LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement | 8 September 2023 | and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement | |
ML23249A261 | 6 September 2023 | License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary | Deep Dose Equivalent |
LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location | 21 April 2023 | License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location | Offsite Dose Calculation Manual |
LR-N23-0009, License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains | 18 April 2023 | License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains | Ultimate heat sink Anticipated operational occurrence GOTHIC |
LR-N23-0024, Submittal of Hope Creek Generating Station Technical Specification Bases Changes | 29 March 2023 | Submittal of Hope Creek Generating Station Technical Specification Bases Changes | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio High Radiation Area Fire Barrier Anticipated operational occurrence Tornado Missile Water Inventory Control Internal Flooding Hydrostatic Missed surveillance Abnormal operational transient Surveillance Frequency Control Program Scram Discharge Volume Feedwater Controller Failure Excess Flow Check Valve Fast acting solenoid valve Spiral reload Overtravel Control of Heavy Loads Power Operated Valves Turbine Missile Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Offsite Circuit Scaffolding Power change Unidentified leakage Failure to Scram |
LR-N22-0051, License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report | 22 June 2022 | License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report | |
LR-N21-0056, License Amendment Request to Amend the Technical Specifications to Revise Surveillance Requirements for Electric Power Monitor Channels for the Reactor Protection System (RPS) and Power Range Neutron Monitoring System | 3 November 2021 | License Amendment Request to Amend the Technical Specifications to Revise Surveillance Requirements for Electric Power Monitor Channels for the Reactor Protection System (RPS) and Power Range Neutron Monitoring System | Half scram Surveillance Frequency Control Program |
LR-N21-0065, License Amendment Request - Revision of Salem and Hope Creek Generating Station Technical Specification (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS | 29 September 2021 | License Amendment Request - Revision of Salem and Hope Creek Generating Station Technical Specification (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS | Shutdown Margin Offsite Dose Calculation Manual Pressure and Temperature Limits Report Annual Radioactive Effluent Release Report Process Control Program Spiral reload Pressure Boundary Leakage |
LR-N21-0025, License Amendment Request to Revise Technical Specification Limits for Ultimate Heat Sink | 7 May 2021 | License Amendment Request to Revise Technical Specification Limits for Ultimate Heat Sink | Safe Shutdown Ultimate heat sink Anticipated operational occurrence Safe Shutdown Earthquake Enforcement Discretion Surveillance Frequency Control Program Recently irradiated fuel |
LR-N20-0060, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | 29 September 2020 | Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | Reactor Vessel Water Level Stroke time Water Inventory Control Operating Basis Earthquake Surveillance Frequency Control Program Control of Heavy Loads Fuel cladding Recently irradiated fuel Offsite Circuit Scaffolding |
LR-N20-0051, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | 21 July 2020 | Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | Internal Flooding Probabilistic Risk Assessment FLEX |
LR-N19-0076, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | 25 November 2019 | Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | Hot Short Safe Shutdown High winds Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Incorporated by reference FLEX Fukushima Dai-Ichi Tornado Missile Protection Large early release frequency Flooding Focused Evaluation |
LR-N19-0064, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer | 29 July 2019 | License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer | |
LR-N19-0065, License Amendment Request for Approval of Changes to Emergency Plan Staffing Requirements | 8 July 2019 | License Amendment Request for Approval of Changes to Emergency Plan Staffing Requirements | |
LR-N19-0060, Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program | 18 June 2019 | Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program | Surveillance Frequency Control Program |
LR-N19-0038, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR | 22 April 2019 | Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR | Shutdown Margin Anticipated operational occurrence Hydrostatic Abnormal operational transient Pressure and Temperature Limits Report Minimum Critical Power Ratio Fuel cladding |
LR-N19-0004, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements | 18 April 2019 | Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements | Recently irradiated fuel |
ML19058A221 | 27 February 2019 | Application to Revise Technical Specifications to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement. | Surveillance Frequency Control Program Scram Discharge Volume |
LR-N18-0127, Application to Revise Technical Specifications to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement. | 27 February 2019 | Application to Revise Technical Specifications to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement. | Surveillance Frequency Control Program Scram Discharge Volume |
LR-N18-0098, License Amendment Request: Remote Shutdown System | 30 October 2018 | License Amendment Request: Remote Shutdown System | Safe Shutdown Surveillance Frequency Control Program Spiral reload Fuel cladding |
LR-N18-0086, Supplemental Information to License Amendment Request (LAR) to Amend the Hope Creek Technical Specifications (TS) to Revise Action for Inoperable Emergency Diesel Generator (EDG) a or 8 | 26 September 2018 | Supplemental Information to License Amendment Request (LAR) to Amend the Hope Creek Technical Specifications (TS) to Revise Action for Inoperable Emergency Diesel Generator (EDG) a or 8 | FLEX |
LR-N18-0059, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules | 29 June 2018 | Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules | Safe Shutdown Time of Discovery |
LR-N18-0032, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension | 13 April 2018 | License Amendment Request: Inverter Allowed Outage Time (AOT) Extension | Safe Shutdown Fire Barrier Enforcement Discretion Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Large early release frequency Fuel cladding |
LR-N18-0013, License Amendment Request (LAR) to Amend the Hope Creek Technical Specifications (TS) to Revise Action for Inoperable Emergency Diesel Generator (EDG) a or B | 28 March 2018 | License Amendment Request (LAR) to Amend the Hope Creek Technical Specifications (TS) to Revise Action for Inoperable Emergency Diesel Generator (EDG) a or B | Safe Shutdown FLEX Offsite Circuit |
LR-N18-0011, Supplement to License Amendment Request- Safety Limit Minimum Critical Power Ratio Change. Includes GNF-004N5379-R1-NP, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR | 22 January 2018 | Supplement to License Amendment Request- Safety Limit Minimum Critical Power Ratio Change. Includes GNF-004N5379-R1-NP, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR | Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Fuel cladding |
LR-N17-0163, License Amendment Request - Safety Limit Minimum Critical Power Ratio Change, Non-Proprietary | 9 November 2017 | License Amendment Request - Safety Limit Minimum Critical Power Ratio Change, Non-Proprietary | Anticipated operational occurrence Minimum Critical Power Ratio Fuel cladding |
LR-N17-0032, License Amendment Request to Amend the Technical Specifications (TS) to Revise and Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report | 27 March 2017 | License Amendment Request to Amend the Technical Specifications (TS) to Revise and Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report | Shutdown Margin Reactor Vessel Water Level Offsite Dose Calculation Manual Anticipated operational occurrence Hydrostatic Pressure and Temperature Limits Report Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program Spiral reload Pressure Boundary Leakage |
LR-N17-0060, Application to Revise Technical Specifications to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs. | 27 March 2017 | Application to Revise Technical Specifications to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs. | Shutdown Margin |
LR-N16-0175, License Amendment Request - Administrative Controls | 17 October 2016 | License Amendment Request - Administrative Controls | High Radiation Area Process Control Program |
LR-N16-0156, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | 7 October 2016 | License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | Safe Shutdown High winds Mission time Fire Barrier Stroke time Internal Flooding Probabilistic Risk Assessment Coatings Operator Manual Action Multiple Spurious Operation Incorporated by reference FLEX Aging Management Fukushima Dai-Ichi Large early release frequency Containment Hardened Vent Moisture barrier Earthquake Scaffolding |
LR-N16-0103, License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing Using Consolidated Line Item Improvement Process | 20 July 2016 | License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing Using Consolidated Line Item Improvement Process | Packing leak Squib Surveillance Frequency Control Program Pressure Boundary Leakage |
LR-N16-0066, License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling | 17 June 2016 | License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling | Reactor Vessel Water Level Surveillance Frequency Control Program |
