Text

LCO Applicability 3.0 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY LCO 3.0.1 LCOs shall be met during the MODES or other specified conditions in the Applicability, except as provided in LCO 3.0.2.

LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5 and 3.0.6.

If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required, unless otherwise stated.

LCO 3.0.3 When an LCO is not met, except as provided in the associated ACTIONS, and an associated ACTION is not met or provided, the unit shall be placed in a MODE or other specified condition in which the Specification is not applicable.

Action shall be initiated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the unit, as applicable, in:

a. MODE 3 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />;
b. MODE 4 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />; and
c. MODE 5 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />.

Exceptions to this Specification are stated in the individual Specifications.

Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.

LCO 3.0.3 is only applicable in MODES 1, 2, 3, and 4.

LCO 3.0.4 When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made:

a. When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time; or (continued)

Crystal River Unit 3 3 .0-1 Amendment No. 215

LCO Applicability 3.0 3.0 LCO APPLICABILITY LCO 3.0.4 b. After performance of a risk assessment addressing (continued) inoperable systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate; exceptions to this Specification are stated in the individual Specifications, or

c. When an allowance is stated in the individual value, parameter, or other Specification.

This Specification shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

LCO 3.0.5 Equipment removed from service or declared inoperable to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate its OPERABILITY, the OPERABILITY of other equipment, or variables to be within limits. This is an exception to LCO 3.0.2 for the system returned to service under administrative control to perform the required testing.

LCO 3.0.6 When a supported system LCO is not met solely due to a support system LCO not being met, the Conditions and Required Actions associated with this supported system are not required to be entered. Only the support system Specification ACTIONS are required to be entered. This is an exception to LCO 3.0.2 for the supported system. In this event, additional evaluations and limitations may be required in accordance with Specification 5.6.2.16, "Safety Function Determination Program." If a loss of safety function is determined to exist by this program, the appropriate Conditions and Required Actions of the Specification in which the loss of safety function exists are required to be entered.

(continued)

Crystal River Unit 3 3.0-2 Amendment No.215

SR Applicability 3.0 3.0 SR APPLICABILITY SR 3.0.3 When the Surveillance is performed within the delay period Ccontinued) and the Surveillance is not met, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

SR 3.0.4 Entry into a MODE or other specified condition in the Applicability of an LCO shall only be made when the LCO's Surveillances have been met within their specified Frequency, except as provided by SR 3.0.3. When an LCO is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with LCO 3.0.4.

This provision shall not prevent entry into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

Crystal River Unit 3 3.0-5 Amendment No . 215

PAM Instrumentation 3.3.17 3.3 INSTRUMENTATION 3.3.17 Post Accident Monitoring (PAM) Instrumentation LCO 3.3.17 The PAM instrumentation for each Function in Table 3.3.17-1 shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS Separate Condition entry is allowed for each Function.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more Functions A.1 Restore required 30 days with one required channel to OPERABLE channel inoperable. status.

B. Required Action and B.1 Initiate action in Immediately associated Completion accordance with Time of Condition A Specification not met. 5.7.2.a.

C. One or more Functions C.1 Restore one channel 7 days with two required to OPERABLE status.

channels inoperable.

(continued)

Crystal River Unit 3 3.3-38 Amendment No-215

Remote Shutdown System 3.3.18 3.3 INSTRUMENTATION 3.3.18 Remote Shutdown System LCO 3.3.18 The Remote Shutdown System Functions in Table 3.3.18-1 shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS


NOTE-----------------------------------

Separate Condition entry is allowed for each Function.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Restore required 30 days Functions inoperable. Function to OPERABLE status.

B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND B.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Crystal River Unit 3 3. 3-42 Amendment No. 215

RCS Loops-MODE 3 3.4.4 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.4 RCS Loops-MODE 3 LCO 3.4.4 Two RCS loops shall be OPERABLE and at least one RCS loop shall be in operation.

__---------------NOTE----------------------------

All reactor coolant pumps (RCPs) may be de-energized for s 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period provided:

a. No operations are permitted that would cause reduction of the RCS boron concentration; and
b. Core outlet temperature is maintained so as to assure subcooling throughout the RCS.

A_____PLICABILITY:__________________________OD_________3.___

APPLICABILITY: MODE 3.

ACTIONS I

/ CONDITION REQUIRED ACTION COMPLETION TIME A. One RCS loop A.1 Restore RCS loop 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable. to OPERABLE status.

