CY2008 Byron Station End-of-Cycle Public Meeting NRC PresentationML090930349 |
Person / Time |
---|
Site: |
Byron  |
---|
Issue date: |
04/02/2009 |
---|
From: |
NRC/RGN-III |
---|
To: |
|
---|
References |
---|
Download: ML090930349 (32) |
|
Similar Documents at Byron |
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML24003A1812024-01-0808 January 2024 Handout - Byron-Braidwood Core Monitoring and Support System LAR Pre-Submittal Meeting January 8,2024 ML23345A0362023-12-11011 December 2023 ATWS Uet December 11, 2023 Pre-submittal Meeting Slides ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23229A0132023-08-17017 August 2023 Relief Request for Alternative Requirements for Byron Unit 1 Reactor Pressure Vessel Inservice Inspection Intervals NRC Meeting Handout ML23229A4832023-08-17017 August 2023 RR 20-Year ISI Pre-Submittal NRC Meeting Handout ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23163A1642023-06-12012 June 2023 2022 Braidwood/Byron End-of-Cycle Meeting Presentation ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23033A6672023-01-30030 January 2023 Public Call with Constellation January 30, 2023 (Slides) ML22159A3332022-06-0909 June 2022 Presentation Slides for Braidwood and Byron 2021 End of Cycle Meeting ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21166A3722021-06-15015 June 2021 End-of-Cycle Meeting Presentation ML20258A0302020-09-22022 September 2020 Decommissioning Licensing Action Submittal Plan for Byron and Dresden Stations Early Shutdowns ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20209A5322020-07-24024 July 2020 2019 Braidwood and Byron End-of-Cycle Presentation ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML19318F9512019-11-20020 November 2019 Presentation Slides for November 20, 2019, Pre-Application Meeting - Request for Revision to Quality Assurance Program Internal Audit Frequency ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19151A6602019-05-31031 May 2019 BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19022A2002019-01-23023 January 2019 Request for Use of ASME Code Case N-879 for Exelon Nuclear Power Plants ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18218A1122018-08-0808 August 2018 Reactor Pressure Vessel Head Penetration Nozzle Post Peening Follow-up Inspection Relief Requests for Byron Unit 2 and Braidwood Unit 1 ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML17296A2032017-10-0303 October 2017 Accident Tolerant Fuel Lead Test Assembly Deployment ML17132A1772017-05-25025 May 2017 LAR for Control Room Cooling at Byron and Braidwood Stations ML17142A2382017-05-25025 May 2017 OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns ML16334A4642016-12-0505 December 2016 Westinghouse Pre-Application Meeting: License Amendment Request to Modify Byron Station Facility Operating License in Support of the Molybdenum-99 Isotope Production Project - December 5, 2016 ML16327A3702016-11-25025 November 2016 Enclosure 3: Exelon Byron Station Design (Meeting Handout) ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML16075A3292016-03-16016 March 2016 OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations ML16062A4222016-03-0202 March 2016 Meeting Slides for March 7, 2016 Public Meeting to Discuss Backfit Appeal ML15342A1012015-12-0909 December 2015 TORMIS Computer Code Methodology Public Meeting Slides ML15232A6832015-08-27027 August 2015 Stations Auxiliary Feedwater System - Unit Cross-tie License Amendment Request ML15209A9722015-07-30030 July 2015 Alloy 600 PWSCC Mitigation Plan for Reactor Vessel Head Penetration Nozzles Utilizing Cavitation Peening at Byron and Braidwood ML15133A4732015-05-20020 May 2015 Digital Upgrades of the Non-Safety Related NSSS Control Systems at Byron and Braidwood Stations ML15026A5702015-02-0303 February 2015 Dseis Public Meeting Slides - February 3, 2015 ML14342A8122014-12-10010 December 2014 Presentation Slides for December 10, 2014 Meeting on Alloy 600 PWSCC Mitigation for Rvh Nozzles ML14261A1112014-09-22022 September 2014 2014 NEI Fire Protection Information Forum NRC Public Slides ML14251A4852014-09-10010 September 2014 Byron/Braidwood Auxiliary Feedwater Cross-Tie ML14051A0662014-02-20020 February 2014 2/06/2014, Exelon Presentation Slides (Public Meeting with Exelon Generation Company, Nuclear Energy Industry, and Cask System Vendors to Discuss Issues with Spent Fuel Vacuum Drying Process) ML14051A0592014-02-20020 February 2014 2/06/2014, NRC Presentation Slides (Public Meeting with Exelon Generation Company, Nuclear Energy Industry, and Cask System Vendors to Discuss Issues with Spent Fuel Vacuum Drying Process) ML13275A0402013-08-20020 August 2013 License Renewal Process and Environmental Scoping Meeting Slides 2024-04-09
