ML053180063

From kanterella
Jump to navigation Jump to search
Entergy Operability, CR-IP2-2005-03470
ML053180063
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 08/26/2005
From: Santini P
Entergy Nuclear Indian Point 2
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2005-0369 CR-IP2-2005-03470
Download: ML053180063 (1)


Text

Entergy OPERABILITY CR-IP2-2005-03470 OperabilityVersion: I Operability Code: EQUIPMENT OPERABLE Immediate Report Code: NOT REPORTABLE Performed By: Santini,Philip R 08/26/2005 15:04 Approved By: LijoiJohn J 08t26t2005 19:18 Operability

Description:

Concur with CR originator's assessment of SFP and FSB operability. (refer also to CR 1P2-2005-03424-CA-2) The SFP is a separate structure and is not affected by the varying soil mechanics in the vicinty of the FSB east loading bay cinder block wall. The FSB east loading bay wall's structural integrity is maintained by column to column steel beams. The soil in the hole is shored up with fire retardant lumber and a steel plate has been placed to prevent access to the FSB from the hole and excessive ambient exposure to the FSB. Therefore no operability challenge is presented at this time by the hole described in this CR Approval Comments:

Approved, no operability issue.