Letter Sequence Supplement |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: BVY 06-014, E-mail, Meyer, Entergy, to Ennis, NRR, VY EPU, BVY 06-019, Extended Power Uprate - Regulatory Commitment Information Regarding Steam Dryer Monitoring and FIV Effects, BVY 06-031, To Steam Dryer Monitoring Plan, BVY 06-039, Revision 2 to Steam Dryer Monitoring Plan, BVY 06-051, Summary of Reactor Feedwater Pump Trip Analysis, BVY 06-056, Submittal of Vermont Yankee Report on the Results of Steam Dryer Monitoring, BVY 06-080, Extended Power Uprate - License Amendment No. 229 Clarifications to NRCs Final Safety Evaluation, BVY 06-087, Update to Information Related to 10CFR50.63 Licensing Basis, BVY-06-056, Attachment 1, Vermont Yankee - Steam Dryer Monitoring Plan Rev. 4, ML033140025, ML033160187, ML040080573, ML040090411, ML041810022, ML041810433, ML042180463, ML042650265, ML042680087, ML043020494, ML043150224, ML050060086, ML050280310, ML050450423, ML050940230, ML050940242, ML052080154, ML052630053, ML053490030, ML053530148, ML060330490, ML060390107, ML061290566
|
MONTHYEARML0323403792003-08-31031 August 2003 Technical Assessment of Quad Cities Unit 2, Steam Dryer Failure - Determination of Root Cause & Extent of Condition Project stage: Request ML0325800892003-09-10010 September 2003 Technical Specification Proposed Change No. 263 Extended Power Uprate Project stage: Request ML0328104472003-10-0101 October 2003 Technical Specification Proposed Change No. 263, Supplemental No. 1 Regarding Extended Power Uprate, Technical Review Guidance Project stage: Request ML0331000472003-10-30030 October 2003 Sign-in Sheet for 10/30/2003 Meeting with ENVY and ENO Re to Discuss Arts/Mellla, Alternate Source Term, and Extended Power Uprate Aplications Project stage: Meeting ML0330403972003-10-30030 October 2003 Meeting Handouts for Meeting with Entergy Re Issues for Alternate Source Term, Power Uprate & Acts/Mellla Application Project stage: Meeting ML0331000232003-11-19019 November 2003 Meeting with Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc Regarding Arts/Mellla, Alternate Source Term, and Extended Power Uprate Applications Project stage: Meeting ML0331800882003-12-15015 December 2003 Extended Power Uprate Acceptance Review Project stage: Acceptance Review ML0331601872003-12-16016 December 2003 Withholding from Public Disclosure, NEDC-33090P, Revision 0, Project stage: Other ML0430204942003-12-24024 December 2003 NRR Work Request to IEPB-A Project stage: Other ML0336401382003-12-30030 December 2003 Draft Request for Additional Information Project stage: Draft RAI ML0400805732004-01-0707 January 2004 NPSH for BWR Extended Power Upgrades (EPU) Project stage: Other ML0400904112004-01-0909 January 2004 NPSH for BWR Extended Power Upgrades (EPU) Project stage: Other BVY 04-009, Technical Specification Proposed Change No. 263, Supplement No. 4 Regarding Extended Power Uprate, NRC Acceptance Review2004-01-31031 January 2004 Technical Specification Proposed Change No. 263, Supplement No. 4 Regarding Extended Power Uprate, NRC Acceptance Review Project stage: Supplement ML0404001612004-02-19019 February 2004 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0405003022004-02-20020 February 2004 Extended Power Uprate Acceptance Review Project stage: Acceptance Review ML0406306032004-02-27027 February 2004 G20040138/LTR-04-0107 - Sen. James Jeffords & Patrick Leahy Ltr Proposed Power Uprate at Vermont Yankee Project stage: Request ML0408500762004-03-15015 March 2004 G20040206/LTR-04-0168 - Ltr. Rep. Michael Dworkin Independent Safety Asessment of Vermont Yankee Project stage: Request ML0404100222004-03-19019 March 2004 Withholding from Public Disclosure, Responses to Request for Additional Information (Attachment 1 to Letter Bvy 04-008) Project stage: RAI ML0411203582004-03-31031 March 2004 Transcription Meeting Summary, 03/31/2004 Category 3 Meeting with Public to Discuss Proposed Power Uprate, Pages 1-124 Project stage: Meeting ML0411007042004-03-31031 March 2004 Enclosure 1, March 31, 2004, Vermont Yankee Annual Assessment Meeting Power Up-Rate Public Meeting Attendance List Project stage: Meeting ML0411201272004-05-17017 May 2004 Category 3 Public Meeting Summary with Entergy Nuclear Operations Inc. to Discuss Proposed Power Uprate for Vermont Yankee Nuclear Power Station Project stage: Meeting ML0411203682004-05-17017 May 2004 Enclosure 14, 03/31/2004 Meeting Summary for Vermont Yankee. Slides Presentation Proposed Power Uprate Project stage: Meeting ML0410603312004-05-17017 May 2004 Enclosures 3 - 13, 03/31/2004 Meeting Summary for Vermont Yankee Project stage: Meeting ML0414500202004-05-28028 May 2004 Request for Additional Information - Extended Power Uprate Project stage: RAI ML0331400252004-06-25025 June 2004 Vermont, Notice of Consideration of Issuance of Amendment to Facility Operating License for Extended Power Uprate and Opportunity for Hearing Project stage: Other ML0418100222004-06-25025 June 2004 Compliance with NRC Regulatory Compliance Project stage: Other ML0418104332004-06-29029 June 2004 06/29/04 E-mail - Compliance with NRC Regulatory Compliance Project stage: Other ML0420804642004-07-0202 July 2004 Letter Transmitting Vermont Yankee Nuclear Power Station, Technical Specification Proposed Change No. 263 - Supplement No. 8, Extended Power Uprate - Response to Request for Additional Information Project stage: Supplement ML0417400392004-07-0606 July 2004 Vermont Nuclear Power Station, Request for Additional Information, Extended Power Uprate. TAC No. MC0761 Project stage: RAI ML0422501402004-07-27027 July 2004 Technical Specification Proposed Change No. 263 - Supplement No. 9, Extended Power Uprate - Revised Containment Overpressure Envelope Project stage: Supplement BVY 04-074, Technical Specification Proposed Change No. 263, Supplement No. 10 Extended Power Uprate, Response to Request for Additional Information, Attachment 2,2004-07-30030 July 2004 Technical Specification Proposed Change No. 263, Supplement No. 10 Extended Power Uprate, Response to Request for Additional Information, Attachment 2, Project stage: Supplement BVY 04-081, Technical Specification Proposed Change No. 263 - Supplement No. 11 Extended Power Uprate - Response to Request for Additional Information2004-08-12012 August 2004 Technical Specification Proposed Change No. 263 - Supplement No. 11 Extended Power Uprate - Response to Request for Additional Information Project stage: Supplement ML0424305662004-08-25025 August 2004 Technical Specification Proposed Change No. 263 - Supplement No. 12, Extended Power Uprate - Revised Grid Impact Study Project stage: Supplement ML0421804632004-08-31031 August 2004 Withholding from Public Disclosure, Project stage: Other ML0424405372004-09-0101 September 2004 Request for Additional Information - Extended Power Uprate Project stage: RAI ML0422200222004-09-0202 September 2004 & 07/22/2004 Summary of Meeting with Entergy Nuclear Operations, Inc., on Steam Dryer Analysis Project stage: Meeting ML0425103952004-09-0202 September 2004 Attachments 1 Through 4 of 07/21/2004 & 07/22/2004 Summary of Meeting with Entergy Nuclear Operations, Inc., on Steam Dryer Analysis Project stage: Meeting BVY 04-097, Technical Specification Proposed Change No. 263 - Supplement No. 13 Extended Power Uprate - Response to Steam Dryer Action Items2004-09-14014 September 2004 Technical Specification Proposed Change No. 263 - Supplement No. 13 Extended Power Uprate - Response to Steam Dryer Action Items Project stage: Supplement BVY 04-098, Technical Specification Proposed Change No. 263 - Supplement No. 14 Extended Power Uprate - Response to Request for Additional Information2004-09-15015 September 2004 Technical Specification Proposed Change No. 263 - Supplement No. 14 Extended Power Uprate - Response to Request for Additional Information Project stage: Supplement BVY 04-100, Technical Specification Proposed Change No. 263 - Supplement No. 15 Extended Power Uprate - Response to Steam Dryer Action Item No. 22004-09-23023 September 2004 Technical Specification Proposed Change No. 263 - Supplement No. 15 Extended Power Uprate - Response to Steam Dryer Action Item No. 2 Project stage: Supplement ML0505901452004-09-29029 September 2004 Attendance List for Sept. 29, 2004 Meeting Steam Dryer Analysis Project stage: Meeting BVY 04-113, Proposed Technical Specification Change No. 263 - Supplement No. 20 Extended Power Uprate - Meeting on Steam Dryer Analysis Meeting Presentation Slides2004-09-29029 September 2004 Proposed Technical Specification Change No. 263 - Supplement No. 20 Extended Power Uprate - Meeting on