HNP-09-015, Submittal of 2008 Annual Report in Accordance with Technical Specification 6.9.1.2
ML090490673 | |
Person / Time | |
---|---|
Site: | Harris |
Issue date: | 02/02/2009 |
From: | Corlett D Progress Energy Carolinas |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
HNP-09-015 | |
Download: ML090490673 (1) | |
Similar Documents at Harris | |
---|---|
Category:Annual Operating Report
MONTHYEARRA-24-0083, Annual Report of Changes Pursuant to 10 CFR 50.462024-04-25025 April 2024
[Table view]Annual Report of Changes Pursuant to 10 CFR 50.46 RA-23-0044, Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.462023-04-26026 April 2023 Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.46 RA-23-0046, Annual Radioactive Effluent Release Report - 20222023-04-24024 April 2023 Annual Radioactive Effluent Release Report - 2022 RA-22-0028, Annual Report of Changes Pursuant to 10 CFR 50.462022-04-27027 April 2022 Annual Report of Changes Pursuant to 10 CFR 50.46 RA-21-0131, Annual Environmental (Non-radiological) Operating Report2021-04-27027 April 2021 Annual Environmental (Non-radiological) Operating Report RA-21-0051, Shearon Harris Nuclear Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, and H. B. Robinson Steam Electric Plant - Annual Report of Changes Pursuant to 10 CFR 50.462021-04-0505 April 2021 Shearon Harris Nuclear Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, and H. B. Robinson Steam Electric Plant - Annual Report of Changes Pursuant to 10 CFR 50.46 RA-20-0126, Annual Report of Changes Pursuant to 10 CFR 50.462020-05-27027 May 2020 Annual Report of Changes Pursuant to 10 CFR 50.46 RA-18-0022, Carolinas, LLC (Duke Energy) - Annual Report of Changes Pursuant to 10 CFR 50.462018-05-24024 May 2018 Carolinas, LLC (Duke Energy) - Annual Report of Changes Pursuant to 10 CFR 50.46 HNP-18-021, Annual Report in Accordance with Technical Specification 6.9.1.22018-02-19019 February 2018 Annual Report in Accordance with Technical Specification 6.9.1.2 RA-17-0027, Duke Energy Carolinas, LLC - Annual Report of Changes Pursuant to 10 CFR 50.462017-05-25025 May 2017 Duke Energy Carolinas, LLC - Annual Report of Changes Pursuant to 10 CFR 50.46 RA-16-0025, Duke Energy Annual Report of Changes Pursuant to 10 CFR 50.462016-05-31031 May 2016 Duke Energy Annual Report of Changes Pursuant to 10 CFR 50.46 HNP-15-031, Annual Environmental (Nonradiological) Operating Report for 20142015-04-27027 April 2015 Annual Environmental (Nonradiological) Operating Report for 2014 HNP-13-050, Annual Report of Changes Pursuant to 10 CFR 50.46 for May 23, 2012 Through April 23, 20132013-06-0606 June 2013 Annual Report of Changes Pursuant to 10 CFR 50.46 for May 23, 2012 Through April 23, 2013 HNP-13-030, Annual Radiological Environmental Operating Report for 20122013-04-19019 April 2013 Annual Radiological Environmental Operating Report for 2012 HNP-13-039, Annual Environmental (Non-Radiological) Operating Report, January 1, 2012 Through December 31, 2012, Appendix B2013-04-19019 April 2013 Annual Environmental (Non-Radiological) Operating Report, January 1, 2012 Through December 31, 2012, Appendix B HNP-12-035, Submittal of Annual Radioactive Effluent Release Report2012-04-16016 April 2012 Submittal of Annual Radioactive Effluent Release Report HNP-11-046, Emergency Core Cooling System Evaluation Changes Annual Report2011-05-23023 May 2011 Emergency Core Cooling System Evaluation Changes Annual Report ML11123A2592011-04-27027 April 2011 Submittal of Annual Radiological Environmental Operating Report for 2010 HNP-11-031, Annual Environmental (Nonradiological) Operating Report2011-04-27027 April 2011 Annual Environmental (Nonradiological) Operating Report HNP-11-032, Annual Radioactive Effluent Release Report for 20102011-04-25025 April 2011 Annual Radioactive Effluent Release Report for 2010 HNP-11-011, Annual Report in Accordance with Technical Specification 6.9.1.22011-02-0202 February 2011 Annual Report in Accordance with Technical Specification 6.9.1.2 HNP-10-043, Submittal of Annual Radiological Environmental Operating Report2010-04-27027 April 2010 Submittal of Annual Radiological Environmental Operating Report HNP-10-041, Annual Radioactive Effluent Release Report for 20092010-04-16016 April 2010 