August 5, 2008 Mr. Barry Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION - NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Allen:

On September 8, 2008, the NRC will begin the inspection for Temporary Instruction 2515/172, Reactor Coolant System Dissimilar Metal Butt Welds, at the Davis-Besse Nuclear Power Station. This on-site inspection is scheduled to be performed September 8 through September 12, 2008.

In order to minimize the impact to your on-site resources, and to ensure a productive inspection for both sides, we have enclosed a request for documents needed for this inspection. The inspector will need this information upon arrival at the site. It is important that all of these documents are up-to-date, and complete, in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. G. Wolf, of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector Mr. T. Bilik at (630) 829-9944.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document

B. Allen Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-346 License No. NPF-3

Enclosure:

TI-172 INSPECTION DOCUMENT REQUEST cc w/encl: The Honorable Dennis Kucinich J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC Manager - Site Regulatory Compliance - FENOC D. Pace, Senior Vice President of Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight - FENOC P. Harden, Vice President, Nuclear Support D. Jenkins, Attorney, FirstEnergy Corp.

Director, Fleet Regulatory Affairs - FENOC Manager - Fleet Licensing - FENOC C. OClaire, State Liaison Officer, Ohio Emergency Management Agency R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners

B. Allen Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-346 License No. NPF-3

Enclosure:

TI-172 INSPECTION DOCUMENT REQUEST cc w/encl: The Honorable Dennis Kucinich J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC Manager - Site Regulatory Compliance - FENOC D. Pace, Senior Vice President of Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight - FENOC P. Harden, Vice President, Nuclear Support D. Jenkins, Attorney, FirstEnergy Corp.

Director, Fleet Regulatory Affairs - FENOC Manager - Fleet Licensing - FENOC C. OClaire, State Liaison Officer, Ohio Emergency Management Agency R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners DOCUMENT NAME: G:\DRS\Work in Progress\Ltr. 07__08 DAV-BESSE TI-172 RFI TXB.doc 9 Publicly Available 9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy OFFICE RIII RIII NAME DEHills for TBilik DHills DATE 08/05/08 08/05/08 OFFICIAL RECORD COPY

Letter to Mr. Barry Allen from Mr. David E. Hills dated August 05, 2008.

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION - NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION DISTRIBUTION:

Russell Gibbs Tamara Bloomer Thomas Wengert RidsNrrDirsIrib Resource Mark Satorius Kenneth Obrien Jared Heck Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports@nrc.gov

TI-172 INSPECTION DOCUMENT REQUEST Inspection Dates: September 8 through September 12, 2008 Inspection Procedures: Temporary Instruction 2515/172, Reactor Coolant System Dissimilar Metal Butt Welds Inspectors: Tom Bilik (630) 829-9722, txb@nrc.gov I. Information Requested The following information is requested to be available and ready for review by the start of the on-site inspection, scheduled for September 8, 2008. This information is requested to complete our inspection of Sections 03.01 and 03.05 of TI-172. If you have any questions regarding this information, please call the inspector as soon as possible.

1. Inspection Plans and schedules:

For Dissimilar Metal Butt Welds (DMBWs) determined in the scope of the Materials Reliability Program: Primary System Piping Butt Weld Inspection and Evaluation Guidelines (MRP-139) and not identified as Category A, please provide:

a. Inspection schedule(s) listing the DMBWs determined in the scope of MRP-139 showing the ultrasonic and visual examination completed and planned for the future. Also:
  • The date of the examination completed or planned should be clearly identified;
  • Identify ultrasonic examinations with indications; and
  • For any ultrasonic examinations provide information on the percentage of the required volume achieved for completed exams or expected for future exams.
b. Plans for completed or planned mitigation activities, including dates.
  • Identify any mitigation activities that required repairs.
c. Document which identifies the MRP-139 category and the basis for the category.
  • For each weld, clearly identify if any welds are categorized as H or I.
d. Plans for mechanical stress improvement activities.
e. Approved or planned deviations from MRP-139 requirements, including their basis.

1 Enclosure

TI-172 INSPECTION DOCUMENT REQUEST

2. Drawings
a. Flow diagrams for the Reactor Coolant System showing or referencing piping specifications.
b. Applicable piping specifications as referenced on the drawings identified in 2-a above.
c. Fabrication drawing showing weld details: 1) for the reactor vessel nozzle to pipe welds; 2) pressurizer nozzle to pipe welds; 3) reactor coolant pump nozzle to pipe welds; 4) steam generator nozzle to pipe welds; and 5) reactor coolant piping branch connection welds, where material specification changes take place.
d. Vendor documents or reports, such as WCAPs, that provide additional details or supporting information for determining if MRP-139 requirements are applicable to the a weld.
3. Supporting Documents
a. NRC approved American Society of Mechanical Engineers (ASME) Code Relief Requests applicable to inspections or mitigation completed to meet MRP-139 requirements.
b. List with description of DMBW or MRP-139 related issues or errors entered into your corrective action system since MRP-139 was issued, July 14, 2005.

2 Enclosure