To: | Donna Anderson, Anson C, Barclay W, Beardsley F, Bullard T, Burdick K, Gardner K, Gosek J, Grimshaw T, Tom Gurdziel, Jerrett T, Rachel Johnson, Judson T, Kunzwiler M, Leemann B, Lyman S, James Mchugh, Oaks R, Proud J, Somers T, Vasho P, Jason Wright Central New York Citizens Awareness Network, Oswego County, NY, State of NY, Senate, State of NY, State Assembly, Town of Mexico, NY, Town of Scriba, NY, US Congress, Village of Mexico, NY |
Shared Package | |
ML040620013 | List: |
References | |
Download: ML040711255 (22) | |
Text
March 11, 2004 The Honorable Stephen P. Lyman County Administrator 46 East Bridge Street Oswego, NY 13126
SUBJECT:
NINE MILE POINT NUCLEAR STATION- ANNUAL ASSESSMENT OF SAFETY PERFORMANCE
Dear Mr. Lyman:
I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Constellation Nuclear (Nine Mile Point Nuclear Station) in which the NRC staff will discuss with Constellation Nuclear our annual assessment of the safety performance of the Nine Mile Point Nuclear Station.
The meeting will be held at 1:00 p.m. on Tuesday, May 18, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Constellation Nuclear our assessment of their safety performance of Nine Mile Point and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Nine Mile Point and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of the Nine Mile Point Nuclear Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to the Constellation Nuclear on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620013). ADAMS is accessible from the NRC Web Site at: http://www/nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point Nuclear Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on May 18, 2004. In the interim, please do not hesitate to contact me at 610-337-5186, if I can be of further assistance to you.
Sincerely,
/RA/ by Kenneth M. Jenison Acting For/
James M. Trapp, Chief Projects Branch 1 Division of Reactor Projects
Enclosure:
As Stated
March 11, 2004 The Honorable John Gosek Mayor of Oswego City Hall 13 West Oneida Street Oswego, NY 13126
SUBJECT:
NINE MILE POINT NUCLEAR STATION- ANNUAL ASSESSMENT OF SAFETY PERFORMANCE
Dear Mayor Gosek:
I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Constellation Nuclear (Nine Mile Point Nuclear Station) in which the NRC staff will discuss with Constellation Nuclear our annual assessment of the safety performance of the Nine Mile Point Nuclear Station.
The meeting will be held at 1:00 p.m. on Tuesday, May 18, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Constellation Nuclear our assessment of their safety performance of Nine Mile Point and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Nine Mile Point and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of the Nine Mile Point Nuclear Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to the Constellation Nuclear on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620013). ADAMS is accessible from the NRC Web Site at: http://www/nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point Nuclear Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on May 18, 2004. In the interim, please do not hesitate to contact me at 610-337-5186, if I can be of further assistance to you.
Sincerely,
/RA/ by Kenneth M. Jenison Acting For/
James M. Trapp, Chief Projects Branch 1 Division of Reactor Projects
Enclosure:
As Stated
March 11, 2004 The Honorable Kenneth Burdick Supervisor Town of Scriba 42 Creamery Road Oswego, NY 13126
SUBJECT:
NINE MILE POINT NUCLEAR STATION- ANNUAL ASSESSMENT OF SAFETY PERFORMANCE
Dear Mr. Burdick:
I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Constellation Nuclear (Nine Mile Point Nuclear Station) in which the NRC staff will discuss with Constellation Nuclear our annual assessment of the safety performance of the Nine Mile Point Nuclear Station.
The meeting will be held at 1:00 p.m. on Tuesday, May 18, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Constellation Nuclear our assessment of their safety performance of Nine Mile Point and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Nine Mile Point and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of the Nine Mile Point Nuclear Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to the Constellation Nuclear on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620013). ADAMS is accessible from the NRC Web Site at: http://www/nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point Nuclear Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on May 18, 2004. In the interim, please do not hesitate to contact me at 610-337-5186, if I can be of further assistance to you.
Sincerely,
/RA/ by Kenneth M. Jenison Acting For/
James M. Trapp, Chief Projects Branch 1 Division of Reactor Projects
Enclosure:
As Stated
March 11, 2004 The Honorable Terry Grimshaw Mayor of Mexico Village of Mexico 3236 Main Street P. O. Box 39 Mexico, NY 13114
SUBJECT:
NINE MILE POINT NUCLEAR STATION- ANNUAL ASSESSMENT OF SAFETY PERFORMANCE
Dear Mayor Grimshaw:
I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Constellation Nuclear (Nine Mile Point Nuclear Station) in which the NRC staff will discuss with Constellation Nuclear our annual assessment of the safety performance of the Nine Mile Point Nuclear Station.