Annual Radioactive Effluent Release Report for 2009 HNP-09-040, Annual Radiological Environmental Operating Report for 20082009-04-28028 April 2009 Annual Radiological Environmental Operating Report for 2008 HNP-09-015, Submittal of 2008 Annual Report in Accordance with Technical Specification 6.9.1.22009-02-0202 February 2009 Submittal of 2008 Annual Report in Accordance with Technical Specification 6.9.1.2 ML0817101312008-06-12012 June 2008 Submittal of Report of Changes Pursuant to CFR 50.59 HNP-07-044, Annual Environmental (Non-Radiological) Operating Report for 20062007-04-24024 April 2007 Annual Environmental (Non-Radiological) Operating Report for 2006 HNP-06-027, Annual Report in Accordance with Technical Specification 6.9.1.22006-02-0202 February 2006 Annual Report in Accordance with Technical Specification 6.9.1.2 HNP-05-100, Annual Radiological Environmental Operating Amended Report2005-09-23023 September 2005 Annual Radiological Environmental Operating Amended Report ML0513003802005-05-0909 May 2005 Report of Changes Pursuant to 10 CFR 50.59 for May 18, 2003 - December 31, 2004 HNP-05-041, Transmittal of Annual Environmental (Non-Radiological) Operating Report for 20042005-04-15015 April 2005 Transmittal of Annual Environmental (Non-Radiological) Operating Report for 2004 HNP-05-016, Annual Operating Report - 20042005-02-16016 February 2005 Annual Operating Report - 2004 HNP-04-057, Annual Environmental (Non-Radiological) Operating Report2004-04-23023 April 2004 Annual Environmental (Non-Radiological) Operating Report HNP-04-014, Annual Operating Report - 20032004-02-24024 February 2004 Annual Operating Report - 2003 HNP-03-043, Annual Environmental Operating Report2003-04-22022 April 2003 Annual Environmental Operating Report HNP-03-017, Annual Operating Report - 20022003-02-19019 February 2003 Annual Operating Report - 2002 HNP-02-057, Annual Environmental (Non-Radiological) Operating Report for 20012002-04-23023 April 2002 Annual Environmental (Non-Radiological) Operating Report for 2001 HNP-02-016, Annual Operating Report for 20012002-02-19019 February 2002 Annual Operating Report for 2001 2024-04-25 Category:Letter type:HNP MONTHYEARHNP-18-050, Request to Extend Reactor Vessel Surveillance Capsule Report Submission Date2018-09-17017 September 2018
[Table view]Request to Extend Reactor Vessel Surveillance Capsule Report Submission Date HNP-18-004, License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme2018-08-13013 August 2018 License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme HNP-18-035, Relief Request I3R-18, Alternative Repair and Replacement Testing Requirements for the Containment Building Equipment Hatch Sleeve Weld, Lnservice Inspection Program for Containment, Third Ten-Year Interval2018-06-0404 June 2018 Relief Request I3R-18, Alternative Repair and Replacement Testing Requirements for the Containment Building Equipment Hatch Sleeve Weld, Lnservice Inspection Program for Containment, Third Ten-Year Interval HNP-18-049, Submittal of 1 0 CFR 50.54(q) Evaluation Form of Changes to Procedure EMP-420, Emergency Program Maintenance, Revision 192018-05-0303 May 2018 Submittal of 1 0 CFR 50.54(q) Evaluation Form of Changes to Procedure EMP-420, Emergency Program Maintenance, Revision 19 HNP-18-023, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes2018-05-0202 May 2018 Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes HNP-18-042, Annual Environmental (Non-radiological) Operating Report2018-04-30030 April 2018 Annual Environmental (Non-radiological) Operating Report HNP-18-032, Annual Radiological Environmental Operating Report2018-04-25025 April 2018 Annual Radiological Environmental Operating Report HNP-18-031, Annual Radioactive Effluent Release Report2018-04-25025 April 2018 Annual Radioactive Effluent Release Report HNP-18-047, Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval, Non-Proprietary Version of Calculation2018-04-20020 April 2018 Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval, Non-Proprietary Version of Calculation HNP-18-045, Submittal of Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval2018-04-18018 April 2018 Submittal of Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval HNP-18-044, Cycle 22 Core