January 17, 2006 Mr. Richard Anderson Vice President FirstEnergy Nuclear Operating Company Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, Ohio 44081

SUBJECT:

PERRY NUCLEAR POWER PLANT, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO OSCILLATION POWER RANGE MONITORS (TAC NO. MC7489)

Dear Mr. Anderson:

By letter to the Nuclear Regulatory Commission (NRC) dated July 5, 2005, FirstEnergy Nuclear Operating Company submitted a request for a license amendment to modify the existing Technical Specification 3.3.1.3, Oscillation Power Range Monitor (OPRM) Instrumentation, Surveillance Requirement 3.3.1.3.5, for the Perry Nuclear Power Plant, Unit 1.

The NRC staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter, and was forwarded to your staff on November 30, 2005. During a discussion with your staff, it was agreed that you would provide a response 120 days from the date of this letter.

The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRCs goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-1496.

Sincerely,

/RA by S.Sands for/

Kahtan N. Jabbour, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-440

Enclosure:

As stated cc w/encl: See next page

Mr. Richard Anderson January 17, 2006 Vice President FirstEnergy Nuclear Operating Company Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, Ohio 44081

SUBJECT:

PERRY NUCLEAR POWER PLANT, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO OSCILLATION POWER RANGE MONITORS (TAC NO. MC7489)

Dear Mr. Anderson:

By letter to the Nuclear Regulatory Commission (NRC) dated July 5, 2005, FirstEnergy Nuclear Operating Company submitted a request for a license amendment to modify the existing Technical Specification 3.3.1.3, Oscillation Power Range Monitor (OPRM) Instrumentation, Surveillance Requirement 3.3.1.3.5, for the Perry Nuclear Power Plant, Unit 1.

The NRC staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter, and was forwarded to your staff on November 30, 2005. During a discussion with your staff, it was agreed that you would provide a response 120 days from the date of this letter.

The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRCs goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-1496.

Sincerely,

/RA by S.Sands for/

Kahtan N. Jabbour, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-440

Enclosure:

As stated cc w/encl: See next page DISTRIBUTION:

PUBLIC LPLIIII-2 R/F RidsNrrPMKJabbour RidsOGCRP RidsNrrLADClarke RidsRgn3MailCenter RidsNrrDorlLplF RidsAcrsAcnwMailCenter DORL DPR GHill (2)

SCampbell RidsNrrDssSnpb Accession Number: ML060060484 OFFICE NRR/LPL3-2/PM NRR/LPL3-2/PM NRR/LPL3-2/LA DSS/SNPB/BC NRR/LPL3-2/BC (A)

NAME SCampbell KJabbour:mw DClarke FAkstulewicz MLandau DATE 1/13/06 1/13/06 1/15/06 1/17/06 1/17/06 OFFICIAL RECORD COPY

Perry Nuclear Power Plant, Unit 1 cc:

David W. Jenkins, Attorney Dennis Clum FirstEnergy Corporation Radiological Assistance Section Supervisor Mail Stop A-GO-18 Bureau of Radiation Protection 76 South Main Street Ohio Department of Health Akron, OH 44308 P.O. Box 118 Columbus, OH 43266-0118 Resident Inspector's Office U.S. Nuclear Regulatory Commission Zack A. Clayton P.O. Box 331 DERR Perry, OH 44081-0331 Ohio Environmental Protection Agency ATTN: Mr. Zack A. Clayton Regional Administrator, Region III P.O. Box 1049 U.S. Nuclear Regulatory Commission Columbus, OH 43266-0149 2443 Warrenville Road Lisle, IL 60532-4531 Chairman Perry Township Board of Trustees Sue Hiatt 3750 Center Road, Box 65 OCRE Interim Representative Perry, OH 44081 8275 Munson Mentor, OH 44060 Daniel Z. Fisher Transportation Department Manager - Regulatory Compliance Public Utilities Commission FirstEnergy Nuclear Operating Company 180 East Broad Street Perry Nuclear Power Plant Columbus, OH 43215-3793 P.O. Box 97, A210 10 Center Road Joseph J. Hagan Perry, OH 44081 Senior Vice President of Operations and Chief Operating Officer Mayor, Village of North Perry First Energy Nuclear Operating Company North Perry Village Hall Mail Stop A-GO-14 4449 Lockwood Road 76 South Main Street North Perry Village, OH 44081 Akron, OH 44308 Donna Owens, Director Director, Regulatory Affairs Ohio Department of Commerce FirstEnergy Nuclear Operating Company Division of Industrial Compliance 395 Ghent Road Bureau of Operations & Maintenance Akron, OH 44333 6606 Tussing Road P.O. Box 4009 Gary R. Leidich Reynoldsburg, OH 43068-9009 President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company Carol OClaire, Chief, Radiological Branch Mail Stop A-GO-19 Ohio Emergency Management Agency 76 South Main Street 2855 West Dublin Granville Road Akron, OH 44308 Columbus, OH 43235-7150 Mayor, Village of Perry P.O. Box 100 Perry, OH 44081-0100

Perry Nuclear Power Plant, Unit 1 cc:

Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GHE-107 395 Ghent Road Akron, OH 44333 L. W. Pearce Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081-0097 Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant Mail Stop A-PY-A200 P.O. Box 97, 10 Center Road Perry, OH 44081-0097

REQUEST FOR ADDITIONAL INFORMATION RELATED TO OSCILLATION POWER RANGE MONITORS PERRY NUCLEAR PLANT, UNIT 1 DOCKET NO. 50-440 In reviewing the FirstEnergy Nuclear Operating Companys (FirstEnergy) July 5, 2005, (Agencywide Documents Access and Management System Accession Number ML051940205) request to modify Technical Specification (TS) Surveillance Requirement 3.3.1.3.5, the NRC staff has determined that the following information is needed in order to complete its review:

1. On page 1 of the cover letter, the second paragraph states that the Perry Nuclear Plant, Unit 1 (Perry) is currently operating with the oscillation power range monitors enabled at

$ 23.8-percent rated thermal power. This is below the TS value of 28.6-percent rated thermal power. Please document the historical basis for the 23.8-percent rated thermal power value.

2. On page 4 of Attachment 2, the fourth paragraph states that General Electric developed an analytical method which can be used to explain the interactive corrective action (ICA) and enabled regions. The methodology is called backup stability protection (BSP) analysis and is used to redraw the power to flow map. The BSP analysis uses plant-specific inputs to develop decay ratios. The decay ratios are then used to adjust the ICA regions in order to provide stability protection. Please summarize the Perry-specific applicability for decay ratio.

Enclosure