Letter Sequence Supplement |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: BVY 06-014, E-mail, Meyer, Entergy, to Ennis, NRR, VY EPU, BVY 06-019, Extended Power Uprate - Regulatory Commitment Information Regarding Steam Dryer Monitoring and FIV Effects, BVY 06-031, To Steam Dryer Monitoring Plan, BVY 06-039, Revision 2 to Steam Dryer Monitoring Plan, BVY 06-051, Summary of Reactor Feedwater Pump Trip Analysis, BVY 06-056, Submittal of Vermont Yankee Report on the Results of Steam Dryer Monitoring, BVY 06-080, Extended Power Uprate - License Amendment No. 229 Clarifications to NRCs Final Safety Evaluation, BVY 06-087, Update to Information Related to 10CFR50.63 Licensing Basis, BVY-06-056, Attachment 1, Vermont Yankee - Steam Dryer Monitoring Plan Rev. 4, ML033140025, ML033160187, ML040080573, ML040090411, ML041810022, ML041810433, ML042180463, ML042650265, ML042680087, ML043020494, ML043150224, ML050060086, ML050280310, ML050450423, ML050940230, ML050940242, ML052080154, ML052630053, ML053490030, ML053530148, ML060330490, ML060390107, ML061290566
|
MONTHYEARML0323403792003-08-31031 August 2003 Technical Assessment of Quad Cities Unit 2, Steam Dryer Failure - Determination of Root Cause & Extent of Condition Project stage: Request ML0325800892003-09-10010 September 2003 Technical Specification Proposed Change No. 263 Extended Power Uprate Project stage: Request ML0328104472003-10-0101 October 2003 Technical Specification Proposed Change No. 263, Supplemental No. 1 Regarding Extended Power Uprate, Technical Review Guidance Project stage: Request ML0331000472003-10-30030 October 2003 Sign-in Sheet for 10/30/2003 Meeting with ENVY and ENO Re to Discuss Arts/Mellla, Alternate Source Term, and Extended Power Uprate Aplications Project stage: Meeting ML0330403972003-10-30030 October 2003 Meeting Handouts for Meeting with Entergy Re Issues for Alternate Source Term, Power Uprate & Acts/Mellla Application Project stage: Meeting ML0331000232003-11-19019 November 2003 Meeting with Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc Regarding Arts/Mellla, Alternate Source Term, and Extended Power Uprate Applications Project stage: Meeting ML0331800882003-12-15015 December 2003 Extended Power Uprate Acceptance Review Project stage: Acceptance Review ML0331601872003-12-16016 December 2003 Withholding from Public Disclosure, NEDC-33090P, Revision 0, Project stage: Other ML0430204942003-12-24024 December 2003 NRR Work Request to IEPB-A Project stage: Other ML0336401382003-12-30030 December 2003 Draft Request for Additional Information Project stage: Draft RAI ML0400805732004-01-0707 January 2004 NPSH for BWR Extended Power Upgrades (EPU) Project stage: Other ML0400904112004-01-0909 January 2004 NPSH for BWR Extended Power Upgrades (EPU) Project stage: Other BVY 04-009, Technical Specification Proposed Change No. 263, Supplement No. 4 Regarding Extended Power Uprate, NRC Acceptance Review2004-01-31031 January 2004 Technical Specification Proposed Change No. 263, Supplement No. 4 Regarding Extended Power Uprate, NRC Acceptance Review Project stage: Supplement ML0404001612004-02-19019 February 2004 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0405003022004-02-20020 February 2004 Extended Power Uprate Acceptance Review Project stage: Acceptance Review ML0406306032004-02-27027 February 2004 G20040138/LTR-04-0107 - Sen. James Jeffords & Patrick Leahy Ltr Proposed Power Uprate at Vermont Yankee Project stage: Request ML0408500762004-03-15015 March 2004 G20040206/LTR-04-0168 - Ltr. Rep. Michael Dworkin Independent Safety Asessment of Vermont