and Nine Mile Point Nuclear Station - Annual Assessment of Safety Performance Invitation Letter
ML050950532
Person / Time
Site: Nine Mile Point, FitzPatrick  Constellation icon.png
Issue date: 04/05/2005
From: Brian Mcdermott, James Trapp
Reactor Projects Branch 1, Reactor Projects Branch 2
To: Donna Anderson, Anson C, Barclay W, Beardsley F, Beckwith J, Brewer C, Beth Brown, Bryant J, Bullard T, Burdick K, Capella D, Eddy P, Egan P, French M, Gardner K, Gearsbeck A, Gosek J, Grimshaw T, Tom Gurdziel, Hoefer F, Jerrett T, Rachel Johnson, Judson T, Kunzwiler M, Leemann B, Lyman S, Domonique Malone, James Mchugh, Mullen V, Oaks R, Osetek G, Ospelt A, Ponzi L, Proud J, Quinlan M, Rusaw C, Santore P, Seager K, Somers T, John Thomas, Todd R, Vasho P, Waters D, Jason Wright, Zukovsky A
Citizens Awareness Network, Oswego County, NY, Oswego County, NY, Legislature, State of NY, Dept of Public Service, State of NY, Senate, State of NY, State Assembly, Town of Scriba, NY, United Way of Greater Oswego County, US HR (House of Representatives), Village of Mexico, NY
References
Download: ML050950532 (90)


Text

April 5, 2005 The Honorable Stephen P. Lyman County Administrator 46 East Bridge Street Oswego, NY 13126

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Mr. Lyman:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 The Honorable John Gosek Mayor of Oswego City Hall 13 West Oneida Street Oswego, NY 13126:

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Sir:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 The Honorable Kenneth Burdick Supervisor Town of Scriba 42 Creamery Road Oswego, NY 13126

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Sir:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 The Honorable Terry Grimshaw Mayor Village of Mexico 3236 Main Street P. O. Box 39 Mexico, NY 13114

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Sir/Madam:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 The Honorable David Anderson Supervisor Village of Mexico P.O. Box 98 Mexico, NY 13114

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Mr. Anderson:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 The Honorable Russ Johnson Chairman, Oswego County Legislature County Office Building 46 East Bridge Street Oswego, NY 13126

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Sir:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 The Honorable Jack Proud 7th District County Office Building 46 East Bridge Street Oswego, NY 13126

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Sir:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 The Honorable Michael Kunzwiler Minority Leader, Oswego County Legislature 18th District 161 East Third Street Oswego, NY 13126

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Sir:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 The Honorable Kevin Gardner 13th District 19 Mason Road Mexico, NY 13114

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Mr. Gardner:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 The Honorable Phillip E. Vasho Oswego County Legislature 22nd District 656 West 1st Street Fulton, NY 13069

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Sir:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 The Honorable Thomas Bullard Oswego County Legislature 14th District - Majority Whip 165 Duke Road Oswego, NY 13126

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Sir:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 The Honorable William A. Barclay New York State Assembly 124th District 543 Legislative Office Building Albany, NY 12248

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Sir:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 The Honorable James W. Wright New York State Senate 48th District 915 Legislative Office Building Albany, NY 12247

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Sir:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 The Honorable Robert C. Oaks New York State Assembly 128th District 437 Legislative Office Building Albany, NY 12248

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Sir:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 The Honorable Carl Anson, Sr.,

Vice-Chairman 2nd District 1479 County Route 22 Altmar, NY 13302

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Sir:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 The Honorable Theodore Jerrett Clerk of the Legislature 46 East Bridge Street Oswego, NY 13126

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Mr. Jerrett:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 The Honorable Teresa A. Somers Deputy Clerk of the Legislature 46 East Bridge Street Oswego, NY 13126

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Ms. Somers:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 The Honorable Fred Beardsley Oswego County Legislature 9th District 10 Canterbury Way Central Square, NY 13036

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Mr. Beardsley:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 The Honorable John M. McHugh Congressman, 23rd District 2333 Rayburn House Office Building Washington, DC 20515

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Mr. McHugh:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 Mr. Tim Judson Central NY Citizens Awareness Network 140 Bassett Street Syracuse, NY 13210-2142

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Mr. Judson:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 Mr. Thomas Gurdziel 9 Twin Orchard Drive Oswego, NY 13126-3107

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Mr. Gurdziel:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 The Honorable Barry Leemann Majority Leader 4th District 521 County Route 17A Williamstown, NY 13493

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Mr. Leemann:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 Sheriff Reuel A. Todd 39 Churchill Road Oswego, NY 13126 Sheriff Todd

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Sir:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 Ms Patricia Egan, Director Emergency Management County Branch Building 200 N. Second Street Fulton, NY 13069

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Madam:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 Ms. Maureen Quinlan Executive Director United Way of Greater Oswego County, Inc.