B. Required Action and B.1 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A not met.

Crystal River Unit 3 3.4-6 Amendment No. 215

RCS Leakage Detection Instrumentation 3.4.14 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.14 RCS Leakage Detection Instrumentation LCO 3.4.14 The following RCS leakage detection instrumentation shall be OPERABLE:

a. One containment sump monitor; and
b. One containment atmosphere radioactivity monitor (gaseous or particulate).

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Containment sump A.1 Perform SR 3.4.12.1. Once per monitor inoperable. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND A.2 Restore containment 30 days sump monitor to OPERABLE status.

B. Required containment B.1.1 Analyze grab samples Once per atmosphere of the containment 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> radioactivity monitor atmosphere.

inoperable.

OR

___ ______ ___ ___ ___ ____ ___ ___ ___ ___(c o n ti nued)

Crystal River Unit 3 3.4-27 Amendment No.'215

RCS Specific Activity 3.4.15 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.15 RCS Specific Activity LCO 3.4.15 The specific activity of the reactor coolant shall be within limits.

APPLICABILITY: MODES 1 and 2, MODE 3 with RCS average temperature (T.,,) - 500SF.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. DOSE EQUIVALENT I-131 ------------ NOTE------------

> 1.0 pCi/gm. LCO 3.0.4.c is applicable.

A.1 Verify DOSE Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> EQUIVALENT 1-131 within the acceptable region of Figure 3.4.15-1.

AND A.2 Restore DOSE 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> EQUIVALENT 1-131 to within limit.

B. Required Action and B.1 Be in MODE 3 with 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion T < 500DF.

Time of Condition A Ha not met.

OR DOSE EQUIVALENT I-131 in the unacceptable region of Figure 3.4.15-1.

(continued)

Crystal River Unit 3 3. 4-30 Amendment No. 215

ECCS - Shutdown 3.5.3 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.3 ECCS-Shutdown LCO 3.5.3 One ECCS train shall be OPERABLE.


NOTE ------------

High pressure injection (HPI) may be deactivated in accordance with LCO 3.4.11, "Low Temperature Overpressure Protection (LTOP) System."

APPLICABILITY: MODE 4.

ACTIONS


NOTE-------------------------------------

LCO 3.O.4.b is not applicable to ECCS LPI loops.

CONDITION REQUIRED ACTION COMPLETION TIME A. Required low pressure A.1 Initiate action to Immediately injection (LPI) restore required LPI subsystem inoperable. subsystem to OPERABLE status.

B. Required HPI subsystem B.1 Restore required HPI 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable. subsystem to OPERABLE status.

C. Required Action and C.1 Be in MODE 5. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> associated Completion Time not met.

Crystal River Unit 3 3.5S-7 Amendment No.215

EFW System 3.7.5 3.7 PLANT SYSTEMS 3.7.5 Emergency Feedwater (EFW) System LCO 3.7.5 Two EFW trains shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3.

ACTIONS


NOTE-------------------------------------

LCO 3.0.4.b is not applicable when entering MODE 1.

CONDITION REQUIRED ACTION COMPLETION TIME A. One steam supply to A.1 Restore steam supply 7 days the turbine driven EFW to OPERABLE status.

pump inoperable. AND 10 days from discovery of failure to meet the LCO B. One EFW train B.1 Restore EFW train to 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s*

inoperable for reasons OPERABLE status.

other than Condition AND A.

10 days from discovery of failure to meet the LCO*

(continued)

  • On a one-time basis, an EFW train may be inoperable for up to 14 days to allow performance of EFW Pump (EFP-3) repairs. The ability to apply the 14-day Completion Time will expire on March 31, 2005.

Crystal River Unit 3 3.7-9 Amendment No -215

Control Complex Cooling System 3.7.18 3.7 PLANT SYSTEMS 3.7.18 Control Complex Cooling System LCO 3.7.18 Two Control Complex Cooling trains shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION A. One or more trains A.1 Ensure adequate Immediately inoperable. cooling capability from the Control ADD Complex Cooling system in operation.

At least 100% of the cooling capability of AND a single OPERABLE Control Complex A.2 Restore Control 7 days I Cooling train Complex Cooling available. trains(s) to OPERABLE status.

