Amendment, Tech Spec, One-Time Extension of an Emergency Feedwater System Train Completion Time
ML042960209
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/21/2004
From:
NRC/NRR/DLPM
To:
mozafari B, NRR/DLPM, 415-2020
Shared Package
ML042880048 List:
References
TAC MC1586
Download: ML042960209 (1)


Text

EFW System 3.7.5 3.7 PLANT SYSTEMS 3.7.5 Emergency Feedwater (EFW) System LCO 3.7.5 Two EFW trains shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One steam supply to A.1 Restore steam supply 7 days the turbine driven EFW to OPERABLE status.

pump inoperable. AND 10 days from discovery of failure to meet the LCO B. One EFW train B.1 Restore EFW train to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />

other than Condition A. AND 10 days from discovery of failure to meet the LCO*

  • On a one-time basis, an EFW train may be inoperable for up to 14 days to allow performance of EFW Pump (EFP-3) repairs. The ability to apply the 14-day Completion Time will expire on March 31, 2005.

Crystal River Unit 3 3 .7-9 Amendment No. 214