ML052500430

From kanterella
Jump to navigation Jump to search

Tech Spec Pages for Amendment No. 220 Regarding Removal of Obsolete Footnotes from the Technical Specifications
ML052500430
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/06/2005
From:
NRC/NRR/DLPM
To:
Mozafari B,NRR/DLPM, 415-2020
Shared Package
ML052500368 List:
References
TAC MC3742
Download: ML052500430 (2)


Text

- -

Nuclear Services Seawater System 3.7.9 3.7 PLANT SYSTEMS 3.7.9 Nuclear Services Seawater System LCO 3.7.9 Two Nuclear Services Seawater System trains shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One Nuclear Services A.1 Restore Nuclear 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Seawater System train Services Seawater inoperable. System train to OPERABLE status.

B. Required Action and B.1 Be in Mode 3 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND B.2 Be in Mode 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> C..

Crystal River Unit 3 3.7-1.9 Amendment No.220

AC Sources - Operating 3.8.1 ACTIONS (continued)

CONDITION . REQUIRED ACTION J COMPLETION TIME B. (continued) B.3.1 Determine OPERABLE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> EDG is not inoperable due to common cause failure.

OR B.3.2 Perform SR 3.8.1.2 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for OPERABLE EDG.

B.4 Restore EDG to 72 Hours

  • OPERABLE status AND 6 days from discovery of failure to meet LCO OR 14 days if alternate AC power is available I AND 17 days from discovery of failure to meet LCO (continued)

Crystal River Unit 3 B.8-3 Amendment No.220