

Instrument Air System (IAS) System Number 078 K/A 2.2.36 Tier: 2 Group: 1 RO Imp: 3.1 SRO Imp: 4.2 L. Plan: A2LP-RO-EAOP OBJ 16

Description:

Equipment Control - Ability to analyze the effect of maintenance activities, such as degraded power sources, on the status of limiting conditions for operations.

Question:

Given the following: QID use History

  • The plant is at 100% power in the middle of August.
  • A through wall Instrument Air (IA) leak has developed on the 2 inch IA line just RO SRO downstream of 2IA-407 located on Turbine Building 368 elevation.
  • Emergency Maintenance has patched the leak to within acceptable limits. 2003
  • A work order package has been developed to replace the leaking section of pipe.
  • The work order requires that 2IA-407 be closed and the downstream line depressurized. 2005
  • The maintenance is expected to last approximately 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. 2006 Analyze this maintenance request and determine if 2IA-407 could be isolated or not with the plant 2008 online without any adverse effects and select the correct response below. (References Provided) 2009 A. Can be isolated as long as Steam Generator Blowdown is isolated prior to closing. Audit Exam History B. Can be isolated as long as makeup water to the CSTs is isolated prior to closing. 2009 C. Cannot be isolated because it could cause Containment Pressure and Temperature to rise above T.S LCO Limits.

D. Cannot be isolated because it could cause an Atmospheric Dump Valve (ADV) to fail open causing a plant transient.

Answer:

C. Cannot be isolated because it could cause Containment Pressure and Temperature to rise above T.S LCO Limits.

Notes:

Two of the loads supplied off of the header downstream of 2IA-407 are the Main Chill Water supply and return Isolations to Containment Fan Coolers (2CV-3852-1 and 2CV-3851-1) and they fail closed on loss of IA. These valves would close when the IA header was de-pressurized and Containment temperature and pressure would rise rapidly placing the plant in a one hour LCO 3.6.1.4, Containment Internal Pressure and Temperature.

Distracters A and B are viable options to take for this maintenance but are incorrect because the loss of Main Chill water to Containment would cause a LCO entry and a plant shutdown. Distracter D is incorrect because this load is not supplied off of this header.

The following References need to be supplied for this question:

AOP 2203.021, Loss of IA AOP, Rev. 11, Attachment G, Page 3 of 6 of Attachment F; Pages 14, 15,18, 19, and 20 of Attachment E.

References:

Form ES-401-5 Written Exam Question Worksheet 107

Data for 2009 NRC RO/SRO Exam 18-Jun-09 STM 2-45, Main Chill Water System, Rev. 16, Figure on Page 32 AOP 2203.021, Loss of IA AOP, Rev. 11, Step 13, Attachment G, Page 3 of 6 of Attachment F; Pages 14, 15,18, 19, and 20 of Attachment E.

T.S 3.6.1.4. Containment Internal Pressure and Temperature, Amendment 225.

Lesson Plan A2LP-RO-EAOP , Rev. 12, Objective 16: Discuss the Mitigation strategy, Entry Conditions, Instructions and Exit Conditions (as per AOP and Tech Guide) of OP 2203.021, Loss Of Instrument Air.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 108

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1700 Rev: 0 Rev Date: 5/18/2009 9:37:29 QID #: 91 Author: Coble Lic Level: S Difficulty: 4 Taxonomy: H Source: New Search 071000A209 10CFR55: 41.5 / 43.5 / 45.3 / 45. Safety Function 9 System

Title:

Waste Gas Disposal System (WGDS) System Number 071 K/A A2.09 Tier: 2 Group: 2 RO Imp: 3.0 SRO Imp: 3.5 L. Plan: A2LP-RO-CVCS OBJ 8

Description:

Ability to (a) predict the impacts of the following malfunctions or operations on the Waste Gas Disposal System and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: - Stuck open relief valve Question:

Given the following: QID use History

  • The plant has been shutdown for refueling.
  • RCS Degas evolution is in progress. RO SRO
  • The chart recorder for VCT Pressure shows that pressure in the VCT went up to 72 psig and then dropped rapidly to 40 psig and stabilized.. 2005
  • VCT level is currently 70% and steady. 2006
  • VCT Vent Valve 2SV-4837 is Closed and has not been Opened.

2008 Which of the following caused the drop in pressure in the VCT, how can the diagnosis be confirmed 2009 and what action, if any, should be done about these indications?

