MONTHYEARML24009A1152024-01-29029 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24004A0052024-01-17017 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0042 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24004A0342024-01-17017 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0026 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23348A2162023-12-15015 December 2023 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0030 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-104, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation L-2023-160, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule LG-23-097, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23143A3912023-05-23023 May 2023 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements ML23033A4042023-05-15015 May 2023 Exemption from the Requirements of 10 CFR Part 2, Section 2.109(B) Related to Submission of Subsequent License Renewal Application Letter ML23033A4052023-05-15015 May 2023 Exemption from the Requirements of 10 CFR Part 2, Section 2.109(B) Related to Submission of Subsequent License Renewal Application ML23052A0232023-02-17017 February 2023 License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation RS-23-033, Request for Exemption from 10 CFR 2.109(b)2023-01-27027 January 2023 Request for Exemption from 10 CFR 2.109(b) ML22118B1622022-04-28028 April 2022 Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Design Requirements - Supplement ML22090A0982022-03-31031 March 2022 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Design Requirements ML22054A0062022-03-23023 March 2022 Exemption from the Requirements of 10 CFR 50.62 to Delete Diverse Auxiliary Feedwater Actuation System Using Risk-Informed Process for Evaluations (EPID L 2022 Lle 0004) Exemption ML22054A0052022-03-23023 March 2022 Exemption from the Requirements of 10 CFR 50.62 to Delete Diverse Auxiliary Feedwater Actuation System Using Risk-Informed Process for Evaluations (EPID L 2022 Lle 0004) Letter ML22034A9832022-02-15015 February 2022 FRN - Notice of Issuance of COVID-19 Exemptions Issued in January 2022 ML22035A3302022-02-10010 February 2022 Requests for Confirmation of Information for Exemption to Delete Diverse Auxiliary Feedwater Actuation System Based on Risk-Informed Process for Evaluations ML22003A1042022-01-26026 January 2022 the Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Licenses (EPID L 2021 LLM 0002) (FRN) ML22020A0402022-01-21021 January 2022 Exemption from Specific Requirements of 10 CFR Part 26 (EPID L 2022 Lle 0005 (Covid 19)) ML22020A0172022-01-19019 January 2022 Incoming Request from Palo Verde-Arizona Public Service Co. Re COVID-19 Related Request for Exemption from Part 26 Work Hours Requirements ML22014A4152022-01-14014 January 2022 Request for Exemption from Certain Requirements in 10 CFR 50.62(c)(1) Using Risk-Informed Process for Evaluations ML21344A2062021-12-15015 December 2021 Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR Part 50, Appendix E, Section IV.F.2.C (EPID L-2021-LLE-0044) (Exemption) ML21330A0422021-12-15015 December 2021 Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR Part 50, Appendix E, Section IV.F.2.C (EPID L-2021-LLE-0044) (Letter) ML21330A0432021-12-15015 December 2021 Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR Part 50, Appendix E, Section IV.F.2.C (EPID L-2021-LLE-0044) (FRN) ML21293A1332021-10-19019 October 2021 R. E. Ginna Nuclear Power Plant - Acceptance of Request for Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR 50, Appendix E, Section IV.F.2.C ML21279A1122021-10-0606 October 2021 R. E. Ginna Nuclear Power Plant - Request for Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR 50, Appendix E, Section IV.F.2.c ML21267A0132021-09-28028 September 2021 R. E. Ginna Nuclear Power Plant- Exemption from Specific Requirements of 10 CFR Part 26 (EPID L-2021-LLE-0042 (COVID-19)) ML21265A1592021-09-21021 September 2021 COVID-19 Related Request for Exemption from Part 26 Work Hours Requirements ML21243A5432021-09-0101 September 2021 Request for Partial Exemption from 10 CFR 50.62(c)(1) Risk-Informed Process for Evaluations (RIPE) ML21063A0042021-04-14014 April 2021 Letter, Exemption from the Requirements of 10 CFR 2.109(b) Related to Subsequent License Renewal Application ML21063A0152021-04-14014 April 2021 Exemption from the Requirements of 10 CFR 2.109(b) Related to Subsequent License Renewal Application ML21078A0502021-04-0606 April 2021 Exemption from Specific Requirements of 10 CFR Part 26 (EPID L-2021-LLE-0017 (COVID-19)) ML21057A1892021-03-30030 