Steam Dryer Analysis Meeting Presentation Slides Project stage: Supplement BVY 04-107, Technical Specification Proposed Change No. 263 - Supplement No. 17 Extended Power Uprate - Response to Request for Additional Information Related to the 10 CFR 50 Appendix R Timeline2004-09-30030 September 2004 Technical Specification Proposed Change No. 263 - Supplement No. 17 Extended Power Uprate - Response to Request for Additional Information Related to the 10 CFR 50 Appendix R Timeline Project stage: Supplement BVY 04-101, Technical Specification Proposed Change No. 263 - Supplement No. 16 Extended Power Uprate - Additional Information Related to Request for Additional Information EMEB-B-52004-09-30030 September 2004 Technical Specification Proposed Change No. 263 - Supplement No. 16 Extended Power Uprate - Additional Information Related to Request for Additional Information EMEB-B-5 Project stage: Supplement BVY 04-106, Technical Specification Proposed Change No. 263 - Supplement No. 18 Extended Power Uprate - ECCS Pump Net Positive Suction Head Margin2004-10-0505 October 2004 Technical Specification Proposed Change No. 263 - Supplement No. 18 Extended Power Uprate - ECCS Pump Net Positive Suction Head Margin Project stage: Supplement ML0428904102004-10-0707 October 2004 Technical Specification Proposed Change No. 263 - Supplement No. 20, Extended Power Uprate - Meeting on Steam Driver Analysis Project stage: Supplement BVY 04-109, Technical Specification Proposed Change No. 263 - Supplement No. 19 Extended Power Uprate - Initial Plant Test Program2004-10-0707 October 2004 Technical Specification Proposed Change No. 263 - Supplement No. 19 Extended Power Uprate - Initial Plant Test Program Project stage: Supplement ML0426800872004-10-13013 October 2004 Technical Audit of Steam Dryer Analysis in Support of Extended Power Uprate Request Project stage: Other ML0426502652004-10-15015 October 2004 Extended Power Uprate Review Schedule Project stage: Other ML0431502242004-11-10010 November 2004 EPU SE Input Section 2.10 Project stage: Other 2004-03-15
[Table View] |
Text
A-'F~Entergy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
Vermont Yankee 185 Old Ferry Rd.
RO. Box 500 Brattleboro, VT 05302 Tel 802-257-5271 March 10, 2005 Docket No. 50-271 BVY 05-024 TAC No. MC0761 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Vermont Yankee Nuclear Power Station Technical Specification Proposed Change No. 263 - Supplement No. 24 Extended Power Uprate - Response to Request for Additional Information
References:
- 1) U.S. Nuclear Regulatory Commission (Richard B. Ennis) letter to Entergy Nuclear Operations, Inc. (Michael Kansler), "Request for Additional Information - Extended Power Uprate, Vermont Yankee Nuclear Power Station (TAC No. MC0761)," December 21, 2004
- 2) Entergy letter to U.S. Nuclear Regulatory Commission, "Vermont Yankee Nuclear Power Station, License No. DPR-28 (Docket No. 50-271), Technical Specification Proposed Change No. 263, Extended Power Uprate," BVY 03-80, September 10, 2003
- 3) Entergy letter to U.S. Nuclear Regulatory Commission, "Vermont Yankee Nuclear Power Station, Technical Specification Proposed Change No. 263 - Supplement No. 23, Extended Power Uprate -
Response to Request for Additional Information," BVY 05-017, February 24, 2005 This letter responds to NRC's request for additional information (RAI) of December 21, 2004 (Reference 1) regarding the application by Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. (Entergy) for a license amendment (Reference 2) to increase the maximum authorized power level of the Vermont Yankee Nuclear Power Station (VYNPS) from--
1593 megawatts thermal (MWt) to 1912 MWt.
Reference 3 provided Entergy's response to 15 of the 18 individual RAls included in Reference
- 1. This submittal provides responses to two of the remaining RAls. Entergy is in the process of preparing a response to the last remaining RAI and anticipates submitting that response by March 16, 2005.
Subsequent to the receipt of the RAI, discussions were held with the NRC staff to further clarify the RAls.
In certain instances the RAls may have been modified based on clarifications C (
BVY 05-024 Docket No. 50-271 Page 2 of 3 reached during the telecons.
The information provided herein is consistent with those clarifications.
