CY2008 Byron Station End-of-Cycle Public Meeting NRC Presentation
ML090930349
Person / Time
Site: Byron  Constellation icon.png
Issue date: 04/02/2009
From:
NRC/RGN-III
To:
References
Download: ML090930349 (32)


Text

Byron Station Annual Assessment Meeting Reactor Oversight Program - 2008 Nuclear Regulatory Commission - Region III Lisle, Illinois April 2, 2009

2 Purpose of Todays Meeting

  • A public forum for discussion of the licensees performance in 2008
  • NRC will address the performance issues identified in the annual assessment letter
  • Licensee will be given the opportunity to respond and inform the NRC of new or existing programs to maintain or improve performance

3 Agenda

  • Introduction
  • Review of Reactor Oversight Process
  • National Summary of Plant Performance
  • Discussion of Plant Performance Results
  • Licensee Response and Remarks
  • NRC Closing Remarks
  • Break
  • NRC available to address public questions

4 Our Mission

  • To license and regulate the nations civilian use of byproduct, source, and special nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment.

5 Some Nuclear Facts

  • More than 100 nuclear power plants supply about 20 percent of the electricity in the U.S.
  • Nuclear materials are used in medicine for diagnosis and cancer treatment.
  • Nuclear materials are widely used in industry, such as in density gauges, flow measurement devices, radiography devices, and irradiators.

6 The NRC Regulates

  • Nuclear reactors - commercial power reactors, research and test reactors, new reactor designs
  • Nuclear materials - nuclear reactor fuel, radioactive materials for medical, industrial, and academic use
  • Nuclear waste - transportation, storage and disposal of nuclear material and waste, decommissioning of nuclear facilities
  • Nuclear security - physical security of nuclear facilities and materials from sabotage or attacks

7 What We Dont Do

  • Regulate nuclear weapons, military reactors, or space vehicle reactors
  • Own or operate nuclear power plants
  • Regulate some radioactive materials, such as X-rays and naturally occurring radon

8 How We Regulate

  • Establish rules and regulations
  • Issue licenses
  • Provide oversight through inspection, enforcement, and evaluation of operational experience
  • Conduct research to provide support for regulatory decisions
  • Respond to events and emergencies

9 Assurance of Plant Safety

  • Require defense-in-depth
  • Require long-term maintenance of equipment
  • Require continual training of operators
  • Verify compliance with regulations

10 What We Do - Nuclear Waste

  • The NRC regulates:

- Storage of spent reactor fuel in fuel pools or dry storage casks, and

- A national spent fuel storage site--Yucca Mountain.

11 What We Do - Nuclear Security

  • NRC Requires:

- Well-armed and well-trained security forces,

- Surveillance and perimeter

patrols,

- State-of-the-art site access equipment and controls,

- Physical barriers and detection zones, and

- Intrusion detection systems and alarm stations.

12 NRC Performance Goals

  • Safety: Ensure adequate protection of public health and safety and the environment.
  • Security: Ensure adequate protection in the secure use and management of radioactive materials.

13 Region III Organization Mark A. Satorius Regional Administrator Pat L. Hiland Deputy Regional Administrator - Acting Cynthia D. Pederson Director Division of Reactor Projects Anne T. Boland Deputy Director - Acting K. Steven West Director Division of Reactor Safety Jimi T. Yerokun Deputy Director - Acting Richard A. Skokowski Branch Chief Regional Specialists Byron Station Resident Inspectors Bruce A. Bartlett John S. Robbins Branch Staff Raymond M. Ng Robert P. Jones Thomas C. Hartman Meghan M. Thorpe-Kavanaugh Jennifer L. Dalzell

14 Reactor Oversight Process Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas

15 Regulatory Framework INITIATING EVENTS MITIGATING SYSTEMS BARRIER INTEGRITY EMERGENCY PREPAREDNESS Cornerstones PUBLIC RADIATION SAFETY OCCUPATIONAL RADIATION SAFETY SECURITY Strategic Performance Areas REACTOR SAFETY RADIATION SAFETY SAFEGUARDS HUMAN PERFORMANCE SAFETY CONSCIOUS WORK ENVIRONMENT PROBLEM IDENTIFICATION AND RESOLUTION PUBLIC HEALTH AND SAFETY AS A RESULT OF CIVILIAN NUCLEAR REACTOR OPERATION NRCs Overall Safety Mission Cross-Cutting Areas

16 Examples of Baseline Inspections

  • Equipment Alignment

~80 hrs/yr

  • Triennial Fire Protection

~250 hrs every 3 yrs

  • Operator Response

~125 hrs/yr

~80 hrs/yr

  • Rad Release Controls

~110 hrs every 2 yrs

  • Worker Radiation Protection ~95 hrs/yr
  • Corrective Action Program ~250 hrs every 2 yrs
  • Corrective Action Case Reviews ~60 hrs/yr

17 Significance Threshold Performance Indicators Green:

Only Baseline Inspection White:

May increase NRC oversight Yellow:

Requires more NRC oversight Red:

Requires more NRC oversight Inspection Findings Green:

Very low safety issue White:

Low to moderate safety issue Yellow:

Substantial safety issue Red:

High safety issue

18 Action Matrix Concept Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions Licensee

Response

Regulatory

Response

Degraded Cornerstone Multiple/Rep.

Degraded Cornerstone Unacceptable Performance

19 National Summary of Plant Performance Status at End of 2008 Licensee Response 86 Regulatory Response 14 Degraded Cornerstone 3

Multiple/Repetitive Degraded Cornerstone 1

Unacceptable 0

Total 104

20 National Summary

  • Performance Indicator Results (end of CY 2008)

- Green 1762

- White 6

- Yellow 0

- Red 0

  • Total Inspection Findings (for 2008)

- Green 776

- White 17

- Yellow 0

- Red 0

21 Byron Station Assessment Results (January 1 - December 31, 2008)

  • Byron Units 1 and 2 were within the Regulatory Response column for 2008 due to a White finding in the Mitigating Systems Cornerstone identified in the 1st quarter of 2008.

22 Safety Significant Findings or PIs

  • On February 14, 2008, the NRC completed a Special Inspection to evaluate the facts and circumstances surrounding the degradation of the essential service water (SX) system riser piping at the cooling tower basin, and the subsequent dual Unit shutdown on October 19, 2007.

- One White finding associated with two violations was identified.

- Three Green Non-Cited Violations were identified.

23 Byron Inspection Activities (January 1 - December 31, 2008)

  • Jan 14 - Jan 31: Modification/50.59 Inspection
  • March 23 - April 22: Scheduled Unit 1 Refueling Outage
  • May 19 - May 30: Initial License Examination
  • October 5 - October 23: Scheduled Unit 2 Refueling Outage
  • May 21 - Dec 11: ISFSI Inspection

24 Byron Inspection Results (January 1 - December 31, 2008)

  • Over 2,000 man-hours of direct inspection

- 1 White Finding & Associated Violations

- 19 Green Findings and/or Violations

- 1 Substantive Cross-Cutting Issue Decision Making in Human Performance Area

25 Byron Station Annual Assessment Summary (January 1 - December 31, 2008)

  • Exelon operated Byron Station Units 1 & 2 in a manner that preserved public health and safety.
  • All cornerstone objectives were met.
  • One White finding was identified. (Essential Service Water System Piping Degradation)

26 (January 1 - December 31, 2008)

  • Supplement inspection for the White finding related to the Essential Service Water piping degradation was completed in January 2009 with no finding.
  • NRC plans baseline inspections at Byron Station for the remainder of 2009.
  • Substantive cross-cutting issue

- Decision Making Component in Human Performance

- Identified since 2008 Mid-Cycle Assessment Byron Station Annual Assessment Summary

27 Licensee Response and Remarks Daniel Enright Site Vice President Byron Station

28 Open to the Public

  • The NRC places a high priority on keeping the public and stakeholders informed of its activities.
  • At www.nrc.gov, you can:

- Find public meeting dates and transcripts;

- Read NRC testimony, speeches, press releases, and policy decisions; and

- Access the agencys Electronic Reading Room to find NRC publications and documents.

29 Contacting the NRC

  • Report an emergency

- (301) 816-5100 (call collect)

  • Report a safety concern

- (800) 695-7403

- Allegation@nrc.gov

  • General information or questions

- www.nrc.gov

- Select What We Do for Public Affairs

30 NRC Representatives

  • Cynthia Pederson, Director, Division Reactor Projects

- (630) 829-9600

  • Anne Boland, Deputy Division Director, DRP

- (630) 829-9601

  • Marshall David, Project Manager, NRR

- (301) 415-1547

- (815) 234-5451

- (815) 234-5451

- (630) 829-9574

- (630) 829-9620

31 NRC Representatives

- (630) 829-9834

- (630) 829-9662

- (630) 829-9663

  • NRC Region III Office Switchboard

- (630) 829-9500 (800) 522-3025

32 Reference Sources