Audit Exam History A. Temporary stuck Open VCT relief valve; rise in the in-service Hold UP Tank (2T-12) pressure; Secure all addition of Gas to the VCT in accordance with the ACA and 2009 re-brief the evolution.

B. Temporary stuck Open VCT relief valve; rise in the in-service Gas Surge Tank (2T-17)

Pressure; Secure all addition of Gas to the VCT and enter AOP 2203.010, H2O2 Concentration High.

C. WCO manually venting the VCT in accordance with the RCS DEGAS procedure OP 2104.002, CVCS, Attachment E, RCS Degas; rise in the in-service Gas Decay Tank, No action required.

D. WCO manually venting the VCT in accordance with the RCS DEGAS procedure OP 2104.002, CVCS, Att. E; rise in plant stack radiation readings; Have Chemistry perform dose assessment.

Answer:

A. Temporary stuck Open VCT relief valve; rise in the in-service Hold UP Tank (2T-12) pressure; Secure all addition of Gas to the VCT in accordance with the ACA and re-brief the evolution.

Notes:

The procedure for RCS degas has the Control room align the VCT vent (2SV-4837) to the suction of the Waste Gas compressors when pressurizing with nitrogen. Is this case it was not and the VCT pressure went above the relief setpoint of 70 psig and opened. The relief did not reseat until 40 psig. The evolution should be stopped until the line up is correct and personnel counseled. The relief valves on the VCT are currently lined up to relieve to the Hold up tanks. They used to be lined up to the Waste Gas Surge Tank and could be manually aligned to the Waste Gas collection header which goes to the Plant Stack Exhaust vent. Distracter B is incorrect because the relief path to the Gas Surge Tank has been cut and blanked off and there is no explosive mixture of gas in this question. Distracter C is incorrect because the Vent valve is controlled form the control room not a Form ES-401-5 Written Exam Question Worksheet 109

Data for 2009 NRC RO/SRO Exam 18-Jun-09 manual valve. Distracter D is incorrect because the manual vent to the Gas Collection Header is locked closed and is not part of the procedure.

References:

STM 2-04, CVCS, Rev. 27, Sections 2.1.21, 2.1.21.2, and drawing of VCT to Gaseous Rad Waste Compressors.

STM 2-54, Gaseous Radwaste System, Rev. 7, Section 2.1, 2.2, and figures on pages 17 and 18. STM 2-52, Boron Management System, Rev. 14, Figure on page 41.

Annunciator Corrective Action 2203.012L, Rev. 37, Window 2K12 K-5, VCT 2T4 PRESS HI/LO.

NOP 2104.002, CVCS, Rev. 56, Attachment E. RCS Degas and VCT Purge.

AOP 2203.010, H2O2 Concentration High, Rev. 7, Entry Conditions.

Lesson Plan A2LP-RO-CVCS, Rev 11, Objective 8: Given an alarm associated with the CVCS, describe the cause of the alarm, including setpoint and the expected operator response.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 110

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1701 Rev: 0 Rev Date: 10/30/2001 QID #: 92 Author: Coble Lic Level: S Difficulty: 3 Taxonomy: F Source: NRC Exam Bank 0415 Search 0720002240 10CFR55: 41.10 / 43.2 / 43.5 / 45 Safety Function 7 System

Title:

Area Radiation Monitoring (ARM) System System Number 072 K/A 2.2.40 Tier: 2 Group: 2 RO Imp: 3.4 SRO Imp: 4.7 L. Plan: A2LP-RO-RMON OBJ 18

Description:

Equipment Control - Ability to apply Technical Specifications for a system.

Question:

Given the following: QID use History

  • The plant is at 100% Power steady state.
  • Technical Specification 3.4.6.2, RCS Leakage, requires a RCS Water Inventory Balance RO SRO surveillance be completed once every 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in Modes 1 through 4.
  • Chemistry is not available to perform any samples at this time. 2003 Which ONE of the following radiation monitors being inoperable would REQUIRE the frequency of the 2005 RCS Water inventory balance surveillance to be increased to once every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />? 2006 A. Containment High Range Radiation Monitors 2RITS-8925-1 and 2RITS-8925-2. 2008 2009 B. Containment elevation 404 South West end of the Refueling Deck 2RITS-8912.

Audit Exam History C. Containment Atmosphere Monitors (CAMS) 2RITS-8231-1 and 2RITS-8271-2.