Yankee Project stage: Request ML0404100222004-03-19019 March 2004 Withholding from Public Disclosure, Responses to Request for Additional Information (Attachment 1 to Letter Bvy 04-008) Project stage: RAI ML0411203582004-03-31031 March 2004 Transcription Meeting Summary, 03/31/2004 Category 3 Meeting with Public to Discuss Proposed Power Uprate, Pages 1-124 Project stage: Meeting ML0411007042004-03-31031 March 2004 Enclosure 1, March 31, 2004, Vermont Yankee Annual Assessment Meeting Power Up-Rate Public Meeting Attendance List Project stage: Meeting ML0411201272004-05-17017 May 2004 Category 3 Public Meeting Summary with Entergy Nuclear Operations Inc. to Discuss Proposed Power Uprate for Vermont Yankee Nuclear Power Station Project stage: Meeting ML0411203682004-05-17017 May 2004 Enclosure 14, 03/31/2004 Meeting Summary for Vermont Yankee. Slides Presentation Proposed Power Uprate Project stage: Meeting ML0410603312004-05-17017 May 2004 Enclosures 3 - 13, 03/31/2004 Meeting Summary for Vermont Yankee Project stage: Meeting ML0414500202004-05-28028 May 2004 Request for Additional Information - Extended Power Uprate Project stage: RAI ML0331400252004-06-25025 June 2004 Vermont, Notice of Consideration of Issuance of Amendment to Facility Operating License for Extended Power Uprate and Opportunity for Hearing Project stage: Other ML0418100222004-06-25025 June 2004 Compliance with NRC Regulatory Compliance Project stage: Other ML0418104332004-06-29029 June 2004 06/29/04 E-mail - Compliance with NRC Regulatory Compliance Project stage: Other ML0420804642004-07-0202 July 2004 Letter Transmitting Vermont Yankee Nuclear Power Station, Technical Specification Proposed Change No. 263 - Supplement No. 8, Extended Power Uprate - Response to Request for Additional Information Project stage: Supplement ML0417400392004-07-0606 July 2004 Vermont Nuclear Power Station, Request for Additional Information, Extended Power Uprate. TAC No. MC0761 Project stage: RAI ML0422501402004-07-27027 July 2004 Technical Specification Proposed Change No. 263 - Supplement No. 9, Extended Power Uprate - Revised Containment Overpressure Envelope Project stage: Supplement BVY 04-074, Technical Specification Proposed Change No. 263, Supplement No. 10 Extended Power Uprate, Response to Request for Additional Information, Attachment 2,2004-07-30030 July 2004 Technical Specification Proposed Change No. 263, Supplement No. 10 Extended Power Uprate, Response to Request for Additional Information, Attachment 2, Project stage: Supplement BVY 04-081, Technical Specification Proposed Change No. 263 - Supplement No. 11 Extended Power Uprate - Response to Request for Additional Information2004-08-12012 August 2004 Technical Specification Proposed Change No. 263 - Supplement No. 11 Extended Power Uprate - Response to Request for Additional Information Project stage: Supplement ML0424305662004-08-25025 August 2004 Technical Specification Proposed Change No. 263 - Supplement No. 12, Extended Power Uprate - Revised Grid Impact Study Project stage: Supplement ML0421804632004-08-31031 August 2004 Withholding from Public Disclosure, Project stage: Other ML0424405372004-09-0101 September 2004 Request for Additional Information - Extended Power Uprate Project stage: RAI ML0422200222004-09-0202 September 2004 & 07/22/2004 Summary of Meeting with Entergy Nuclear Operations, Inc., on Steam Dryer Analysis Project stage: Meeting ML0425103952004-09-0202 September 2004 Attachments 1 Through 4 of 07/21/2004 & 07/22/2004 Summary of Meeting with Entergy Nuclear Operations, Inc., on Steam Dryer Analysis Project