Attachment I is Entergy's response to RAI SPSB-C-35. Attachment 2 provides the "Exhibits" referenced in the response. is Entergy's response to RAI SRXB-A-6. Because the response to RAI SRXB-A-6 contains proprietary information as defined by 10CFR2.390, Attachment 3 has been designated in its entirety as proprietary information. A non-proprietary version of Attachment 3, suitable for public disclosure, is provided as Attachment 4 to this letter with the proprietary information redacted. An affidavit that constitutes a request for withholding of the proprietary information in from public disclosure in accordance with NRC regulations is provided by the owner of the proprietary information (General Electric Company (GE)) as Attachment 5. The proprietary information in Attachment 3 is designated by double underline within double square brackets. In each case, the superscript notation, u{3) refers to paragraph (3) of the affidavit, which provides the basis for the proprietary determination.
The proprietary information has been handled and classified as proprietary, is customarily held in confidence, and has been withheld from public disclosure. The proprietary information contained in the response was provided to Entergy in a GE transmittal that is referenced by the affidavit. The proprietary information has been faithfully reproduced in the enclosed response such that the affidavit remains applicable. GE requests that the enclosed proprietary information be withheld from public disclosure in accordance with the provisions of 10CFR2.390 and 10CFR9.17.
There are no new regulatory commitments contained in the responses to the RAls.
This supplement to the license amendment request provides additional information to clarify Entergy's application for a license amendment and does not change the scope or conclusions in the original application, nor does it change Entergy's determination of no significant hazards consideration.
If you have any questions or require additional information, please contact Mr. James DeVincentis at (802) 258-4236.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on March
/o
, 2005.
Sincerely, VWilliam F. YaguNl General A
,Plant Operations Vermont Yankee Nuclear Power Station Attachments (5)
BVY 05-024 Docket No. 50-271 Page 3 of 3 cc:
Mr. Richard B. Ennis, Project Manager Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Mail Stop 0 8 B1 Washington, DC 20555 Mr. Samuel J. Collins (w/o attachments)
Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 USNRC Resident Inspector (wlo attachments)
Entergy Nuclear Vermont Yankee, LLC P.O. Box 157 Vernon, Vermont 05354 Mr. David O'Brien, Commissioner (w/o proprietary information)
VT Department of Public Service 112 State Street - Drawer 20 Montpelier, Vermont 05620-2601
BVY 05-024 Docket No. 50-271 Attachment I Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 263 - Supplement No. 24 Extended Power Uprate Response to RAI SPSB-C-35 Total number of pages in Attachment 1 (excluding this cover sheet) is 1.
to BVY 05-024 Docket No. 50-271 Page 1 of 1 Probabilistic Safety Assessment Branch (SPSB) a Containment and Accident Dose Assessment Section (SPSB-C)
RAI SPSB-C-35 (a)
The licensee's December 29, 1999, letter to the NRC, concerning installation of larger emergency core cooling system suction strainers in accordance with NRC Bulletin 96-03, stated that the head loss correlation of NUREG/CR 6224 was used.
Verify that this correlation was used within its range of applicability considering debris materials present in the VYNPS containment, bed thickness, suppression pool temperature, and approach velocity.
(b)
The head loss due to loss-of-coolant accident (LOCA)-generated debris appears to be low.
Please provide the calculation of head loss, VYC-1924, Revision 0 (Reference 2 to calculation VYC-0808, Revision 8).
Response to RAI SPSB-C-35 (a)
The Vermont Yankee Nuclear Power Station (VYNPS) strainers were designed for conservative suppression pool debris loads based on debris material present in the VYNPS containment. The parameters considered in the calculation of head loss (i.e., debris materials present, bed thickness, suppression pool temperature, and approach velocity) following a postulated loss-of-coolant accident at VYNPS are within the range of applicability of the correlation in NUREG/CR 6224.
To validate the parameters used in the NUREG/CR 6224 head loss correlation a series of tests were performed at Alden Research Labs (ARL) in Holden, Massachusetts.
These tests included debris mixes and low approach velocities characteristic of the very large VYNPS strainers. The tests were done at room temperature. Correlation to suppression pool temperature is made with appropriate adjustment to viscosity and density terms in the head loss correlation. Supporting information on the ARL testing and the basis for the debris head loss correlations is contained in VYNPS calculations VYC-1959, Rev. 1, "Analysis of Tests for Investigating the Effect of Coatings Debris on ECCS Strainer Performance for Vermont Yankee," (non-proprietary version) and VYC-1924, Rev. 0, "Vermont Yankee ECCS Suction Strainer Head Loss Performance Assessment. RHR and CS Debris Head Loss Calculations".
These calculations are included herewith as Exhibits 1 and 2, respectively, of Attachment 2.
(b)
The VYNPS strainers are very large and sized to achieve a very low head loss. See calculation VYC-1924. This calculation provides an analysis of the debris head loss tests performed at Alden Research Labs.