Report 22 - Inspection/Activity Plan for 09/01/2007 - 03/31/2009
ML072480284
Person / Time
Site: Surry  Dominion icon.png
Issue date: 08/31/2007
From:
NRC/RGN-II/DRP/RPB5
To:
References
Download: ML072480284 (2)


Text

Page 1 of 2 Surry 08/31/2007 09:08:32 Inspection / Activity Plan Report 22 09/01/2007 - 03/31/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PI&R - PROBLEM IDENTIFICATION & RESOLUTION 4 1, 2 IP 71152B Identification and Resolution of Problems 09/24/2007 09/28/2007 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 10/08/2007 10/12/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL PRE-INSP VISIT/ISFSI 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 10/01/2007 10/03/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE INSP WK1 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 10/22/2007 10/26/2007 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 10/22/2007 10/26/2007 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 10/22/2007 10/26/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/22/2007 10/26/2007 Baseline Inspections EB3-ISI - U1 INSERVICE INSPECTION 2 1 IP 7111108P Inservice Inspection Activities - PWR 10/29/2007 11/02/2007 Baseline Inspections EB3SGISI - U1 STEAM GENERATOR ISI 2 1 IP 7111108P Inservice Inspection Activities - PWR 11/05/2007 11/09/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE INSP WK2 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 11/05/2007 11/09/2007 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 11/05/2007 11/09/2007 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 11/05/2007 11/09/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 11/05/2007 11/09/2007 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-1) 1 1 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 11/13/2007 11/16/2007 Safety Issues EB1-CDBI - COMPONENT DESIGN BASES INSPECTION 8 1, 2 IP 7111121 Component Design Bases Inspection 01/14/2008 01/18/2008 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 01/28/2008 02/01/2008 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 02/11/2008 02/15/2008 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 02/25/2008 02/29/2008 Baseline Inspections OL EXAM - INITIAL EXAM PREP 4 1 V23279 SURRY/MARCH 2008 EXAM AT POWER FACILITIES 02/25/2008 02/29/2008 Not Applicable OL EXAM - INITIAL EXAM 4 1 V23279 SURRY/MARCH 2008 EXAM AT POWER FACILITIES 03/17/2008 03/28/2008 Not Applicable EB3-ISI - UNIT 2 - ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 04/28/2008 05/02/2008 Baseline Inspections EB3SGISI - U2 SG ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 05/05/2008 05/09/2008 Baseline Inspections This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.

Page 2 of 2 Surry 08/31/2007 09:08:32 Inspection / Activity Plan Report 22 09/01/2007 - 03/31/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB1-SUMP - TI 2515/166 CONTAINMENT SUMP INSPECTION 1 2 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 05/12/2008 05/16/2008 Safety Issues EB3-HS - HEAT SINK 1 1, 2 IP 7111107B Heat Sink Performance 06/02/2008 06/06/2008 Baseline Inspections PSB1-RP - RADIATION PROTECTION PREINSPECTION VISIT 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 06/23/2008 06/25/2008 Baseline Inspections PSB1-EP - EP INSP 1 1, 2 IP 7111402 Alert and Notification System Testing 07/14/2008 07/18/2008 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 07/14/2008 07/18/2008 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 07/14/2008 07/18/2008 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 07/14/2008 07/18/2008 Baseline Inspections 1, 2 IP 71151-EP01 Drill/Exercise Performance 07/14/2008 07/18/2008 Baseline Inspections 1, 2 IP 71151-EP02 ERO Drill Participation 07/14/2008 07/18/2008 Baseline Inspections 1, 2 IP 71151-EP03 Alert & Notification System 07/14/2008 07/18/2008 Baseline Inspections PSB1-RP - RADIATION PROTECTION PUBLIC BASELINE 4 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 07/28/2008 08/01/2008 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 07/28/2008 08/01/2008 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 07/28/2008 08/01/2008 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 07/28/2008 08/01/2008 Baseline Inspections 1, 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 07/28/2008 08/01/2008 Baseline Inspections 1, 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 07/28/2008 08/01/2008 Baseline Inspections This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.