Letter Sequence Response to RAI |
---|
|
|
MONTHYEARML0414503252004-05-14014 May 2004 Submittal of In-Service Examination Program Relief Requests Project stage: Request ML0431300902004-11-0909 November 2004 Request for Additional Information (RAI) for the Review of Relief Requests, IR-050, IR-051, and IR-052, from Certain ISI Requirements Associated with the Implementation of Section XI of the ASME Boiler and Pressure Vessel Code Project stage: RAI ML0435502252004-12-0707 December 2004 Responses to Requests for Additional Information Regarding In-Service Examination Program Relief Requests IR-050, IR-051, and IR-052 Project stage: Response to RAI ML0502102222005-02-0202 February 2005 Inservice Inspection Relief Requests IR-050, IR-051, and IR-052 Project stage: Acceptance Review 2004-12-07
[Table View] |
Similar Documents at Perry |
---|
Category:Drawing
MONTHYEARML21361A2202021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 2, Figures 2.5-50 to 2.5-215 ML21361A1952021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 2, Figures 2.1-1 to 2.5-46 ML21361A2002021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 2, Figures 02D-3 to 02E-1 ML21361A2292021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 4, Figures 4.2-1 to 4.6-9 ML21361A2282021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 11, Figures 11.1-1 to 11.5-1 ML21361A2272021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 15, Figures 15.0-1 to 15F.3-3 ML21361A2242021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 8, Figures 8.1-1 to 8.3-23 (Redacted) ML21361A2232021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 6, Figures 6.2-1 to 6.9-1 ML21361A2212021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 13, Figures 13.1-2 to 13.5-1 ML21361A1932021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 2, Figures 02D-1 to 02D-2 ML21361A2192021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 12, Figures 12.2-1 to 12.6-9 (Redacted) ML21361A2162021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 7, Figures 7.2-1 to 7.7-8 ML21361A2122021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 5, Figures 5.1-1 to 5.4-21 ML21361A2112021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 10, Figures 10.1-1 to 10.4-3 ML21361A2082021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 2, Figures 2.5-47 to 2.5-49 ML21361A2072021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 1, Plant Layout (Redacted) ML21361A2052021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 9, Figures 9.5-1 to 9.5-26 ML21361A2022021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 14, Figures 14.2-1 to 14.2-7 ML21361A1922021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 3, Figures 3.2-1 to 3B1-1 (Redacted) ML21361A1892021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 9, Figures 9.1-1 to 9.4-29 (Redacted) ML21307A1802021-10-28028 October 2021 2 to Updated Safety Analysis Report, Section 3, Figures 3.2-1 to 3B1-1 (Redacted) ML21307A1772021-10-28028 October 2021 2 to Updated Safety Analysis Report, Section 9, Figures 9.1-1 to 9.4-29 (Redacted) ML21307A1812021-10-28028 October 2021 2 to Updated Safety Analysis Report, Section 2, Figures 2D-1 to 2D-2 ML21307A1832021-10-28028 October 2021 2 to Updated Safety Analysis Report, Section 2, Figures 2.1-1 to 2.5-46 ML21307A1882021-10-28028 October 2021 2 to Updated Safety Analysis Report, Section 2, Figures 2D-3 to 2E-1 ML21307A1932021-10-28028 October 2021 2 to Updated Safety Analysis Report, Section 9, Figures 9.5-1 to 9.5-26 ML21307A1952021-10-28028 October 2021 2 to Updated Safety Analysis Report, Section 1 - Plant Layout (Redacted) ML21307A1972021-10-28028 October 2021 2 to Updated Safety Analysis Report, Section 2, Figures 2.5-47 to 2.5-49 ML21307A2002021-10-28028 October 2021 2 to Updated Safety Analysis Report, Section 10, Figures 10.1-1 to 10.4-3 ML21307A2012021-10-28028 October 2021 2 to Updated Safety Analysis Report, Section 5, Figures 5.1-1 to 5.4-21 ML21307A2092021-10-28028 October 2021 2 to Updated Safety Analysis Report, Section 12, Figures 12.2-1 to 12.6-9 (Redacted) ML21307A2102021-10-28028 October 2021 2 to Updated Safety Analysis Report, Section 2, Figures 2.5-50 to 2.5-215 ML21307A2142021-10-28028 October 2021 2 to Updated Safety Analysis Report, Section 8, Figures 8.1-1 to 8.3-23 (Redacted) ML21307A2182021-10-28028 October 