The meeting will be held at 1:00 p.m. on Tuesday, May 18, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Constellation Nuclear our assessment of their safety performance of Nine Mile Point and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Nine Mile Point and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of the Nine Mile Point Nuclear Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to the Constellation Nuclear on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620013). ADAMS is accessible from the NRC Web Site at: http://www/nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point Nuclear Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on May 18, 2004. In the interim, please do not hesitate to contact me at 610-337-5186, if I can be of further assistance to you.
Sincerely,
/RA/ by Kenneth M. Jenison Acting For/
James M. Trapp, Chief Projects Branch 1 Division of Reactor Projects
Enclosure:
As Stated
March 11, 2004 The Honorable David Anderson Supervisor Town of Mexico P.O. Box 98 Mexico, NY 13114
SUBJECT:
NINE MILE POINT NUCLEAR STATION- ANNUAL ASSESSMENT OF SAFETY PERFORMANCE
Dear Mr. Anderson:
I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Constellation Nuclear (Nine Mile Point Nuclear Station) in which the NRC staff will discuss with Constellation Nuclear our annual assessment of the safety performance of the Nine Mile Point Nuclear Station.
The meeting will be held at 1:00 p.m. on Tuesday, May 18, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Constellation Nuclear our assessment of their safety performance of Nine Mile Point and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Nine Mile Point and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of the Nine Mile Point Nuclear Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to the Constellation Nuclear on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620013). ADAMS is accessible from the NRC Web Site at: http://www/nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point Nuclear Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on May 18, 2004. In the interim, please do not hesitate to contact me at 610-337-5186, if I can be of further assistance to you.
Sincerely,
/RA/ by Kenneth M. Jenison Acting For/
James M. Trapp, Chief Projects Branch 1 Division of Reactor Projects
Enclosure:
As Stated
March 11, 2004 The Honorable Russ Johnson Chairman, Oswego County Legislature County Office Building 46 East Bridge Street Oswego, NY 13126
SUBJECT:
NINE MILE POINT NUCLEAR STATION- ANNUAL ASSESSMENT OF SAFETY PERFORMANCE
Dear Chairman Johnson:
I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Constellation Nuclear (Nine Mile Point Nuclear Station) in which the NRC staff will discuss with Constellation Nuclear our annual assessment of the safety performance of the Nine Mile Point Nuclear Station.
The meeting will be held at 1:00 p.m. on Tuesday, May 18, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Constellation Nuclear our assessment of their safety performance of Nine Mile Point and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Nine Mile Point and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of the Nine Mile Point Nuclear Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to the Constellation Nuclear on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620013). ADAMS is accessible from the NRC Web Site at: http://www/nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point Nuclear Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on May 18, 2004. In the interim, please do not hesitate to contact me at 610-337-5186, if I can be of further assistance to you.
Sincerely,
/RA/ by Kenneth M. Jenison Acting For/
James M. Trapp, Chief Projects Branch 1 Division of Reactor Projects
Enclosure:
As Stated
March 11, 2004 The Honorable Jack Proud 7th District County Office Building 46 East Bridge Street Oswego, NY 13126
SUBJECT:
NINE MILE POINT NUCLEAR STATION- ANNUAL ASSESSMENT OF SAFETY PERFORMANCE
Dear Mr. Proud:
I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Constellation Nuclear (Nine Mile Point Nuclear Station) in which the NRC staff will discuss with Constellation Nuclear our annual assessment of the safety performance of the Nine Mile Point Nuclear Station.
The meeting will be held at 1:00 p.m. on Tuesday, May 18, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Constellation Nuclear our assessment of their safety performance of Nine Mile Point and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Nine Mile Point and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of the Nine Mile Point Nuclear Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to the Constellation Nuclear on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620013). ADAMS is accessible from the NRC Web Site at: http://www/nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point Nuclear Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on May 18, 2004. In the interim, please do not hesitate to contact me at 610-337-5186, if I can be of further assistance to you.
Sincerely,
/RA/ by Kenneth M. Jenison Acting For/
James M. Trapp, Chief Projects Branch 1 Division of Reactor Projects
Enclosure:
As Stated
March 11, 2004 The Honorable Michael Kunzwiler Minority Leader, Oswego County Legislature 18th District 161 East Third Street Oswego, NY 13126
SUBJECT:
NINE MILE POINT NUCLEAR STATION- ANNUAL ASSESSMENT OF SAFETY PERFORMANCE
Dear Mr. Kunzwiler:
I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Constellation Nuclear (Nine Mile Point Nuclear Station) in which the NRC staff will discuss with Constellation Nuclear our annual assessment of the safety performance of the Nine Mile Point Nuclear Station.
The meeting will be held at 1:00 p.m. on Tuesday, May 18, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Constellation Nuclear our assessment of their safety performance of Nine Mile Point and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Nine Mile Point and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of the Nine Mile Point Nuclear Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to the Constellation Nuclear on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620013). ADAMS is accessible from the NRC Web Site at: http://www/nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point Nuclear Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on May 18, 2004. In the interim, please do not hesitate to contact me at 610-337-5186, if I can be of further assistance to you.
Sincerely,
/RA/ by Kenneth M. Jenison Acting For/
James M. Trapp, Chief Projects Branch 1 Division of Reactor Projects
Enclosure:
As Stated
March 11, 2004 The Honorable Kevin Gardner 13th District 19 Mason Road Mexico, NY 13114
SUBJECT:
NINE MILE POINT NUCLEAR STATION- ANNUAL ASSESSMENT OF SAFETY PERFORMANCE
Dear Mr. Gardner:
I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Constellation Nuclear (Nine Mile Point Nuclear Station) in which the NRC staff will discuss with Constellation Nuclear our annual assessment of the safety performance of the Nine Mile Point Nuclear Station.
The meeting will be held at 1:00 p.m. on Tuesday, May 18, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Constellation Nuclear our assessment of their safety performance of Nine Mile Point and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Nine Mile Point and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of the Nine Mile Point Nuclear Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to the Constellation Nuclear on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620013). ADAMS is accessible from the NRC Web Site at: http://www/nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point Nuclear Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on May 18, 2004. In the interim, please do not hesitate to contact me at 610-337-5186, if I can be of further assistance to you.
Sincerely,
/RA/ by Kenneth M. Jenison Acting For/
James M. Trapp, Chief Projects Branch 1 Division of Reactor Projects
Enclosure:
As Stated
March 11, 2004 The Honorable Phillip E. Vasho Oswego County Legislature 22nd District 656 West 1st Street Fulton, NY 13069
SUBJECT:
NINE MILE POINT NUCLEAR STATION- ANNUAL ASSESSMENT OF SAFETY PERFORMANCE
Dear Mr. Vasho:
I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Constellation Nuclear (Nine Mile Point Nuclear Station) in which the NRC staff will discuss with Constellation Nuclear our annual assessment of the safety performance of the Nine Mile Point Nuclear Station.
The meeting will be held at 1:00 p.m. on Tuesday, May 18, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Constellation Nuclear our assessment of their safety performance of Nine Mile Point and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Nine Mile Point and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of the Nine Mile Point Nuclear Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to the Constellation Nuclear on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620013). ADAMS is accessible from the NRC Web Site at: http://www/nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point Nuclear Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on May 18, 2004. In the interim, please do not hesitate to contact me at 610-337-5186, if I can be of further assistance to you.
Sincerely,
/RA/ by Kenneth M. Jenison Acting For/
James M. Trapp, Chief Projects Branch 1 Division of Reactor Projects
Enclosure:
As Stated
March 11, 2004 The Honorable Thomas Bullard Oswego County Legislator 14th District - Majority Whip 165 Duke Road Oswego, NY 13126
SUBJECT:
NINE MILE POINT NUCLEAR STATION- ANNUAL ASSESSMENT OF SAFETY PERFORMANCE
Dear Mr. Bullard:
I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Constellation Nuclear (Nine Mile Point Nuclear Station) in which the NRC staff will discuss with Constellation Nuclear our annual assessment of the safety performance of the Nine Mile Point Nuclear Station.
The meeting will be held at 1:00 p.m. on Tuesday, May 18, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Constellation Nuclear our assessment of their safety performance of Nine Mile Point and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Nine Mile Point and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of the Nine Mile Point Nuclear Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to the Constellation Nuclear on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620013). ADAMS is accessible from the NRC Web Site at: http://www/nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point Nuclear Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on May 18, 2004. In the interim, please do not hesitate to contact me at 610-337-5186, if I can be of further assistance to you.