Operating Limits Report, Revision O2018-04-16016 April 2018 Cycle 22 Core Operating Limits Report, Revision O HNP-18-039, Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2018-04-13013 April 2018 Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses HNP-18-021, Annual Report in Accordance with Technical Specification 6.9.1.22018-02-19019 February 2018 Annual Report in Accordance with Technical Specification 6.9.1.2 HNP-18-020, Supplement to Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses2018-02-16016 February 2018 Supplement to Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses HNP-18-019, Cycle 21 Core Operating Limits Report, Revision 12018-02-14014 February 2018 Cycle 21 Core Operating Limits Report, Revision 1 HNP-18-017, CFR 50.54(q) Evaluations2018-02-0505 February 2018 CFR 50.54(q) Evaluations HNP-18-001, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors.2018-02-0101 February 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors. HNP-18-002, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements2018-01-22022 January 2018 Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements HNP-18-003, Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses2018-01-18018 January 2018 Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses HNP-18-007, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Supplement Regarding De Minimis Penetrations2018-01-11011 January 2018 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Supplement Regarding De Minimis Penetrations HNP-18-006, Submittal of 14-Day Special Report for Accident Radiation Monitors2018-01-0404 January 2018 Submittal of 14-Day Special Report for Accident Radiation Monitors HNP-17-093, Supplement to License Amendment Request Proposing a New Set of Fission Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 32017-11-29029 November 2017 Supplement to License Amendment Request Proposing a New Set of Fission Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3 HNP-17-078, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements2017-11-27027 November 2017 Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements HNP-17-082, Response to Request for Additional Information Regarding License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Limit Detailed In..2017-10-30030 October 2017 Response to Request for Additional Information Regarding License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Limit Detailed In.. HNP-17-084, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements2017-10-30030 October 2017 Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements HNP-17-025, Fourth Interval Lnservice Inspection Plan, Third Interval Containment Lnservice Inspection Plan, and Fourth Interval Lnservice Inspection Pressure Test Plan2017-10-23023 October 2017 Fourth Interval Lnservice Inspection Plan, Third Interval Containment Lnservice Inspection Plan, and Fourth Interval Lnservice Inspection Pressure Test Plan HNP-17-072, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis2017-10-19019 October 2017 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis HNP-17-077, License Amendment Request Regarding Rod Control Movable Assemblies Technical Specifications2017-10-10010 October 2017 License Amendment Request Regarding Rod Control Movable Assemblies Technical Specifications HNP-17-076, Supplement to License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete Duplicate Reporting Requirements.2017-10-0202 October 2017 Supplement to License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete Duplicate Reporting Requirements. HNP-17-073, Supplemental Information for License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2017-09-14014 September 2017 Supplemental Information for License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses HNP-17-062, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal2017-09-13013 September 2017 Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal HNP-17-061, Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2017-07-20020 July 2017 Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses HNP-17-008, License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2017-06-28028 June 2017 License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses HNP-17-003, License Amendment Request for Emergency Diesel Generator Surveillance Requirements Regarding Voltage and Frequency Limits and the Voltage Limit for Emergency Diesel Generator Load Rejection2017-06-0505 June 2017 License Amendment Request for Emergency Diesel Generator Surveillance Requirements Regarding Voltage and Frequency Limits and the Voltage Limit for Emergency Diesel Generator Load Rejection HNP-17-040, Snubber Program Plan2017-06-0101 June 2017 Snubber Program Plan HNP-17-051, 10 CFR 50.54(q) Evaluation2017-05-24024 May 2017 10 CFR 50.54(q) Evaluation HNP-17-050, Transmittal of 10 CFR 50.54(q) Evaluation for Revision 21 to PEP-250, Activation and Operation of the Joint Information Center2017-05-24024 May 2017 Transmittal of 10 CFR 50.54(q) Evaluation for Revision 21 to PEP-250, Activation and Operation of the Joint Information Center HNP-17-041, Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete2017-05-22022 May 2017 Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete Du HNP-17-033, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 112017-05-22022 May 2017 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 11 HNP-17-049, Transmittal of 10 CFR 50.54(q) Evaluation and Revision 26 to PEP-110, Emergency Classification and Protective Action Recommendations.2017-05-18018 May 2017 Transmittal of 10 CFR 50.54(q) Evaluation and Revision 26 to PEP-110, Emergency Classification and Protective Action Recommendations. HNP-17-047, 10 CFR 50.54(q) Evaluation2017-05-18018 May 2017 10 CFR 50.54(q) Evaluation HNP-17-048, Transmittal of 10 CFR 50.54(q) Evaluation and Revision 28 to PEP-230, Control Room Operations.2017-05-18018 May 2017 Transmittal of 10 CFR 50.54(q) Evaluation and Revision 28 to PEP-230, Control Room Operations. HNP-17-046, 10 CFR 50.54(q) Evaluation2017-05-18018 May 2017 10 CFR 50.54(q) Evaluation HNP-17-024, Annual Environmental (Nonradiological) Operating Report2017-04-28028 April 2017 Annual Environmental (Nonradiological) Operating Report HNP-17-023, Annual Radioactive Effluent Release Report2017-04-28028 April 2017 Annual Radioactive Effluent Release Report HNP-17-034, Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106..2017-04-25025 April 2017 Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106.. HNP-17-035, Request for Pilot Plant Status and Fee Waiver to Implement Tornado Missile Risk Evaluator2017-04-12012 April 2017 Request for Pilot Plant Status and Fee Waiver to Implement Tornado Missile Risk Evaluator HNP-17-045, 10 CFR 50.54(q) Evaluation of Change in Emergency Plan Implementation Procedure PEP-241, Revision 7, Technical Support Center (TSC) Emergency Ventilation System Operation2017-03-30030 March 2017 10 CFR 50.54(q) Evaluation of Change in Emergency Plan Implementation Procedure PEP-241, Revision 7, Technical Support Center (TSC) Emergency Ventilation System Operation HNP-17-014, Annual Report in Accordance with Technical Specifications, Section 6.9.1.22017-02-16016 February 2017 Annual Report in Accordance with Technical Specifications, Section 6.9.1.2 HNP-17-015, Summary of 10 CFR 50.54(q) Evaluation2017-02-15015 February 2017 Summary of 10 CFR 50.54(q) Evaluation 2018-09-17 |
Text
Progress Energy FEB -02 2009 SERIAL: HNP-09-015 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 ANNUAL REPORT IN ACCORDANCE WITH TECHNICAL SPECIFICATION 6.9.1.2 Ladies and Gentlemen:
In accordance with Harris Nuclear Plant (HNP) Technical Specification 6.9.1.2, Carolina Power &
Light Company, doing business as Progress Energy Carolinas, Inc., provides the following information regarding primary coolant specific activity limits for 2008.
During 2008, activity levels in the HNP primary coolant did not exceed 1.0 pCi/gram dose equivalent 1-131 or 100/E-bar ýtCi/gram gross radioactivity as set forth in HNP Technical Specification 3.4.8.
If you have questions regarding this submittal, please contact me at (919) 362-3137.
Sincerely, D. H. Corlett Supervisor - Licensing/Regulatory Programs Harris Nuclear Plant DHC/mgw c: Mr. J. D. Austin (NRC Senior Resident Inspector, HNP)
Mr. L. A. Reyes (NRC Regional Administrator, Region II)
Ms. M. G. Vaaler (NRC Project Manager, HNP)
Progress Energy Carolinas, Inc.
Harris Nuclear Plant P.0. Box 165 New Hill, NC27562