MONTHYEARML0327216462003-09-25025 September 2003 9/25/03 Stars RAI TSs 3.8.1 and 3.8.4 for Callaway, Diablo Canyon, Palo Verde and Wolf Creek Plants. (Tacs. MB9664, MB9476, MB9477, MB9150, MB9151, MB9152 and MB8763 Respectively) Project stage: RAI ML0403005072004-01-30030 January 2004 Memo Clarification of Licensee'S Response to NRC Request for Additional Information Project stage: RAI ML0405801342004-02-26026 February 2004 Clarification of Licensee'S Application and Response to NRC Request for Additional Information Project stage: RAI ML0406206992004-02-27027 February 2004 Memo to File Clarification of Licensee'S Application and Response to NRC Request for Additional Info. Tac. MB9664 Project stage: Other ML0407011152004-03-10010 March 2004 Clarification of Licensee'S Application and Response to NRC RAI (Tac. MB8763) Project stage: RAI ML0417001282004-06-14014 June 2004 Issuance of Amendment Technical Specification 3.8.1 and 3.8.4 - AC and DC Sources Project stage: Approval ML0419704352004-07-12012 July 2004 License Amendment, Revised Surveillance Requirements in Technical Specifications 3.8.1 and 3.8.4 - AC and DC Sources Project stage: Other ML0419705832004-07-12012 July 2004 Technical Specifications, 3.8.1 and 3.8.4 - AC and DC Sources Project stage: Other ML0421703802004-08-0404 August 2004 Correction Letter for Amendment No. 154 on Technical Specifications 3.8.1 and 3.8.4, AC and DC Sources Project stage: Other ML0427902552004-09-28028 September 2004 Diablo Canyon Units 1 & 2 - Issuance of Amendments 174 & 176, Re Technical Specifications on Ac/Dc Sources Project stage: Approval ML0427805292004-09-28028 September 2004 Technical Specifications Pages, Re Alternating Current Sources for Plant Operation Project stage: Other ML0504602142005-02-0202 February 2005 Amended Supporting Information for the Revision to Technical Specifications 3.8.1, AC Sources - Operating, and 3.8.4, DC Sources - Operating Project stage: Other 2004-03-10
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARDCL-24-018, License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2024-02-28028 February 2024 License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) ML23012A2172023-02-0909 February 2023 Issuance of Amendment Nos. 244 and 245 Revision to Technical Specifications to Adopt TSTF-569, Revision 2, Revise Response Time Testing Definition ML21242A2162022-12-21021 December 2022 Issuance of Amendment Nos. 243 and 244 Technical Specifications and Revised License Conditions for the Permanently Defueled Condition (EPID: L-2020-LLA-0261 DCL-22-059, License Amendment Request 22-03 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions2022-07-26026 July 2022 License Amendment Request 22-03 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions ML21188A3452021-07-0808 July 2021 Issuance of Amendment No. 238 Revision to TS 3.7.8, Auxiliary Saltwater (Asw) System (Emergency Circumstances) ML21188A0372021-07-0707 July 2021 Attachment 1 TS_3_7_8 (Marked Up Pages) ML21188A0352021-07-0707 July 2021 Attachment 2 TS_3_7_8 (Retype Pages) ML21188A0342021-07-0707 July 2021 Attachment 3-TS Bases Section 3_7_8 (Marked-up Pages) DCL-19-094, License Amendment Request 19-02 to Relocate Technical Specification 5.3, Unit Staff Qualifications, to the Updated Final Safety Analysis Report2019-12-0505 December 2019 License Amendment Request 19-02 to Relocate Technical Specification 5.3, Unit Staff Qualifications, to the Updated Final Safety Analysis Report DCL-18-100, License Amendment Request 18-02 - License Amendment Request to Revise Technical Specification 5.6.5b1 Core Operating Limits Report (COLR) for Full Spectrum Loss-of-Coolant Accident Methodology2018-12-26026 December 2018 License Amendment Request 18-02 - License Amendment Request to Revise Technical Specification 5.6.5b1 Core Operating Limits Report (COLR) for Full Spectrum Loss-of-Coolant Accident Methodology ML16330A6722017-01-0505 January 2017 Issuance of Amendment Nos. 228 and 230, Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation ML16139A0082016-12-21021 December 2016 Issuance of Amendment Nos. 227 and 229, Digital Replacement of the Process Protection System Portion of the Reactor Protection System and Engineered Safety Features Actuation System ML16035A4412016-04-14014 April 2016 Issuance of Amendment Nos. 225 and 227, Adopt National Fire Protection Association NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) ML16083A5642016-03-23023 March 2016 License Amendment Request 16-02, License Amendment Request to Revise Technical Specification 3.4.12., Low Temperature Overpressure Protection (Ltop) System. DCL-16-028, Technical Specifications B.4.17., Steam Generator (SG) Tube Integrity, LTOP Orifice-Key Design Features, and Additional Information2016-03-23023 March 2016 Technical Specifications B.4.17., Steam Generator (SG) Tube Integrity, LTOP Orifice-Key Design Features, and Additional Information ML16055A3592016-03-0909 March 2016 Issuance of Amendment Nos. 224 and 226, Revise Updated Final Safety Analysis Report for Beacon Power Distribution Monitoring System Methodology and TS 5.6.5 (COLR) Paragon and Nexus Methodologies ML16032A0062016-02-19019 February 2016 Redacted, Issuance of Amendment Nos. 223 and 225, Revise UFSAR Section 15.4.2.2 to Incorporate Pressurizer Filling Analysis for Major Rupture of a Main Feedwater Pipe Accident Into Licensing Basis ML15245A5422015-09-30030 September 2015 Issuance of Amendment Nos. 220 and 222, Request to Revise Operating License Condition Related to Cyber Security Plan Milestone H Full Implementation Date ML15204A2222015-08-27027 August 2015 Issuance of Amendment Nos. 219 and 221, Adopt Technical Specifications Task Force Traveler TSTF-432, Revision 1, Change in Technical Specification End States (WCAP-16294) ML15162A8822015-07-0101 July 2015 Issuance of Amendment Nos. 218 and 220, Revise Surveillance Requirements in TS 3.8.1, AC Sources, Related to Diesel Generator Testing DCL-15-052, Response to NRC Request for Additional Information Regarding License Amendment Request 14-01, Revision to Technical Specification 3.8.1, AC Sources - Operating.2015-04-29029 April 2015 Response to NRC Request for Additional Information Regarding License Amendment Request 14-01, Revision to Technical Specification 3.8.1, AC Sources - Operating. ML14042A1932014-02-27027 February 2014 Issuance of Amendment Nos. 217 and 219, Editorial and Clarifying Changes to Technical Specification (TS) 3.7.10, Control Room Ventilation System (CRVS) and TS 5.6.5, Core Operating Limits Report (COLR) (TAC MF1959-MF1960) ML13130A2252013-05-10010 May 2013 Technical Specification 3.5.2 Safety Injection Pump 2-1 Issue Information ML13267A1352013-01-31031 January 2013 Attachment 6 to DCL-13-016, LTR-RAM-1-13-002 NP-Attachment, Revision 0, Justification for the Application of Technical Specifications Changes in WCAP-14333 and WCAP-15376 to the Tricon/Als Process Protection System at the Diablo Canyon Powe DCL-12-107, Supplement to PG&E Letter DCL-11-059, License Amendment Request 11-04, Revision to Technical Specification (TS) 3.6.6, 'Containment Spray and Cooling Systems,' TS 3.7.5, 'Auxiliary Feedwater (AFW) System,' TS 3.8.1, 'Ac.....2012-11-0101 November 2012 Supplement to PG&E Letter DCL-11-059, License Amendment Request 11-04, Revision to Technical Specification (TS) 3.6.6, 'Containment Spray and Cooling Systems,' TS 3.7.5, 'Auxiliary Feedwater (AFW) System,' TS 3.8.1, 'Ac..... DCL-12-057, Supplement to PG&E Letter DCL-12-017, Response to NRC Request for Additional Information: NRC Question 12012-05-31031 May 2012 Supplement to PG&E Letter DCL-12-017, Response to NRC Request for Additional Information: NRC Question 1 DCL-11-097, License Amendment Request 11-05, Evaluation Process for New Seismic Information and Clarifying the Diablo Canyon Power Plant Safe Shutdown Earthquake2011-10-20020 October 2011 License Amendment Request 11-05, Evaluation Process for New Seismic Information and Clarifying the Diablo Canyon Power Plant Safe Shutdown Earthquake DCL-11-059, Diablo Canyon Units 1 & 2, License Amendment Request 11-04, Revision to Technical Specification 3.6.6, Containment Spray and Cooling Systems, TS 3.7.5, Auxiliary Feedwater System, TS 3.8.1, AC Sources-Operating, TS 3.8.9, Distribution Sys2011-06-0101 June 2011 Diablo Canyon Units 1 & 2, License Amendment Request 11-04, Revision to Technical Specification 3.6.6, Containment Spray and Cooling Systems, TS 3.7.5, Auxiliary Feedwater System, TS 3.8.1, AC Sources-Operating, TS 3.8.9, Distribution Syste DCL-11-055, Supplement to License Amendment Request 11-02, Revision to Technical Specification 3.7.1, Main Steam Safety Valves (Mssvs).2011-04-21021 April 2011 Supplement to License Amendment Request 11-02, Revision to Technical Specification 3.7.1, Main Steam Safety Valves (Mssvs). DCL-11-018, License Amendment Request 11-02, Revision to Technical Specification 3.7.1, Main Steam Safety Valves (Mssvs)2011-02-17017 February 2011 License Amendment Request 11-02, Revision to Technical Specification 3.7.1, Main Steam Safety Valves (Mssvs) DCL-10-028, Emergency License Amendment Request 10-02, One Time Revision to Technical Specification 3.8.1, AC Sources - Operating.2010-03-11011 March 2010 Emergency License Amendment Request 10-02, One Time Revision to Technical Specification 3.8.1, AC Sources - Operating. DCL-10-028, Diablo Canyon, Units 1 and 2, Emergency License Amendment Request 10-02, One Time Revision to Technical Specification 3.8.1, AC Sources - Operating.2010-03-11011 March 2010 Diablo Canyon, Units 1 and 2, Emergency License Amendment Request 10-02, One Time Revision to Technical Specification 3.8.1, AC Sources - Operating. DCL-10-018, License Amendment Request 10-01, Revision to Technical Specification 3.8.1, AC Sources - Operating.2010-02-24024 February 2010 License Amendment Request 10-01, Revision to Technical Specification 3.8.1, AC Sources - Operating. DCL-09-062, Emergency License Amendment Request 09-04 Revision to Technical Specification 3.7.1, Main Steam Safety Valves (Mssvs) for Unit 2 Cycle 15.2009-09-0303 September 2009 Emergency License Amendment Request 09-04 Revision to Technical Specification 3.7.1, Main Steam Safety Valves (Mssvs) for Unit 2 Cycle 15. ML0919601772009-07-0303 July 2009 License Amendment Request 09-02, Revision to Technical Specification 3.4.15, RCS Leakage Detection Instrumentation, Operability Requirements and Actions for RCS Leakage Detection Instrumentation DCL-09-009, License Amendment Request 09-01 - Revision to Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, Deletion of the High Negative Rate Trip Function2009-02-24024 February 2009 License Amendment Request 09-01 - Revision to Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, Deletion of the High Negative Rate Trip Function DCL-08-100, Supplement to License Amendment Request 07-03, Revision to Technical Specification 3.7.10, Control Room Ventilation System (CRVS)2008-11-25025 November 2008 Supplement to License Amendment Request 07-03, Revision to Technical Specification 3.7.10, Control Room Ventilation System (CRVS) ML0824102622008-10-30030 October 2008 Issuance of Amendment Nos. 200 and 201, Technical Specifications Change to Relocate Surveillance Test Intervals to a Licensee-Controlled Program (Risk-Informed Initiative 5b) DCL-07-097, License Amendment Request 07-04, Proposed Technical Specifications Change to Relocate Surveillance Test Intervals to a Licensee-Controlled Program (Risk Informed Technical Specifications Initiative 5b)2007-10-15015 October 2007 License Amendment Request 07-04, Proposed Technical Specifications Change to Relocate Surveillance Test Intervals to a Licensee-Controlled Program (Risk Informed Technical Specifications Initiative 5b) DCL-07-075, Supplement to License Amendment Request 07-01, Revision to Technical Specifications to Support Steam Generator Replacement, and Response to Request for Additional Information2007-08-0909 August 2007 Supplement to License Amendment Request 07-01, Revision to Technical Specifications to Support Steam Generator Replacement, and Response to Request for Additional Information ML0713707332007-06-26026 June 2007 Tech Spec Pages for Amendment Nos. 197 and 198 TS 5.5.16, Containment Leakage Rate Testing Program, for Consistency with 10 CFR 50.55a(g)(4) ML0709900742007-06-25025 June 2007 Units, 1 and 2, Tech Spec Page for Amendments 196 and 197 Administrative Changes to the Technical Specification 5.5.8, Inservice Testing Program. ML0703500522007-04-17017 April 2007 Tech Spec Pages for Amendment Nos. 195 and 196 TS 3.4.1 Reactor Coolant System Pressure, Temperature, & Flow Departure from Nucleate Boiling Limits & TS 5.6.5 Core Operating Limits Report. ML0704404942007-03-21021 March 2007 Tech Spec Pages for Amendments 194 and 195 Regarding Steam Generator Tube Integrity Technical Specifications ML0701902142007-01-19019 January 2007 Units, 1 and 2 - Tech Spec Pages for Amendments 192 and 193 Technical Specification 1.1 Definitions and Technical Specification 3.4.16 Reactor Coolant System Specific Activity DCL-06-143, License Amendment Request 06-10 Revision to Technical Specification 5.5.8, Inservice Testing Program2006-12-29029 December 2006 License Amendment Request 06-10 Revision to Technical Specification 5.5.8, Inservice Testing Program DCL-06-136, License Amendment Request 06-05 Revision to Technical Specification 3.4.1, Reactor Coolant System Pressure, Temperature, and Flow Departure from Nucleate Boiling Limits, and Technical Specification 5.6.5, Core Operating....2006-12-29029 December 2006 License Amendment Request 06-05 Revision to Technical Specification 3.4.1, Reactor Coolant System Pressure, Temperature, and Flow Departure from Nucleate Boiling Limits, and Technical Specification 5.6.5, Core Operating.... DCL-06-142, License Amendment Request 06-09, Revision to Technical Specification 5.5.16, Containment Leakage Rate Testing Program (TSTF-343)2006-12-29029 December 2006 License Amendment Request 06-09, Revision to Technical Specification 5.5.16, Containment Leakage Rate Testing Program (TSTF-343) ML0635500312006-12-20020 December 2006 Tech Spec Pages for Amendment 192 Regarding TS 5.6.5, Core Operating Limits Report. DCL-06-129, Special Report 06-03 - 180 Day Report for Steam Generator Technical Specification Task Force 449, Thirteenth Refueling Outage2006-11-17017 November 2006 Special Report 06-03 - 180 Day Report for Steam Generator Technical Specification Task Force 449, Thirteenth Refueling Outage 2024-02-28
[Table view] |
Text
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.8.1.7 ~~NOTE- -----
All DG starts may be preceded by an engine prelube period.
Verify each DG starts from standby condition and 184 days achieves:
- a. in
- 10 seconds, speed Ž 900 rpm; and
- b. in
- 13 seconds, voltage Ž 3785 V and
- 4400 V, and frequency Ž 58.8 Hz and
1 SR 3.8.1.8 -------- NOTE--I--
This Surveillance shall not normally be performed for automatic transfers in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
Verify automatic and manual transfer of AC power 24 months sources from the normal offsite circuit to the alternate required offsite circuit and manual transfer from the alternate offsite circuit to the delayed access circuit.
SR 3.8.1.9 ____--' t to---________
- 1. This Surveillance shall not normally be performed in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
- 2. If performed with the DG synchronized with offsite power, it shall be performed at a power factor
Verify each DG rejects a load greater than or equal to 24 months its associated single largest post-accident load, and:
- a. Following load rejection, the frequency is
- b. Within 2.4 seconds following load rejection, the voltage is > 3785 V and
- c. Within 2.4 seconds following load rejection, the frequency is Ž 58.8 Hz and
(continued)
DIABLO CANYON - UNITS I & 2 3.8-5 Unit I - Amendment No. 435,174 TAB3.8-RX 5 Unit 2 - Amendment No. 43,5176
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.8.1.10 Verify each DG operating at a power factor
- 0.87 24 months does not trip and voltage is maintained
- 5075 V I during and following a load rejection of - 2340 kW and
1IA.. %
SR 3.8.1.11 ______----Nt ~_JIrFI tb-And_ _
- 1. All DG starts may be preceded by an engine prelube period.
- 2. This Surveillance shall not normally be performed in MODE 1, 2, 3, or 4. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
Verify on an actual or simulated loss of offsite power 24 months signal:
- a. De-energization of emergency buses;
- b. Load shedding from emergency buses;
- c. DG auto-starts from standby condition and:
- 1. energizes permanently connected loads in
- 2. energizes autb-connected loads through auto-transfer sequencing timers,
- 3. maintains steady state voltage 2 3785 V and
- 4. maintains steady state frequency 2 58.8 Hz and
- 5. supplies permanently connected and auto-connected loads for Ž 5 minutes.
(continued)
DIABLO CANYON - UNITS I & 2 3.8-6 Unit 1 - Amendment No. 43.5,174 TAB3.8-RX 6 Unit 2 - Amendment No. 435,176
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.8.1.12 NOTES---
- 1. All DG starts may be preceded by an engine prelube period.