Sincerely,
/RA/ by Kenneth M. Jenison Acting For/
James M. Trapp, Chief Projects Branch 1 Division of Reactor Projects
Enclosure:
As Stated
March 11, 2004 The Honorable William A. Barclay New York State Assembly 124th District 543 Legislative Office Building Albany, NY 12248
SUBJECT:
NINE MILE POINT NUCLEAR STATION- ANNUAL ASSESSMENT OF SAFETY PERFORMANCE
Dear Mr. Barclay:
I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Constellation Nuclear (Nine Mile Point Nuclear Station) in which the NRC staff will discuss with Constellation Nuclear our annual assessment of the safety performance of the Nine Mile Point Nuclear Station.
The meeting will be held at 1:00 p.m. on Tuesday, May 18, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Constellation Nuclear our assessment of their safety performance of Nine Mile Point and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Nine Mile Point and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of the Nine Mile Point Nuclear Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to the Constellation Nuclear on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620013). ADAMS is accessible from the NRC Web Site at: http://www/nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point Nuclear Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on May 18, 2004. In the interim, please do not hesitate to contact me at 610-337-5186, if I can be of further assistance to you.
Sincerely,
/RA/ by Kenneth M. Jenison Acting For/
James M. Trapp, Chief Projects Branch 1 Division of Reactor Projects
Enclosure:
As Stated
March 11, 2004 The Honorable James W. Wright New York State Senate 48th District 707 Legislative Office Building Albany, NY 12247
SUBJECT:
NINE MILE POINT NUCLEAR STATION- ANNUAL ASSESSMENT OF SAFETY PERFORMANCE
Dear Mr. Wright:
I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Constellation Nuclear (Nine Mile Point Nuclear Station) in which the NRC staff will discuss with Constellation Nuclear our annual assessment of the safety performance of the Nine Mile Point Nuclear Station.
The meeting will be held at 1:00 p.m. on Tuesday, May 18, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Constellation Nuclear our assessment of their safety performance of Nine Mile Point and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Nine Mile Point and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of the Nine Mile Point Nuclear Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to the Constellation Nuclear on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620013). ADAMS is accessible from the NRC Web Site at: http://www/nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point Nuclear Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on May 18, 2004. In the interim, please do not hesitate to contact me at 610-337-5186, if I can be of further assistance to you.
Sincerely,
/RA/ by Kenneth M. Jenison Acting For/
James M. Trapp, Chief Projects Branch 1 Division of Reactor Projects
Enclosure:
As Stated
March 11, 2004 The Honorable Robert C. Oaks New York State Assembly 128th District 718 Legislative Office Building Albany, NY 12248
SUBJECT:
NINE MILE POINT NUCLEAR STATION- ANNUAL ASSESSMENT OF SAFETY PERFORMANCE
Dear Mr. Oaks:
I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Constellation Nuclear (Nine Mile Point Nuclear Station) in which the NRC staff will discuss with Constellation Nuclear our annual assessment of the safety performance of the Nine Mile Point Nuclear Station.
The meeting will be held at 1:00 p.m. on Tuesday, May 18, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Constellation Nuclear our assessment of their safety performance of Nine Mile Point and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Nine Mile Point and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of the Nine Mile Point Nuclear Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to the Constellation Nuclear on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620013). ADAMS is accessible from the NRC Web Site at: http://www/nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point Nuclear Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on May 18, 2004. In the interim, please do not hesitate to contact me at 610-337-5186, if I can be of further assistance to you.
Sincerely,
/RA/ by Kenneth M. Jenison Acting For/
James M. Trapp, Chief Projects Branch 1 Division of Reactor Projects
Enclosure:
As Stated
March 11, 2004 The Honorable Carl Anson, Sr.,
Vice-Chairman 2nd District 1479 County Route 22 Altmar, NY 13302
SUBJECT:
NINE MILE POINT NUCLEAR STATION- ANNUAL ASSESSMENT OF SAFETY PERFORMANCE
Dear Mr. Anson:
I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Constellation Nuclear (Nine Mile Point Nuclear Station) in which the NRC staff will discuss with Constellation Nuclear our annual assessment of the safety performance of the Nine Mile Point Nuclear Station.