stage: Meeting BVY 04-097, Technical Specification Proposed Change No. 263 - Supplement No. 13 Extended Power Uprate - Response to Steam Dryer Action Items2004-09-14014 September 2004 Technical Specification Proposed Change No. 263 - Supplement No. 13 Extended Power Uprate - Response to Steam Dryer Action Items Project stage: Supplement BVY 04-098, Technical Specification Proposed Change No. 263 - Supplement No. 14 Extended Power Uprate - Response to Request for Additional Information2004-09-15015 September 2004 Technical Specification Proposed Change No. 263 - Supplement No. 14 Extended Power Uprate - Response to Request for Additional Information Project stage: Supplement BVY 04-100, Technical Specification Proposed Change No. 263 - Supplement No. 15 Extended Power Uprate - Response to Steam Dryer Action Item No. 22004-09-23023 September 2004 Technical Specification Proposed Change No. 263 - Supplement No. 15 Extended Power Uprate - Response to Steam Dryer Action Item No. 2 Project stage: Supplement ML0505901452004-09-29029 September 2004 Attendance List for Sept. 29, 2004 Meeting Steam Dryer Analysis Project stage: Meeting BVY 04-113, Proposed Technical Specification Change No. 263 - Supplement No. 20 Extended Power Uprate - Meeting on Steam Dryer Analysis Meeting Presentation Slides2004-09-29029 September 2004 Proposed Technical Specification Change No. 263 - Supplement No. 20 Extended Power Uprate - Meeting on Steam Dryer Analysis Meeting Presentation Slides Project stage: Supplement BVY 04-107, Technical Specification Proposed Change No. 263 - Supplement No. 17 Extended Power Uprate - Response to Request for Additional Information Related to the 10 CFR 50 Appendix R Timeline2004-09-30030 September 2004 Technical Specification Proposed Change No. 263 - Supplement No. 17 Extended Power Uprate - Response to Request for Additional Information Related to the 10 CFR 50 Appendix R Timeline Project stage: Supplement BVY 04-101, Technical Specification Proposed Change No. 263 - Supplement No. 16 Extended Power Uprate - Additional Information Related to Request for Additional Information EMEB-B-52004-09-30030 September 2004 Technical Specification Proposed Change No. 263 - Supplement No. 16 Extended Power Uprate - Additional Information Related to Request for Additional Information EMEB-B-5 Project stage: Supplement BVY 04-106, Technical Specification Proposed Change No. 263 - Supplement No. 18 Extended Power Uprate - ECCS Pump Net Positive Suction Head Margin2004-10-0505 October 2004 Technical Specification Proposed Change No. 263 - Supplement No. 18 Extended Power Uprate - ECCS Pump Net Positive Suction Head Margin Project stage: Supplement ML0428904102004-10-0707 October 2004 Technical Specification Proposed Change No. 263 - Supplement No. 20, Extended Power Uprate - Meeting on Steam Driver Analysis Project stage: Supplement BVY 04-109, Technical Specification Proposed Change No. 263 - Supplement No. 19 Extended Power Uprate - Initial Plant Test Program2004-10-0707 October 2004 Technical Specification Proposed Change No. 263 - Supplement No. 19 Extended Power Uprate - Initial Plant Test Program Project stage: Supplement ML0426800872004-10-13013 October 2004 Technical Audit of Steam Dryer Analysis in Support of Extended Power Uprate Request Project stage: Other ML0426502652004-10-15015 October 2004 Extended Power Uprate Review Schedule Project stage: Other ML0431502242004-11-10010 November 2004 EPU SE Input Section 2.10 Project stage: Other 2004-03-15
[Table View] |
Text
Entergy Nuclear Vermont Yankee, LLC Entergy Nuclear Operations, Inc.