B. Required Action and B.1 Be in Mode 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A AND not met.

B.2 Be in Mode 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Crystal River Unit 3 3.7-37 Amendment No. 215

Diesel Driven EFW Pump Fuel Oil, Lube Oil and Starting Air 3.7.19 3.7 PLANT SYSTEMS 3.7.19 Diesel Driven EFW (DD-EFW) Pump Fuel Oil, Lube Oil and Starting Air LCO 3.7.19 The stored diesel fuel oil, lube oil, and starting air subsystems shall be within limits for the DD-EFW Pump.

APPLICABILITY: When the associated DD-EFW Pump is required to be OPERABLE.

I ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. DD-EFW Pump fuel oil A.1 Restore fuel oil level 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> supply tank to within limits.

level < 9,480 gal and

> 8,335 gal in the storage tank.

B. With stored DD-EFW Pump B.1 Restore stored lube 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> diesel lube oil oil inventory to inventory < 207 gal and within limits.

> 178 gal.

C. DD-EFW Pump with C.1 Restore fuel oil total 7 days stored fuel oil total particulates to within particulates not limits.

within limits.

D. DD-EFW Pump with new D.1 Restore stored fuel 30 days fuel oil properties oil properties to not within limits. within limits.

E. DD-EFW Pump with E.1 Restore starting air 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> starting air receiver receiver pressure to pressure < 177 psig within limits.

and > 150 psig.

(continued)

Crystal River Unit 3 3.7-39 Amendment No.215

  • AC Sources - Operating 3.8.1 3.8 ELECTRICAL POWER SYSTEMS 3.8.1 AC Sources-Operating LCO 3.8.1 The following AC electrical power sources shall be OPERABLE:
a. Two qualified circuits between the offsite transmission network and the onsite Class lE AC Electrical Power Distribution System; and
b. Two emergency diesel generators (EDGs) each capable of supplying one train of the onsite Class lE AC Electrical Power Distribution System.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS


NOTE- ----- ---- --------------------

LCO 3.0.4.b is not applicable to EDGs.

CONDITION REQUIRED ACTION COMPLETION TIME A. One required offsite A.1 Perform SR 3.8.1.1 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> circuit inoperable. for OPERABLE required offsite circuit. AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter AND A.2 Declare required 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from feature(s), with no discovery of no offsite power offsite power available, inoperable to one train when its redundant concurrent with required feature(s) inoperability are inoperable. of redundant required feature(s)

AND (continued)

Crystal River Unit 3 3 .8-1 Amendment No.215

Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 3.8 ELECTRICAL POWER SYSTEMS 3.8.3 Diesel Fuel Oil, Lube Oil, and Starting Air LCO 3.8.3 The stored diesel fuel oil lube oil, and starting air subsystem shall be within limits for each required emergency diesel generator (EDG).

APPLICABILITY: When associated EDG is required to be OPERABLE.

ACTIONS


NOTE-------------------------------------

Separate Condition entry is allowed for each EDG.

CONDITION REQUIRED ACTION COMPLETION TIME A. One EDG with stored A.1 Verify combined 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> fuel oil level stored fuel oil level

< 22,917 gal and > 45,834 gal.

> 19,643 gal in storage tank.

B. One or more EDGs with B.1 Restore fuel oil 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> stored fuel oil level level to within

< 22,917 gal and limits.

> 19,643 gal in storage tank.

AND Combined stored fuel oil level < 45,834 gal.

C. With stored EDG lube oil C.1 Restore lube oil 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> inventory < 280 gal and inventory to within

> 240 gal. limits. OR Declare both EDGs inoperable.

(continued)

Crystal River Unit 3 3.8-14 .Amendment No.215

Battery Cell Parameters 3.8.6 3.8 ELECTRICAL POWER SYSTEMS 3.8.6 Battery Cell Parameters LCO 3.8.6 Battery cell parameters for the Train A and Train B batteries shall be within the limits of Table 3.8.6-1.

APPLICABILITY: When associated DC electrical power subsystems are required to be OPERABLE.

ACTIONS


aod SNOTEn------------------------- -----

Separate Condition entry is allowed for each battery.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more batteries A.1 Verify pilot cell(s) 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> with one or more electrolyte level and required battery cell float voltage meet parameters not within Table 3.8.6-1 limits. Category C values.

AND A.2 Verify required 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> battery cell parameters meet Table 3.8.6-1 Category C values.

AND A.3 Restore required 31 days battery cell parameters to Category A and B limits of Table 3.8.6-1.

(continued)

Crystal River Unit 3 3.9-23 Amendment No.215