2009 D. Containment Purge Exhaust, 2VEF-15 Discharge, Radiation Monitor 2RITS-8233.

Answer:

C. Containment Atmosphere Monitors (CAMS) 2RITS-8231-1 and 2RITS-8271-2.

Notes:

Technical Specification 3.4.6.1 requires a containment atmosphere particulate and gaseous radioactivity monitor to be operable or the action requires grab samples or an RCS leak rate every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Distracter A is incorrect because both Containment High Range monitors being OOS require alternate method of monitoring within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. Distracter B requires an alternate method of monitoring if refueling operations is in progress.

Distracter D requires discontinuation of containment Purge which should not be in operation in Mode 1.

References:

Technical Specification 3.4.6.1, Amendment 281, Action A.2 Technical Specification 3.4.6.2, Amendment 280 surveillance 4.4.6.2.1 Lesson Plan A2LP-RO-RMON, Rev. 12, Objective 18: Explain the Technical Specifications/ODCM associated with the Radiation Monitoring System to include the reason for spec and actions required if inoperable.

Historical Comments:

Used on the 2002 NRC Exam Form ES-401-5 Written Exam Question Worksheet 111

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1702 Rev: 0 Rev Date: 11/7/2004 QID #: 93 Author: Coble Lic Level: S Difficulty: 4 Taxonomy: H Source: NRC Exam Bank 0530 Search 029000A201 10CFR55: 41.5 / 43.5 / 45.3 / 45. Safety Function 8 System

Title:

Containment Purge System (CPS) System Number 029 K/A A2.01 Tier: 2 Group: 2 RO Imp: 2.9 SRO Imp: 3.6 L. Plan: A2LP-RO-CVENT OBJ 15

Description:

Ability to (a) predict the impacts of the following malfunctions or operations on the Containment Purge System and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: - Maintenance or other activity taking place inside Containment.

Question:

Given the following: QID use History

  • The plant is in Mode 6 with Core Alterations in progress.
  • The Containment Purge system is in operation continuously ventilating. RO SRO
  • The Equipment and Personnel Hatches are Open but capable of being Closed.
  • I&C is performing maintenance on the Auxiliary Building 2VEF8A/B Exhaust 2003 Radiation Monitor 2RE-8245 when they inadvertently de-energize the Containment Purge Exhaust Radiation Monitor 2RE-8233. 2005
  • All attempts to restore power to 2RE-8233 have failed. 2006
  • Containment Purge Exhaust SPING 5 is Operable and in service.

2008 Which one of the following actions should be taken for these conditions? 2009 A. Secure Containment Purge, Close the isolation valves, Core Alterations can continue without Audit Exam History interruption as long as SPING 5 is operable.

2009 B. Continue with Containment Purge and Core Alterations since the Containment Purge Isolations will automatically close on a high activity signal from SPING 5.

C. Immediately Suspend Core Alterations since the automatic closure function of the Containment Purge isolation valves is inoperable.

D. Restore the Containment Purge Exhaust Radiation Monitor 2RE-8233 to Operable status within one hour or suspend Core Alterations in the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

Answer:

C. Immediately Suspend Core Alterations since the automatic closure function of the Containment Purge Isolation valves is inoperable.

Notes:

Distracter A is incorrect because core alteration should be suspended until the purge containment isolations are verified closed. Distracter B is incorrect because the SPING does not provide auto closure of the containment isolation valves. Distracter D is incorrect because the TS action is to immediately suspend core alteration if a Containment penetration cannot be automatically closed if open.

References:

NOP 2104.033, Containment Atmosphere Control, Rev. 55, Section 12.1.

T.S. 3.9.4, Containment Building Penetrations, LCO c.1 and ACTION, Amendment 230.

T.S. 3.3.3.1, Radiation Monitoring Instrumentation, Table 3.3-6, Action 16.a, Amendment 255 STM 2-09, Rev.16, Containment Cooling and Purge Systems, Sections 7.6 and 7.7 Form ES-401-5 Written Exam Question Worksheet 112

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Lesson Plan A2LP-RO-CVENT, Rev. OBJ. 15: Describe the conditions required to satisfy the TS LCOs associated with the Containment Ventilation System and based on given plant conditions, determine the correct course of action.

Historical Comments:

Question was used on the 2005 NRC Exam.

