MONTHYEARML0523802052005-08-31031 August 2005 RAI, Proposed License Amendment Request No. 290, Revision 1, Project stage: RAI 3F0905-06, License Amendment Request 290, Revision 2 Re Probabilistic Methodology to Determine the Contribution to Main Steam Line Break Leakage Rates for the Once-Through Steam Generator from the Tube End Crack Alternate Repair Criteria2005-09-0909 September 2005 License Amendment Request #290, Revision 2 Re Probabilistic Methodology to Determine the Contribution to Main Steam Line Break Leakage Rates for the Once-Through Steam Generator from the Tube End Crack Alternate Repair Criteria Project stage: Request 3F1005-06, Supplemental Information Regarding License Amendment Request 290, Probabilistic Methodology to Determine the Contribution to Main Steam Line Break Leakage Rates for the Once-Though Steam Generator from the Tube End Crack . . .2005-10-21021 October 2005 Supplemental Information Regarding License Amendment Request #290, Probabilistic Methodology to Determine the Contribution to Main Steam Line Break Leakage Rates for the Once-Though Steam Generator from the Tube End Crack . . . Project stage: Supplement ML0529401792005-10-31031 October 2005 License Amendment, Probabilistic Methodology for Tube End Crack Alternate Repair Criteria, TAC No. MC5813 Project stage: Other ML0530503972005-10-31031 October 2005 TS for License Amendment, Probabilistic Methodology for Tube End Crack Alternate Repair Criteria, TAC No. MC5813 Project stage: Other ML0530703862005-11-23023 November 2005 Letter, Re Corrected Page to Technical Specifications Project stage: Other 2005-11-23
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML21238A0952021-10-13013 October 2021 Issuance of Amendment No. 259 Approving the ISFSI-Only Emergency Plan, Revision Draft a ML15261A4522015-11-27027 November 2015 Nuclear Generating Plant - Issuance of Amendment No. 249 Regarding Technical Specification Change of Management Titles to General Manager Decommissioning ML15224B2862015-09-0404 September 2015 Nuclear Generating Plant - Issuance of Amendment for Operating License and Technical Specification Based on Permanently Shutdown and Defueled Status ML15121A5702015-05-29029 May 2015 Letter, Safety Evaluation for Order Approving Transfer of Licenses and Conforming Amendments ML14097A1452014-07-11011 July 2014 Nuclear Generating Plant - Issuance of Amendment No. 244, Revise Technical Specifications to Remove Certain Requirements from Section 5, Administrative Controls 3F0514-01, Response to Requests for Additional Information and Supplement 1 to License Amendment Request 316, Revision 02014-05-0707 May 2014 Response to Requests for Additional Information and Supplement 1 to License Amendment Request #316, Revision 0 3F0413-01, License Amendment Request 313, Revision 0, Revision to Improved Technical Specifications Administrative Controls for Permanently Defueled Conditions2013-04-25025 April 2013 License Amendment Request #313, Revision 0, Revision to Improved Technical Specifications Administrative Controls for Permanently Defueled Conditions 3F1212-06, CR-3 Extended Power Uprate LAR Supplement to Support NRC Accident Dose Branch (Aadb) Technical Review2012-12-18018 December 2012 CR-3 Extended Power Uprate LAR Supplement to Support NRC Accident Dose Branch (Aadb) Technical Review ML12339A0672012-12-18018 December 2012 Issuance of License Amendments Regarding Cyber Security 3F0811-01, Response to Request for Additional Information to Support NRC Instrumentation and Controls Branch Acceptance Review of the CR-3 Extended Power Uprate LAR2011-08-18018 August 2011 Response to Request for Additional Information to Support NRC Instrumentation and Controls Branch Acceptance Review of the CR-3 Extended Power Uprate LAR 3F0209-06, License Amendment Request 310, Revision 0: Application to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-490, Rev. 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Technical Specification2009-02-26026 February 2009 License Amendment Request #310, Revision 0: Application to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-490, Rev. 