March 2021 Exemption from Select Requirements of 10 CFR Part 26 (EPID L-2021-LLE-0013 (COVID-19)) ML21064A0022021-03-0404 March 2021 COVID-19 Related Request for Exemption from Part 26 Work Hours Requirements ML21050A1822021-03-0101 March 2021 Exemption from Select Requirements of 10 CFR Part 26 (EPID L-2021-LLE-0010 (Covid 19)) ML21056A5142021-02-25025 February 2021 Incoming Request-Braidwood-Exelon Generation Co. LLC ML21049A0512021-02-17017 February 2021 Incoming Request-Quad Cities-Exelon Generation Co., LLC ML20355A0002021-01-0505 January 2021 Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0XXX (COVID-19)) ML20357A0552020-12-23023 December 2020 Subsequent Request for Exemption from Select Requirements of 10 CFR Part 26 (EPID L-2020-LLE-0238 (COVID-19)) ML20345A1192020-12-21021 December 2020 Exemption from Requirements of 10 CFR Part 50, Appendix E, Sections IV.F.2.B and IV.F.2.C (EPID L-2020-LLE-0229 and EPID L-2020-LLE-0230 (COVID-19)) ML20335A0902020-12-21021 December 2020 Federal Register Notice - November 2020 COVID-19 Exemptions ML20356A2922020-12-21021 December 2020 Independent Spent Fuel Storage Installation (ISFSI) - Subsequent Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs ML20353A3442020-12-18018 December 2020 Exemption Request for NRC Review Fees for the License Amendment Request for the Limerick Digital Modernization Project ML20353A3912020-12-18018 December 2020 Independent Spent Fuel Storage Installation (ISFSI) - Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section VI, Subsection A.7 and Subsection C.3(l)(1) ML20343A0272020-12-17017 December 2020 Exemption from Select Requirements of 10 CFR Part 26 (EPID L-2020-LLE-0228 (COVID-19)) 2024-01-29
[Table view] Category:Federal Register Notice
MONTHYEARML23271A0042023-10-24024 October 2023 Installation Support License Amendment Request Public Notice and Hearing Request Notice ML23237B4412023-09-29029 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Federal Register Notice, Direct and Indirect License Transfer Issuance Order ML23166B0852023-07-0606 July 2023 FRN: for Issuance of Exemption ML23110A1222023-06-12012 June 2023 Environmental Assessment and Finding of No Significant Impact Related to a Requested Increase in Ultimate Heat Sink Temperature (EPID L-2023-LLA-0042) (FRN) ML23110A1152023-06-12012 June 2023 Environmental Assessment and Finding of No Significant Impact Related to a Requested Increase in Ultimate Heat Sink Temperature (EPID L-2023-LLA-0042) (Letter) ML23094A1982023-05-17017 May 2023 Notice of Issuance of Amendment Nos. 261 & 223 and Denial - Federal Register Notice ML23124A0772023-05-17017 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (FRN) ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) ML23033A4032023-05-15015 May 2023 Exemption from the Requirements of 10 CFR Part 2, Section 2.109(B) Related to Submission of Subsequent License Renewal Application - FRN ML23033A4042023-05-15015 May 2023 Exemption from the Requirements of 10 CFR Part 2, Section 2.109(B) Related to Submission of Subsequent License Renewal Application Letter ML23045A3112023-03-15015 March 2023 Order Extending the Effectiveness of the Approval of the Indirect Transfer of the Co-Owner Licenses from Public Service Company of New Mexico to Avangrid, Inc. (EPID L-2022-LLO-0000) (FRN) ML22314A2502022-12-19019 December 2022 Withdrawal of an Amendment Request - FRN - ML22159A1762022-07-15015 July 2022 Federal Register Notice - Braidwood Station, Units 1 and 2 Environmental Assessment and Finding of No Significant Impact Related to a Requested Increase in Ultimate Heat Sink Temperature ML22159A1742022-07-15015 July 2022 Environmental Assessment and Finding of No Significant Impact Related to a Requested Increase in Ultimate Heat Sink Temperature ML22157A3562022-06-30030 June 2022 FRN for License Amendment Application (Including NSHC) ML22157A3702022-06-15015 June 2022 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures Publica ML22146A1872022-06-0101 June 2022 FRN for Issuance of Exemption ML22101A2572022-05-11011 May 2022 Order Extending the Effectiveness of the Approval of the Indirect Transfer of the Co-Owner Licenses from Public Service Company of New Mexico to Avangrid, Inc. (EPID L-2022-LLO-0000) (FRN) ML22054A0072022-03-24024 March 2022 Exemption from the Requirements of 10 CFR 50.62 to Delete Diverse Auxiliary Feedwater Actuation System Using Risk-Informed Process for Evaluations (EPID L 2022 Lle 0004) FRN ML22034A9832022-02-15015 February 2022 FRN - Notice of Issuance of COVID-19 Exemptions Issued in January 