ML062960087

From kanterella
Jump to navigation Jump to search

E-mail: (PD) Oyster Creek Items from the 6-21 Telecon
ML062960087
Person / Time
Site: Oyster Creek
Issue date: 06/22/2006
From: Ashley D
NRC/NRR/ADRO/DLR/RLRA
To: Hufnagel J
Office of Nuclear Reactor Regulation
References
%dam200611, %dam200612, TAC 8261
Download: ML062960087 (4)


Text

D. Ashley - items from the 6-21 telecon Page 11 From:

D. Ashley To:

John Hufnagel Date:

06/22/2006 11:36:17 AM

Subject:

items from the 6-21 telecon John-This is the list that has been distilled from the 6/21 telecon to focus and clarify your documentation search and package preparation.

Noel-Please review and coordinate with John and Hans to assist in the collection and forwarding of the required information to Jason.

Thanks

regards, Donnie Ashley NRR/DLR/RLRA Oyster Creek License Renewal Project Manger 301-415-3191 djal @nrc.gov CC:

Noel Dudley

c:\\temp\\GWjd0001.TMP Page 1 1 ip\\GW)OOO01.TMP Page 1 Mail Envelope Properties (449AB8Fl.IFO: 9:10848)

Subject:

Creation Date From:

Created By:

items from the 6-21 telecon 06/22/2006 11:36:17 AM D. Ashley DJA1 @nrc.gov Recipients exeloncorp.com john.hufnagel (John Hufnagel) 11:37:02 AM nrc.gov NFD CC (Noel Dudley) 11:36:23 AM Action Transferred Date & Time 22 June, 2006 Delivered Opened AM 22 June, 2006 23 June, 2006 8:42:26 Route exeloncorp.com nrc.gov Post Office Delivered Files Size Date & Time MESSAGE 1170 22 June, 2006 11:36:17 AM OysterCreekAssessment EssentialItems from 6-21'telepcon.pdf 31593 22 June, 2006 11:31:40 AM D. Ashley.vcf 232 22 June, 2006 11:36:16 AM Options Auto Delete:

Expiration Date:

Notify Recipients:

Priority:

ReplyRequested:

Return Notification:

Concealed

Subject:

Security:

To Be Delivered:

Status Tracking:

No None No Standard No None No Standard Immediate Delivered & Opened

D. Ashley__OysterLCreek Assessment Essentialltems from 6-21teleoonpdf Page 1 Essential Materials (Oyster Creek Integrity Analysis)

Drywall Strncturld Dravngs & Gemetry (not indudinnorrosion detals)

Ptetralions, heade's, barn seals, stiffewe's, etc, (Iocations and detals) o Structurd detaIs aid Iocationsfor lage penetrtions and atadvirents (tobenoidedqalidtly) f ListedinTablas2-5a, 2-5band12-5cofGE Part I*,adTable3-2ofGE Pal I1" o

E'e wtion aid emuth for nrnorpenetrations orother Ioads (to berxAlde vdWth sdl loado f

ListedinTeIes2-5a, 2-Sband2-5cdGEPart I*,

Tad e3-2ofGE Part I" o

Wthoutseng the detailsofthem itear itisclffioittodeanrine vWich aredgnificantemuh tobe nuddedi aqvidtly, and v1id* can bei ndud wth id l loads onry. C* outy, rnrjor aqtprnent doorA hatdm and stiffe'es vmll benodded epldtly. In adtiorn sniel pipingpmerationsflass than -18? vill not bernodded eqplidtly.

Location of diffeing plate thicnssaes id details of thewdd transitions o

Structurd laout ofthedryWl idll ates f

Table3-1 of GE Part l1* indudesallst of Drywll S*ell Thidcnesses (sorofthxserecons are not identifiablein the drawings in the rqpor) o Ratetrasitin detdIs(eeda/lybetveen platesofdfferant thidvs)

SDetdals on vet jet ddlectors, ventlines, bellows, eta o

Sxneedent of the ventlinewill bemodded asin theGEandyse.

o 7he GEanales cnnects the vietline to the ertical header st*xotinsde the torus Withspring denarts IlVa v.ll need asnrrud infornationasposiblere ardngthe ventline and aentline crnnection to the torus since the dWtails for thespri ngstiffnessare not given in the GErqxprt.

  • Tablesbbdngreternmod arefrom "An ASMEE ction VIII Evaluation of the Oyster Creek Drywdl -Part I Stress Analysis, GEReort No.

9-3, DW-# 00664, Fdxuay 1991, prepared by GRJN.7, and "An ASIE ection VIII Evaluation oftheOyster Cree DrywdI -Part 1 Stdility Andyss, GEReport No. 9-4, DRF# 00664, Fbruary 1991, prepared byGFUN."

Drawlno 1itlI Here isalistof-20 stnacturd draing shee titlesforanothe-Mark I by CB&I. Hopefully, thetitIese sirnilarfor Oyster Creek. This listdoes not Indudaedl of the Irformli on outlined diove, but dsould provide agood steating point.

Gke"rd Ra Dywdl hdl Strelddout Penetration Si'klue & Oientatiion Bdeow Equtor Penetration Schedue & Orientation Above Equator Drywdal Shall dd Asserty DrywdI Cell IddJointDetaIs SIReference Details Drywdl Vent Insert Assenbly & Jet Deftectors Drywdl SIpport Sdkr Drywdl Top Fanges Assaenbly

D. Ashley - Oyster._CreekAssessment EssentialItems from 6-21 telecon.pdf Page 2 I

" 1Mr Diarnete EqLi pmalt Door Assernly MdeStahizerAsserriy FenalaSabiI i zrAssarbiy Basc Qirve Drywall F~araion (there emery of these only need ckavng for large penerations.)

Barn Ses HeddAssernbly DraMng Weding Fbd Locations for Drywall Vent Heade Assarnby Vent Li ne $Veaoxn Breakes ExpanisonBellowsfor VentLines Gmenea Arraigeirent Rersonne Lock

" A full dlynairc anaysisof thermodl W~thaprcpriate ground mcaionisd'iuld bedoazeitee In:

o asrnic Andysis DetalsAppendx Bof letter dted Decenber 21, l99Ofrom H.S Mertaof GE to SQ Tumni rid I Iof GRJN.

The MAR (page3B-1 5 f romn Fkwi on 13, Apfl 12003) prov~ideslgatra and vertical saicad Smi cacefi dais which are dlaimal to be onsi stit with more detlI addynari~c analyse& Rovide details onaxnpalsons, between detailed dynarnicaidysiasd staicloeding forsanismi The FEAR staethat JohnA.Blumne &

Asscaes~ peformned the fill dynarnic anlysisaid reporestat ic coef id ents equal to those used by CB& 1 (225/6 1ated, end 109%vertical).