2021 2 to Updated Safety Analysis Report, Section 11, Figures 11.1-1 to 11.5-1 L-21-018, 2 to Updated Safety Analysis Report, Section 4, Figures 4.2-1 to 4.6-92021-10-28028 October 2021 2 to Updated Safety Analysis Report, Section 4, Figures 4.2-1 to 4.6-9 ML17305A2242017-10-23023 October 2017 Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 04 ML17305A2322017-10-23023 October 2017 Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 10 ML17305A2312017-10-23023 October 2017 Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 09 (9A-1 to 9A-34) ML17305A2302017-10-23023 October 2017 Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 09 (9.5-1 to 9.5-26) ML17305A2292017-10-23023 October 2017 Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 09 (9.1-1 to 9.4-29) ML17305A2282017-10-23023 October 2017 Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 08 ML17305A2272017-10-23023 October 2017 Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 07 ML17305A2262017-10-23023 October 2017 Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 06 ML17305A2252017-10-23023 October 2017 Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 05 ML17305A2232017-10-23023 October 2017 Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 03 ML17305A2222017-10-23023 October 2017 Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 02 (02D-3 to 02E-1) ML17305A2202017-10-23023 October 2017 Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 02 (02D-1 to 02D-2) ML17305A2192017-10-23023 October 2017 Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 02 (2.5-50 to 2.5-215) ML17305A2182017-10-23023 October 2017 Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 02 (2.5-47 to 2.5-49) ML17305A2172017-10-23023 October 2017 Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 02 (2.1-1 to 2.5-46) 2021-12-20
[Table view] Category:Letter
MONTHYEARIR 05000440/20230042024-01-30030 January 2024 Integrated Inspection Report 05000440/2023004 L-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative IR 05000440/20234022024-01-10010 January 2024 Cyber Security Inspection Report 05000440/2023402 ML24003A8032024-01-0303 January 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML23321A0472023-12-20020 December 2023 Letter to Rod L. Penfield - Perry Nuclear Power Plant, Unit 1 - License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000440/20230112023-11-28028 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000440/2023011 IR 05000440/20234032023-11-27027 November 2023 Security Baseline Inspection Report 05000440/2023403 ML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 L-23-052, Submittal of the Updated Safety Analysis Report, Revision 232023-10-27027 October 2023 Submittal of the Updated Safety Analysis Report, Revision 23 ML23292A2482023-10-19019 October 2023 Fws to NRC, Federal Agency Coordination Under ESA Section 7 for Perry Nuclear Plant, Unit 1, License Renewal, and Concurrence with Not Likely to Adversely Affect Determination for Northern Long-eared Bat ML23292A2472023-10-19019 October 2023 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000440/20230032023-10-11011 October 2023 Integrated Inspection Report 05000440/2023003 ML23249A1032023-10-0303 October 2023 Letter to Rod L. Penfield, Site Vice President-Perry Nuclear Power Plant, Unit 1-Notice of Intent to Conduct Scoping Process and Prepare an Environmental Impact Statement ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23261C3642023-09-25025 September 2023 License Renewal Application Online Reference Portal ML23261B0192023-09-25025 September 2023 Aging Management Audit Plan Regarding the License Renewal Application Review ML23256A3592023-09-22022 September 2023 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Energy Harbor Nuclear Corp. Application for License Renewal L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD2023-09-12012 September 2023 Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000440/20234012023-08-28028 August 2023 Public - Perry Nuclear Power Plant Security Baseline Inspection Report 05000440/2023401 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000440/20230052023-08-24024 August 2023 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2023005) ML23172A2852023-08-23023 August 2023 Safety Evaluation Irradiated Fuel Management Plan and Preliminary Decommissioning Cost Estimate ML23227A2202023-08-15015 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Perry Nuclear Power Plant L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications IR 05000440/20230022023-08-0202 August 2023 Integrated Inspection Report 05000440/2023002 L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2023-07-19019 July 2023 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative ML23198A2842023-07-17017 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant IR 05000440/20230102023-06-29029 June 2023 Comprehensive Engineering Team Inspection Report 05000440/2023010 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-22022 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-051, Plan, Nineteenth Inservice Inspection Summary Report2023-06-22022 June 2023 Plan, Nineteenth Inservice Inspection Summary Report L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener ML23144A3562023-05-25025 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End of Cycle Plant Performance Assessment of Perry Nuclear Power Plant, Unit 1 L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) IR 05000440/20230012023-05-0404 May 2023 Integrated Inspection Report (05000440/2023001) L-23-122, Annual Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Radiological Environmental Operating Report L-23-121, Annual Radiological Effluent Release Report2023-04-26026 April 2023 Annual Radiological Effluent Release Report 2024-01-30
[Table view] |
Text
Perry Nuclear Power Station E OPerry, Ohio 44081 FirstEnergy Nuclear Operating Company Richard L. Anderson 440-280-5579 Vice President-Nuclear Fax: 440280-8029 December 7, 2004 PY-CEI/NRR-2846L United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Perry Nuclear Power Plant Docket No. 50-440 Responses to Requests for Additional Information Regarding In-Service Examination Program Relief Requests IR-050, IR-051, and IR-052 (TAC Nos. MC3169, MC3170 and MC3171)
Ladies and Gentlemen:
This letter provides responses to the Nuclear Regulatory Commission (NRC) Request for Additional Information dated November 9, 2004 pertaining to the Perry Nuclear Power Plant (PNPP) requests for relief from certain Inservice Inspection (ISI) requirements associated with the implementation of Section Xl of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code. This letter supplements the May 14, 2004 PNPP letter (PY-CEI/NRR-2754L), which submitted Relief Requests IR-050, IR-051, and IR-052 for NRC review and approval.
NRC review and approval of the Relief Requests as supplemented is still requested before January 1, 2005 as stated in the May 14, 2004 letter.
If you have questions or require additional information, please contact Mr. Henry L. Hegrat, FirstEnergy Nuclear Operating Company Fleet Licensing, at (330) 315-6944.
Very truly yours,
' L7 Attachments:
- 1. Response to Request for Additional Information
- 2. Nozzle Assembly Drawings
- 3. Commitment cc: NRC Project Manager NRC Resident Inspector NRC Region IlIl State of Ohio
Attachment 1 PY-CEI/NRR-2846L Page 1 of 5 RESPONSES TO REQUESTS FOR ADDITIONAL INFORMATION REGARDING PERRY NUCLEAR POWER PLANT IN-SERVICE EXAMINATION PROGRAM RELIEF REQUESTS IR-050, IR-051 AND IR-052 RELIEF REQUEST # IR-050 NRC REQUEST IR-050, "Proposed Alternatives and Technical Basis," Item 11 provides the proposed alternative as Table VII1-Sl0-1, "Performance Demonstration Detection Test Acceptance Criteria." What are the proposed values for "False Call Test Acceptance Criteria" when the number of flawed grading units and the minimum detection criteria under "Detection Test Acceptance Criteria" are 20 and 14, respectively?
RESPONSE
When the number of flawed grading units and the minimum detection criteria under "Detection Test Acceptance Criteria" are 20 and 14, the "False Call Test Acceptance Criteria" values will be 30 unflawed grading units and a maximum of 5 false calls.
RELIEF REQUEST # IR-051 IR-051, "ASME Boiler & Pressure Vessel Code Section Xl Requirements," states that the only Category C-F-2 item numbers applicable to PNPP are C5.51, C5.52, and C5.81.
Item No. C5.81 covers pipe branch connections of branch piping with a nominal pipe size (NPS) greater than or equal to 2. The subject components affected by this relief request are identified as Class 2, Category C-F-2, carbon steel piping welds greater than NPS4.
NRC REQUEST Please explain how Item C5.81 will be affected by this relief request.
RESPONSE
The Perry Nuclear Power Plant (PNPP) is a Boiling Water Reactor and in accordance with Note 1 of Table IWC-2500-1, Category C-F-2, the requirements for examination of welds in piping less than or equal to 4 inches only apply to Pressurized Water Reactors.
Thus, all of PNPP's Item No. C5.81 welds are greater than NPS 4 and are within the stated scope of the relief request. Therefore, for all of PNPP's Item C5.81 welds, in lieu of the surface examination requirements of Table IWC-2500-1, Category C-F-2, the alternative requirements of Code Case N-663 will be used.
Attachment 1 PY-CEI/NRR-2846L Page 2 of 5 NRC REQUEST What Class 2 components (examination categories and item numbers) are affected in Section III, "Relief Requested" ?
RESPONSE
Section I of the relief request identifies the Class 2 components for which relief is requested (i.e., all Category C-F-2 piping welds greater than NPS 4). Within Section II of the relief request, it states that the only Category C-F-2 items that are applicable to PNPP are C5.51, C5.52, and C5.81. Thus, components affected by the relief requested in Section III of the relief request are Category C-F-2, Item No. C5.51, C5.52 and C5.81 piping welds.
NRC REQUEST IR-051, "Basis for Relief' states that: "Table 4-11 "Summary of Degradation-Specific Inspection Requirements and Examination Methods," of the EPRI report lists the required degradation mechanisms to be evaluated in Class 1, 2, and 3 piping."
Table 4-11 is not mentioned in the Electric Power Research Institute report, and the title mentioned above belongs to Table 4-1. What table is being referenced in this section?
RESPONSE
Table 4-11 was a typographical error. It is in fact Table 4-1 of EPRI TR-1 12657, Rev B-A.
RELIEF REQUEST # IR-052 NRC REQUEST Provide the number of nozzles included in this request and the identification of each nozzle.
RESPONSE
The relief would be applied to the RPV nozzle to shell Welds that remain to be examined for the PNPP Second 10-year inspection interval. The component identification, description, and last time examined are as follows.
Component Identification Last Exam 1B13-N1A-KB Recirculation Outlet Nozzle N1A to Vessel Weld RFO5 (1996) 1B13-NlB-KB Recirculation Outlet Nozzle NIB to Vessel Weld RFO5 1B13-N2A-KB Recirculation Inlet Nozzle N2A to Vessel Weld RFO5 I 61 3-N2B-KB Recirculation Inlet Nozzle N2B to Vessel Weld RFO5 1B13-N2C-KB Recirculation Inlet Nozzle N2C to Vessel Weld RFO2 (1990)
Attachment 1 PY-CEI/NRR-2846L Page 3 of 5 Component Identification (Continued) Last Exam (Continued) 1B13-N2D-KB Recirculation Inlet Nozzle N2D to Vessel Weld RFO5 1B13-N2E-KB Recirculation Inlet Nozzle N2E to Vessel Weld RFO5 1B13-N2F-KB Recirculation Inlet Nozzle N2F to Vessel Weld RFO5 1B13-N2G-KB Recirculation Inlet Nozzle N2G to Vessel Weld RFO5 1B13-N2H-KB Recirculation Inlet Nozzle N2H to Vessel Weld RFO5 1B13-N2J-KB Recirculation Inlet Nozzle N2J to Vessel Weld RFO2 1B1 3-N2K-KB Recirculation Inlet Nozzle N2K to Vessel Weld RFO5 1B13-N3A-KB Main Steam Nozzle N3A to Vessel Weld RFO1 (1989) 1B13-N3B-KB Main Steam Nozzle N3B to Vessel Weld RFO5 1B13-N3C-KB Main Steam Nozzle N3C to Vessel Weld RFO5 1B13-N3D-KB Main Steam Nozzle N3D to Vessel Weld RFO5 1B13-N7-KB Top Head Spare Nozzle N7 to Vessel Weld RFO6 (1997) 1B13-N9A-KB Jet Pump Instrumentation Nozzle N9A to Vessel Weld RFO2 1B13-N9B-KB Jet Pump Instrumentation Nozzle N9B to Vessel Weld RFO5 1B13-N16-KB Vibration Monitoring Nozzle N16 to Vessel Weld RFO1 NRC REQUEST In the submittal it states, "The examination volume required by IWB-2500-7(b) for the reactor vessel pressure retaining nozzle-to-vessel welds extends far beyond the weld and the heat affected zones into the base metal, and is unnecessarily large." It further states, "Note that residual stresses in the weld and heat affected zones of the nozzle-to-shell welds are minimal as all these welds, including in-process weld repairs if any, were subjected to post-weld heat treatment during vessel fabrication." Provide analyses to indicate the extent and magnitude of stresses associated with reactor pressure vessel (RPV) nozzle-to-vessel welds at PNPP in support of the contention that highly stressed areas of the reactor vessel nozzle-to-shell welds will be included in the proposed examination volume.
RESPONSE
Specific weld residual stress analysis for the PNPP's nozzles is not readily available.
However, EPRI Technical Report 1003557, "BWRVIP-108: BWR Vessel and Internals Project Technical Basis for the Reduction of Inspection Requirements for Boiling Water Reactor Nozzle-to-Vessel Shell Welds and Nozzle Blend Radii", which is referenced in IR-052, concludes that the probability of failure due to the limiting loading event of low temperature over-pressurization is less than 1 x 1046 for 40 years, even without any inservice inspection. Within Section 4 of BWRVIP-108, there is a detailed evaluation of BWR nozzle stresses. These operational stresses and the residual weld stresses were factored in to the Probabilistic Fracture Mechanics Evaluation given in Section 5 of the report. Within the assumptions for this evaluation, it states, "the Residual stress at the nozzle-to-shell weld is modeled using a cosine through-wall distribution with a mean of 8 ksi at each surface."
Attachment 1 PY-CEI/NRR-2846L Page 4 of 5 NRC REQUEST In accordance with guidance provided to staff for review of relief requests, provide detailed drawings which depict the examination volume that has been examined during previous inspections and the proposed examination volume. The weld sketches should show the exact dimensions of the as installed welds and the positions of any repairs to those welds so that the licensee will be able to precisely locate the extremities (widest sections) of the nozzle-to-vessel welds and any repair weld areas so that the new examination volumes will encompass these repair weld areas.
(a) Discuss the documentation available of the actual cross-sectional dimensions and precise locations of repaired areas for all RPV nozzle-to-vessel welds at PNPP.
Discuss the process for defining new examination volumes that encompass these repair weld areas.
(b) If examination personnel are to identify the extremities (widest sections) of the nozzle-to-vessel welds, what positive means of examination will be used to identify the weld extremities, such as, weld etching, etc.? Will the weld extremities be identified on both the inside diameter and outside diameter of the vessel to ensure complete coverage of the welds?
RESPONSE
As stated in IR-052, all of the PNPP's nozzles are of the configuration depicted by ASME Xl Figure IWB-2500-7(b). The PNPP's vessel was fabricated by Chicago Bridge and Iron - Nuclear (CBIN). Attachment 2 provides the CBIN drawing for the Main Steam Nozzle-to-Vessel weld and mark-ups of that weld configuration denoting the current ASME Xl required coverage and the proposed coverage. This configuration is typical of all of the subject nozzle-to-vessel welds.
Since fabrication, there have been no repairs to any of the PNPP's nozzle-to-vessel welds. Detailed records of the in-process repairs that were made to the nozzle-to-vessel welds during fabrication are not available. Until such time that the Nuclear Regulatory Commission (NRC) staff formally approves Code Case N-613-1, to ensure that the in-process repairs are encompassed in the examination areas, the PNPP staff will extend the Code Case N-613-1 examination volume out from 1/2 inch on either side of the weld to 1 inch on either side of the weld (see Attachment 2).
All of the subject nozzle-to-vessel welds were made using the Submerged Arc Welding method with the root of the weld being on the outside of the vessel and the face of the weld being on the inside of the vessel (see Attachment 2). As such, the widest section of the weld is not visible to the examination personnel. Complete coverage is determined by calculating the weld width from the drawings and scanning the appropriate distance on either side of the weld centerline, which was marked with punch marks by CBIN when the vessel was fabricated.
Attachment I PY-CEI/NRR-2846L Page 5 of 5 NRC REQUEST In the submittal it states, "In addition, these regions have been extensively examined during the fabrication and installation periods before the vessels were put in service and during the inservice examinations already performed." What is the date that the last inservice examination was performed on the welds and base metal and what were the results? If necessary, can comparisons be made between past and present examinations, with the reduced base metal examination volume?
RESPONSE
The refueling outage in which the subject nozzle-to-vessel welds were last examined is given in the list provided in the response for the first RAI for IR-052 (Pages 2 and 3 of this attachment). Some of the exams were manual exams and some were automated.
In the case of the automated exams, comparisons to previous data could be made but not for the manual exams. However, the preservice and inservice exams did not find any recordable indications that we are tracking for growth or changes so the need to compare future examination results to previously recorded indications is not applicable.
Attachment 2 PY-CEI/NRR-2846L Page 1 of 2 1
_ -1e 14 C.tXw L_
THE CIDEVELA ELE.CTPI'. I DStC IN O. g4-is h; t/~t(4_
1- t<y~C0 _9 _ C por- Nvtshatr powat P13rt Unds I1 2 APPROV0 D- 4e-h u X est-. S - obx A--VCD AS r,.b -;-t,*ts*
13NOTED .'.S 1 Li C6_%--r,>.**f wU" FN rOR v i .IV,rs*ss
.1 I t .-..( FL. -r .: r % :,Rcq 11M 4-- l*- %--Z ~i u-
_ _ _~~~. *__*_
13 ALs *------
. . .. 1:,, rC-# ak-C) *__.i WI.. ' -
t' liETAL 6v_
I
Cl Cn4" -
.IBR .W' ASS_ r Mr O
-_E 67
.-@. m
. Ie
_CCI :po I
I -1.
f.I 4 . : \-.-I- *. ^ I.
t.1 rmtPL&
COIWM X'. -QkRt.AY S~r)P L3A~rf P Al (SW, 0AwL")
§ ;} *
<58J /\s3 N OZ/ vlz T '
,me i = _, ., l _
I I. .,
I *- P.& t--
- ms **S -;
-^- w - ; - ., , -. : , . ..... ,,.. . .. .. I, . .. ,il . .m I
- : ;---T .,
.4, Ir
- -t..
.4',,.
6,
.I
. .; 0. . .
Attachment 2 1.
PY-CEI/NRR-2846L Page 2 of 2 a ST
. * . I j~s/, 3.15 "
Coerces axa.m f aoe°4et eoc.4 1"t
.VAv~e .
4L J-1.5s
... . . .. . A..
... ... . .*: C . * * *: .
. . .* .*... l :..
, 7 . 1S7~u*UO'G
_. /ZLL sr&
M
.- , *.. *4 * .. *- , * :*
Attachment 3 PY-CEI/NRR-2846L Page 1 of I Regulatory Commitment The following table identifies the actions that are considered to be a regulatory commitment. Any other actions discussed in this document represent intended or planned actions, are described for the NRC's information, and are not regulatory commitments. Please notify Mr. Henry L. Hegrat, FirstEnergy Nuclear Operating Company, Fleet Licensing, at (330) 315-6944 of any questions regarding this document or any associated regulatory commitments.
Commitment
- 1. Until such time that the Nuclear Regulatory Commission (NRC) staff formally approves Code Case N-613-1, to ensure that the in-process repairs are encompassed in the examination areas, the PNPP staff will extend the Code Case N-613-1 examination volume out from Y2 inch on either side of the weld to 1 inch on either side of the weld (see Attachment 2).