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24310A0672024-11-0505 November 2024 Constellation NRC Pre-Submittal Meeting Slides - Proposed Alternative for Reactor Vessel Closure Stud Exam Optimization ML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML24003A1812024-01-0808 January 2024 Handout - Byron-Braidwood Core Monitoring and Support System LAR Pre-Submittal Meeting January 8,2024 ML23345A0362023-12-11011 December 2023 ATWS Uet December 11, 2023 Pre-submittal Meeting Slides ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23229A1722023-08-17017 August 2023 RR Pen-75 Pre-Submittal NRC Meeting Handout ML23229A0132023-08-17017 August 2023 Relief Request for Alternative Requirements for Byron Unit 1 Reactor Pressure Vessel Inservice Inspection Intervals NRC Meeting Handout ML23229A4832023-08-17017 August 2023 RR 20-Year ISI Pre-Submittal NRC Meeting Handout ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23163A1642023-06-12012 June 2023 2022 Braidwood/Byron End-of-Cycle Meeting Presentation NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides2023-02-21021 February 2023 Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23033A6672023-01-30030 January 2023 Public Call with Constellation January 30, 2023 (Slides) ML22159A3332022-06-0909 June 2022 Presentation Slides for Braidwood and Byron 2021 End of Cycle Meeting ML22098A0512022-04-11011 April 2022 2 Cycle 25 High Burnup Lead Test Assembly NRC Pre-Submittal Meeting on April 22, 2022 (EPID L-2022-LRM-0022) (Slides) ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21166A3722021-06-15015 June 2021 End-of-Cycle Meeting Presentation ML21162A3322021-06-11011 June 2021 BWR Fleet Relief Request Associated with RPV Instrument Nozzle Repairs ML20258A0302020-09-22022 September 2020 Decommissioning Licensing Action Submittal Plan for Byron and Dresden Stations Early Shutdowns ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20209A5322020-07-24024 July 2020 2019 Braidwood and Byron End-of-Cycle Presentation ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18218A1122018-08-0808 August 2018 Reactor Pressure Vessel Head Penetration Nozzle Post Peening Follow-up Inspection Relief Requests for Byron Unit 2 and Braidwood Unit 1 ML18086A8432018-03-27027 March 2018 NUREG-1021, Revision 11 Implementation ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML17291B0282017-10-17017 October 2017 Submittal of Slide Package Westinghouse Encore Lead Test Rod Program Byron Unit 2 (Proprietary/Non-Proprietary) ML17296A2032017-10-0303 October 2017 Accident Tolerant Fuel Lead Test Assembly Deployment ML17132A1772017-05-25025 May 2017 LAR for Control Room Cooling at Byron and Braidwood Stations ML16334A4452016-12-0505 December 2016 Pre-submittal Meeting Byron UT RR Presentation ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML16062A4222016-03-0202 March 2016 Meeting Slides for March 7, 2016 Public Meeting to Discuss Backfit Appeal ML15342A1012015-12-0909 December 2015 TORMIS Computer Code Methodology Public Meeting Slides ML15232A6832015-08-27027 August 2015 Stations Auxiliary Feedwater System - Unit Cross-tie License Amendment Request ML15209A9722015-07-30030 July 2015 Alloy 600 PWSCC Mitigation Plan for Reactor Vessel Head Penetration Nozzles Utilizing Cavitation Peening at Byron and Braidwood ML15204A5052015-07-23023 July 2015 EPRI Tech Basis for Brd-Byr Head RR ML15204A4932015-07-23023 July 2015 Bb Station Requests for Relief for Alternate Examination Frequency ML15133A4732015-05-20020 May 2015 Digital Upgrades of the Non-Safety Related NSSS Control Systems at Byron and Braidwood Stations ML15026A5702015-02-0303 February 2015 Dseis Public Meeting Slides - February 3, 2015 ML14342A8122014-12-10010 December 2014 Presentation Slides for December 10, 2014 Meeting on Alloy 600 PWSCC Mitigation for Rvh Nozzles ML14261A1112014-09-22022 September 2014 2014 NEI Fire Protection Information Forum NRC Public Slides ML14251A4852014-09-10010 September 2014 Byron/Braidwood Auxiliary Feedwater Cross-Tie ML14051A0662014-02-20020 February 2014 2/06/2014, Exelon Presentation Slides (Public Meeting with Exelon Generation Company, Nuclear Energy Industry, and Cask System Vendors to Discuss Issues with Spent Fuel Vacuum Drying Process) 2024-04-09
[Table view] |
Text
Byron Station Annual Assessment Meeting Reactor Oversight Program - 2008 Nuclear Regulatory Commission - Region III Lisle, Illinois April 2, 2009
2 Purpose of Todays Meeting
- A public forum for discussion of the licensees performance in 2008
- NRC will address the performance issues identified in the annual assessment letter
- Licensee will be given the opportunity to respond and inform the NRC of new or existing programs to maintain or improve performance
3 Agenda
- Review of Reactor Oversight Process
- National Summary of Plant Performance
- Discussion of Plant Performance Results
- Licensee Response and Remarks
- NRC available to address public questions
4 Our Mission
- To license and regulate the nations civilian use of byproduct, source, and special nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment.