The meeting will be held at 1:00 p.m. on Tuesday, May 18, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Constellation Nuclear our assessment of their safety performance of Nine Mile Point and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Nine Mile Point and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of the Nine Mile Point Nuclear Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to the Constellation Nuclear on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620013). ADAMS is accessible from the NRC Web Site at: http://www/nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point Nuclear Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on May 18, 2004. In the interim, please do not hesitate to contact me at 610-337-5186, if I can be of further assistance to you.
Sincerely,
/RA/ by Kenneth M. Jenison Acting For/
James M. Trapp, Chief Projects Branch 1 Division of Reactor Projects
Enclosure:
As Stated
March 11, 2004 The Honorable Theodore Jerrett Clerk of the Legislature 46 East Bridge Street Oswego, NY 13126
SUBJECT:
NINE MILE POINT NUCLEAR STATION- ANNUAL ASSESSMENT OF SAFETY PERFORMANCE
Dear Mr. Jerrett:
I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Constellation Nuclear (Nine Mile Point Nuclear Station) in which the NRC staff will discuss with Constellation Nuclear our annual assessment of the safety performance of the Nine Mile Point Nuclear Station.
The meeting will be held at 1:00 p.m. on Tuesday, May 18, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Constellation Nuclear our assessment of their safety performance of Nine Mile Point and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Nine Mile Point and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of the Nine Mile Point Nuclear Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to the Constellation Nuclear on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620013). ADAMS is accessible from the NRC Web Site at: http://www/nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point Nuclear Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on May 18, 2004. In the interim, please do not hesitate to contact me at 610-337-5186, if I can be of further assistance to you.
Sincerely,
/RA/ by Kenneth M. Jenison Acting For/
James M. Trapp, Chief Projects Branch 1 Division of Reactor Projects
Enclosure:
As Stated
March 11, 2004 The Honorable Teresa A. Somers Deputy Clerk of the Legislature 46 East Bridge Street Oswego, NY 13126
SUBJECT:
NINE MILE POINT NUCLEAR STATION- ANNUAL ASSESSMENT OF SAFETY PERFORMANCE
Dear Ms. Somers:
I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Constellation Nuclear (Nine Mile Point Nuclear Station) in which the NRC staff will discuss with Constellation Nuclear our annual assessment of the safety performance of the Nine Mile Point Nuclear Station.
The meeting will be held at 1:00 p.m. on Tuesday, May 18, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Constellation Nuclear our assessment of their safety performance of Nine Mile Point and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Nine Mile Point and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of the Nine Mile Point Nuclear Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to the Constellation Nuclear on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620013). ADAMS is accessible from the NRC Web Site at: http://www/nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point Nuclear Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on May 18, 2004. In the interim, please do not hesitate to contact me at 610-337-5186, if I can be of further assistance to you.
Sincerely,
/RA/ by Kenneth M. Jenison Acting For/
James M. Trapp, Chief Projects Branch 1 Division of Reactor Projects
Enclosure:
As Stated
March 11, 2004 The Honorable Fred Beardsley Oswego County Legislature 9th District 178 Hungry Lane Central Square, NY 13036
SUBJECT:
NINE MILE POINT NUCLEAR STATION- ANNUAL ASSESSMENT OF SAFETY PERFORMANCE
Dear Mr. Beardsley:
I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Constellation Nuclear (Nine Mile Point Nuclear Station) in which the NRC staff will discuss with Constellation Nuclear our annual assessment of the safety performance of the Nine Mile Point Nuclear Station.
The meeting will be held at 1:00 p.m. on Tuesday, May 18, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Constellation Nuclear our assessment of their safety performance of Nine Mile Point and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Nine Mile Point and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of the Nine Mile Point Nuclear Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to the Constellation Nuclear on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620013). ADAMS is accessible from the NRC Web Site at: http://www/nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point Nuclear Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on May 18, 2004. In the interim, please do not hesitate to contact me at 610-337-5186, if I can be of further assistance to you.
Sincerely,
/RA/ by Kenneth M. Jenison Acting For/
James M. Trapp, Chief Projects Branch 1 Division of Reactor Projects
Enclosure:
As Stated
March 11, 2004 The Honorable John M. McHugh Congressman, 23rd District 2333 Rayburn House Office Building Washington, DC 20515
SUBJECT:
NINE MILE POINT NUCLEAR STATION- ANNUAL ASSESSMENT OF SAFETY PERFORMANCE
Dear Mr. McHugh:
I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Constellation Nuclear (Nine Mile Point Nuclear Station) in which the NRC staff will discuss with Constellation Nuclear our annual assessment of the safety performance of the Nine Mile Point Nuclear Station.
