Letter Sequence Other |
|---|
|
|
MONTHYEARML0429203002004-10-0404 October 2004 No. 2 - License Amendment Request Nos. 302 and 173 Project stage: Request L-04-124, License Amendment Request Nos. 318 and 1912004-10-0404 October 2004 License Amendment Request Nos. 318 and 191 Project stage: Request ML0433703072004-12-0202 December 2004 Meeting with Firstenergy Nuclear Operating Company (Fenoc), ET Al., Regarding Beaver Valley Power Station, Units 1 and 2 (BVPS-1 and 2) Extended Power Uprate Project stage: Meeting ML0434401132005-01-0606 January 2005 Extended Power Uprate (EPU) Acceptance Review Project stage: Acceptance Review ML0511604292005-02-23023 February 2005 Supplemental Information Supporting License Amendment Request Nos. 302 and 173, Attachment B Project stage: Supplement ML0511604262005-02-23023 February 2005 Supplemental Information Supporting License Amendment Request Nos. 302 and 173 Project stage: Supplement L-05-026, Supplemental Information Supporting License Amendment Request Nos. 302 and 173, Appendix a of Attachment D2005-02-23023 February 2005 Supplemental Information Supporting License Amendment Request Nos. 302 and 173, Appendix a of Attachment D Project stage: Supplement ML0506701272005-03-10010 March 2005 Notice of Meeting with Firstenergy Nuclear Operating Company, Senior Management Beaver Valley Power Station, Unit Nos. 1 and 2 Steam Generation Replacement (Unit 1 Only) and Extended Power Uprate Project stage: Meeting ML0506300622005-03-11011 March 2005 RAI, - Extended Power Uprate Project stage: RAI ML0511902682005-03-23023 March 2005 Meeting Presentation Slides - Summary of Meeting with FENOC Re Category 1, Pre-Application Review Re BVPS-1 Steam Generator (SG) Replacement and Related Alternate Source Term (AST) Approval Project stage: Meeting L-05-053, February 2005 NPDES Discharge Monitoring Report2005-03-28028 March 2005 February 2005 NPDES Discharge Monitoring Report Project stage: Request ML0508100022005-03-28028 March 2005 Request for Additional Information, Containment Conversion from Subatmospheric Conditions Project stage: RAI ML0510401672005-04-28028 April 2005 Summary of Meeting with FENOC Re Category 1, Pre-Application Review Re BVPS-1 Steam Generator (SG) Replacement and Related Alternate Source Term (AST) Approval Project stage: Meeting ML0511600692005-05-0505 May 2005 RAI, Extended Power Uprate (EPU) Project stage: RAI L-05-079, Responses to a Request for Additional Information in Support of License Amendment Request Nos. 317 and 1902005-05-12012 May 2005 Responses to a Request for Additional Information in Support of License Amendment Request Nos. 317 and 190 Project stage: Request ML0513001472005-05-18018 May 2005 (BVPS-1 and 2) - Extended Power Uprate (EPU) Acceptance Review Project stage: Acceptance Review L-05-078, Responses to a Request for Additional Information in Support of License Amendment Request Nos. 302 and 1732005-05-26026 May 2005 Responses to a Request for Additional Information in Support of License Amendment Request Nos. 302 and 173 Project stage: Request ML0518004852005-07-19019 July 2005 (BVPS-1 and 2) - Extended Power Uprate (EPU) Acceptance Review Project stage: Acceptance Review L-05-130, Responses to a Request for Additional Information (RAI Dated June 30, 2005) in Support of License Amendment Request Nos. 302 and 1732005-07-28028 July 2005 Responses to a Request for Additional Information (RAI Dated June 30, 2005) in Support of License Amendment Request Nos. 302 and 173 Project stage: Request ML0520800052005-08-0202 August 2005 RAI, Extended Power Uprate Project stage: RAI 05000412/LER-2005-002, Regarding Automatic Actuation of Standby Service Water Pump Following Unexpected Service Water Pump Trip2005-09-30030 September 2005 Regarding Automatic Actuation of Standby Service Water Pump Following Unexpected Service Water Pump Trip Project stage: Request ML0526600022005-09-30030 September 2005 RAI, Extended Power Uprate Project stage: RAI L-05-168, Supplement to License Amendment Request2005-10-28028 October 2005 Supplement to License Amendment Request Project stage: Supplement L-05-163, Supplement to License Amendment Request Nos. 327/197, 317/190, and 320, Regarding Steam Generator Level Allowable Value Setpoints, Containment Conversion & Replacement Steam Generators, Respectively2005-10-31031 October 2005 Supplement to License Amendment Request Nos. 327/197, 317/190, and 320, Regarding Steam Generator Level Allowable Value Setpoints, Containment Conversion & Replacement Steam Generators, Respectively Project stage: Supplement ML0529700862005-11-0101 November 2005 Request for Additional Information (RAI) - Extended Power Uprate Project stage: RAI L-05-179, Supplement to Responses to Request for Additional Information Dated March 28, 2005 in Support of License Amendment Request Nos. 317 and 1902005-11-14014 November 2005 Supplement to Responses to Request for Additional Information Dated March 28, 2005 in Support of License Amendment Request Nos. 317 and 190 Project stage: Supplement L-05-180, Supplement to License Amendment Request Nos. 318 and 1912005-11-14014 November 2005 Supplement to License Amendment Request Nos. 318 and 191 Project stage: Supplement L-05-169, Response to a Request for Additional Information (RAI Dated September 30, 2005) in Support of License Amendment Request Nos. 302 and 1732005-11-21021 November 2005 Response to a Request for Additional Information (RAI Dated September 30, 2005) in Support of License Amendment Request Nos. 302 and 173 Project stage: Response to RAI L-05-198, Supplemental Information for License Amendment Request2005-12-16016 December 2005 Supplemental Information for License Amendment Request Project stage: Supplement ML0603302622006-01-25025 January 2006 Additional Information in Support of License Amendment Request Nos. 302 and 173 Project stage: Request ML0601003252006-02-0606 February 2006 Units, 1 and 2 - Issuance of License Amendment 271 and 153 Containment Conversion from Subatmospheric to Atmospheric Operating Conditions Project stage: Approval ML0603900852006-02-0606 February 2006 Tech Spec Pages for Amendments 272 and 154 Applicability of Westinghouse Topical Report WCAP-12945-O-A, Volume 1 (Revision 2) 1996 and Volume 2-5 (Revision 1), Code Qualification Document for Best Estimate Loca Project stage: Other ML0601201452006-02-0606 February 2006 License Amendment 272 and 154 Applicability of Westinghouse Topical Report WCAP-12945-O-A, Volume 1 (Revision 2) 1996 and Volume 2-5 (Revision 1), Code Qualification Document for Best Estimate LOCA (Beloca) Project stage: Approval ML0603100312006-02-0606 February 2006 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Unit Nos. 1 and 2 Project stage: Withholding Request Acceptance ML0604000352006-02-0606 February 2006 Units, 1 and 2 - Tech Spec Pages for Amendment 271 and 153 Containment Conversion from Subatmospheric to Atmospheric Operating Conditions Project stage: Other L-06-018, Units, 1 and 2,Supplemental Response in Support of License Amendment Request Nos. 302 & 1732006-02-14014 February 2006 Units, 1 and 2,Supplemental Response in Support of License Amendment Request Nos. 302 & 173 Project stage: Supplement ML0604503032006-02-16016 February 2006 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Unit Nos. 1 and 2 Project stage: Withholding Request Acceptance L-06-025, Supplemental Information Pertaining to License Amendment Request No. 3022006-02-22022 February 2006 Supplemental Information Pertaining to License Amendment Request No. 302 Project stage: Supplement ML0604503422006-02-22022 February 2006 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure Ffor Beaver Valley Power Station, Unit Nos. 1 and 2 Project stage: Withholding Request Acceptance L-06-035, Supplemental Information - EPU Implementation Plan & Power Ascension Testing: License Amendment Request Nos. 302 and 1732006-03-10010 March 2006 Supplemental Information - EPU Implementation Plan & Power Ascension Testing: License Amendment Request Nos. 302 and 173 Project stage: Supplement ML0610004692006-05-0303 May 2006 (BVPS-1 and 2) - Draft Environmental Assessment and Finding of No Significant Impact Related to Extended Power Uprate Project stage: Draft Other L-06-083, Supplemental Information in Support of License Amendment Request Nos. 302 and 1732006-05-12012 May 2006 Supplemental Information in Support of License Amendment Request Nos. 302 and 173 Project stage: Supplement L-06-114, Additional Information in Support of License Amendment Request Nos. 302 and 1732006-07-0606 July 2006 Additional Information in Support of License Amendment Request Nos. 302 and 173 Project stage: Request ML0617706052006-07-10010 July 2006 Final Environmental Assessment and Finding of No Significant Impact Related to Proposed Extended Power Uprate Project stage: Other ML0620200662006-07-19019 July 2006 Issuance of Amendment Regarding the 8-Percent Extended Power Uprate, Technical Specifications Project stage: Approval ML0617202482006-07-19019 July 2006 (BVPS-1 and 2) - Issuance of Amendment 8-Percent Extended Power Uprate Project stage: Approval L-08-340, Transmittal of 10 CFR 50.46 Report of Changes or Errors in ECCS Evaluation Models2008-11-26026 November 2008 Transmittal of 10 CFR 50.46 Report of Changes or Errors in ECCS Evaluation Models Project stage: Request ML14210A2392014-07-31031 July 2014 Correction Letter Regarding Amendment Nos. 275 and 156 Issuance of Amendment Regarding the 8-Percent Extended Power Uprate Project stage: Approval 2005-05-26
[Table View] |
Tech Spec Pages for Amendments 272 and 154 Applicability of Westinghouse Topical Report WCAP-12945-O-A, Volume 1 (Revision 2) 1996 and Volume 2-5 (Revision 1), Code Qualification Document for Best Estimate Loca| ML060390085 |
| Person / Time |
|---|
| Site: |
Beaver Valley |
|---|
| Issue date: |
02/06/2006 |
|---|
| From: |
NRC/NRR/ADRO |
|---|
| To: |
|
|---|
| References |
|---|
| TAC MC4647, TAC MC4648 |
| Download: ML060390085 (2) |
|
Text
ADMINISTRATIVE CONTROLS CORE OPERATING LIMITS REPORT (Continued)
- b.
The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
WCAP-9272-P-A, "WESTINGHOUSE RELOAD SAFETY EVALUATION METHODOLOGY," July 1985 (Westinghouse Proprietary).
WCAP-8745-P-A, Design Bases for the Thermal Overtemperature AT and Thermal Overpower AT trip functions, September 1986.
WCAP-12945-P-A, Volume 1 (Revision 2) and Volumes 2 through 5
(Revision 1),
"Code Qualification Document for Best Estimate LOCA Analysis,"
March 1998 (Westinghouse Proprietary).
WCAP-8385, "POWER DISTRIBUTION CONTROL AND LOAD FOLLOWING PROCEDURES -
TOPICAL REPORT."
September 1974 (Westinghouse Proprietary).
T. M. Anderson to K. Kniel (Chief of Core Performance Branch, NRC) January 31, 1980 --
Attachment:
Operation and Safety Analysis Aspects of an Improved Load Follow Package.
NUREG-0800, Standard Review Plan, U.S. Nuclear Regulatory Commission, Section 4.3, Nuclear Design, July 1981.
Branch Technical Position CPB 4.3-1, Westinghouse Constant Axial Offset Control (CAOC), Rev. 2, July 1981.
WCAP-12610-P-A, "VANTAGE+ Fuel Assembly Reference Core Report," April 1995 (Westinghouse Proprietary).
As described in reference documents listed above, when an initial assumed power level of 102% of rated thermal power is specified in a previously approved method, 100.6% of rated thermal power may be used when input for reactor thermal power measurement of feedwater flow is by the leading edge flow meter (LEFM).
- Caldon, Inc.
Engineering Report-80P, "Improving Thermal Power Accuracy and Plant Safety While Increasing Operating Power Level Using the LEFMIITM System," Revision 0, March 1997.
BEAVER VALLEY -
UNIT 1 6-19 Amendment No.272
ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS (ContinuejL WCAP-8745-P-A, "Design Bases for the Thermal Overtemperature AT and Thermal Overpower AT Trip Functions," September 1986.
WCAP-12945-P-A, Volume 1 (Revision 2) and Volumes 2 through 5 (Revision 1),
"Code Qualification Document for Best Estimate LOCA Analysis,"
March 1998 (Westinghouse Proprietary).
WCAP-8385, "POWER DISTRIBUTION CONTROL AND LOAD FOLLOWING PROCEDURES -
TOPICAL REPORT." September 1974 (Westinghouse Proprietary).
T. M. Anderson to K. Kniel (Chief of Core Performance Branch, NRC) January 31, 1980 --
Attachment:
Operation and Safety Analysis Aspects of an Improved Load Follow Package.
NUREG-0800, Standard Review Plan, U.S. Nuclear Regulatory Commission, Section 4.3, Nuclear Design, July 1981.
Branch Technical Position CR8 4.3-1, Westinghouse Constant Axial Offset Control (CAOC), Rev. 2, July 1981.
WCAP-12610-P-A, "VANTAGE+ Fuel Assembly Reference Core Report," April 1995 (Westinghouse Proprietary).
As described in reference documents listed above, when an initial assumed power level of 102% of rated thermal power is specified in a previously approved method, 100.6% of rated thermal power may be used when input for reactor thermal power measurement of feedwater flow is by the leading edge flow meter (LEFM).
- Caldon, Inc.
Engineering Report-80P, "Improving Thermal Power Accuracy and Plant Safety While Increasing Operating Power Level Using the LEFMVTM System," Revision 0, March 1997.
- Caldon, Inc.
Engineering Report-160P, "Supplement to Topical Report ER-80P:
Basis for a Power Uprate With the LEFM\\ TM System," Revision 0, May 2000.
BEAVER VALLEY - UNIT 2 6-2 0 Amendment No.154