Form ES-401-5 Written Exam Question Worksheet 113

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1703 Rev: 0 Rev Date: 5/19/2009 11:52:4 QID #: 94 Author: Coble Lic Level: S Difficulty: 4 Taxonomy: H Source: NRC Exam Bank 1427 Search 1940012107 10CFR55: 41.5 / 43.5 / 45.12 / 45 Safety Function System

Title:

Generic System Number GENERIC K/A 2.1.7 Tier: 3 Group: 1 RO Imp: 4.4 SRO Imp: 4.7 L. Plan: A2LP-RO-COLSS OBJ 17

Description:

Conduct of Operations - Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.

Question:

Consider the following: QID use History

  • The plant has been returned to full power following the restoration from a loss of COLSS.
  • OP 2105.013, COLSS Operations, Attachment F, COLSS Return to Service Checks has RO SRO been completed.
  • Smoothed Plant Power (PMS Point CV5993) indicates 100%
  • Smoothed KW/FT Power Operating Limit (POL) (PMS Point CV5997) indicates 99.7% 2005 2006 Which of the following actions is REQUIRED be taken for this alarm and indications?

2008 A. Reduce plant power below 99.7% within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> using Power OPs Procedure 2102.004. 2009 B. Commence reducing power within 15 minutes to a power below KW/FT POL with 2102.004. Audit Exam History C. Trip the Reactor within 15 minutes due to exceeding KW/FT POL and enter SPTAs. 2009 D. Declare COLSS inoperable and perform the actions required by 2203.043, Loss of COLSS.

Answer:

B. Commence reducing power within 15 minutes to a power below KW/FT POL with 2102.004.

Notes:

This question is based on an actual event that occurred on Unit 2 where Axial Shape Index (ASI) was diverging quickly to the top of the core. When the 2K10-A2 alarm came in, the crew mistakenly declared COLSS inoperable again (even though they had just verified COLSS operable a couple of hours earlier) instead of taking the correct action of starting a power reduction within the 15 minute time limit of T.S. 3.2.1 Action a.

Distracter A is incorrect because the required action is to restore the limit within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and commence the restoration within 15 minutes. Distracter C is incorrect because a trip is not required. Distracter D is incorrect because COLSS is still operable and calculating a POL.

References:

T.S 3.2.1 Linear Heat Rate, Amendment 157, Action a.1.

Annunciator Corrective Action 2K10-A2 "COLSS POWER MARGIN EXCEEDED" Rev. 35, Step 2.3.1.

OP 2105.013, COLSS Operations, Rev. 29, Attachment F, COLSS Return to Service Checks.

Lesson Plan A2LP-RO-COLSS, Rev. 14, Objective 17: EVALUATE a set of plant conditions that is causing an alarm on the following and determine the cause of the alarm and any action required to be taken. - 2K10 A2 - COLSS Power Margin Alarm.

Historical Comments:

Question has never been used on an initial NRC Exam (Modified slightly from a previous Biennial Exam)

Form ES-401-5 Written Exam Question Worksheet 114

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1704 Rev: 0 Rev Date: 5/19/2009 3:20:19 QID #: 95 Author: Coble Lic Level: S Difficulty: 3 Taxonomy: H Source: New Search 1940012123 10CFR55: 41.10 / 43.5 / 45.2 / 45 Safety Function System

Title:

Generic System Number GENERIC K/A 2.1.23 Tier: 3 Group: 1 RO Imp: 4.3 SRO Imp: 4.4 L. Plan: A2LP-RO-EAOP OBJ 39

Description:

Conduct of Operations - Ability to perform specific system and integrated plant procedures during all modes of plant operation.

Question:

Given the following: QID use History

  • The plant is at full power.
  • Alarm 2K07 window C 1 "CIAS ACT" came in 5 minutes ago. RO SRO
  • Alarm "CCW DISCH FLOW LOW" is locked in.
  • RCS Pressure is 2200 psia. 2003
  • Containment Pressure is 14.8 psia.

2005 Which one of the following actions should be taken for these conditions? 2006 A. Trip the Reactor, Secure all RCPs, then isolate RCP controlled bleedoff during SPTAs. 2008 2009 B. Enter RCP Emergencies AOP 2203.025 and override ACW to CCW isolation valves.

Audit Exam History C. Enter Inadvertent CIAS AOP 2203.039 and override CCW to RCP isolation valves.

2009 D. Trip the Reactor, Secure all RCPs, then align RCP bleedoff to the Quench Tank in SPTAs.

Answer:

C. Enter Inadvertent CIAS AOP 2203.039, and override CCW to RCP isolation valves.

Notes:

Containment Pressure is below the CIAS setpoint so this alarm has come in based on a fault. The crew should enter the inadvertent CIAS AOP and take those actions. CCW to RCPs should be restored within 10 minutes or possible seal failure and small break LOCA could occur which would complicate the inadvertent CIAS event. Distracter A would be taken if the RCP CCW could not be restored within 10 minutes. Distracters B is incorrect because the wrong AOP is used to mitigate this event and the action is not required.. Distracter D is incorrect because it has not been 10 minutes and RCP bleedoff does not require operator action to got o the Quench Tank.

References:

ACA for Annunciator 2K07 C-1, CIAS ACT, Rev. 29.

AOP 2203.039, Inadvertent CIAS, Rev 5, Entry Conditions and Steps 4 and 5 AOP TG 2203.039, Rev. 5 Step 4.

AOP 2203.025, RCP Emergencies, Entry Conditions.

Lesson Plan A2LP-RO-EAOP, Rev. 12, Objective 29: Discuss the Mitigation strategy, Entry Conditions, Instructions and Exit Conditions (as per AOP and Tech Guide) of OP 2203.039, Inadvertent CIAS.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 115

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1705 Rev: 0 Rev Date: 5/21/2009 1:13:30 QID #: 96 Author: Jim Wright Lic Level: S Difficulty: 3 Taxonomy: F Source: New Search 1940012211 10CFR55: 41.10 / 43.3 / 45.13 Safety Function System

Title:

Generic System Number GENERIC K/A 2.2.11 Tier: 3 Group: 1 RO Imp: 2.3 SRO Imp: 3.3 L. Plan: A2LP-SRO-MNTC OBJ 7

Description:

Equipment Control - Knowledge of the process for controlling temporary design changes.

Question:

Given the following: QID use History

  • A Hot spot formed in a pipe as a result of transferring resin from Spent Fuel Pool DI (2T-5) to the Spent Resin Storage Tank (2T-13). RO SRO
  • A plan has been developed to flush the hot spot by using a section of rubber hose and 2003 connecting the Reactor Makeup Water System (RMWT) and Resin Transfer Header, using water to flush the hot spot to 2T-13. 2005 2006
  • System Engineering has determined that connecting these two systems with a rubber hose would be a Temporary Modification. 2008 2009 Before the hose is installed between the Reactor Makeup Water System (RMWT) and Resin Transfer Header, who must authorize installation AND what is the minimum number of check valves that must Audit Exam History be installed in series to satisfy procedural requirements?

2009 A. System Engineering Manager, Two Check Valves.

B. Shift Manager, Three Check Valves.

C. System Engineering Manager, Three Check Valves.

D. Shift Manager, Two Check Valves.

Answer:

D. Shift Manager, Two Check Valves.

Notes:

A and C are incorrect because the System engineering manager cannot authorize Temporary Modification installation- Engineering is responsible to ensure that the Temporary Modification is acceptable for safe plant operation. B is incorrect because Two check valves not three are required for Mechanical Hose jumper installation.

References:

Maintenance Procedure EN-DC-136 4.9 [2] REV 3 Maintenance ProcedureEN-DC-136 5.0 [4] REV 3 Lesson Plan ASLP-SRO-MNTC Rev 4 Objective 7: Describe the operations department responsibilities associated with installation and restoration of a temporary modification package.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 116

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1706 Rev: 0 Rev Date: 5/21/2009 1:06:16 QID #: 97 Author: Jim Wright Lic Level: S Difficulty: 3 Taxonomy: F Source: New Search 1940012243 10CFR55: 41.10 / 43.5 / 45.13 Safety Function System

Title:

Generic System Number GENERIC K/A 2.2.43 Tier: 3 Group: 1 RO Imp: 3.0 SRO Imp: 3.3 L. Plan: ASLP-RO-OPSPR OBJ 4

Description:

Equipment Control - Knowledge of the process used to track inoperable alarms.

Question:

Given the following: QID use History

  • An annunciator on 2K01 has been determined to be a Nuisance Alarm and has become a distraction to the control room operating staff. RO SRO
  • The shift manager has given permission to pull the annunciator card per 1015.001 2003 "Conduct of Operations" 2005 Whose concurrence must be obtained to ensure that pulling the annunciator card has no effect on 2006 continued system operability and what type of tag is required to be installed on the pulled annunciator card stored inside the annunciator panel. 2008 2009 A. System Engineer (SYSE), Equipment Out of Service or Caution Tag.

Audit Exam History B. Shift Technical Advisor (STA), Equipment out of Service or Caution Tag.

2009 C. System Engineer (SYSE), Work Incomplete or Temporary Services and Equipment Tag.

D. Shift Technical Advisor (STA), Work Incomplete or Temporary Services and Equipment Tag.

Answer:

D. Shift Technical Advisor (STA), Work Incomplete or Temporary Services and Equipment Tag.

Notes:

A and C are incorrect because the Shift Technical Advisor (STA) performs the system operability not the system engineer. The system engineers technical knowledge may be relied upon to make the appropriate operability call- but the final determination will be made by the STA. A and B are incorrect because there are no Equipment Out of Service Tags a Caution Tag is a specific tag, not a generic tag as called for in the procedure.

According to OPS expectations, Temporary Services and Equipment (TSE) Tags should be used but the procedure still calls for Work Incomplete Tags or other generic identification tag.

References:

Admin Procedure 1015.001, REV 073, Steps 10.1.1 (B) and 10.1.4 (A)

Lesson Plan ASLP-RO-OPSPR REV 11 Objective 4.f: With respect to Annunciator Controls:

1. Describe the instructions related to the following a) Malfunctioning Alarms b) Nuisance Alarms c) Superfluous Alarms d) Annunciators associated with out of service equipment 2. Describe the process for removing annunciators from service.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 117

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1707 Rev: 0 Rev Date: 5/20/2009 10:36:4 QID #: 98 Author: Coble Lic Level: S Difficulty: 2 Taxonomy: F Source: NRC Exam Bank 425 Modified Search 1940012306 10CFR55: 41.13 / 43.4 / 45.10 Safety Function System

Title:

Generic System Number GENERIC K/A 2.3.6 Tier: 3 Group: 1 RO Imp: 2.0 SRO Imp: 3.8 L. Plan: A2LP-RO-RWST OBJ 6

Description:

Radiological Controls - Ability to approve release permits.

Question:

Unless there is a written justification, a gas decay tank (2T18) shall be isolated for ______ days prior to QID use History release approval because this _________________________________________________.

A. 30 ; allows short lived gaseous activity present in the tank to decay. RO SRO B. 30; prevents purging high activity RCS gas to the tank prior to release. 2003 C. 60 ; allows short lived gaseous activity present in the tank to decay. 2005 2006 D. 60; prevents purging high activity RCS gas to the tank prior to release.

2008 2009 Audit Exam History 2009 Answer:

A. 30 ; allows short lived gaseous activity present in the tank to decay.

Notes:

Based on NRC letter 0-NRCM-90-04-19, a Gas Decay tank should be isolated for 30 days by Tagging out the isolation valves unless written justification is provided on the release permit, NOP 2104.022, Gaseous Radwaste System, Supplement 1 Section 3.1. Distracters C and D are incorrect because the time limit of 60 days is not a requirement. Distracters B and D are incorrect because this is not the correct reason for the 30 days but it is a valid reason to keep someone from inadvertently placing the tank in service.

References:

NOP 2104.022, Gaseous Radwaste System, Rev. 39, Section 3.0, Step 9.14, and Supplement 1, Gaseous Radwaste Release Permit, Step 3.1.

Lesson Plan A2LP-RO-RWST, Rev. 6, Objective 6:Describe the following tasks associated with the radioactive waste operating procedures: Gaseous Rad Waste System 2104.022 and Perform a Waste Gas Decay Tank Release.

Historical Comments:

Original question was used on the 2002 NRC Exam.

Form ES-401-5 Written Exam Question Worksheet 118

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1708 Rev: 0 Rev Date: 5/20/2009 2:31:21 QID #: 99 Author: Coble Lic Level: S Difficulty: 4 Taxonomy: H Source: NRC Exam Bank 277 Modified Search 1940012315 10CFR55: 41.12 / 43.4 / 45.9 Safety Function System

Title:

Generic System Number GENERIC K/A 2.3.15 Tier: 3 Group: 1 RO Imp: 2.9 SRO Imp: 3.1 L. Plan: A2LP-RO-RMON OBJ 11

Description:

Radiological Controls - Knowledge of radiation monitoring systems, such as fixed radiation monitors and alarms, portable survey instruments, personnel monitoring equipment, etc.

Question:

Given the following plant conditions: QID use History

  • Plant has returned to full power after a transient.
  • PZR level is 60.3% and lowering. RO SRO
  • RCS pressure is 2202 psia.
  • One Charging Pumps, 2P-36A is running. 2003
  • Letdown flow is 68 gpm and rising.
  • Letdown Gross Activity Monitor (2RITS-4806-A) reads 2E+5 CPM and rising. 2006

2008 Which of the following events occurred for the given indications and also list the correct implementing 2009 procedure to mitigate this event?

Audit Exam History A. Failed Fuel; AOP 2203.020, RCS High Activity 2009 B. RCS crud burst; AOP 2203.020, RCS High Activity C. RCS leak; AOP 2203.016, Excess RCS Leakage D. RCS head void; AOP 2203.016, Excess RCS leakage Answer:

A. Failed Fuel; AOP 2203.020, RCS High Activity Notes:

The indication of rising Letdown flow is normal since PZR level is higher than 60% setpoint for 100% power.

PZR level is lowering back to setpoint with only one charging pump running. Therefore, and RCS leak or void should not be diagnosed. Rising activity on both the Gross and Iodine 131 monitors indicate Fuel Failure in the RCS Distracters B is incorrect because only Gross activity would rise during a crud burst. Distracters C and D are incorrect because

References:

STM 2-62, Radiation Monitoring System, Rev. 15 Section 2.2.1.

AOP 2203.020, RCS High Activity AOP, Rev. 10, Entry Conditions and Step 6, 7 and 8.

Lesson Plan A2LP-RO-RMON, Rev. 12, Objective 11: Describe the use of the Radiation Monitoring System in the Abnormal Operating Procedures.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 119

Data for 2009 NRC RO/SRO Exam 18-Jun-09 Bank: 1709 Rev: 0 Rev Date: 5/20/2009 4:18:38 QID #: 100 Author: Coble Lic Level: S Difficulty: 3 Taxonomy: H Source: NRC Exam Bank 1484 Modified Search 1940012406 10CFR55: 41.10 / 43.5 / 45.13 Safety Function System

Title:

Generic System Number GENERIC K/A 2.4.6 Tier: 3 Group: 1 RO Imp: 3.7 SRO Imp: 4.7 L. Plan: A2LP-RO-ESGTR OBJ 12

Description:

Emergency Procedures/Plan - Knowledge of EOP mitigation strategies.

Question:

Consider the following: QID use History

  • Unit 2 has tripped from full power.
  • RCS pressure is 1350 psia and slowly rising RO SRO
  • All RCPs have been secured
  • PZR Level is 62% and slowly rising 2003
  • 'B' SG Main Steam Radiation is in alarm and reads 2500 mr/hr 2005
  • Condenser Off-Gas Radiation is alarm 2006
  • Forced flow needs to be established to mitigate this event 2008 Assuming all RCP restart conditions are satisfied, which of the following RCPs should be started FIRST 2009 and why?

Audit Exam History A. 2P-32C to ensure thorough mixing of the boron with the RCS during SG draining.

2009 B. 2P-32B to prevent sending a slug of diluted water through the Reactor core.

C. 2P-32C to prevent sending a slug of diluted water through the Reactor core.

D. 2P-32B to ensure thorough mixing of the boron with the RCS during SG draining.

Answer:

B. 2P-32B to prevent sending a slug of diluted water through the Reactor core.

Notes:

Based on the indication a SGTR has occurred in the 'B' Steam Generator (ruptured SG) and 'A' Steam Generator is considered the intact SG. A RCP in the intact (least affected) loop should be started first and flow should be allowed to stabilize for 5 minutes. Following the stabilization period the selected RCP in the ruptured loop should be enabled and started. The 5 minute time delay is necessary to allow for mixing of a possible slug of water with reduced boron concentration from the ruptured SG loop. Distracters A and C are incorrect because 2P-32C is on the ruptured loop. Distracter D is incorrect because the reason is wrong.

References:

EOP 2202.004 SGTR, Rev. 9, Step 13 (Note), Step 45 and Technical Guidance for Step 45.

STM 2-03-02 RCPs, Rev. 13 Figure on page 44.

Lesson Plan A2LP-RO-ESGTR, Rev. 5, Objective 12: Given a set of plant conditions during a SGTR, determine if a RCP can be restarted.

Historical Comments:

Form ES-401-5 Written Exam Question Worksheet 120