ML062780179

From kanterella
Jump to navigation Jump to search
Revision 3 to Technical Specification TSB1, Technical Specification Bases Unit 1 Manual.
ML062780179
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 09/22/2006
From:
Susquehanna
To: Gerlach R
Document Control Desk, Office of Nuclear Reactor Regulation
References
TSB1, Rev 3
Download: ML062780179 (24)


Text

Sep. 22, 2006 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2006-40192 USER INFORMATION:

GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:

TO: GERLACH*ROSE M 09/22/2006 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.

ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.

TSBI - TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL REMOVE MANUAL TABLE OF CONTENTS DATE: 09/08/2006 ADD MANUAL TABLE OF CONTENTS DATE: 09/21/2006 CATEGORY: DOCUMENTS TYPE: TSBI

>4-ooj

Sep. 22, 2006 Page 2 of 2 ID: TEXT 3.6.4.3 REMOVE: REV:3 ADD: REV: 4 CATEGORY: DOCUMENTS TYPE: TSB1 ID: TEXT LOES REMOVE: REV:76 ADD: REV: 77 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

SSES MANUIAL Manual Name: TSB1--

inual

Title:

TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL Table Of Contents Issue Date: 09/21/2006 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 77 09/21/2006

Title:

LIST OF EFFECTIVE SECTIONS TEXT TOC 10 06/13/2006

Title:

TABLE OF CONTENTS TEXT 2.1.1 2 04/18/2006

Title:

SAFETY LIMITS (SLS) REACTOR CORE SLS TEXT 2.1.2 0 11/15/2002

Title:

SAFETY LIMITS (SLS) REACTOR COOLANT SYSTEM, (RCS)'PRESSURE SL TEXT 3.0 1 04/18/2005

Title:

LIMITING CONDITION FOR OPERATION ">(LCO) .APPLICABILITY TEXT 3.1. 1 1 ,,04fi8/2006

Title:

REACTIVITY CONTROL SYSTEMS S HUTDOWN MARGIN (SDM)

TEXT 3.1.2 -o0 11/15/2002

Title:

REACTIVITY CONTROL ýSYSTEMS E.EACTIVITY ANOMALIES TEXT 3.1.3 1 07/06/2005

Title:

REACTIVITY CONTROL ,SYSTEMS C'ONTROL ROD OPERABILITY TEXT 3.1.4 2 04/18/2006

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM TIMES TEXT 3.1.5 1 07/06/2005

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS TEXT 3.1.6 2 04/18/2006

Title:

REACTIVSTY CONTROL; SYSTEMS ROD PATTERN CONTROL Report Date: 09/21/06 PagelI Page of of 88 Report Date: 09/21/06

SSES MANUAL Manual Name: TSBI--

Manual

Title:

TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.1.7 1 08/30/2005

Title:

REACTIVITY CONTROL SYSTEMS STANDBY LIQUID CONTROL (SLC) SYSTEM TEXT 3.1.8 1 10/19/2005

Title:

REACTIVITY CONTROL SYSTEMS SCRAM DISCHARGE VOLUME (SDV) VENT AND DRAIN VALVES TEXT 3.2.1 1 04/18/2006

Title:

POWER DISTRIBUTION LIMITS AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)

TEXT 3.2.2 1 04/18/2006

Title:

POWER DISTRIBUTION LIMITS MINIMUM CRITICAL POWER RATIO (MCPR)

TEXT 3.2.3 0 11/15/2002

Title:

POWER DISTRIBUTION LIMITS LINEAR HEAT GENERATION RATE (LHGR)

TEXT 3.2.4 2 04/12/2006

Title:

POWER DISTRIBUTION.LIMITS AVERAGE POWER RANGE MONITOR (APRM) GAIN AND SETPOINTS TEXT 3.3.1.1 3 04/12/2006

Title:

INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS),INSTRUMENTATION TEXT 3.3.1.2 1 04/12/2006

Title:

INSTRUMENTATION SOURCE RANGE MONITOR (SRM) INSTRUMENTATION TEXT 3.3.2.1 2 04/12/2006

Title:

INSTRUMENTATION CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.3.2.2 0 11/15/2002

Title:

INSTRUMENTATION FEEDWATER - MAIN TURBINE HIGH WATER LEVEL TRIP INSTRUMENTATION TEXT 3.3.3.1 5 06/13/2006

Title:

INSTRUMENTATION POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT 3.3.3.2 .- 1 04/18/2005

Title:

INSTRUMENTATION REMOTE SHUTDOWN SYSTEM Report Date: 09/21/06 Page22 Page of of 88 Report Date: 09/21/06

SSES MANUAL j Manual Name: TSB+/--

Manual

Title:

TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.3.4.1 0 11/15/2002

Title:

INSTRUMENTATION END OF CYCLE RECIRCULATION PUMP TRIP (EOC-RPT) INSTRUMENTATION TEXT 3.3.4.2 0 11/15/2002

Title:

INSTRUMENTATION ANTICIPATED TRANSIENT WITHOUT SCRAM RECIRCULATION PUMP TRIP (ATWS-RPT) INSTRUMENTATION TEXT 3.3.5.1 2 07/06/2005

Title:

INSTRUMENTATION EMERGENCY CORE COOLING SYSTEM (ECCS) INSTRUMENTATION TEXT 3.3.5.2 0 11/15/2002

Title:

INSTRUMENTATION REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM INSTRUMENTATION TEXT 3.3.6.1 1 11/09/2004

Title:

INSTRUMENTATION PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.6.2 1 11/09/2004

Title:

INSTRUMENTATION-SECONDARY CONTAINMENT ISOLATION'INSTRUMENTATION.

TEXT 3.3.7.1 0 11/15/2002

Title:

INSTRUMENTATION CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM INSTRUMENTATION TEXT 3.3.8.1 1 09/02/2004

Title:

INSTRUMENTATION LOSS OF POWER (LOP) INSTRUMENTATION TEXT 3.3.8.2 0 11/15/2002

Title:

INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) ELECTRIC POWER MONITORING TEXT 3.4.1 3 04/12/2006

Title:

REACTOR COOLANT SYSTEM (RCS) RECIRCULATION LOOPS OPERATING TEXT 3.4.2 .0 11/15/2002

Title:

REACTOR COOLANT SYSTEM (RCS) JET PUMPS TEXT 3.4.3 1 01/16/2006

Title:

REACTOR COOLANT SYSTEM (RCS) SAFETY/RELIEF VALVES (S/RVS)

Page 3 of 8 Report Date: 09/21/06

SSES MANUAL Manual Name: TSBt--

Manual

Title:

TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.4.4 0 11/15/2002

Title:

REACTOR- COOLANT SYSTEM (RCS) RCS OPERATIONAL LEAKAGE TEXT 3.4.5 1 01/16/2006

Title:

REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE ISOLATION VALVE (PIV) LEAKAGE TEXT 3.4.6 1 04/18/2005

Title:

REACTOR COOLANT SYSTEM (RCS) RCS LEAKAGE DETECTION INSTRUMENTATION TEXT 3.4.7 .1 04/18/2005

Title:

REACTOR COOLANT SYSTEM (RCS) RCS SPECIFIC ACTIVITY TEXT 3.4.8 1 04/18/2005

Title:

REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLI]NG SYSTEM

- HOT SHUTDOWN TEXT 3.4.9 0 11/15/2002

Title:

REACTOR COOLANT SYSTEM (RCS)

- COLD.SHUTDOWN RESIDUAL HEAT'REMOVAL (RHR) SHUTDOWN COOLI)NG SYSTEM K.>

TEXT 3.4.10 2 05/10/2006

Title:

REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE AND TEMPERATURE (P/T) LIMITS.

TEXT 3.4.11 0 11/15/2002

Title:

REACTOR COOLANT SYSTEM (RCS) REACTOR STEAM DOME PRESSURE TEXT 3.5.1 2 01/16/2006

Title:

EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)

SYSTEM ECCS - OPERATING TEXT 3.5.2 0 11/15/2002

Title:

EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)

SYSTEM ECCS - SHUTDOWN TEXT 3.5.3 1 04/18/2005

Title:

EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)

SYSTEM RCIC SYSTEM TEXT 3.6.1.1 - 0 11/15/2002

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT K~

Report Date: 09/21/06 Page4 Page 4 of of 88 Report Date: 09/21/06

SSES MANUAL Manual Name: TSB1-Manual

Title:

TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.6.1.2 0 11/15/2002

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT AIR LOCK TEXT 3.6.1.3 3 12/08/2005

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT ISOLATION VALVES (PCIVS)

TEXT 3.6.1.4 0 11/15/2002

Title:

CONTAINMENT SYSTEMS CONTAINMENT PRESSURE TEXT 3.6.1.5 1 . 10/05/2005

Title:

CONTAINMENT SYSTEMS DRYWELL AIR TEMPERATURE TEXT 3.6.1.6 0 11/15/2002

Title:

CONTAINMENT SYSTEMS SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKERS TEXT 3.6.2.1 0 11/15/2002 Title CONTAINMENT SYSTEMS SUPPRESSION POOL AVERAGE TEMPERATURE TEXT 3.6.2.2 0 11/15/2002

Title:

CONTAINMENT SYSTEMS SUPPRESSION POOL WATER LEVEL TEXT 3.6.2.3 1 01/16/2006

Title:

CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL COOLING TEXT 3.6.2.4 0 11/15/2002

Title:

CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL SPRAY TEXT 3.6.3.1 2 06/13/2006

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT HYDROGEN RECOMBINERS TEXT 3.6.3.2 1 04/18/2005

Title:

CONTAINMENT SYSTEMS DRYWELL AIR FLOW SYSTEM TEXT 3.6.3.3 0 11/15/2002

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT OXYGEN CONCENTRATION Report Date: 09/21/06 PageS5 Page of of 88 Report Date: 09/21/06

SSES MANUJAL Manual Name: TSBI---

Manual

Title:

TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL K)

TEXT 3.6.4.1 6 08/08/2006

Title:

CONTAINMENT SYSTEMS SECONDARY CONTAINMENT TEXT 3.6.4.2 2 01/03/2005

Title:

CONTAINMENT SYSTEMS SECONDARY CONTAINMENT ISOLATION VALVES (SCIVS)

TEXT 3.6.4.3 4 09/21/2006

Title:

CONTAINMENT SYSTEMS STANDBY GAS TREATMENT (SGT) SYSTEM TEXT 3.7.1 0 11/15/2002

Title:

PLANT SYSTEMS RESIDUAL HEAT REMOVAL SERVICE WATER (RHRSW) SYSTEM AND THE ULTIMATE HEAT SINK (UHS)

TEXT 3.7.2 1 11/09/2004

Title:

PLANT SYSTEMS EMERGENCY SERVICE WATER (ESW) SYSTEM TEXT 3.7.3 0 11/15/2002

Title:

PLANT SYSTEMS CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM K-;

TEXT 3.7.4 0 11/15/2002

Title:

PLANT SYSTEMS CONTROL ROOM FLOOR COOLING SYSTEM TEXT 3.7.5 0 11/15/2002

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS TEXT 3.7.6 1 01/17/2005

Title:

PLANT SYSTEMS MAIN TURBINE BYPASS SYSTEM TEXT 3.7.7 0 11/15/2002

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOL WATER LEVEL TEXT 3.8.1 4 04/18/2006

Title:

ELECTRICAL POWER SYSTEMS AC SOURCES - OPERATING TEXT 3.8.2 0 11/15/2002

Title:

ELECTRICAL POWER SYSTEMS AC SOURCES - SHUTDOWN Report Date: 09/21/06 Page 66 of 8 Report Date: 09/21/06

SSES MANUAL Manual Name: TSBI--

Manual

Title:

TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.8.3 0 11/15/2002

Title:

ELECTRICAL POWER SYSTEMS DIESEL FUEL OIL, LUBE OIL, AND STARTING AIR TEXT 3.8.4 1 06/13/2006

Title:

ELECTRICAL POWER SYSTEMS DC SOURCES - OPERATING TEXT 3.8.5 0 11/15/2002

Title:

ELECTRICAL POWER SYSTEMS DC SOURCES - SHUTDOWN TEXT 3.8.6 .0 11/15/2002

Title:

ELECTRICAL POWER SYSTEMS BATTERY CELL PARAMETERS TEXT 3.8.7 1 10/05/2005

Title:

ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS - OPERATING TEXT 3.8.8 0 11/15/2002 Title ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS - SHUTDOWN TEXT 3.9.1 0 11/15/2002

Title:

REFUELING )PERATIONS REFUELING EQUIPMENT INTERLOCKS TEXT 3.9.2 0 11/15/2002

Title:

REFUELING OPERATIONS REFUEL POSITION ONE-ROD-OUT INTERLOCK TEXT 3.9.3 0 11/15/2002

Title:

REFUELING )PERATIONS CONTROL ROD POSITION TEXT 3.9.4 0 11/15/2002

Title:

REFUELING )PERATIONS CONTROL ROD POSITION INDICATION TEXT 3.9.5 0 11/15/2002

Title:

REFUELING OPERATIONS CONTROL ROD OPERABILITY - REFUELING TEXT 3.9.6 0 11/15/2002

Title:

REFUELING OPERATIONS REACTOR PRESSURE VESSEL (RPV) WATER LEVEL Report Date: 09/21/06 Page 7 7 of of 88 Report Date: 09/21/06

SSES MANUAL Manual Name: TSB3--

Manual

Title:

TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.9.7 0 11/15/2002

Title:

REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - HIGH WATER LEVEL TEXT 3.9.8 0 11/15/2002

Title:

REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR).- LOW WATER LEVEL TEXT 3.10.1 0 11/15/2002

Title:

SPECIAL OPERATIONS INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION TEXT 3.10.2 .0 . 11/15/2002

Title:

SPECIAL OPERATIONS REACTOR MODE SWITCH INTERLOCK TESTING TEXT 3.10.3 0 11/15/2002

Title:

SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - HOT SHUTDOWN TEXT 3.10.4 0 11/15/2002 .-.

Title:

SPECIAL OPERATIONS SINGLE CONTROL ROD' WITHDRAWAL - COLD SHUTDOWN K>

TEXT 3.10.5 0 11/15/2002

Title:

SPECIAL OPERATIONS SINGLE CONTROL ROD DRIVE (CRD) REMOVAL - REFUELING TEXT 3.10.6 0 11/15/2002

Title:

SPECIAL OPERATIONS MULTIPLE CONTROL ROD WITHDRAWAL - REFUELING TEXT 3.10.7 1 04/18/2006.

Title:

SPECIAL OPERATIONS CONTROL ROD TESTING - OPERATING TEXT 3.10.8 1 04/12/2006

Title:

SPECIAL OPERATIONS SHUTDOWN MARGIN (SDM) TEST - REFUELING Report Date: 09/21/06 Page Page 88 of 88 Report Date: 09/21/06

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision TOC Table of Contents 10 B 2.0 SAFETY LIMITS BASES Page B 2.0-1 .0 Page TS / B 2.0-2 3 Page TS / B 2.0-3 4 Pages TS / B 2.0-4 and TS / B 2.0-5 3 Page TS / B 2.0-6 1 Pages B 2.0-7 through B 2.0-9 0 B 3.0 LCO AND SR APPLICABILITY BASES Pages B 3.0-1 through B 3.0-4 0 Pages TS / B 3.0-5 through TS / B 3.0-7 - 1 Pages TS / B 3.0-8 through TS / B 3.0-9 2 Pages TS / B.3.0-10 through TS / B 3.0-12 1 Pages TS / B 3.0-13 through TS / B 3.0-15 2 Pages TS i B 3.0-16 and TS / B 3.0-17 0 B 3.1 REACTIVITY CONTROL BASES' Pages B 3.1-1 through B 3.1-4 0 Page TS / B 3.1-5 1 Pages TS / B 3.1-6 and TS I B 3.1-7 2 Pages B 3.'1-8 through B 3.1-13 0 1

Page TS / B 3.1-14 Pages B 31-15 through B'3.1-22 0 Page TS / B 3.1-23 1 PagesB 3!1'-2'4 through B 3.1-27 0 Page TS / B 3.1-28 2 Page TS / B 3.1'-29 1 "Pages iB3.,I-30 through B 3.1-33 0

  • Pages TS / B 3.3-34 through TS / B 3.3-36 1 Pages TS / B 3.1-37 and TS / B 3.1-38 2 Pages B 3j1-39 through B 3.1-44 0 Page TS I B 3.1-45 1 Pages B 3 j1-4 6 and B 3.1-47 0 Pages TS / B 3.1-48 and TS / B 3.1-49 1 Page B 3.1-50 0 Page TS I B 3.1-51 1 B 3.2 POWER DISTRIBUTION LIMITS BASES Page TS / B 3.2-1 1 Pages TS / B 3.2-2 through TS / B 3.2-6 2 SUSQUEHANNA - UNIT 1 TS / B LOES-1 Revision 77

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVESECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision Page B 3.2-7 0 Pages TS / B 3.2-8 and TS / B 3.2-9 2 Page TS / B 3.2.10 1 Page TS / B 3.2-11 2 Page B 3.2-12 0 Page TS / B 3.2-13 2 Pages B 3.2-14 and B 3.2-15 0 Page TS / B 3.2-16 2 Page B 3.2-17 0 Page TS / B 3.2-18 1 Page TS / B 3.2-19 4 B 3.3 INSTRUMENTATION Pages TS / B 3.3-1 through TS / B 3.3-4 1 Page TS / B 3.3-5 2 Page TS / B 3.3-6 1 Page TS / B 3.3-7 3 Page TS / B 3.3-7a 0 Pages TS / B 3.3-8 through TS I B 3.3-12 3 Pages TS / B 3.3-12a through TS / B 3.3-12c 0 Page TS / B 3.3-13 1 Page TS / B 3.3-14 3 Pages TS / B 3.3-15 and TS / B 3.3-16 1 Pages TS / B 3.3-17 and TS / B 3.3-18 3 Page TS / B 3.3-19 1 Pages TS / B 3.3-20 through TS / B 3.3-22 2 Page TS / B 3.3-22a 0 Pages TS / B 3.3-23 and TS / B 3.3-24 2 Pages TS / B 3.3-24a and TS / B 3.3-24b 0 Pages TS / B 3.3-25 and TS / B 3.3-26 2 Page TS / B 3.3-27 1 Pages TS / B 3.3-28 through TS / B 3.3-30 3 Page TS / B 3.3-30a 0 Page TS / B 3.3-31 3 Page TS / B 3.3-32: 5 Pages TS / B 3.3-32a and TS I B 3.3-32b 0 Page TS / B 3.3-33' 5 Page TS / B 3.3-33a 0 Page TS / B 3.3-34 1 Pages TS / B 3.3-35 and TS I B 3.3-36 2 Pages TS / B 3.3-37 through TS / B 3.3-43 1 Page TS / B 3.3-444 3 LOES-2 Revision 77 SUSQUEHANNA - UNIT SUSQUEHANNA - UNIT 1I TS I/ B TS B LOES-2 Revision 77

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision Pages TS / B 3.3-45 through TS / B 3.3-49 2 Page TS / B 3.3-50 3 Page TS / B 3.3-51 2 Pages TS / B 3.3-52 and TS / B 3.3-53 1 Page TS / B 3.3-54 3 Pages B 3.3-55 through B 3.3-63 0 Pages TS / B 3.3-64 and TS I B 3.3-65 2 Page TS / B 3.3-66 4 Page TS / B 3.3-67. 3 Page TS / B 3.3-68 4 Page TS / B 3.3-69 5 Pages TS / B 3.3-70 and TS / B 3.3-71 3 Pages TS / B 3.3-72 and TS / B 3.3-73 2 Page TS / B 3.3-74 3 Page TS / B 3.3-75 2 Page TS / B 3.3-75a 5 Page TS / B 3.3-75b 6 Page TS / B 3.3-75c 4 Pages B 3.3-76 through 3.3-77 0 Page TS / B 3.3-78 1 Pages B 3.3-79 through B 3.3-89 0 Page TS / B 33-90 1 Page B 3.3-91 0 Pages TS / B 3.3-92 through TS / B 3.3-100 1 Pages B 3.3-101 through B 3.3-103 0 Page TS / B 3.3-104 1 Pages B 3.3-105 and B 3.3-106 0 Page TS / B 33-107 1 Page B 3.3-108 0 Page TS / B 3!3-109 1 Pages B 3.3-110 and B 3.3-111 0 Pages TS / B 3.3-112 and TS / B 3.3-112a 1 Pages TS / B 3.3-113 through TS / B 3.3-115 1 Page TS / B 3.3-116 2 Page TS / B 3.3-117 1 Pages B 3.3-118 through B 3.3-122 0 Pages TS / B 3.3-123 and TS / B 3.3-124 1 Page TS / B 3J3-124a 0 Page B 3.3-125 0 Pages TS / B 3.3-126 and TS / B 3.3-127 1 Pages B 3.3-128 through B 3.3-130 0 Page TS / B 3!3-131 1 Pages B 3.3-132 through B 3.3-137 0 TS/BLOES-3 Revision 77 SUSQUEHANNA - UNIT SUSQUEHANNA -

UNIT 11. TS / B LOES-3 Revision 77

-g SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision Page TS / B 3.3-138 1 Pages B 3.3-139 through B 3.3-149 0 Pages TS / B 3.3-150 through TS / B 3.3-162 1 Page TS / B 3.3-163 2 Pages TS / B 3.3-164 through TS / B 3.3-177 1 Pages TS / B 3.3-178 and TS / B 3.3-179 2 Pages TS / B 3.3-179a and TS / B 3.3-179b 2 Page TS / B 3.3-179c 0 Page TS / B 3.3-180 1 Page TS / B 3.3-181 2 Pages TS / B 313-182 through TS / B 3.3-186 1 Pages TS / B 313-187 and TS/B 3.3-188 2 Pages TS / B 3.3-189 through TS / B 3.3-191 1 Pages B 3.3-192 through B 3.3-204 0 Page TS / B 3.3-205 1 Pages B 3.3-206 through B 3.3-219 0 B 3.4 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 and B 3.4-2 0 Pages TS / B 314-3 and Page TS / B 3.4-4 4 Pages TS / 8 314-5 through TS / B 3.4-9 2 Pages B 3.4-10 through B 3.4-14 0 Page TS / B 3.4-15 1 Pages TS / B 314-16 through TS / B 3.4-18 2 Pages B 3.4-19 through B 3.4-27 0 Pages TS / B 314-28 and TS / B 3.4-29 1 Pages B 3.4-30 and B 3.4-31 0 Page TS / B 3.4-32 1 Pages B 3.4-33, through B 3.4-36 0 Page TS / B 3.4-37 1 Pages B 3.4-38,through B 3.4-40 0 Page TS / B 3.4-41 1 Pages B 3.4-42 through B 3.4-48 0 Page TS / B 3.4-49 3 Page TS / B 3.4-50 1 Page TS / B 3.4-51 3 Page TS / B 3.4-52 2 Page TS / B 3.4-53 1 Pages TS / B 3J4-54 and TS / B 3.4-55 2 Page TS / B 3.4-56 1 Page TS / B 3.4-57 3 Pages TS / B 3j4-58 through TS / B 3.4-60 1 TS/BLOES-4 Revision 77 SUSQUEHANNA - UNIT SUSQUEHANNA -

UNIT 1I TS / B LOES-4 Revision 77

SUSQUEHANNA STEAM ELECTRIC STATION LIST OFEFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 0 Page TS / B 3.5-3 2 Page TS / B 3.5-4 1 Page TS / B 3.5-5 2 Page TS / B 3.5-6 1 Pages B 3.5-7 through B 3.5-10 0 Page TS / B 3.5-11 1 Page TS / B 3.5-12 0 Page TS / B 3.5-13 1 Pages TS / B 3.5-14 and TS / B 3.5-15 0 Pages TS / B 3.5-16 through TS / B 3.5-18 1 Pages B 3.5-19 through B 3.5-24 0 Page TS / B 3.5-25 1 Pages TS / B 3.5-26 and TS / B 3.5-27 1 Pages B 3.5-28 through B 3.5-31 0 B 3.6 CONTAINMENT SYSTEMS BASES Page TS / B 3.6-1 2 Page TS / B 3.6-1a 3 Pages TS / B 3.6-2 through TS / B 3.6-5 2 Page TS / B 3.6-6 3 Pages TS / B 3.6-6a and TS / B 3.6-6b 2 Page TS / B 3.6-6c 0 Pages B 3.6-7 through B 3.6-14 0 Page TS / B 3.6-15 2 Pages TS / B 3.6-15a and TS /B 3.6-15b 0 Page B 3.6-16 ; 0 Page TS / B 3.6-17 1 Page TS / B 3.6-17a 0 Pages TS / B 3.6-18 and TS I B 3.6-19 0 Page TS / B 3.6-20 1 Page TS / B 3.6-21 2 Page TS / B 3.6-22 1 Page TS / B 3.6-22a 0 Page TS / B 3.6-23 1 Pages TS / B 3.6-24 through TS / B 3.6-25 0 Page TS / B 3.6-26 1 Page TS / B 3.6-27 2 Page TS / B 3.6228 5 Pages TS / B 3.6-29 and TS /B 3.6-30 1 Page TS / B 3.6-31 3 TS/BLOES-5 Revision 77 SUSQUEHANNA - UNIT SUSQUEHANNA - UNIT 1I TS / B LOES-5 Revision 77

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVESECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision Page B 3.6-32 0 Page TS / B 3.6-33 1 Pages B 3.6-34 and B 3.6-35 0 Page TS / B'3.6-36 1 Page B 3.6-37 0 Page TS / B 3.6-38 1 Page B 3.6-39 0 Page TS / B.3.6-40 4 Pages B 3.6-41 through B 3.6-43 3 Pages TS / B 3.6-44 and TS / B 3.6-45 1 Page TS / B3.6-46 2 Pages TS / B 3.6-47 through TS / B 3.6-51 1 Page TS / B 3.6-52 2 Pages B 3.6-53 through B 3.6-63 0 Pages TS / B 3.6-64 and TS / B 3.6-65 1 Pages B 3.6-66 through B 3.6-69 0 Pages TS / B 3.6-70 through TS / B 3.6-72 1 Page TS / B13.6-73 2 Pages TS / B 3.6-74 and TS / B 3.6-75. 1 Pages B 3.6-76 and B 3.6-77 0 Page TS / B'3.6-78 1 Pages B 3.6-79 through B 3.3.6-83 0 Page TS / B13.6-84 3 Page TS / B 3.6-85 2 Page TS / B;3.6-86 4 Page TS / B'.3.6-87 through TS I B 3.6-88a 2 Page TS / B13.6-89 3 Page TS / B:3.6-90 2 Page TS / B13.6-91 3 Pages TS / B 3.6-92 through TS / B 3.6-96 1 Page TS / Bi3.6-97 2 Pages TS / B 3.6-98 and TS / B 3.6-99 1 Page TS / B'3.6-100 2 Pages TS / B 3.6-101 and TS / B 3.6-102 1 Pages TS / B 3.6-103 and TS / B 3.6-104 2 Page TS / B 3.6-105 3 Page TS / B:3.6-106 2 Page TS / B 3.6-107 3 B 3.7 PLANT SYSTEMS BASES Pages TS / B 3.7-1 through TS I B 3.7-6 2 Page TS / B 3.716a 2 Pages TS / B 3 3.7-6b and TS / B 3.7-6c 0 Page TS / Bi3.7-7 2 Pages TS / B 3.7-8 through TS / B 3.7-13 1 Pages TS / B 3.7-14 through TS / B 3.7-18 2 SUSQUEHANNA - UNIT' l TS / B LOES-6 Revision 77

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision Page TS / B 3.7-18a 0 Pages TS / B 3.7-19 through TS / B 3.7-23 1 Pages B 3.7-24 through B 3.7-26 0 Pages TS / B 3.7-27 through TS / B 3.7-29 4 Page TS / B 3.7-30 2 Pages B 3.7-31 through B 3.7-33 0 B 3.8 ELECTRICAL POWER SYSTEMS BASES Pages TS / B 3.8-1 through TS / B 3.8-3 2 Page TS/B 3.8-4 3 Pages TS / B 3.8-4a and TS / B 3.8-4b 0 Page TS / B 3.8-5 4 Page TS / B 3.8-6 3 Pages TS / B 3.8-7 through TS/B 3.8-8 2 Page TS / B 3.8-9 4 Page TS / B 3.8-10 3 Pages TS / B 3.8-11 and TS / B 3.8-17 2 Page TS / 8 3.8-18 3 Pages TS / B 3.8-19 through TS / B 3.8-21 2 Pages TS / B 3.8-22 and TS / B 3.8-23 3 Pages TS / B 3.8-24 through TS / B 3.8-37 2 Pages B 3.8-38 through B 3.8-53 0 Pages TS / B 3.8-54 through TS / B 3.8-61 1 Pages TS / B 3.8-62 and TS / B 3.8-63 3 Page TS / B 3.8-64 2 Page TS / B 3.8-65 3 Pages B 3.8-66 through B 3.8-80 0 Page TS / B 3.8-81 1 Pages B 3.8-82 through B 3.8-90 0 B 3.9 REFUELING OPERATIONS BASES Pages TS / B 3.9-1 land TS / B 3.9-1a 1 Pages TS / B 3.9-2 through TS / B 3.9-4 1 Pages B 3.9-5 through B 3.9-30 0 B 3.10 SPECIAL OPERATIONS BASES Page TS / B 3.10-1 1 Pages B 3.10-2 through B 3.10-31 0 Page TS / B 3.10-32 2 Page B 3.10-33 1 0 Page TS / B 3.10-34 1 Pages B 3.10-ý35 and B 3.10-36 0 Page TS / B 3.10-37 1 Page TS / B 3.10-38 2 TSB1 text LOES 8/25/06 SUSQUEHANNA - UNIT 1 TS / B LOES-7 Revision 77

PPL Rev. 4 SGT System B 3.6.4.3 B 3.6 CONTAINMENT Ii SYSTEMS B 3.6.4.3 Standby Gas Treatment (SGT) System BASES BACKGROUND The SGT System is required by 10 CFR 50, Appendix A, GDC 41, "Containment Atmosphere Cleanup" (Ref. 1). The safety function of the SGT System is to ensure that radioactive materials that leak from the pnmary containment into the secondary containment following a Design Basis 'Accident (DBA) are filtered and adsorbed prior to exhausting to the environment.

The SGT System consists of two redundant subsystems, each with its own set of dampers, filter train, and a reactor building recirculation fan and associated dampers and controls.

Each filter train consists of (components listed in order of the direction of the air flow):

a. A demister;
b. An electric heater;
c. A prefilter;
d. A high efficiency particulate air (HEPA) filter;
e. A charcoal adsorber;
f. A second HEPA filter; and
g. A centrifugal fan.

The sizing of the SGT System equipment and components is based on handling an incoming air mixture at a maximum of 1250 F. The internal pressure of the secondary containment is maintained at a negative pressure of 0.25 inches water gauge when the system is in operation.

Maintenance of a negative pressure precludes direct outleakage.

The demister is provided to remove entrained water in the air, while ih'e electric heater reduces the relative humidity of the airstrea'm to less than 70% (Ref. 2). The prefilter removes large particulate matter, while the HEPA filter (continued)

SUSQUEHANNA - UNIT 1, TS / B 3.6-101 Revision 1

PPL Rev. 4 SGT System B 3.6.4.3 BASES BACKGROUND removes fine particulate matter and protects the charcoal from fouling.

(continued) The charcoal adsorber removes gaseous elemental iodine and organic iodides, and the final HEPA filter collects any carbon fines exhausted from the charcoal adsorber.

The SGT System automatically starts and operates in response to actuation signals indicative of conditions or an accident that could require operation of the system. Following initiation in each division, the associated filter train fan starts. Upon verification that both subsystems are operating, the redundant subsystem may be shut down.

The SGT System also contains a cooling function to remove heat generated by fission product decay on the HEPA filters and charcoal adsorbers during shutdown of an SGT subsystem. The cooling function consists of two separate and independent filter cooling modes per SGT subsystem. The two cooling modes are:

1) Outside air damper and the filter cooling bypass damper open, allowing outside air to flow through the shutdown SGT subsystem's filter train and exit via the opposite SGT subsytem's exhaust fan.
2) Outside air damper opens and the SGT exhaust fan of the shutdown SGT subsystem starts. This configurations draws outside air through the shutdown SGT subsystem's filter train and exits via the associated SGT subsystem's exhaust fan.

APPLICABLE The design basis for the SGT System is to mitigate the consequences of a SAFETY loss of coolant accident and fuel handling accidents (Ref. 2). For all ANALYSES events analyzed, the SGT System is shown to be automatically initiated to reduce, via filtration and adsorption, the radioactive material released to the environment.

The SGT System satisfies Criterion 3 of the NRC Policy Statement (Ref. 3).

LCO Following a DBA, a minimum of one SGT subsystem is required to maintain the secondary containment at a negative pressure with respect to the environment and to process gaseous releases. Meeting the LCO requirements for two OPERABLE subsystems ensures operation of at least (continued)

SUSQUEHANNA - UNIT 1 TS / B 3.6-102 Revision 1

PPL Rev. 4 SGT System B 3.6.4.3 BASES LCO one SGT subsystem in the event of a single active failure. A SGT (continued) subsystem is considered OPERABLE when it has an OPERABLE set of dampers, filter train, one reactor building recirculation fan and associated dampers, and associated controls, including instrumentation. (The reactor building recirculation fans and associated dampers are not dedicated to either SGT subsystem. As a result, when any one reactor building recirculation division is not OPERABLE, one arbitrarily determined SGT subsystem is not operable. This interpretation only applies if both divisions of Secondary Containment Isolation logic are operable). This includes the components required for at least one of the two SGTS filter cooling modes.

APPLICABILITY In MODES 1, 2, and 3, a DBA could lead to a fission product release to primary containment that leaks to secondary containment. Therefore, SGT System OPERABILITY is required during these MODES.

In MODES 4 and 5, the probability and consequences of these events are reduced due to the pressure and temperature limitations in these MODES.

Therefore, maintaining the SGT System in OPERABLE status is not required in MODE 4 or 5, except for other situations under which significant releases of radioactive material can be postulated, such as during operations with a potential for draining the reactor vessel (OPDRVs), during CORE ALTERATIONS, or during movement of irradiated fuel assemblies in the secondary containment.

ACTIONS A..I With one SGT subsystem inoperable, the inoperable subsystem must be restored to OPERABLE status in 7 days. In this Condition, the remaining OPERABLE SGT subsystem is adequate to perform the required radioactivity release control function. However, the overall system reliability is reduced because a single failure in the OPERABLE subsystem could result in the radioactivity release control function not being adequately performed. The 7 day Completion Time is based on consideration of such factors as the availability of the OPERABLE redundant SGT System and the low probability of a DBA occurring during this period.

(continued)

SUSQUEHANNA - UNIT 1 TS / B 3.6-103 Revision 2

PPL Rev. 4 SGT System B 3.6.4.3 BASES ACTIONS B.1 and B.2 (continued)

If the SGT subsystem cannot be restored to OPERABLE status within the required Completion Time in MODE 1, 2, or 3, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and to MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

C.1, C.2.1, C.2.2, and C.2.3 During movement of irradiated fuel assemblies, in the secondary containment, during CORE ALTERATIONS, or during OPDRVs, when Required Action A.1 cannot be completed within the required Completion Time, the OPERABLE SGT filter train should immediately be placed in operation. This action ensures that the remaining filter train is OPERABLE, that no failures that could prevent automatic actuation have occurred, and that any other failure would be readily detected.

An alternative to Required Action C.1 is to immediately suspend activities that represent a potential for releasing radioactive material to the secondary containment, thus placing the plant in a condition that minimizes risk. If applicable, CORE ALTERATIONS and movement of irradiated fuel assemblies must immediately be suspended. Suspension of these activities must not preclude completion of movement of a component to a safe position. Also, if applicable, actions must immediately be initiated to suspend OPDRVs in order to minimize the probability of a vessel draindown and subsequent potential for fission product release. Actions must continue until OPDRVs are suspended.

The Required Actions of Condition C have been modified by a Note stating that LCO 3.0.3 is not applicable. If moving irradiated fuel assemblies while in MODE 4 or 5, LCO 3.0.3 would not specify any action.

If moving irradiated fuel assemblies while in MODE 1, 2, or 3, the fuel movement is independent of reactor operations. Therefore, in either case, inability to suspend movement of irradiated fuel assemblies would not be a sufficient reason to require a reactor shutdown.

(continued)

SUSQUEHANNA - UNIT 1 TS / B 3.6-104 Revision 2

PPL Rev. 4 SGT System B 3.6.4.3 BASES ACTIONS D.1 (continued)

If both SGT subsystems are inoperable in MODE 1, 2, or 3, the SGT system may not be capable of supporting the required radioactivity release control function. The 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Completion Time provides a period of time to correct the problem that is commensurate with the importance of maintaining the SGT System contribution to secondary containment during MODES 1, 2, and 3. This time period also ensures that the probability of an accident (requiring SGT OPERABILITY) occurring during periods where SGT is inoperable is minimal.

A temporary (one-time) Completion Time is connected to the Completion Time Requirements above (4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />) with an "OR" connector. The Temporary Completion Time is 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> and applies to the replacement of the Reactor Building Recirculating Fan Damper Motors. The Temporary Completion Time of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> may only be used once, and expires on December 31, 2005.

E.1 and E.2 If at least one SGT subsystem cannot be restored to OPERABLE status within the required Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and to MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

F.1, F.2, and F.3 When two SGT subsystems are inoperable, if applicable, CORE ALTERATIONS and movement of irradiated fuel assemblies in secondary containment must immediately be suspended. Suspension of these activities shall not preclude completion of movement of a component to a safe position. Also, if applicable, actions must immediately be initiated to suspend OPDRVs in order to minimize the probability of a vessel draindown and subsequent potential for fission product release. Actions must continue until OPDRVs are suspended.

(continued)

SUSQUEHANNA-UNIT 1 TS / B 3.6-105 Revision 3

PPL Rev. 4 SGT System B 3.6.4.3 BASES ACTIONS F.1, F.2, and F.3 (continued)

Required Action F.1 has been modified by a Note stating that LCO 3.0.3 is not applicable. If moving irradiated fuel assemblies while in MODE 4 or 5,.

LCO 3.0.3 would not specify any action. If moving irradiated fuel assemblies while in MODE 1, 2, or 3, the fuel movement is independent of reactor operations. Therefore, in either case, inability to suspend movement of irradiated fuel assemblies would not be a sufficient reason to require a reactor shutdown.

SURVEILLANCE SR 3.6.4.3.1 REQUIREMENTS Operating each SGT filter train for > 10 continuous hours ensures that both filter train are OPERABLE and that all associated controls are functioning properly. It also ensures that blockage, fan or motor failure, or excessive vibration can be detected for corrective action.

Operation with the heaters on (automatic heater cycling to maintain temperature) for > 10 continuous hours every 31 days eliminates moisture on the adsorbers and HEPA filters. The 31 day Frequency is consistent with the requirements of Reference 4.

SR 3.6.4.3.2 This SR verifies that the required SGT filter testing is performed in accordance with the Ventilation Filter Testing Program (VFTP). The VFTP includes testing HEPA filter performance, charcoal adsorber efficiency, minimum system flow rate, and the physical properties of the activated charcoal (general use and following specific operations). Specific test frequencies and additional information are discussed in detail in the VFTP.

SR 3.6.4.3.3 This SR verifies that each SGT subsystem starts on receipt of an actual or simulated initiation signal. While this Surveillance can be performed with the reactor at power, operating experience has shown that these components usually pass the Surveillance when performed at the 24 month Frequency. The LOGIC SYSTEM FUNCTIONAL TEST in SR 3.3.6.2.5 overlaps this SR to provide complete testing of the safety function.;" Therefore, the Frequency was found to be acceptable from a reliability standpoint.

(continued)

SUSQUEHANNA-UNIT 1 TS / B 3.6-106 Revision 2

PPL Rev. 4 SGT System B 3.6.4.3 BASES SURVEILLANCE SR 3.6.4.3.4 REQUIREMENTS (continued) This SR verifies that both cooling modes for each SGT subsystem are available. Although both cooling modes are tested, only one cooling mode for each SGT subsystem is required for an SGT subsystem to be considered OPERABLE. While this Surveillance can be performed with the reactor at power, operating experience has shown that these components usually pass the Surveillance when performed at the 24 month Frequency, which is based on the refueling cycle.

Therefore, the Frequency was found to be acceptable from a reliability standpoint.

REFERENCES 1. 10 CFR 50, Appendix A, GDC 41.

2. FSAR, Section 6.5.1
3. Final Policy Statement on Technical Specifications Improvements, July 22, 1993 (58 FR 39132).
4. Regulatory Guide 1.52, Rev. 1. I SUSQUEHANNA - UNIT 1 TS / B 3.6-107 Revision 3