5 Some Nuclear Facts
- More than 100 nuclear power plants supply about 20 percent of the electricity in the U.S.
- Nuclear materials are used in medicine for diagnosis and cancer treatment.
- Nuclear materials are widely used in industry, such as in density gauges, flow measurement devices, radiography devices, and irradiators.
6 The NRC Regulates
- Nuclear reactors - commercial power reactors, research and test reactors, new reactor designs
- Nuclear materials - nuclear reactor fuel, radioactive materials for medical, industrial, and academic use
- Nuclear waste - transportation, storage and disposal of nuclear material and waste, decommissioning of nuclear facilities
- Nuclear security - physical security of nuclear facilities and materials from sabotage or attacks
7 What We Dont Do
- Regulate nuclear weapons, military reactors, or space vehicle reactors
- Own or operate nuclear power plants
- Regulate some radioactive materials, such as X-rays and naturally occurring radon
8 How We Regulate
- Establish rules and regulations
- Provide oversight through inspection, enforcement, and evaluation of operational experience
- Conduct research to provide support for regulatory decisions
- Respond to events and emergencies
9 Assurance of Plant Safety
- Require long-term maintenance of equipment
- Require continual training of operators
- Verify compliance with regulations
10 What We Do - Nuclear Waste
- Storage of spent reactor fuel in fuel pools or dry storage casks, and
- A national spent fuel storage site--Yucca Mountain.
11 What We Do - Nuclear Security
- Well-armed and well-trained security forces,
- Surveillance and perimeter
- patrols,
- State-of-the-art site access equipment and controls,
- Physical barriers and detection zones, and
- Intrusion detection systems and alarm stations.
12 NRC Performance Goals
- Safety: Ensure adequate protection of public health and safety and the environment.
- Security: Ensure adequate protection in the secure use and management of radioactive materials.
13 Region III Organization Mark A. Satorius Regional Administrator Pat L. Hiland Deputy Regional Administrator - Acting Cynthia D. Pederson Director Division of Reactor Projects Anne T. Boland Deputy Director - Acting K. Steven West Director Division of Reactor Safety Jimi T. Yerokun Deputy Director - Acting Richard A. Skokowski Branch Chief Regional Specialists Byron Station Resident Inspectors Bruce A. Bartlett John S. Robbins Branch Staff Raymond M. Ng Robert P. Jones Thomas C. Hartman Meghan M. Thorpe-Kavanaugh Jennifer L. Dalzell
14 Reactor Oversight Process Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas
15 Regulatory Framework INITIATING EVENTS MITIGATING SYSTEMS BARRIER INTEGRITY EMERGENCY PREPAREDNESS Cornerstones PUBLIC RADIATION SAFETY OCCUPATIONAL RADIATION SAFETY SECURITY Strategic Performance Areas REACTOR SAFETY RADIATION SAFETY SAFEGUARDS HUMAN PERFORMANCE SAFETY CONSCIOUS WORK ENVIRONMENT PROBLEM IDENTIFICATION AND RESOLUTION PUBLIC HEALTH AND SAFETY AS A RESULT OF CIVILIAN NUCLEAR REACTOR OPERATION NRCs Overall Safety Mission Cross-Cutting Areas
16 Examples of Baseline Inspections
~80 hrs/yr
- Triennial Fire Protection
~250 hrs every 3 yrs
~125 hrs/yr
~80 hrs/yr
~110 hrs every 2 yrs
- Worker Radiation Protection ~95 hrs/yr
- Corrective Action Program ~250 hrs every 2 yrs
- Corrective Action Case Reviews ~60 hrs/yr
17 Significance Threshold Performance Indicators Green:
Only Baseline Inspection White:
May increase NRC oversight Yellow:
Requires more NRC oversight Red:
Requires more NRC oversight Inspection Findings Green:
Very low safety issue White:
Low to moderate safety issue Yellow:
Substantial safety issue Red:
High safety issue
18 Action Matrix Concept Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions Licensee
Response
Regulatory
Response
Degraded Cornerstone Multiple/Rep.
Degraded Cornerstone Unacceptable Performance
19 National Summary of Plant Performance Status at End of 2008 Licensee Response 86 Regulatory Response 14 Degraded Cornerstone 3
Multiple/Repetitive Degraded Cornerstone 1
Unacceptable 0
Total 104
20 National Summary
- Performance Indicator Results (end of CY 2008)
- Green 1762
- White 6
- Yellow 0
- Red 0
- Total Inspection Findings (for 2008)
- Green 776
- White 17
- Yellow 0
- Red 0
21 Byron Station Assessment Results (January 1 - December 31, 2008)
- Byron Units 1 and 2 were within the Regulatory Response column for 2008 due to a White finding in the Mitigating Systems Cornerstone identified in the 1st quarter of 2008.
22 Safety Significant Findings or PIs
- On February 14, 2008, the NRC completed a Special Inspection to evaluate the facts and circumstances surrounding the degradation of the essential service water (SX) system riser piping at the cooling tower basin, and the subsequent dual Unit shutdown on October 19, 2007.
- One White finding associated with two violations was identified.
- Three Green Non-Cited Violations were identified.
23 Byron Inspection Activities (January 1 - December 31, 2008)
- Jan 14 - Jan 31: Modification/50.59 Inspection
- March 23 - April 22: Scheduled Unit 1 Refueling Outage
- May 19 - May 30: Initial License Examination
- October 5 - October 23: Scheduled Unit 2 Refueling Outage
- May 21 - Dec 11: ISFSI Inspection
24 Byron Inspection Results (January 1 - December 31, 2008)
- Over 2,000 man-hours of direct inspection
- 1 White Finding & Associated Violations
- 19 Green Findings and/or Violations
- 1 Substantive Cross-Cutting Issue Decision Making in Human Performance Area
25 Byron Station Annual Assessment Summary (January 1 - December 31, 2008)
- Exelon operated Byron Station Units 1 & 2 in a manner that preserved public health and safety.
- All cornerstone objectives were met.
- One White finding was identified. (Essential Service Water System Piping Degradation)
26 (January 1 - December 31, 2008)
- Supplement inspection for the White finding related to the Essential Service Water piping degradation was completed in January 2009 with no finding.
- NRC plans baseline inspections at Byron Station for the remainder of 2009.
- Substantive cross-cutting issue
- Decision Making Component in Human Performance
- Identified since 2008 Mid-Cycle Assessment Byron Station Annual Assessment Summary
27 Licensee Response and Remarks Daniel Enright Site Vice President Byron Station
28 Open to the Public
- The NRC places a high priority on keeping the public and stakeholders informed of its activities.
- Find public meeting dates and transcripts;
- Read NRC testimony, speeches, press releases, and policy decisions; and
- Access the agencys Electronic Reading Room to find NRC publications and documents.
29 Contacting the NRC
- (301) 816-5100 (call collect)
- (800) 695-7403
- Allegation@nrc.gov
- General information or questions
- www.nrc.gov
- Select What We Do for Public Affairs
30 NRC Representatives
- Cynthia Pederson, Director, Division Reactor Projects
- (630) 829-9600
- Anne Boland, Deputy Division Director, DRP
- (630) 829-9601
- Marshall David, Project Manager, NRR
- (301) 415-1547
- (815) 234-5451
- (815) 234-5451
- (630) 829-9574
- (630) 829-9620
31 NRC Representatives
- (630) 829-9834
- (630) 829-9662
- (630) 829-9663
- NRC Region III Office Switchboard
- (630) 829-9500 (800) 522-3025
32 Reference Sources
- Reactor Oversight Process
- http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html
- Public Electronic Reading Room
- http://www.nrc.gov/reading-rm.html
- Public Document Room 800-397-4209 (Toll Free)