Report 22 - Inspection/Activity Plan for 09/01/2007 - 03/31/2009
ML072480284
Person / Time
Site: Surry  Dominion icon.png
Issue date: 08/31/2007
From:
NRC/RGN-II/DRP/RPB5
To:
References
Download: ML072480284 (2)


Text

Surry Inspection / Activity Plan 09/01/2007 - 03/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/31/2007 09:08:32 Report 22 4

PI&R

- PROBLEM IDENTIFICATION & RESOLUTION Baseline Inspections 09/24/2007 09/28/2007 1, 2 71152B IP Identification and Resolution of Problems Baseline Inspections 10/08/2007 10/12/2007 1, 2 71152B IP Identification and Resolution of Problems 1

PSB1-RP

- RP OCCUPATIONAL PRE-INSP VISIT/ISFSI Baseline Inspections 10/01/2007 10/03/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas 2

PSB1-RP

- RP OCCUPATIONAL BASELINE INSP WK1 Baseline Inspections 10/22/2007 10/26/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 10/22/2007 10/26/2007 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 10/22/2007 10/26/2007 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 10/22/2007 10/26/2007 1, 2 71151 IP Performance Indicator Verification 2

EB3-ISI

- U1 INSERVICE INSPECTION Baseline Inspections 10/29/2007 11/02/2007 1

7111108P IP Inservice Inspection Activities - PWR 2

EB3SGISI

- U1 STEAM GENERATOR ISI Baseline Inspections 11/05/2007 11/09/2007 1

7111108P IP Inservice Inspection Activities - PWR 2

PSB1-RP

- RP OCCUPATIONAL BASELINE INSP WK2 Baseline Inspections 11/05/2007 11/09/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 11/05/2007 11/09/2007 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 11/05/2007 11/09/2007 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 11/05/2007 11/09/2007 1, 2 71151 IP Performance Indicator Verification 1

EB1-SUMP

- PWR CONTAINMENT SUMP BLOCKAGE TI (U-1)

Safety Issues 11/13/2007 11/16/2007 1

2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]

8 EB1-CDBI

- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 01/14/2008 01/18/2008 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 01/28/2008 02/01/2008 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 02/11/2008 02/15/2008 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 02/25/2008 02/29/2008 1, 2 7111121 IP Component Design Bases Inspection 4

OL EXAM

- INITIAL EXAM PREP Not Applicable 02/25/2008 02/29/2008 1

V23279 SURRY/MARCH 2008 EXAM AT POWER FACILITIES 4

OL EXAM

- INITIAL EXAM Not Applicable 03/17/2008 03/28/2008 1

V23279 SURRY/MARCH 2008 EXAM AT POWER FACILITIES 1

EB3-ISI

- UNIT 2 - ISI Baseline Inspections 04/28/2008 05/02/2008 2

7111108P IP Inservice Inspection Activities - PWR 1

EB3SGISI

- U2 SG ISI Baseline Inspections 05/05/2008 05/09/2008 2

7111108P IP Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Surry Inspection / Activity Plan 09/01/2007 - 03/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/31/2007 09:08:32 Report 22 1

EB1-SUMP

- TI 2515/166 CONTAINMENT SUMP INSPECTION Safety Issues 05/12/2008 05/16/2008 2

2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]

1 EB3-HS

- HEAT SINK Baseline Inspections 06/02/2008 06/06/2008 1, 2 7111107B IP Heat Sink Performance 1

PSB1-RP

- RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections 06/23/2008 06/25/2008 1, 2 7112101 IP Access Control to Radiologically Significant Areas 1

PSB1-EP

- EP INSP Baseline Inspections 07/14/2008 07/18/2008 1, 2 7111402 IP Alert and Notification System Testing Baseline Inspections 07/14/2008 07/18/2008 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 07/14/2008 07/18/2008 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 07/14/2008 07/18/2008 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 07/14/2008 07/18/2008 1, 2 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 07/14/2008 07/18/2008 1, 2 71151-EP02 IP ERO Drill Participation Baseline Inspections 07/14/2008 07/18/2008 1, 2 71151-EP03 IP Alert & Notification System 4

PSB1-RP

- RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections 07/28/2008 08/01/2008 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 07/28/2008 08/01/2008 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 07/28/2008 08/01/2008 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 07/28/2008 08/01/2008 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 07/28/2008 08/01/2008 1, 2 71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 07/28/2008 08/01/2008 1, 2 71151-PR01 IP RETS/ODCM Radiological Effluent This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure