Letter from D. Gillen, NMSS, to J. Maxand, Snake River Alliance; D. Hirsch, Committee to Bridge the Gap; G. Pollet, Heart of America Northwest, and D. D'Arrigo, Nuclear Information and Resource Service, Application by CYAPCO to Dispose of SML060330145 |
Person / Time |
---|
Site: |
Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
---|
Issue date: |
06/23/2005 |
---|
From: |
Gillen D NRC/NMSS/DWMEP |
---|
To: |
D'Arrigo D, Hirsch D, Maxand J, Pollet G Committee to Bridge the Gap, Heart of America Northwest, Nuclear Information & Resource Service (NIRS), Snake River Alliance |
---|
Shared Package |
---|
ML060320259 |
List: |
---|
References |
---|
FOIA/PA-2005-0293 |
Download: ML060330145 (3) |
|
|
---|
Category:Letter
MONTHYEARIR 05000213/20240012024-08-27027 August 2024 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation NRC Inspection Report Nos. 07200039/2024001 and 05000213/2024001 ML24094A0742024-05-30030 May 2024 Issuance of Exemption for Connecticut Yankee Atomic Power Company Regarding Haddam Neck Plant Independent Spent Fuel Storage Installation ML23342A0972024-01-0909 January 2024 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan CY-23-014, Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI2023-12-0404 December 2023 Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI ML23124A2012023-04-20020 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2022 CY-23-006, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2023-03-0606 March 2023 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-23-007, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2023-03-0606 March 2023 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22340A4922023-02-24024 February 2023 Closeout Letter to Connecticut Yankee Regarding 2018 and 2021 Updated DFPs for Haddam Neck Plant ISFSI CY-23-003, Independent Spent Fuel Storage Installation, Nuclear Liability Insurance Coverage2023-01-17017 January 2023 Independent Spent Fuel Storage Installation, Nuclear Liability Insurance Coverage CY-23-004, Independent Spent Fuel Storage Installation, Property Insurance Coverage2023-01-17017 January 2023 Independent Spent Fuel Storage Installation, Property Insurance Coverage CY-23-002, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2023-01-0505 January 2023 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments CY-23-001, Independent Spent Fuel Storage Installation, Report of 10 CFR 50.59 Changes, Tests, and Experiments2023-01-0505 January 2023 Independent Spent Fuel Storage Installation, Report of 10 CFR 50.59 Changes, Tests, and Experiments IR 07200039/20224012022-10-0505 October 2022 Connecticut Yankee Atomic Power Company - NRC Independent Spent Fuel Storage Security Inspection Report No. 07200039/2022401 CY-22-012, Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2022-08-0303 August 2022 Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-22-010, Connecticut Yankee Atomic Power Company Haddam Neck Plant Independent Spent Fuel Storage Installation, Formal Announcement of New ISFSI Manager2022-05-25025 May 2022 Connecticut Yankee Atomic Power Company Haddam Neck Plant Independent Spent Fuel Storage Installation, Formal Announcement of New ISFSI Manager CY-22-006, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 20212022-04-25025 April 2022 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2021 CY-22-003, and Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report2022-03-14014 March 2022 and Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report CY-22-004, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2022-03-14014 March 2022 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22011A1352022-01-31031 January 2022 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan CY-22-002, Independent Spent Fuel Storage Installation - Property Insurance Coverage2022-01-20020 January 2022 Independent Spent Fuel Storage Installation - Property Insurance Coverage CY-22-001, Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage2022-01-20020 January 2022 Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage CY-21-015, Independent Spent Fuel Storage Installation, Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2021-12-10010 December 2021 Independent Spent Fuel Storage Installation, Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-21-011, Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI2021-12-0101 December 2021 Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI CY-21-013, Biennial Update to the Haddam Neck Plant License Termination Plan2021-12-0101 December 2021 Biennial Update to the Haddam Neck Plant License Termination Plan ML22075A2382021-12-0101 December 2021 Biennial Update to the Haddam Neck Plant Updated Final Safety Analysis Report CY-21-014, Independent Spent Fuel Storage Installation - Adoption of Amendment 8 of NAC-MPC Certificate of Compliance No. 72-1025 and Canister Registration2021-11-18018 November 2021 Independent Spent Fuel Storage Installation - Adoption of Amendment 8 of NAC-MPC Certificate of Compliance No. 72-1025 and Canister Registration IR 05000213/20210012021-10-26026 October 2021 Connecticut Yankee Atomic Power Company - NRC Independent Spent Fuel Storage Installation Inspection Report Nos. 07200039/2021001 and 05000213/2021001 ML21144A2512021-04-13013 April 2021 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2020 CY-21-006, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2021-03-0202 March 2021 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-21-005, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2021-03-0202 March 2021 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-21-004, Independent Spent Fuel Storage Installation - Property Insurance Coverage2021-01-27027 January 2021 Independent Spent Fuel Storage Installation - Property Insurance Coverage CY-21-003, Independent Spent Fuel Storage Installation Nuclear Liability Insurance Coverage2021-01-27027 January 2021 Independent Spent Fuel Storage Installation Nuclear Liability Insurance Coverage ML21012A3192021-01-13013 January 2021 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan IR 07200039/20204012020-11-20020 November 2020 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Report 07200039/2020401, Without Enclosure (Public - Cover Letter Only) ML20150A3352020-06-19019 June 2020 COVID-19 Exemption for Haddam Neck CY-20-011, Independent Spent Fuel Storage Installation - Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section Le and 10 CFR 73.55(r) Annual Physical Requalification Requirement2020-05-14014 May 2020 Independent Spent Fuel Storage Installation - Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section Le and 10 CFR 73.55(r) Annual Physical Requalification Requirement ML20143A0972020-04-16016 April 2020 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2019 CY-20-007, Independent Spent Fuel Storage Installation - Formal Announcement of New Tsfst Manager2020-03-31031 March 2020 Independent Spent Fuel Storage Installation - Formal Announcement of New Tsfst Manager CY-20-004, Independent Spent Fuel Storage Installation - Funding Report for Managing Irradiated Fuel and GTCC Waste2020-03-17017 March 2020 Independent Spent Fuel Storage Installation - Funding Report for Managing Irradiated Fuel and GTCC Waste CY-20-003, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2020-03-12012 March 2020 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-20-002, Independent Spent Fuel Storage Installation, Letter Notifying NRC the Amount of Property Insurance Coverage in Force for 20202020-01-22022 January 2020 Independent Spent Fuel Storage Installation, Letter Notifying NRC the Amount of Property Insurance Coverage in Force for 2020 ML20015A5262020-01-15015 January 2020 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan ML19269C4642019-10-11011 October 2019 Letter to B. Mitchell Exemption from 10 CFR 72.212 and 72.214 for Dry Spent Fuel Storage Activities - Haddam Neck Plant Independent Spent Fuel Storage Installation CY-19-014, Independent Spent Fuel Storage Installation - Formal Announcement of ISFSI Manager'S Return2019-06-0505 June 2019 Independent Spent Fuel Storage Installation - Formal Announcement of ISFSI Manager'S Return CY-19-012, Independent Spent Fuel Storage Installation - 2018 Individual Monitoring NRC Form 5 Report2019-04-23023 April 2019 Independent Spent Fuel Storage Installation - 2018 Individual Monitoring NRC Form 5 Report ML19070A0332019-02-20020 February 2019 Letter to C. Pizzella Nuclear Regulatory Commission'S Analysis of Connecticut Yankee Atomic Power Company'S Initial and Updated Decommissioning Funding Plans for the Haddam Neck Plant Independent Spent Fuel Storage Installation CY-18-021, Connecticut Yankee Atomic Power Company Haddam Neck Plant Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2018-12-10010 December 2018 Connecticut Yankee Atomic Power Company Haddam Neck Plant Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan IR 05000213/20180012018-05-31031 May 2018 NRC Independent Spent Fuel Storage Installation Inspection Report Nos. 07200039/2018001 and 05000213/2018001, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 07200039/20184012018-05-17017 May 2018 Connecticut Yankee Atomic Power Company Independent Spent Fuel Storage Security Inspection Report No. 07200039/2018401 - (Cover Letter Only) CY-18-004, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2018-03-0505 March 2018 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report 2024-08-27
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Jeremy M. Maxand Snake River Alliance Mr. Dan Hirsch Committee to Bridge the Gap Mr. Gerald Pollet, J.D.
Executive Director Heart of America Northwest Ms. Diare D'Arrigo Nuclear Information and Resource Service
Dear Mr. Maxand,
Mr. Hirsch, Mr. Pollet, and Ms. D'Arrigo:
On behalf of the U.S. Nuclear Regulatory Commission (NRC), I am responding to your April 15, 2005, letter to the Office of the Secretary, in which you expressed concerns about an application by Connecticut Yankee Atomic FPower Company (CYAPCO), to NRC, to dispose of solid waste from the decommissioning of this Haddam Neck Plant (HNP) facility at a Subtitle C Resource Conservation and Recovery Act (RCRA) disposal facility in Grand View, Idaho. You specifically requested that NRC consider several issues related to the CYAPCO proposal, including alternate disposals under the Atomic Energy Act, characterization and monitoring concerns, generic rulemaking activities, public involvement, and the National Environmental Policy Act (NEPA) processes.
On September 16, 2004, CYAPCO applied to the NRC, in accordance with the provisions of 10 CFR 20.2002, to dispose of demolition debris from decommissioning activities at the HNP facility. Section 20.2002 is a regulation of long-standing, practical use that has been applied many times over the years. It is applicable to individual licensee requests and entails its own environmental and safety evaluation for the unique and specific proposed disposal. The NRC staff determined that CYAPCO's request was protective of the public health and safety and the environment and approved the request, as supplemented, on April 19, 2005. Below, I have responded to the specific concerns you raised in your letter regarding this alternate disposal procedure.
NRC Authority Under the Atomic Energy Act CYAPCO requested approval to dispose of solid waste from decommissioning activities of the HNP facility at the U.S. Ecology Idaho Facility in Grand View, Idaho in accordance with 10 CFR 20.2002. Section 20.2002 states that a "licensee or applicant for a license may apply to the Commission for approval of proposed procedures, not otherwise authorized in the regulations in this chapter, to dispose of licensed material generated in the licensee's activities." Section 20.2002 provides a disposal option available to licensees pursuant to 10 CFR 20.2001 (a)(4),
provided that the Commission determines the proposed method of disposal is protective of public health and safety and the environment. Each 20.2002 authorization request is evaluated by the NRC on a case-by-case basis that includes both an environmental and technical review.
. 1 Mr. Maxand, Mr. Hirsch, Mr. Pollet, Ms. D'Arrigo The environmental review evaluates the environmental impacts of the proposed disposal method, including, to the extent appropriate, any resulting cumulative impacts. The technical review evaluates the application and may approve alternate disposals under a criterion of a few millirerm (mrem) annually, which is a small fraction of the NRC limit for exposure to members of the public.
As part of the review for a request for off-site disposal at a non-NRC licensed facility under 10 CFR 2C.2002, the NRC also issues a specific exemption for the material to be disposed of from further licensing and regulatory requirements. Sections 30.11, 40.14, and 70.17 implement the NRC's authority under the Atomic Energy Act to issue specific exemptions upon determining that the exemptions "are authorized by law and will not endanger life or property or the common defense and security and are otherwise in the public interest."
Characterization In performing radiological dose assessments, the normal practice is to evaluate exposure scenarios which result in dose, which for the CYAPCO request included scenarios for transportation workers, landfill workers, and landfill post-closure resident farmers. For each of these evaluated scenarios, averaging is allowed as appropriate to the scenario. In addition, NRC staff requested CYAPCO establish a maximum allowable concentration on each transport container, and that CYAPCO describe how these limits would be monitored. NRC staff reviewed CYAPCO's approach and found it acceptable. CYAPCO performance would be monitored by NRC regional inspectors, as part of NRC's decommissioning site inspection program.
You also expressed concern about the potential for leakage at commercial radioactive waste landfills. Neither the dose modeling used by the licensee, nor NRC's independent verification take credit for the landfill barriers to prevent migration of radiological material to the groundwater. Thus, the dose estimates evaluated already address this concern.
Generic Rulemaking The rulemaking you referred to is on controlling the disposition of solid materials. The Commission has disapproved publication of this proposed rule at this time. The Commission's decision is based on the fact that the Agency is currently faced with several high priority and complex tasks, that on the current approach to review specific cases on an individual basis is fully protective of public health and safety, and that theimnmediate need for this rule has changed due to the shift in timing for reactori decommissioning. As such, the Commission is deferring this rulemaking for the time being.
However, this generic rulemaking was a separate regulatory action and was not intended to encompass all activities that could be permitted under 10 CFR 20.2002.
Public Involvement As correctly pointed out in your letter, a 10 CFR 20.2002 authorization request does not involve
Mr. MaXand, Mr. Hirsch, Mr. Pollet, Ms. D'Arrigo the right to an adjudicatory hearing. CYCAPO's 20.2002 request, in effect, sought an exemption from NRC regulations. In NRC practice, requests for exemptions do not ordinarily call for an adjudicatory hearing. See Private Fuel Storage, LLC (Independent Spent Fuel Storage Installation), CLI-01 -12, 53 NRC 459, 466-467 (2001). An exemption is not one of the hearing.triggering agency actions listed in section 189 of the Atomic Energy Act. Nonetheless, in the NRC's January 21, 2005, letter, the agency did invite the Snake River Alliance to provide written comments on CYAPCO's 10 CFR 20.2002 request. Your comments were not received prior to the agency taking final action.
NEPA Process Each 11) CFR 20.2002 request received by the NRC is a separate action initiated by the NRC licensee as a request for an approved disposal option. Licensees retain the ability to request multiple 10 CFR 20.2002 approvals for the same materials, or to dispose of radiological material by other authorized means. In reviewing the requests, NRC staff followed the NEPA process and the Commissions regulations in 10 CFR Part 51, "Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions." For the very low contamiiated materials that are typically the subject of a 10 CFR 20.2002 request, this process normally results in an environmental assessment (EA) and a finding of no significant impact (FONSI). The cumulative impact assessment for the proposed CYAPCO disposal focused on the resource affected by the proposed action - disposal in a RCRA C facility. The EA for the CYAPCO request concluded that since the conservatively modeled dose contribution from demolition debris is small, it would not constitute a significant increase in the cumulative dose at a RCRA C or other facility. Thus, the CYAFPCO application for a 10 CFR 20.2002 disposal does not segment the NEPA process.
The Commission takes its NEPA responsibilities very seriously and believes that its environmental reviews for 10 CFR 20.2002 reviews are appropriate and comply with both the requirements and spirit of NEPA.
I recognize your interest in this matter and appreciate your comments. I hope this response clarifies NRC's process for evaluating 10 CFR 20.2002 alternate disposal requests.
Sincerely, ASmtMC i_
Daniel M. Gillen, Deputy Director Division of Waste Management and Environmental Protection Office of Nuclear Material Safety and Safeguards Ticket No.: G20050309