En
- ter, gy 185 Old Ferry Road Hog Brattleboro, Vr 05302-0500 August 25, 2004 Docket No. 50-271 BVY 04-086 TAC No. MC0761 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Vermont Yankee Nuclear Power Station Technical Specification Proposed Change No. 263 - Supplement No. 12 Extended Power Uprate - Revised Grid Impact Study
Reference:
- 1) Entergy Nuclear Operations, Inc. letter to U.S. Nuclear Regulatory Commission, "Technical Specification Proposed Change No. 263 -
Supplement No. 2, Extended Power Uprate - Grid Impact Study,"
BVY 03-095, October 28, 2003 In support of the application by Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. (Entergy) for a license amendment to increase the maximum authorized power level of the Vermont Yankee Nuclear Power Station from 1593 to 1912 megawatts thermal, Entergy provided in Reference 1 an analysis of the effects of the extended power uprate on transmission grid stability. The attachments to this letter update the information provided in Reference 1. is a letter dated March 12, 2004, from the transmission grid operator, ISO New England, which concludes that the extended power uprate will not have adverse effects with respect to electrical grid operations or reliability.
The conclusion is conditioned upon the implementation of certain modifications to the plant and transmission system.
The letter provided in Attachment 1 supplements but does not supercede the ISO New England letter of October 8, 2003 (provided as Attachment 1 in Reference 1).
Those plant modifications necessary to support the first step of power uprate, including the modifications specified in, will be completed prior to increasing power above the current licensed thermal power level.
The second step of power increase is scheduled to commence in the Fall of 2005 following the next refueling outage and the completion of the remaining modifications to support full power uprate. An additional modification, identified as Item 4 in ISO New England's letter of October 8, 2003, entails the addition of capacitor banks. Additional capacitor banks are not required to support the first phase of power uprate, but will be installed prior to exceeding 630 megawatts gross electric.
BVY 04-086 Docket No. 50-271 Page 2 of 3 The other modifications identified in ISO New England's letter of October 8, 2003, relate to modifications that will be completed as part of the first phase of power uprate. Some of the identified modifications have been revised by Attachment 1. completely supercedes the previously submitted System Impact Study (provided as Attachment 2 in Reference 1). Attachment 2 contains certain embedded links or references to spreadsheets, figures, etc. that support the conclusions reached in the study. Based on discussions with NRC staff, Entergy understands that inclusion of the referenced spreadsheets, etc. is unnecessary for NRC review of the study. Therefore, those references are not included herewith. However, if the NRC staff should require additional information that is contained in any supporting reference, Entergy will provide the relevant information upon request.
This supplement to the license amendment request does not change the scope or conclusions in the original application, nor does it change Entergy's determination of no significant hazards consideration. Commitments made in this submittal are contained in Attachment 3.
If you have any questions or require additional information, please contact Mr. James DeVincentis at (802) 258-4236.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on August AS, 2004.
Sincerely, Joy K/T14yer Ste/ice President Vermont Yankee Nuclear Power Station Attachments (3) cc:
(see next page)
BVY 04-086 Docket No. 50-271 Page 3 of 3 cc:
Mr. Richard B. Ennis, Project Manager (w/attachment)
Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Mail Stop 0 8 B1 Washington, DC 20555 Mr. Samuel J. Collins (w/o attachment)
Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 USNRC Resident Inspector (w/o attachment)
Entergy Nuclear Vermont Yankee, LLC P.O. Box 157 Vernon, Vermont 05354 Mr. David O'Brien, Commissioner (w/attachment)
VT Department of Public Service 112 State Street - Drawer 20 Montpelier, Vermont 05620-2601
BVY 04-086 Docket No. 50-271 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 263 - Supplement No. 12 Extended Power Uprate - Revised Grid Impact Study ISO New England Letter of March 12, 2004 l Total number of pages in Attachment I1 I (excludina this cover sheet) is 2.
