MONTHYEARML24303A3142024-10-25025 October 2024 Notification of Shearon Harris Nuclear Power Plant FEI and Information Request IR 05000261/20240042024-10-0303 October 2024 Document Request for Robinson Nuclear Plant - Radiation Protection Inspection - Inspection Report 05000261/2024004 ML24227A9572024-08-14014 August 2024 LRA - Requests for Additional Information - Set 1 (Email to Applicant) ML24191A4232024-07-0303 July 2024 RAI2 NRC Response to Fws ESA Crystal River Unit 3 LTP ML24187A0262024-07-0303 July 2024 NRR E-mail Capture - Change in Review Schedule - Harris Risk-Informed Process for Evaluations Exemption (L-2024-LLE-0004) ML24179A1292024-06-24024 June 2024 Acceptance Review for LAR to Revise TS to Adopt TSTF-234-A, Revision 1 ML24170A9242024-06-18018 June 2024 024-0023697 Crystal River License Termination Plan Unit 3 ML24190A1382024-06-18018 June 2024 Supplement to NRC Request for Concurrence with ESA Determinations for Crystal River Unit 3 LTP ML24164A0052024-06-11011 June 2024 NRR E-mail Capture - Request for Additional Information Regarding Dukes February 15, 2024, Relief Request RA-23-0300 for Robinson ML24143A0242024-05-20020 May 2024 Draft EA for Crystal River Unit 3 Opportunity for Flhealth Review and Comment ML24143A0132024-05-20020 May 2024 Achp Response for Crystal River Unit 3 (Achp Project No. 020794) ML24143A0212024-05-20020 May 2024 SHPO Response to Initiate Section 106 Consultation for Crystal River Unit 3 ML24120A3312024-04-24024 April 2024 Seminole Tribe of Florida Email - Initiation ML24113A2522024-04-22022 April 2024 NRR E-mail Capture - Audit Plan - Shearon Harris Nuclear Power Plant, Unit 1 - RIPE Exemption 10 CFR 50.55a(h)(2) (L-2024-LLE-0004) ML24101A0522024-04-10010 April 2024 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 - Request for Additional Information - ITS Alignments LAR (L-2023-LLA-0078) ML24101A0542024-04-10010 April 2024 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-23-0244 - Extend CT for Accumulators - CLIIP (L-2024-LLA-0032) ML24079A3062024-03-19019 March 2024 NRR E-mail Capture - Acceptance Review Results for Robinson - Proposed Relief Request RA-23-0300 ML24054A6462024-02-29029 February 2024 Request for RAI Extension Related to the Crystal River License Termination Plan ML24060A0862024-02-29029 February 2024 NRC Request for Concurrence with Endangered Species Act Determinations for Crystal River Unit 3 Nuclear Generating Plant License Termination Plan (Consultation Code: 2024-0023697) ML24145A1732024-02-26026 February 2024 002 Radiation Safety Baseline Inspection Information Request ML24025A1592024-01-25025 January 2024 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 - Request for Additional Information - Rvi AMP and Inspection Plan (L-2023-LLL-0016) ML24025A0952024-01-24024 January 2024 Clarifications Related to the NRC Staffs EA for Crystal River ML24002A7382024-01-0202 January 2024 NRR E-mail Capture - Request for Additional Information Regarding Dukes August 20, 2023, License Amendment Request for Robinson, Unit 2 ML23262B4502023-09-19019 September 2023 NRR E-mail Capture - H. B. Robinson Steam Electric Plant, Unit 2 - Acceptance of License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures Based on Leak-Before-Break Methodology ML23220A2342023-08-0808 August 2023 NRR E-mail Capture - Robinson, Unit 2 - Acceptance Review Results for Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule ML23177A1992023-06-26026 June 2023 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-23-0005 - LAR to Align Certain TSs with ISTS (L-2023-LLA-0078) ML23172A0132023-06-20020 June 2023 Duke Fleet - Correction to June 2, 2023, Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23180A0562023-06-13013 June 2023 ADP-CR3, Crystal River Unit 3 Email from J. Jernigan to Tim Barvitskie Confirmation That Enclosure 22 Radiological Groundwater Characterization Report ML23153A1892023-06-0202 June 2023 Duke Fleet - Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23131A4192023-05-10010 May 2023 003 Radiation Safety Baseline Inspection Information Request ML23124A1212023-05-0404 May 2023 Acceptance of Requested Licensing Action Duke Fleet Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23082A0432023-03-23023 March 2023 002 Radiation Safety Baseline Inspection Information Request Final ML23073A2282023-03-13013 March 2023 Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review ML23065A0942023-03-0606 March 2023 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-22-0081 - LAR to Address Administrative Changes to the Operating License and Technical Specifications (L-2023-LLA-0020) ML23058A0562023-02-27027 February 2023 Acceptance of Amendment to Revise Surveillance Frequencies for RCS Pressure Isolation Valve Operational Leakage Testing and Reactor Trip System Instrumentation ML23048A1512023-02-16016 February 2023 Acceptance Review - Proposed Alternative for Steam Generator Welds (L-2023-LLR-0003) ML23011A0152023-01-11011 January 2023 NRR E-mail Capture - Request for Additional Information to Dukes Request for Robinson to Add Feedwater Isolation Function to TS 3.3.2 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML22285A1552022-10-12012 October 2022 NRR E-mail Capture - H. B. Robinson, Unit 2 - Acceptance of License Amendment Request Regarding the Addition of Feedwater Isolation Function to TS 