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Technical Specification 3F0608-08, License Amendment Request 299, Revision 1: Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using Consolidated Line Item Improvement Process..2008-06-19019 June 2008 License Amendment Request #299, Revision 1: Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using Consolidated Line Item Improvement Process.. ML0730300752007-10-25025 October 2007 Tech Spec Pages for Amendment 227 Fuel Storage Patterns in the Spent Fuel Pool ML0730303862007-10-23023 October 2007 Tech Spec Pages for Amendment 225 Regarding Nuclear Services Closed Cycle Cooling Water System 3F0707-03, License Amendment Request No. 299, Revision 0, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement..2007-07-12012 July 2007 License Amendment Request No. 299, Revision 0, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement.. ML0716904912007-06-15015 June 2007 Technical Specifications, Issuance of Amendment to Adopt TSTF-372 ML0714101022007-05-16016 May 2007 Tech Spec Pages for Amendment 223 Regarding Steam Generator Tube Inspection Program 3F0307-11, License Amendment Request 264, Revision 2: Application to Modify Improved Technical Specifications Regarding Steam Generator Tube Integrity - Administration Correction2007-03-30030 March 2007 License Amendment Request #264, Revision 2: Application to Modify Improved Technical Specifications Regarding Steam Generator Tube Integrity - Administration Correction 3F0307-07, License Amendment Request 264, Revision 2: Application to Modify Improved Technical Specifications Regarding Steam Generator Tube Integrity and Response to Request for Additional Information2007-03-14014 March 2007 License Amendment Request #264, Revision 2: Application to Modify Improved Technical Specifications Regarding Steam Generator Tube Integrity and Response to Request for Additional Information 3F1206-02, License Amendment Request 264, Revision 1: Application to Modify Improved Technical Specifications Regarding Steam Generator Tube Integrity and Response to Request for Additional Information2006-12-21021 December 2006 License Amendment Request #264, Revision 1: Application to Modify Improved Technical Specifications Regarding Steam Generator Tube Integrity and Response to Request for Additional Information 3F1206-05, License Amendment Request No. 291, Revision 0, Application for Improved Technical Specification Change to Add LCO 3.0.8 on the Operability of Snubbers Using the Consolidated Line Item Improvement Process2006-12-14014 December 2006 License Amendment Request No. 291, Revision 0, Application for Improved Technical Specification Change to Add LCO 3.0.8 on the Operability of Snubbers Using the Consolidated Line Item Improvement Process 3F1006-01, License Amendment Request 292, Revision 0, Additional Storage Patterns for Crystal River Unit 3 Storage Pools a and B2006-10-0505 October 2006 License Amendment Request #292, Revision 0, Additional Storage Patterns for Crystal River Unit 3 Storage Pools a and B ML0530503972005-10-31031 October 2005 TS for License Amendment, Probabilistic Methodology for Tube End Crack Alternate Repair Criteria, TAC No. MC5813 3F0905-06, License Amendment Request 290, Revision 2 Re Probabilistic Methodology to Determine the Contribution to Main Steam Line Break Leakage Rates for the Once-Through Steam Generator from the Tube End Crack Alternate Repair Criteria2005-09-0909 September 2005 License Amendment Request #290, Revision 2 Re Probabilistic Methodology to Determine the Contribution to Main Steam Line Break Leakage Rates for the Once-Through Steam Generator from the Tube End Crack Alternate Repair Criteria ML0525004302005-09-0606 September 2005 Tech Spec Pages for Amendment No. 220 Regarding Removal of Obsolete Footnotes from the Technical Specifications ML0521603482005-08-0404 August 2005 Technical Specifications, Reactor Building Spray Nozzle Surveillance Requirements ML0521001812005-07-27027 July 2005 Technical Specifications, Amendment 218 on Surveillance Requirements for RCP Flywheel Inspection ML0511102352005-04-19019 April 2005 Tech Spec Pages for Amendment No. 217, Revision to Eliminate Monthly Operating and Annual Occupational Radiation Exposure Reports Requirements 3F0105-03, License Amendment Request 290, Revision 0, Probabilistic Methodology to Determine the Contribution to Main Stream Line Break Leakage Rates for the Once-Through Steam Generator from the Tube End Crack Alternate Repair Criteria2005-01-27027 January 2005 License Amendment Request #290, Revision 0, Probabilistic Methodology to Determine the Contribution to Main Stream Line Break Leakage Rates for the Once-Through Steam Generator from the Tube End Crack Alternate Repair Criteria ML0501204702005-01-11011 January 2005 License Amendment, Mode Change Limitations (Tac No. MC1861) ML0501300522005-01-11011 January 2005 Technical Specification Pages Re Mode Change Limitations ML0429602092004-10-21021 October 2004 Amendment, Tech Spec, One-Time Extension of an Emergency Feedwater System Train Completion Time ML0414101392004-05-18018 May 2004 Tech Spec Pages Amendment 212 Regarding the Nuclear Services Seawater System ML0414101442004-05-18018 May 2004 Tech Spec Pages for Amendment 212 Regarding the Nuclear Services Seawater System ML0336001152003-12-19019 December 2003 Application for Technical Specification Change Re Mode Change Limitations Using Consolidated Line Item Improvement Process ML0329503392003-10-16016 October 2003 Technical Specification for Crystal River, Unit 3, Amendment No. 211 ML0327905482003-10-0101 October 2003 Tech Spec for Crystal River, Unit 3 - Issuance of Amendment Regarding TS Change Request for the Use of M5 Advanced Alloy Fuel Cladding ML0325412262003-09-0808 September 2003 Technical Specification Change Request for Containment Isolation Valves 3.6.3 ML0319604892003-07-14014 July 2003 Tech Spec Pages for Amendment 208 Regarding TS Change Request for Containment Requirements During Irradiated Fuel Handling and Core Alterations ML0316713192003-06-13013 June 2003 Tech Spec Pages for Amendment 207 Technical Specification Change Request for Emergency Diesel Generator Allowed Outage Time Extension 3F0403-04, TS Bases Control Program2003-04-10010 April 2003 TS Bases Control Program 3F0303-03, Response to Request for Additional Information & Revision 1 to Proposed License Amendment Request 257, Emergency Diesel Generator Allowed Outage Time Extension2003-03-20020 March 2003 Response to Request for Additional Information & Revision 1 to Proposed License Amendment Request #257, Emergency Diesel Generator Allowed Outage Time Extension 3F0203-05, License Amendment Request 274, Revision 0, Containment Isolation Valves2003-02-17017 February 2003 License Amendment Request #274, Revision 0, Containment Isolation Valves ML0304400642003-02-11011 February 2003 Technical Specification Pages for Amendment No. 206 Proposed Change to Loss-of-Power Instrumentation Technical Specifications (Tac No. MB5384) ML0234300622002-12-0404 December 2002 Technical Specifications, Increase Maximum Steady-state Core Power Level from 2544 Megawatts Thermal (Mwt) to 2568 Mwt ML0220302412002-07-16016 July 2002 Technical Specification Pages, Amendment No. 204 Re Table 3.3.1-1 (Page 1 of 1), Reactor Protection System Instrumentation 3F0602-01, License Amendment Request 273, Revision 0 - Emergency Diesel Generator Diesel (EDG) Loss of Power Start.2002-06-13013 June 2002 License Amendment Request #273, Revision 0 - Emergency Diesel Generator Diesel (EDG) Loss of Power Start. 2021-10-13
[Table view] |
Text
Procedures, Programs and Manuals 5.6 5.6 Procedures, Programs and Manuals 5.6.2.10 OTSG Tube Surveillance Program (continued)
The inspection data for tubes with axially oriented TEC indications shall be compared to the previous inspection data to monitor the indications for growth.
Tubes with axially oriented TEC may be left in-service using the method described in Topical Report BAW-2346P, Revision 0, provided the combined projected leakage from all primary-to-secondary leakage, including axial TEC indications left in-service, does not exceed the Main Steam Line Break (MSLB) accident leakage limit of one gallon per minute, minus 150 gallons per day, per OTSG. The contribution to MSLB leakage rates from TEC indications shall be determined utilizing the methodology in Addendum B dated August 10, 2005 to Topical Report BAW-2346P, Revision 0. The projection of TEC leakage that may develop during the next operating cycle shall be determined using the methodology in Addendum C dated August 30, 2005 to Topical Report BAW-2346P, Revision 0.
If the plant is required to shut down due to primary-to-secondary leakage and the cause is determined to be degradation of the TEC portion of the tubes, 100% of the tubes with TEC in that .OTSG shall be examined in the location of the TEC. If more than 1% of the examined tubes are defective tubes, 100% of the tubes with TEC in the other OTSG shall be examined in the location of the TEC.
Tubes with crack-like indications within the carbon steel portion of the tubesheet shall be repaired or removed from service using the appropriate approved method. Tubes with circumferentially oriented TEC or volumetric indications within the Inconel clad region of the tubesheet shall be repaired or removed from service using the appropriate approved method.
The results of each bobbin coil sample inspection shall be classified into one of the following three categories:
NOTE------------------------------
In all inspections, previously degraded tubes whose degradation-has not been spanned by a sleeve must exhibit significant (>10%) further wall penetrations to be included in the below percentage calculations.
NOTE-----------------------------
For the inspection conducted in accordance with 5.6.2.10.2.f, only tubes with TEC indications identified after the 1997 inspection will be included in the below percentage calculations.
(continued)
Crystal River Unit 3 5 .0-14A Amendment No.222
Procedures, Programs and Manuals 5.6 5.6 Procedures, Programs and Manuals 5.6.2.10 OTSG Tube Surveillance Program (continued)
Category Inspection Results C-1 Less than 5% of the total tubes inspected are degraded tubes and none .of the inspected tubes are defective.
C-2 One or more tubes, but not more than 10% of the total tubes inspected are defective, or between 5% and 10% of the total tubes inspected are degraded tubes.
C-3 More than 10% of the total tubes inspected are degraded tubes or more than 1Y of the inspected tubes are defective.
- 3. The above-required inservice inspections of OTSG tubes shall be performed at the following frequencies:
- a. Inservice inspections shall be performed at intervals of not less than 12 nor more than 24 calendar months after the previous inspection. If two consecutive inspections following service under all volatile treatment (AVT) conditions, not including the preservice inspection, result in all inspection results failing into the C-1 category, or if two consecutive inspections demonstrate that previously observed degradation has not continued and no additional degradation has occurred, the inspection interval may be extended to a maximum of once per 40 months.
- b. If the inservice inspection of an OTSG, conducted in accordance with Table 5.6.2-2 or Table 5.6.2-3 requires a third sample inspection whose results fall in Category C-3, the inspection frequency shall be reduced to at least once per 20 months. The reduction in inspection frequency shall apply until a subsequent inspection demonstrates that a third sample inspection is not required. If the C-3 inspection results classification is due to including new tubes with TEC indications that meet the criteria to remain in-service, no reduction in inspection frequency is required.
- c. Additional unscheduled inservice inspections shall be performed on each OTSG in accordance with the first sample inspection specified in Table 5.6.2-2 or Table 5.6.2-3 during the shutdown subsequent to any of the following conditions:
- 1. Primary-to-secondary tube leaks (not including leaks originating from tube-to-tube sheet welds) in excess of the limits of Specification 3.4.12,
- 2. A seismic occurrence greater than the Operating Basis Earthquake,
- 3. A loss-of-coolant accident requiring actuation of the engineered safeguards, or
- 4. A main steam line or feedwater line break.
(continued)
Crystal River Unit 3 5.0-15 Amendment No. 222
Reporting Requirements 5.7 5.0 ADMINISTRATIVE CONTROLS 5.7 Reporting Requirements 5.7.1 Routine Reports 5.7.1.1 Reports required on an annual basis include:
- a. Not Used
- b. Annual Radiological Environmental Operating Report The Annual Radiological Environmental Operating Report covering the operation of the unit during the previous calendar year shall be submitted by May 15 of each year.
The report shall include summaries, interpretations, and analyses of trends of the results of the radiological environmental monitoring for the reporting period. The material provided shall be consistent with the objectives outlined in the Offsite Dose Calculation Manual (ODCM).
The Annual Radiological Environmental Operating Report shall include the results of analyses of all radiological environmental samples and of all environmental radiation measurements taken during the period pursuant to the locations specified in the table and figures in the ODCM, as well as summarized and tabulated results of these analyses and measurements in the format of the table in the Radiological Assessment Branch Technical Position, Revision 1, November 1979. In the event that some individual results are not available for inclusion with the report, the report shall be submitted noting and explaining the reasons for the missing results. The missing data shall be submitted in a supplementary report as soon as possible.
- c. Radioactive Effluent Release Report The Radioactive Effluent Release Report covering the operation of the unit shall be submitted prior to May 1 of each year, and in accordance with 10 CFR 50.36a. The report shall include a summary of the quantities of radioactive liquid and gaseous effluents and solid waste released from the unit. The material provided shall be consistent with the objectives outlined in the ODCM and Process Control Program, and in conformance with 10 CFR 50.36a and 10 CFR 50, Appendix I, Section IV B.1.
(continued)
Crystal River Unit 3 5.0-27 Amendment No.222
Reporting Requirements 5.7 5.7 Reporting Requirements 5.7.1.2 Not Used 5.7.2 Special Reports Special Reports shall be submitted in accordance with 10 CFR 50.4 within the time period specified for each report.
The following Special Reports shall be submitted:
- a. When a Special Report is required by Condition B or F of LCO 3.3.17, "Post Accident Monitoring (PAM) Instrumentation," a report shall be submitted within the following 14 days. The report shall outline the preplanned alternate method of monitoring, the cause of the inoperability, and the plans and schedule for restoring the instrumentation channels of the Function to OPERABLE status.
- b. Any abnormal degradation of the containment structure found during the inspection performed in accordance with ITS 5.6.2.8 shall be reported to the NRC within 30 days of the current surveillance completion. The abnormal degradation shall be defined as findings such as delamination of the dome concrete, widespread corrosion of the liner plate, corrosion of prestressing elements (wires, strands, bars) oranchorage components extending to more than two tendons and group tendons force trends not meeting the requirements of 10CFR50.55a(b)(2)(ix)(B). The report shall include the description of degradation, operability determination, root cause determination and the corrective actions.
- c. Following each inservice inspection of steam generator (OTSG) tubes, the NRC shall be notified of the following prior to ascension into MODE 4:
- 1. Number of tubes plugged and repaired;
- 2. Crack-like indications and assessment of growth for indications in the first span;
- 3. Results of in-situ pressure testing, if performed; and
- 4. Number of tubes and axially oriented TEC indications left in-service, the projected accident leakage, and an assessment of growth for TEC indications.
(continued)
Crystal River Unit 3 5.0-28 Amendment No. 222
Reporting Requirements 5.7 5.7 Reporting Requirements 5.7.2 Special Reports (continued)
- d. Results of OTSG tube inspections that fall into Category C-3 shall be reported to the NRC in accordance with 10CFR50.72.
- e. The complete results of the OTSG tube inservice inspection shall be submitted to the NRC within 90 days after breaker closure following restart. The report shall include:
- 1. Number and extent of tubes inspected,
- 2. Location and percent of wall-thickness penetration for each indication of an imperfection,
- 3. Location, bobbin coil amplitude, and axial and circumferential extent (if determined) for each first span IGA indication, and
- 4. Identification of tubes plugged or repaired and specification of the repair methodology implemented for each tube.
- 5. Number of as-found and as-left tubes with TEC indications, number of as-found and as-left TEC indications, the number of as-found and as-left TEC indications as a function of tubesheet radius, the as-found, as-left, probability of detection and new TEC leakage for upper and lower tubesheet indications. An assessment of the adequacy of the predictive methodology in Addendum C to Topical Report BAW-2346P, Revision 0, including assessing the distribution of indications found in each OTSG to ensure the assumption regarding the similarity of the distribution of indications remain consistent from one cycle to the next and that the assumption of a linear increase in leak rate remain valid. Corrective actions in the event that the assessment indicates the assumptions can not be fully supported.
Crystal River Unit 3 5.0-29 Amendment No.222