2022 ML22003A1042022-01-26026 January 2022 the Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Licenses (EPID L 2021 LLM 0002) (FRN) ML21330A0432021-12-15015 December 2021 Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR Part 50, Appendix E, Section IV.F.2.C (EPID L-2021-LLE-0044) (FRN) ML21307A1332021-11-17017 November 2021 the Independent Spent Fuel Storage Installation - Order Approving Transfers of Control of Licenses for Minority Interests Subject to Expiring Leases (Superseding Order of October 21, 2021) (FRN) ML21307A1312021-11-17017 November 2021 the Independent Spent Fuel Storage Installation - Order Approving Transfers of Control of Licenses for Minority Interests Subject to Expiring Leases (EPID L-2021-LLM-0003) (Letter) ML21294A3762021-11-16016 November 2021 Federal Register Notice for Order Approving Indirect Transfer of Licenses ML21245A0662021-10-21021 October 2021 the Independent Spent Fuel Storage Installation - Order Approving Transfers of Control of Licenses for Minority Interests Subject to Expiring Leases (EPID L-2021-LLM-0003) (FRN) ML21245A0642021-10-21021 October 2021 the Independent Spent Fuel Storage Installation - Order Approving Transfers of Control of Licenses for Minority Interests Subject to Expiring Leases (EPID L-2021-LLM-0003) (Letter) ML21245A0652021-10-21021 October 2021 the Independent Spent Fuel Storage Installation - Order Approving Transfers of Control of Licenses for Minority Interests Subject to Expiring Leases (EPID L-2021-LLM-0003) (Order) ML21277A0772021-10-21021 October 2021 FRN - Notice of Issuance of COVID-19 Exemption Issued in September 2021 ML21165A0412021-06-30030 June 2021 Environmental Assessment and Finding of No Significant Impact Related to a Requested Increase in Ultimate Heat Sink Temperature ML21131A2452021-06-30030 June 2021 Federal Register Notice - Braidwood Station, Units 1 and 2 Environmental Assessment and Finding of No Significant Impact Related to a Requested Increase in Ultimate Heat Sink Temperature ML21165A0542021-06-23023 June 2021 Letter, Notice of Consideration of Approval of Application Proposed Transfer of Control of Licenses and Opportunity to Request a Hearing ML21165A0562021-06-23023 June 2021 FRN - Notice of Consideration of Approval of Application Proposed Transfer of Control of Licenses and Opportunity to Request a Hearing ML21154A0042021-06-0707 June 2021 FRN, Revise Technical Specification 3.7.9, Ultimate Heat Sink, Surveillance Requirement 3.7.9.2 to Allow Temperature of Less than or Equal to 102.8 Degrees Until 9/30/21 ML21154A0032021-06-0707 June 2021 Letter, Revise Technical Specification 3.7.9, Ultimate Heat Sink, Surveillance Requirement 3.7.9.2 to Allow Temperature of Less than or Equal to 102.8 Degrees Until 9/30/21 ML21145A0142021-05-26026 May 2021 Fleet and the Associated Independent Spent Fuel Storage Installations - Extension of Comment Period for Notice of Consideration of Approval of Transfer of Licenses and Conforming Amendments and Opportunity to Request a Hearing EPID L-2021-L ML21145A0152021-05-26026 May 2021 FRN Exelon License Transfer - Extend Comment Period ML21118B0292021-05-25025 May 2021 Order Approving Indirect Transfer of Licenses for Units 1, 2, and 3, and the Independent Spent Fuel Storage Installation (EPID L-2020-LLM-0002) (Order) ML21118B0312021-05-25025 May 2021 FRN - Order Approving Indirect Transfer of Licenses for Units 1, 2, and 3, and the Independent Spent Fuel Storage Installation ML21123A0842021-05-19019 May 2021 FRN - Notice of Issuance of Multiple COVID-19 Exemptions Regarding Various Parts of 10 CFR Issued in April 2021 ML21106A1482021-04-28028 April 2021 ISFSI - Letter - Notice of Consideration of Approval of Application Regarding Proposed Indirect License Transfer and Opportunity to Request a Hearing ML21106A1502021-04-28028 April 2021 ISFSI - FRN - Notice of Consideration of Approval of Application Regarding Proposed Indirect License Transfer and Opportunity to Request a Hearing ML21102A0752021-04-28028 April 2021 Fleet - Notice of Consideration of Approval of Transfer of Licenses and Conforming Amendments and Opportunity for a Hearing (FRN) ML21091A0662021-04-23023 April 2021 FRN - Notice of Issuance of Multiple COVID-19 Exemptions Regarding Various Parts of 10 CFR Issued in March 2021 ML21063A0052021-04-14014 April 2021 Federal Register Notice, Exemption from the Requirements of 10 CFR 2.109(b) Related to Subsequent License Renewal Application ML21028A0122021-02-18018 February 2021 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for January 2021 ML21033B0772021-02-0808 