l
Stephen G. Whitley Senior Vice President & chief Operating Officer March 12, 2004 Mr. Craig Nichols Mr. George Thomas Entergy Nuclear Vermont Yankee, LLC Vermont Yankee Nuclear Power Station P.O. Box 250 Governor Hunt Road Vernon, VT 05354
Subject:
ENTERGY-03-G02 Gentlemen:
ISO New England has determined pursuant to Section 18.4 that implementation of the Participant plan identified in the following application will not have a significant adverse effect on the reliability or operating characteristics of the Participant that submitted the application or upon the system of any other Participant, subject to satisfaction of any conditions identified below with respect thereto:
The Entergy Nuclear Vermont Yankee, LLC (ENTERGY) Subordinate Generation 18.4 Application ENTERGY-03-G02 for increasing the gross electrical megawatt output of the Vermont Yankee Nuclear Power Station generator, located in Vernon, Vermont (the "Project"), by 67 MW (563 MW to 630 MW), as the first phase ("Step 1') of two uprate stages commencing in the third quarter of 2004, as detailed in Messrs. Craig Nichols' and George Thomas' December 2, 2003 transmittal to Mr. Stephen Rourke, Chairman - NEPOOL Reliability Committee and as previously approved by ISO New England on December 11, 2003, subject to the following modified conditions:
- 1. The Project's first step having the net ratings of 604.5 MW at 20 OF and 50 OF and 598.5 MW at 90 OF; a gross maximum plant rating of 630 MW; and a gross reactive capability, under full output conditions, of 100 MVAr leading and 220 MVAr lagging.
- 2. Increasing the pre-contingency MVA rating on the Vermont Yankee -Northfield 345 kV Line (Section 381) from the current rating of 896 MVA to a minimum rating of 1075 MVA by replacing the limiting line relay equipment.
- 3.
Increasing the post-contingency MVA rating on the Ascutney - Coolidge 115 kV Line from the current LTE rating of 205 MVA to 240 MVA by replacing approximately 25 feet of the limiting riser conductor.
- 4.
Providing a second primary protection scheme on Vermont Yankee north bus to achieve acceptable performance in response to a normal contingency fault.
2
- 5. Adding a second primary protection scheme on the Vermont Yankee GSU to achieve acceptable performance in response to a normal contingency fault. Subject to NPCC approval Entergy may, on an interim basis only, install a software based relay scheme to the GSU primary until new low voltage current transformers are installed during the fall of 2005. The new software based relay installation provides two independent primary protection schemes. However, due to the intentional time delay required to maintain proper relay coordination, the system response for some potential disturbances does not meet NEPOOL Reliability Standards.
An NPCC fully compliant second primary protection scheme shall be installed on the Vermont Yankee GSU no later than the Vermont Yankee startup date following the 2005 Refueling Outage.
- 6. Upgrading the Vermont Yankee 381 Breaker to an IPT breaker.
- 7. Addition of out-of-step protection on the Vermont Yankee generator to ensure acceptable performance in response to several extreme contingencies.
- 8. Completion of any additional transmission modifications required for the Project that may result from the development of any or all of the Relevant Queued Resources to the extent required under the Subordinate 18.4 Application Policy. These relevant Queued Resources include:
Bcrwick Encrgy Ccntcr UAE Tewksbury Neptune Phase 3 Boston Import Neptune Phase 7 Wyman Export Mystic 4,5,6 345 klV Conversion Millstone Unit No. 3 Power Uprate projects
- 9. The approval, under Section 18.4 of the Restated NEPOOL Agreement, of the modified excitation system model parameters for the Millstone Point Unit 3 generator that were included in the stability analysis for the Project or the installation of any additional transmission modifications that may be required as the result of those parameters being further modified to attain such approval.
The above plan is hereby approved for implementation.
Sincerely, Stephen G. Whitley Senior Vice President and Chief Operating Officer cc: 18.4 Application ISO New England Inc.- One Sullivan Rd., Holyoke, MA 01040 -Tel: 413/535-4361 / Fax: 413/535-4150