The meeting will be held at 1:00 p.m. on Tuesday, May 18, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Constellation Nuclear our assessment of their safety performance of Nine Mile Point and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Nine Mile Point and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of the Nine Mile Point Nuclear Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to the Constellation Nuclear on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620013). ADAMS is accessible from the NRC Web Site at: http://www/nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point Nuclear Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on May 18, 2004. In the interim, please do not hesitate to contact me at 610-337-5186, if I can be of further assistance to you.
Sincerely,
/RA/ by Kenneth M. Jenison Acting For/
James M. Trapp, Chief Projects Branch 1 Division of Reactor Projects
Enclosure:
As Stated
March 11, 2004 Mr. Tim Judson Central NY Citzens Awareness Network 140 Bassett Street Syracuse, NY 13210-2142
SUBJECT:
NINE MILE POINT NUCLEAR STATION- ANNUAL ASSESSMENT OF SAFETY PERFORMANCE
Dear Mr. Judson:
I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Constellation Nuclear (Nine Mile Point Nuclear Station) in which the NRC staff will discuss with Constellation Nuclear our annual assessment of the safety performance of the Nine Mile Point Nuclear Station.
The meeting will be held at 1:00 p.m. on Tuesday, May 18, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Constellation Nuclear our assessment of their safety performance of Nine Mile Point and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Nine Mile Point and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of the Nine Mile Point Nuclear Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to the Constellation Nuclear on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620013). ADAMS is accessible from the NRC Web Site at: http://www/nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point Nuclear Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on May 18, 2004. In the interim, please do not hesitate to contact me at 610-337-5186, if I can be of further assistance to you.
Sincerely,
/RA/ by Kenneth M. Jenison Acting For/
James M. Trapp, Chief Projects Branch 1 Division of Reactor Projects
Enclosure:
As Stated
March 11, 2004 Mr. Thomas Gurdziel 9 Twin Orchard Drive Oswego, NY 13126-3107
SUBJECT:
NINE MILE POINT NUCLEAR STATION- ANNUAL ASSESSMENT OF SAFETY PERFORMANCE
Dear Mr. Gurdziel:
I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Constellation Nuclear (Nine Mile Point Nuclear Station) in which the NRC staff will discuss with Constellation Nuclear our annual assessment of the safety performance of the Nine Mile Point Nuclear Station.
The meeting will be held at 1:00 p.m. on Tuesday, May 18, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Constellation Nuclear our assessment of their safety performance of Nine Mile Point and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Nine Mile Point and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of the Nine Mile Point Nuclear Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to the Constellation Nuclear on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620013). ADAMS is accessible from the NRC Web Site at: http://www/nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point Nuclear Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on May 18, 2004. In the interim, please do not hesitate to contact me at 610-337-5186, if I can be of further assistance to you.
Sincerely,
/RA/ by Kenneth M. Jenison Acting For/
James M. Trapp, Chief Projects Branch 1 Division of Reactor Projects
Enclosure:
As Stated
March 11, 2004 The Honorable Barry Leemann Majority Leader 4th District 521 County Route 17A Williamstown, NY 13493
SUBJECT:
NINE MILE POINT NUCLEAR STATION- ANNUAL ASSESSMENT OF SAFETY PERFORMANCE
Dear Mr. Leemann:
I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Constellation Nuclear (Nine Mile Point Nuclear Station) in which the NRC staff will discuss with Constellation Nuclear our annual assessment of the safety performance of the Nine Mile Point Nuclear Station.
The meeting will be held at 1:00 p.m. on Tuesday, May 18, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Constellation Nuclear our assessment of their safety performance of Nine Mile Point and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Nine Mile Point and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of the Nine Mile Point Nuclear Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to the Constellation Nuclear on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620013). ADAMS is accessible from the NRC Web Site at: http://www/nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point Nuclear Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on May 18, 2004. In the interim, please do not hesitate to contact me at 610-337-5186, if I can be of further assistance to you.
Sincerely,
/RA/ by Kenneth M. Jenison Acting For/
James M. Trapp, Chief Projects Branch 1 Division of Reactor Projects
Enclosure: