Safety System Design and Performance Capability Inspection - NRC Inspection Report 05000413/2005009 and 05000414/2005009 - Notification Letter
ML051170013
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 04/26/2005
From: Ogle C
Division of Reactor Safety II
To: Jamil D
Duke Energy Corp
References
IR-05-009
Download: ML051170013 (7)


See also: IR 05000413/2005009

Text

April 26, 2005

Duke Energy Corporation

ATTN: Mr. D. M. Jamil

Site Vice President

Catawba Nuclear Station

4800 Concord Road

York, SC 29745

SUBJECT: CATAWBA NUCLEAR STATION - SAFETY SYSTEM DESIGN AND

PERFORMANCE CAPABILITY INSPECTION - NRC INSPECTION REPORT

05000413/2005009 AND 05000414/2005009

Dear Mr. Jamil:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a safety system design and performance capability inspection at

your Catawba Nuclear Station during the weeks of September 19 and October 3, 2005. A team

of five inspectors will perform this inspection. The inspection team will be led by

Mr. Randy Moore, a Senior Reactor Inspector from the NRC Region II Office. This biennial

inspection will be conducted in accordance with baseline inspection program Attachment

71111.21, Safety System Design and Performance Capability.

The inspection will evaluate the capability of installed plant equipment used for the identification

and mitigation of a small break loss of coolant accident (SBLOCA) in conjunction with a loss of

offsite power (LOOP). Procedures which direct the mitigating actions for this event will also be

evaluated.

During a telephone conversation on April 21, 2005, Mr. Randy Moore of my staff, and

Mr. G. Strickland of your staff, confirmed arrangements for an information gathering site visit

and the two-week onsite inspection. The schedule is as follows:

  • Information gathering visit: Week of August 22, 2005
  • Onsite inspection weeks: September 19 and October 3, 2005

The purpose of the information gathering visit is to obtain information and documentation

outlined in the enclosure needed to support the inspection. Mr. R. Bernhard, a Region II Senior

Reactor Analyst, may accompany Mr. Moore during the information gathering visit to review

probabilistic risk assessment data and identify risk significant components which will be

examined during the inspection. Please contact Mr. Moore prior to preparing copies of the

materials listed in the enclosure. The inspectors will try to minimize your administrative burden

by specifically identifying only those documents required for inspection preparation.

DPC 2

During the information gathering visit, the team leader will also discuss the following inspection

support administrative details: office space; specific documents requested to be made

available to the team in their office space; arrangements for site access; scheduling a simulator

demonstration of a SBLOCA/LOOP event; and the availability of knowledgeable plant

engineering and licensing personnel to serve as points of contact during the inspection.

Thank you for your cooperation in this matter. If you have any questions regarding the

information requested or the inspection, please contact Mr. Moore at (404) 562-4642 or me at

(404) 562-4605.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

\\RA\\

Charles R. Ogle, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos.: 50-413, 50-414

License Nos. NPF-35, NPF-52

Enclosure: Information Request for the Safety System Design and

Performance Capability Inspection

cc w/encl:

Lee A. Keller (CNS)

Regulatory Compliance Manager

Duke Energy Corporation

Electronic Mail Distribution

Lisa Vaughn

Legal Department (PB05E)

Duke Energy Corporation

422 South Church Street

P. O. Box 1244

Charlotte, NC 28201-1244

(cc w/encl: - See page 3)

DPC 3

(cc w/encl contd)

Anne Cottingham Peggy Force

Winston & Strawn LLP Assistant Attorney General

Electronic Mail Distribution N. C. Department of Justice

Electronic Mail Distribution

North Carolina MPA-1

Electronic Mail Distribution County Manager of York County, SC

Electronic Mail Distribution

Henry J. Porter, Asst. Director

Div. of Radioactive Waste Mgmt. Piedmont Municipal Power Agency

S. C. Department of Health Electronic Mail Distribution

and Environmental Control

Electronic Mail Distribution R. L. Gill, Jr., Manager

Nuclear Regulatory Issues

R. Mike Gandy and Industry Affairs

Division of Radioactive Waste Mgmt. Duke Energy Corporation

S. C. Department of Health and 526 S. Church Street

Environmental Control Charlotte, NC 28201-0006

Electronic Mail Distribution

Elizabeth McMahon

Assistant Attorney General

S. C. Attorney General's Office

Electronic Mail Distribution

Vanessa Quinn

Federal Emergency Management Agency

Electronic Mail Distribution

North Carolina Electric

Membership Corporation

Electronic Mail Distribution

_________________________

OFFICE RII:DRS RII:DRP RII:DRS

SIGNATURE RLM MEE LSM

NAME RMoore MErnstes LMellen

DATE 4/21/2005 4/21/2005 4/21/2005 4/ /2005 4/ /2005 4/ /2005 4/ /2005

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

INFORMATION REQUEST FOR THE CATAWBA SAFETY SYSTEM DESIGN AND

PERFORMANCE CAPABILITY INSPECTION

SMALL BREAK LOCA IN CONJUNCTION WITH A LOSS OF OFFSITE POWER

(Please provide the information electronically in searchable .pdf files on CDROM. The

CDROM should be indexed and hyperlinked to facilitate ease of use. Information in

lists should contain enough information to be easily understood by someone who has a

knowledge of pressurized water reactor technology.)

1. Piping and instrumentation drawings for the following systems: Chemical Volume and

Control, Residual Heat Removal, Safety Injection, Auxiliary Feedwater, Component

Cooling, and supporting systems. Two paper copies are preferred.

2. The normal operating procedures for the systems listed above. Include the procedures

which specify the normal valve alignment for these systems. Include an index of

procedure titles with this file.

3. A list of surveillance procedures used to ensure the operability of the equipment in the

systems in Item 1 above required by your Technical Specifications that are used during

the mitigation of the LOOP/SBLOCA event. Please include procedure titles with this list.

4. A list of procedures (with titles) used for the operational testing of check valves in

portions of the Item 1 systems and supporting systems used during mitigation of the

event.

5. Document which lists the time critical operator actions assumed in the safety analysis

for SBLOCA.

6. System description and/or design basis document (DBD) for Item 1 systems and

supporting systems.

7. A list, with titles, of calibration and functional test procedures for instruments used in the

identification and mitigation of a SBLOCA including subcooling margin.

8. A list of manual actions required outside the control room during a LOOP/SBLOCA

event.

9. A list, with titles, of test procedures for the pressurizer PORVs.

10. A list of corrective work orders and non-routine work requests initiated since 2003

affecting the systems in Item 1, and support systems, used to detect and mitigate a

LOOP/SBLOCA event, including their power supplies. If work orders are prioritized, just

include the highest priority WOs. If list is more than 25 pages, discuss with lead

inspector how to focus this information to a smaller size.

Enclosure

2

11. Emergency Operating Procedures (EOPs) and supporting procedures, EOP basis

documents, step deviation document, writers guide, and users guide.

Abnormal Operating Procedures that would be used during a LOOP/SBLOCA event.

Please include an index of procedures with this file.

12. Calculations used to support the setpoints in EOPs for this event.

13. A list of engineering calculations applicable to Item 1 systems and support systems. If

these calculations are listed in the DBDs refer this request to Item 6.

14. A list of temporary modifications and operator work-arounds since 2003 for Item 1

systems and support systems.

15. A list of operability determinations performed since 2003 related to Item 1 systems and

support systems.

16. A list of corrective action program documents (PERs) initiated since 2003 for Item 1

systems and support systems.

17. System health reports and system performance trends for Item 1 systems and support

systems going back 2 years.

18. A copy of the Maintenance Rule program procedure and performance criteria for Item 1

systems and support systems. A list of plant systems currently monitored under

50.65(a)(1) and the performance goals. A list of Maintenance Rule functional failures

since 2003

19. Operator training lesson plans, system descriptions, and job performance measures for

the EOPs, EOP support procedures, abnormal, and normal operating procedures that

would be used to mitigate an LOOP/SBLOCA event.

20. Key electrical single line drawings of the intermediate and low voltage alternating current

(AC) and DC power systems that include the power distribution for Item 1 systems, and

support systems equipment. Two paper copies are preferred for these.

21. A current copy of the Updated Final Safety Analysis Report (UFSAR)

22. A brief description of the mitigation strategy for the LOOP/SBLOCA event. This should

include operator actions, equipment and power sources, as well as indications and

control circuits.

23. A list of Operating Experience Program evaluations of industry, vendor, or NRC generic

issues for the past 3 years, related to Item 1 systems and support systems equipment or

operation.

Enclosure

3

24 A list of equipment and operator actions with a Risk Achievement Worth (RAW) greater

than 1.02 for Item 1 systems and support systems.

25. Probabilistic Risk Assessment (PRA) Event Tree for LOOP/SBLOCA initiating event. A

List of PRA system dependencies and success criteria for Item 1 systems and their

support systems.

26. A current revision of the Plant Technical Specifications, Bases, and Technical

Requirements Manual (or equivalent).

27. A list of Catawba design basis requirements, commitments, and industry standards

related to mitigation of the LOOP/SBLOCA event.

28. A list of all permanent plant changes, design changes, setpoint changes, procedure

changes, equivalency evaluations, suitability analyses, calculations, and commercial

grade dedications since 2003 related to Item 1 systems and support systems.

29. Plant procedures that provide the guidelines for the following programs: 1) Corrective

Action Program, 2) program for the evaluation of changes, tests, and experiments

[50.59 Program], 3) program for the incorporation of local and industry operating

experience into Catawba programs and procedures, 4) the design control program.

30. A list of operations training packages which were required due to modifications related

to Item 1 systems and support systems, if any.

31. Summary of differences between Unit 1 and Unit 2 Item 1 systems or SBLOCA

procedures and manual actions.

32. A list of valves that are required to change position or are manually operated during

implementation of the SBLOCA/LOOP mitigation strategy. If possible, provide

equipment failure rates for these valves over the past 10 years.

Enclosure