LR-N16-0092, Supplemental Information - License Amendment Request - Digital Power Range Neutron Monitoring (Prnm) System Upgrade | 17 June 2016 | Supplemental Information - License Amendment Request - Digital Power Range Neutron Monitoring (Prnm) System Upgrade | Reactor Vessel Water Level Surveillance Frequency Control Program Scram Discharge Volume Fuel cladding |
ML16181A193 | 8 June 2016 | Hope Creek Generating Station License Amendment Request - Safety Limit Minimum Critical Power Ratio Change | Minimum Critical Power Ratio |
LR-N16-0099, Hope Creek Generating Station License Amendment Request - Safety Limit Minimum Critical Power Ratio Change | 8 June 2016 | Hope Creek Generating Station License Amendment Request - Safety Limit Minimum Critical Power Ratio Change | Minimum Critical Power Ratio |
LR-N16-0002, License Amendment Request to Amend Technical Specifications (TS) to Delete Action Statement 3.4.2.1.b Associated with Stuck Open Safety/Relief Valves (Srvs) | 11 May 2016 | License Amendment Request to Amend Technical Specifications (TS) to Delete Action Statement 3.4.2.1.b Associated with Stuck Open Safety/Relief Valves (Srvs) | |
ML15265A224 | 21 September 2015 | License Amendment Request, Digital Power Range Neutron Monitoring (Prnm) System Upgrade | Anticipated operational occurrence Commercial Grade Dedication Cyber Security Surveillance Frequency Control Program |
LR-N15-0178, Hope Creek - License Amendment Request, Digital Power Range Neutron Monitoring (Prnm) System Upgrade | 21 September 2015 | Hope Creek - License Amendment Request, Digital Power Range Neutron Monitoring (Prnm) System Upgrade | Anticipated operational occurrence Commercial Grade Dedication Cyber Security Surveillance Frequency Control Program |
LR-N15-0147, License Renewal Commitment Implementation | 22 July 2015 | License Renewal Commitment Implementation | Aging Management |
LR-N14-0224, License Amendment Request to Update Appendix B to the Renewed Facility Operating License | 9 December 2014 | License Amendment Request to Update Appendix B to the Renewed Facility Operating License | |
LR-N14-0189, License Amendment Request to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process | 25 November 2014 | License Amendment Request to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process | Surveillance Frequency Control Program Recently irradiated fuel |
LR-N13-0265, License Amendment Request for Approval of the Revised PSEG Nuclear Cyber Security Plan Milestone 8 Implementation Schedule | 24 December 2013 | License Amendment Request for Approval of the Revised PSEG Nuclear Cyber Security Plan Milestone 8 Implementation Schedule | Cyber Security |
LR-N13-0155, License Amendment Request to Relocate the Flood Protection Technical Specification to the Technical Requirements Manual | 5 September 2013 | License Amendment Request to Relocate the Flood Protection Technical Specification to the Technical Requirements Manual | High winds Surveillance Frequency Control Program Recently irradiated fuel |
LR-N12-0200, for License Amendment Request - Cyber Security Plan Implementation Schedule Milestones | 26 July 2012 | for License Amendment Request - Cyber Security Plan Implementation Schedule Milestones | Cyber Security |
LR-N12-0067, License Amendment Request to Correct Technical Specification and Facility Operating License Editorial Items | 1 March 2012 | License Amendment Request to Correct Technical Specification and Facility Operating License Editorial Items | Safe Shutdown Reactor Vessel Water Level Hydrostatic Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program License Renewal Fire Protection Program Power Uprate |
LR-N11-0068, Application for Technical Specification Change TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems to the Technical Specifications Using Consolidated Line Item Improvement Process | 28 February 2011 | Application for Technical Specification Change TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems to the Technical Specifications Using Consolidated Line Item Improvement Process | Safe Shutdown Reactor Vessel Water Level Ultimate heat sink Surveillance Frequency Control Program Recently irradiated fuel |
LR-N10-0343, License Amendment Request - Operation with Final Feedwater Temperature Reduction and Feedwater Heaters Out-of-Service | 22 September 2010 | License Amendment Request - Operation with Final Feedwater Temperature Reduction and Feedwater Heaters Out-of-Service | Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Process Control Program Feedwater Controller Failure MELLLA Power Uprate Affidavit |
ML102580242 | 8 September 2010 | License Amendment Request H10-01:, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program | |
ML102150073 | 20 July 2010 | License Amendment Request H09-02 to Relocate the Reactor Recirculation System Motor-Generator (MG) Set Scoop Tune Stop Setting Surveillance | |
ML102150092 | 20 July 2010 | License Amendment Requests H10-02 & S10-02: Proposed Revision to Technical Specifications - Removal of Reactor Coolant System Structural Integrity Requirements. | |