- 2. This Surveillance shall not normally be performed in MODE 1 or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
Verify on an actual or simulated Safety Injection 24 months signal each DG auto-starts from standby condition and:
- a. In < 13 seconds after auto-start and during tests, achieves voltage Ž 3785 V and
- b. In
- 13 seconds after auto-start and during tests, achieves frequency > 58.8 Hz and
< 61.2 Hz;
- c. Operates for 2 5 minutes;
- d. Permanently connected loads are energized from the alternate offsite power source; and
- e. Emergency loads are auto-connected through the ESF load sequencing timers to the alternate offsite power source.
SR 3.8.1.13 Verify each DG's automatic trips are bypassed when 24 months I the diesel engine trip cutout switch is in the cutout position and the DG is aligned for automatic operation except:
- a. Engine overspeed;
- b. Generator differential current; and
- c. Low lube oil pressure; (continued)
DIABLO CANYON - UNITS 1 & 2 3.8-7 Unit I - Amendment No. 435,174 TAB3.8-RX 7 Unit 2 - Amendment No. 435,176
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY 4-SR 3.8.1.14
- 1. Momentary transients outside the load and power factor ranges do not invalidate this test.
I Verify each DG operating at a power factor *0.87 24 months operates for Ž 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s:
- a. For Ž 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded Ž 2600 kW and
- b. For the remaining hours of the test loaded
> 2340 kW and s 2600 kW.
SR 3.8.1.15 ---- NOTES--
- 1. This Surveillance shall be performed within 5 minutes of shutting down the DG after the DG has operated Ž 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded 2 2340 kW and
Momentary transients outside of load range do not invalidate this test.
- 2. All DG starts may be preceded by an engine prelube period.
Verify each DG starts and achieves: 24 months
- a. in
- 10 seconds, speed Ž 900 rpm; and
- b. in
- 13 seconds, voltage Ž 3785 V, and
- 4400 V and frequency 2 58.8 Hz and
.4.
SR 3.8.1.16 ______ N [ J _ _______ ___
This Surveillance shall not normally be performed in MODE 1, 2, 3, or 4. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
Verify each DG: 24 months
- a. Synchronizes with offsite power source while loaded with emergency loads upon a simulated restoration of offsite power, (continued)
DIABLO CANYON - UNITS 1 & 2 3.8-8 Unit 1 - Amendment No. 4-5,174 TAB3.8-RX 8 Unit 2 - Amendment No. 435,176
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.16 b. Transfers loads to offsite power source; and (continued)
- c. Returns to ready-to-load operation.
SR 3.8.1.17 -- NOTE--
This Surveillance shall not normally be performed in MODE 1, 2, 3, or 4. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
Verify, with a DG operating in test mode and 24 months connected to its bus, an actual or simulated Safety Injection signal overrides the test mode by:
- a. Opening the auxiliary transformer breaker; and
- b. Automatically sequencing the emergency loads onto the DG.
SR 3.8.1.18 ---- NOTE---
This Surveillance shall not normally be performed in MODE 1, 2, 3, or 4. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
Verify each ESF and auto-transfer load sequencing 24 months timer is within its limits.
SR 3.8.1.19
- 1. All DG starts may be preceded by an engine prelube period.
- 2. This Surveillance shall not normally be performed in MODE 1,2, 3, or 4. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
(continued)
DIABLO CANYON - UNITS 1 & 2 3.8-9 Unit 1 - Amendment No. 435,174 TAB3.8-RX 9 Unit 2 - Amendment No. 435,176
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.19 Verify on an actual or simulated loss of offsite power 4
24 months I (continued) signal in conjunction with an actual or simulated Safety Injection signal:
- a. De-energization of emergency buses;
- b. Load shedding from emergency buses; and
- c. DG auto-starts from standby condition and:
- 1. energizes permanently connected loads in
- 2. energizes auto-connected emergency loads through load sequencing timers,
- 3. achieves steady state voltage 2 3785 V and < 4400 V,
- 4. achieves steady state frequency 2 58.8 Hz and < 61.2 Hz, and
- 5. supplies permanently connected and auto-connected emergency loads for 2 5 minutes.
SR 3.8.1.20 ~NOTE --
All DG starts may be preceded by an engine prelube period.
Verify when started simultaneously from standby 10 years condition, each DG achieves:
- a. in
- 10 seconds, speed 2 900 rpm; and
- b. in
- 13 seconds, voltage 2 3785 V and
- 4400 V, and frequency 2 58.8 Hz and
DIABLO CANYON - UNITS 1 & 2 3.8-10 Unit 1 - Amendment No. 435,174 TAB3.8-RX 10 Unit 2 - Amendment No. 435,176