February 2021 Letter, Individual Notice of Consideration of Issuance of Amendment, Revise Technical Specifications to Defer Steam Generator Inspections to Fall 2022 Refueling Outage ML21033B0782021-02-0808 February 2021 Individual Notice of Consideration of Issuance of Amendment, Revise Technical Specifications to Defer Steam Generator Inspections to Fall 2022 Refueling Outage ML21011A2592021-01-21021 January 2021 ISFSI, FRN - Notice of Consideration of Approval of Application Regarding Proposed Indirect License Transfer and Opportunity for a Hearing ML21011A2492021-01-21021 January 2021 ISFSI, Letter - Notice of Consideration of Approval of Application Regarding Proposed Indirect License Transfer and Opportunity for a Hearing 2023-09-29
[Table view] |
Text
[7590-01-P]
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-334; 50-412; 50-456; 50-457; 50-244; 50-352; 50-353; 50-528; 50-529; 50-530; 72-44; 50-254; 50-265; 50-443; NRC-2020-0110]
Energy Harbor Nuclear Corp.;
Exelon Generation Company, LLC; NextEra Energy Seabrook, LLC; Arizona Public Service Company AGENCY: Nuclear Regulatory Commission.
ACTION: Exemptions; issuance.
SUMMARY
- The U.S. Nuclear Regulatory Commission (NRC) issued seven exemptions in response to requests from Energy Harbor Nuclear Corp.; Exelon Generation Company, LLC; NextEra Energy Seabrook, LLC; and Arizona Public Service Company.
The exemptions allow the licensees to deviate from specific work hours requirements of the NRCs Fitness for Duty Programs regulation and use site-specific fatigue management controls, in response to the COVID-19 public health emergency (PHE).
The NRC is issuing a single notice to announce the issuance of these exemptions.
DATES: The seven exemptions were issued between April 3, 2020, and April 20, 2020.
ADDRESSES: Please refer to Docket ID NRC-2020-0110 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document using any of the following methods:
- Federal Rulemaking Web Site: Go to https://www.regulations.gov and search for Docket ID NRC-2020-0110. Address questions about NRC docket IDs in Regulations.gov to Jennifer Borges; telephone: 301-287-9127; e-mail:
Jennifer.Borges@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document.
- NRCs Agencywide Documents Access and Management System (ADAMS): You may obtain publicly-available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select Begin Web-based ADAMS Search. For problems with ADAMS, please contact the NRCs Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov.
For the convenience of the reader, instructions about obtaining materials referenced in this document are provided in the Availability of Documents section.
FOR FURTHER INFORMATION CONTACT: James Danna, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001; telephone: 301-415-7422, e-mail: James.Danna@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Introduction The NRC issued seven exemptions in response to requests dated between April 2, 2020, and April 18, 2020, from Energy Harbor Nuclear Corp.; Exelon Generation Company, LLC; NextEra Energy Seabrook, LLC; and Arizona Public Service Company.
The exemptions allow the licensees to deviate from specific requirements (cited below) of Title 10 of the Code of Federal Regulations (10 CFR) Part 26, Fitness for Duty Programs, Section 26.205, Work hours.
The exemptions from 10 CFR 26.205(d)(1) through (7) ensure that the control of work hours and management of worker fatigue do not unduly limit licensee flexibility in using personnel resources to most effectively manage the impacts of the COVID-19 PHE on maintaining the safe operation of these facilities. Specifically, the licensees 2
stated that their staffing levels are affected or are expected to be affected by the COVID-19 PHE, and they can no longer meet or likely will not meet the work hour controls of 10 CFR 26.205(d)(1) through (d)(7). The licensees have committed to effecting site-specific administrative controls for COVID-19 PHE fatigue-management for personnel specified in 10 CFR 26.4(a).
The NRC is periodically providing this compiled listing of related exemptions using a single Federal Register notice for COVID-19 related exemptions, instead of issuing individual Federal Register notices. The compiled listing provides transparency regarding the number of exemptions the NRC is issuing related to a given regulatory requirement. Additionally, the NRC publishes a list of approved licensing actions related to the COVID-19 PHE on its public website at https://www.nrc.gov/about-nrc/covid-19/reactors/licensing-actions.html.
II. Availability of Documents.
The table below provides the plant name, docket number, and ADAMS accession number for each exemption issued. Additional details on each exemption issued, including the exemption request submitted by the respective licensee, are provided in each exemption approval listed below. For additional directions on accessing information in ADAMS, see the ADDRESSES section of this document.
DOCUMENT TITLE ADAMS ACCESSION NO.
Beaver Valley Power Station, Units 1 and 2 Docket Nos. 50-334 and 50-412 Beaver Valley Work Hour Rule Exemption Request ML20109A008 Due to Pandemic (L-20-140) dated April 18, 2020 Beaver Valley Power Station, Units 1 and 2 - Verbal ML20109A010 Part 26 Exemption - Delivered 4/18/20 at 7:00 p.m.
Beaver Valley Power Station, Units 1 and 2 -
Exemption from Select Requirements of 10 CFR ML20109A000 Part 26 (EPID L-2020-LLE-0025 [COVID-19]) dated April 20, 2020 3
Braidwood Station, Units 1 and 2 Docket Nos. 50-456 and 50-457 Braidwood Work Hours Control Exemption Request ML20100M588 dated April 9, 2020 Braidwood Station, Units 1 and 2 - Exemption from ML20099A519 Select Requirements of 10 CFR Part 26 (EPID L-2020-LLE-0020 [COVID-19]) dated April 13, 2020 R. E. Ginna Nuclear Power Plant Docket No. 50-244 Ginna - Planned Actions re Requirements for Work Hour Controls During Coronavirus Disease 2019 ML20097D488 (COVID-19) Public Health Emergency dated April 6, 2020 R. E. Ginna Nuclear Power Plant - Exemption from ML20095H256 Select Requirements of 10 CFR Part 26 (EPID L-2020-LLE-0016 [COVID-19]) dated April 6, 2020 Limerick Generating Station, Units 1 and 2 Docket Nos. 50-352 and 50-353 Limerick [50-352, 50-353] Actions Related to the Requirements for Work Hour Controls During the ML20093M206 Coronavirus Disease 2019 Public Health Emergency) dated April 2, 2020 Limerick Generating Station, Units 1 and 2 -
Exemption from Select Requirements of 10 CFR ML20093M820 Part 26 (EPID L-2020-LLE-0014 [COVID-19]) dated April 3, 2020 Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Docket Nos. 50-528, 50-529, 50-530, and 72-44 Palo Verde Nuclear Generating Station Units 1, 2 &
3 and Independent Spent Fuel Storage Installation (ISFSI) - Request for Exemption from Specific ML20105A481 Requirements of 10 CFR Part 26, Fitness for Duty Programs dated April 14, 2020 Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - Exemption from Select Requirements of 10 ML20107F835 CFR Part 26 (EPID L-2020-LLE-0024 [COVID-19])
dated April 16, 2020 4
Quad Cities Nuclear Power Station, Units 1 and 2 Docket Nos. 50-254 and 50-265 Quad Cities Nuclear Power Station Actions Related to the Requirements for Work Hour Controls During ML20098G313 the Coronavirus Disease 2019 Public Health Emergency dated April 7, 2020 Quad Cities Nuclear Power Station, Units 1 and 2 -
Exemption from Select Requirements of 10 CFR ML20099A499 Part 26 (EPID L-2020-LLE-0018 [COVID-19]) dated April 8, 2020 Seabrook Station, Unit No. 1 Docket No. 50-443 Seabrook Station - Requesting NRC Approval to Proactively Enter into the Alternative Work Hour ML20101M597 Controls Delineated in NRC Letter from H. Nieh to NEI Dated March 28, 2020 During COV-19 Public Health Emergency dated April 10, 2020 Seabrook Station, Unit No. 1 - Exemption from Select Requirements of 10 CFR Part 26 (EPID L- ML20101G991 2020-LLE-0021 [COVID-19]) dated April 13, 2020 The NRC may post additional materials to the Federal rulemaking Web site at https://www.regulations.gov under Docket ID NRC-2020-0110. The Federal rulemaking Web site allows you to receive alerts when changes or additions occur in a docket folder.
To subscribe: 1) navigate to the docket folder (NRC-2020-0110); 2) click the Sign up for E-mail Alerts link; and 3) enter your e-mail address and select how frequently you would like to receive e-mails (daily, weekly, or monthly).
Dated: May 7, 2020 For the Nuclear Regulatory Commission.
/RA/
James G. Danna, Chief, Plant Licensing Branch I, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.
5