3.3.2 and Removal of Obsolete Content from TS 2.1.1.1 and TS 5.6.5.b ML22237A1632022-08-25025 August 2022 004 Radiation Safety Baseline Inspection Information Request ML22222A1082022-08-10010 August 2022 NRR E-mail Capture - Request for Additional Information Regarding Dukes Request to Remove 4.160 Kv Bus 2 from Surveillance Requirement 3.8.1.16 ML22146A3652022-05-25025 May 2022 Acceptance of Requested Licensing Action License Amendment Request for Application to Revise Surveillance Requirement 3.8.1.16 ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22112A1482022-04-22022 April 2022 Correction_H. B. Robinson Steam Electric Plant, Unit 2 - Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02 ML22108A0182022-04-15015 April 2022 NRR E-mail Capture - Accepted for Review - Duke Energy Relief Request for Harris Nuclear Plant Inservice Testing Program Plan - Fourth Ten-Year Interval to Extend Type C Test to 75 Months ML22083A0702022-03-24024 March 2022 NRR E-mail Capture - Catawba Nuclear Station, Units 1 and 2, Shearon Harris Nuclear Power Plant, Unit 1, and McGuire Nuclear Station, Units 1 and 2 - Acceptance Review for TSTF-569 LAR ML22083A0282022-03-23023 March 2022 Email Snsb Safety Evaluation for Harris LAR to Revise Reactor Protection System TS ML22080A0042022-03-18018 March 2022 Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22038A1572022-02-0707 February 2022 NRR E-mail Capture - Duke Energy Fleet - Acceptance of License Amendment Request Regarding Adoption of TSTF-541, Revision 2 2024-08-14
[Table view] |
Text
From: Marlayna Vaaler Sent: Thursday, August 07, 2008 3:15 PM To: 'Dennis.Herrin@pgnmail.com' Cc: Farideh Saba; Tom Boyce (NRR); Brenda Mozafari
Subject:
Crystal River GL 2004-02 Call and Diesel Fuel Oil RAIs Attachments: CR3 RAIs on TSTF-374 Diesel Fuel Oil.doc Afternoon Dennis!
In the name of killing two birds with one stone, we are about to be very productive.
First, we are definitely on for Thursday, August 14 at 11 AM to have a call regarding the supplemental response you provided last week regarding GL 2004-02. Unless you need a bridge line to accommodate your folks, the easiest will be to call directly to 301-415-0565, which is where we will all be assembled. Again, neither Farideh nor I will be on this call, but I will make sure someone is there to represent licensing.
According to the technical reviewers, "the issue is that it appears to the staff that after all fiber insulation is removed from within the CR3 D-rings after the September 2009 CR3 outage (extension ADAMS ML073610575), the only fiber would be 10 cu. ft. of assumed NUKON, by our calculations leading to 0.02" of fiber maximum on the strainers after transport, and assumed 30 lbm of latent fiber (from assumed 200 lbm of latent debris) leading to 0.13" of fiber maximum on the strainers, for a total of 0.15" of fiber on the strainers. This is a little over 1/8" and theoretically could lead to a thin-bed effect (high head loss). But should those assumed design basis values be lowered sufficiently to eliminate the possibility of thin beds (simply not enough fibers to create a thin-bed), then RAIs could be avoided in areas like break selection, debris generation, head loss and vortexing/head loss testing."
So the purpose of the call is to clarify the basis of the assumed fiber values and to discuss the level of conservatism inherent therein. If you have any questions or need any additional information regarding the call please let me know!
Second, attached are the official RAIs regarding TSTF-374, which relates to the Diesel Fuel Oil TS requirements. It is my understanding that a draft version of these questions has already been provided to your technical folks, and a call held to discuss them. I will place this e-mail into ADAMS as the official record of these RAIs, and the response clock will start as of today (8/7). However, I believe we are approaching a time crunch to finish up this amendment by October, so if you could provide responses by September 10 it would be much appreciated. If you feel more time is warranted please give me a call and we can discuss a new schedule.
If you need anything further regarding these issues please let me know! Thanks and have a great weekend!
Marlayna 301.415.3178 Marlayna Vaaler, Project Manager
~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Shearon Harris & H.B. Robinson
U.S. Nuclear Regulatory Commission Division of Operating Reactor Licensing Phone: 301.415.3178 Mobile: 440.668.7399 Fax: 301.415.1222 E-mail: marlayna.vaaler@nrc.gov Office Location: O-8E3 Mail Stop: O-8G9 E-mail Properties Mail Envelope Properties ()
Subject:
Crystal River GL 2004-02 Call and Diesel Fuel Oil RAIs Sent Date: 8/7/2008 2:49:20 PM Received Date: 8/7/2008 3:15:00 PM From: Marlayna Vaaler Created By: Marlayna.Vaaler@nrc.gov Recipients:
Dennis.Herrin@pgnmail.com ('Dennis.Herrin@pgnmail.com')
Tracking Status: None Farideh.Saba@nrc.gov (Farideh Saba)
Tracking Status: None Tom.Boyce@nrc.gov (Tom Boyce (NRR))
Tracking Status: None Brenda.Mozafari@nrc.gov (Brenda Mozafari)
Tracking Status: None Leon.Whitney@nrc.gov (Leon Whitney)
Tracking Status: None Gerald.Waig@nrc.gov (Gerald Waig)
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 49954 8/7/2008 CR3 RAIs on TSTF-374 Diesel Fuel Oil.doc 36018 Options
Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: