ML062960087
| ML062960087 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 06/22/2006 |
| From: | Ashley D NRC/NRR/ADRO/DLR/RLRA |
| To: | Hufnagel J Office of Nuclear Reactor Regulation |
| References | |
| %dam200611, %dam200612, TAC 8261 | |
| Download: ML062960087 (4) | |
Text
D. Ashley - items from the 6-21 telecon Page 11 From:
D. Ashley To:
John Hufnagel Date:
06/22/2006 11:36:17 AM
Subject:
items from the 6-21 telecon John-This is the list that has been distilled from the 6/21 telecon to focus and clarify your documentation search and package preparation.
Noel-Please review and coordinate with John and Hans to assist in the collection and forwarding of the required information to Jason.
Thanks
- regards, Donnie Ashley NRR/DLR/RLRA Oyster Creek License Renewal Project Manger 301-415-3191 djal @nrc.gov CC:
Noel Dudley
c:\\temp\\GWjd0001.TMP Page 1 1 ip\\GW)OOO01.TMP Page 1 Mail Envelope Properties (449AB8Fl.IFO: 9:10848)
Subject:
Creation Date From:
Created By:
items from the 6-21 telecon 06/22/2006 11:36:17 AM D. Ashley DJA1 @nrc.gov Recipients exeloncorp.com john.hufnagel (John Hufnagel) 11:37:02 AM nrc.gov NFD CC (Noel Dudley) 11:36:23 AM Action Transferred Date & Time 22 June, 2006 Delivered Opened AM 22 June, 2006 23 June, 2006 8:42:26 Route exeloncorp.com nrc.gov Post Office Delivered Files Size Date & Time MESSAGE 1170 22 June, 2006 11:36:17 AM OysterCreekAssessment EssentialItems from 6-21'telepcon.pdf 31593 22 June, 2006 11:31:40 AM D. Ashley.vcf 232 22 June, 2006 11:36:16 AM Options Auto Delete:
Expiration Date:
Notify Recipients:
Priority:
ReplyRequested:
Return Notification:
Concealed
Subject:
Security:
To Be Delivered:
Status Tracking:
No None No Standard No None No Standard Immediate Delivered & Opened
D. Ashley__OysterLCreek Assessment Essentialltems from 6-21teleoonpdf Page 1 Essential Materials (Oyster Creek Integrity Analysis)
Drywall Strncturld Dravngs & Gemetry (not indudinnorrosion detals)
Ptetralions, heade's, barn seals, stiffewe's, etc, (Iocations and detals) o Structurd detaIs aid Iocationsfor lage penetrtions and atadvirents (tobenoidedqalidtly) f ListedinTablas2-5a, 2-5band12-5cofGE Part I*,adTable3-2ofGE Pal I1" o
E'e wtion aid emuth for nrnorpenetrations orother Ioads (to berxAlde vdWth sdl loado f
ListedinTeIes2-5a, 2-Sband2-5cdGEPart I*,
Tad e3-2ofGE Part I" o
Wthoutseng the detailsofthem itear itisclffioittodeanrine vWich aredgnificantemuh tobe nuddedi aqvidtly, and v1id* can bei ndud wth id l loads onry. C* outy, rnrjor aqtprnent doorA hatdm and stiffe'es vmll benodded epldtly. In adtiorn sniel pipingpmerationsflass than -18? vill not bernodded eqplidtly.
Location of diffeing plate thicnssaes id details of thewdd transitions o
Structurd laout ofthedryWl idll ates f
Table3-1 of GE Part l1* indudesallst of Drywll S*ell Thidcnesses (sorofthxserecons are not identifiablein the drawings in the rqpor) o Ratetrasitin detdIs(eeda/lybetveen platesofdfferant thidvs)
SDetdals on vet jet ddlectors, ventlines, bellows, eta o
Sxneedent of the ventlinewill bemodded asin theGEandyse.
o 7he GEanales cnnects the vietline to the ertical header st*xotinsde the torus Withspring denarts IlVa v.ll need asnrrud infornationasposiblere ardngthe ventline and aentline crnnection to the torus since the dWtails for thespri ngstiffnessare not given in the GErqxprt.
- Tablesbbdngreternmod arefrom "An ASMEE ction VIII Evaluation of the Oyster Creek Drywdl -Part I Stress Analysis, GEReort No.
9-3, DW-# 00664, Fdxuay 1991, prepared by GRJN.7, and "An ASIE ection VIII Evaluation oftheOyster Cree DrywdI -Part 1 Stdility Andyss, GEReport No. 9-4, DRF# 00664, Fbruary 1991, prepared byGFUN."
Drawlno 1itlI Here isalistof-20 stnacturd draing shee titlesforanothe-Mark I by CB&I. Hopefully, thetitIese sirnilarfor Oyster Creek. This listdoes not Indudaedl of the Irformli on outlined diove, but dsould provide agood steating point.
Gke"rd Ra Dywdl hdl Strelddout Penetration Si'klue & Oientatiion Bdeow Equtor Penetration Schedue & Orientation Above Equator Drywdal Shall dd Asserty DrywdI Cell IddJointDetaIs SIReference Details Drywdl Vent Insert Assenbly & Jet Deftectors Drywdl SIpport Sdkr Drywdl Top Fanges Assaenbly
D. Ashley - Oyster._CreekAssessment EssentialItems from 6-21 telecon.pdf Page 2 I
" 1Mr Diarnete EqLi pmalt Door Assernly MdeStahizerAsserriy FenalaSabiI i zrAssarbiy Basc Qirve Drywall F~araion (there emery of these only need ckavng for large penerations.)
Barn Ses HeddAssernbly DraMng Weding Fbd Locations for Drywall Vent Heade Assarnby Vent Li ne $Veaoxn Breakes ExpanisonBellowsfor VentLines Gmenea Arraigeirent Rersonne Lock
" A full dlynairc anaysisof thermodl W~thaprcpriate ground mcaionisd'iuld bedoazeitee In:
o asrnic Andysis DetalsAppendx Bof letter dted Decenber 21, l99Ofrom H.S Mertaof GE to SQ Tumni rid I Iof GRJN.
The MAR (page3B-1 5 f romn Fkwi on 13, Apfl 12003) prov~ideslgatra and vertical saicad Smi cacefi dais which are dlaimal to be onsi stit with more detlI addynari~c analyse& Rovide details onaxnpalsons, between detailed dynarnicaidysiasd staicloeding forsanismi The FEAR staethat JohnA.Blumne &
Asscaes~ peformned the fill dynarnic anlysisaid reporestat ic coef id ents equal to those used by CB& 1 (225/6 1ated, end 109%vertical).