One South First Street Fulton, NY 13069

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Madam:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 Jerry D. Thomas Oswego County Legislature 348 Hadley Road Sandy Creek, NY 13145

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Legislator Thomas:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 James T. Bryant Oswego County Legislature 1322 St. Rt. 49 Constantia, NY 13044

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Legislator Bryant:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 Paul Santore Oswego County Legislature 61 West Third Street Oswego, NY 13126

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Legislator Santore:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 Daniel Capella Minetto Town Supervisor 710 Co. Rt. 25 Oswego, NY 13126

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Supervisor Capella:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 Victoria Mullen Oswego Town Supervisor 2320 Co. Rt. 7 Oswego, NY 13126

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Supervisor Mullen:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 Alexander Zukovsky Oswego City Police Chief 169 West Second Street Oswego, NY 13126

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Chief Zukovsky:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 Paul Eddy NYS Department of Public Service 3 Empire Plaza Albany, New York 12223

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Mr. Eddy:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 David Waters Oswego County Legislature 785 Towne Road Pulaski, NY 13142

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Legislator Waters:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 Carlton J. Rusaw Oswego County Legislature 1822 County Route 6, Lot E4 Fulton, NY 13069

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Legislator Rusaw:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 Arthur Gearsbeck Oswego County Legislature 226 Dutch Road Central Square, NY 13036

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Legislator Gearsbeck:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 Barbara Brown Oswego County Legislature 232 Blumer Road Pennellville, NY 13132

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Legislator Brown:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 Kimberly Seager Oswego County Legislature 17 Church Street Phoenix, NY 13135

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Legislator Seager:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 Arthur Ospelt Oswego County Legislature 237 Stewarts Corners Road Pennellville, NY 13132

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Legislator Ospelt:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 Gregory Osetek, Vice-Chairman Oswego County Legislature 194 Ellen Street Oswego, NY 13126

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Legislator Osetek:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 Leonard Ponzi Oswego County Legislature 28 Mitchell Street Oswego, NY 13126

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Legislator Ponzi:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 Francis E. Hoefer Oswego County Legislature 1041 Rathburn Road Oswego, NY 13126

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Legislator Hoefer:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 Jack M. Beckwith Oswego County Legislature 189 Mills Street Hannibal, NY 13074

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Legislator Beckwith:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 Michael G. French Oswego County Legislature 104 Bingham Road Oswego, NY 13126

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Legislator French:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 Douglas Malone, Minority Whip Oswego County Legislature 169 Demass Road Oswego, NY 13126

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Legislator Malone:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated

April 5, 2005 Clayton Brewer Oswego County Legislature 515 Hannibal Street Fulton, NY 13069

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT and NINE MILE POINT NUCLEAR STATION - ANNUAL ASSESSMENTS OF SAFETY PERFORMANCE

Dear Legislator Brewer:

We would like to personally invite you and other members of your organization to attend meetings between the Nuclear Regulatory Commission (NRC) and the management of the James A. FitzPatrick and Nine Mile Point Nuclear Power Plants. This year we've decided to have both meetings on the same day to make it easier for stakeholder attendance. In addition, we've also added an evening question and answer session to discuss plant performance with public stakeholders who are unable to attend our afternoon meetings. The public is cordially invited to attend either the afternoon or evening sessions. The NRC holds meetings annually in the vicinity of all nuclear power plants to discuss the safety performance during the preceding year.

All three meetings will be held on Thursday, April 28, 2005. The first meeting will be held at 12:00 p.m. between the NRC and Entergy Nuclear Northeast to discuss the performance of the James A. FitzPatrick Nuclear Power Plant. Directly following this meeting, a similar meeting will be held at 1:00 p.m. between the NRC and Constellation Nuclear to discuss the performance of the Nine Mile Point Nuclear Station. Both of these meetings will be held at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. During these meetings, we will briefly discuss our Reactor Oversight Process and our assessment of the safety performance at the plants. Following this initial business portion of the meetings, the NRC will address any questions from members of the public.

The third meeting will be held at 7:00 p.m. at Assembly Hall in the Town of Scriba at 42 Creamery Road, Oswego, NY. During this evening meeting the NRC staff will be available to answer questions from you and other members of the public regarding the safety performance of Nine Mile Point and FitzPatrick and the role of the NRC in ensuring safe plant operations.

Information describing our assessment process and specific information related to safety performance at both the James A. FitzPatrick and Nine Mile Point Nuclear Station nuclear power plants can be accessed on the NRC's website. NRCs safety assessment letters and meeting notices with the meeting agendas are enclosed. The notices includes references to the NRC's annual assessment meeting slides located in ADAMS. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Nine Mile Point and James A. FitzPatrick Nuclear Power Plants through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, we look forward to meeting you on April 28, 2005. In the interim, if you have any specific questions or topics of interest you would like to discuss during our assessment meeting, please do not hesitate to contact us prior to the meeting.

Sincerely, Sincerely,

/RA/ /RA/

James M. Trapp, Chief Brian J. McDermott, Chief Projects Branch 1 Projects Branch 2 Division of Reactor Projects Division of Reactor Projects 610-337-5186 610-337-5233 JMT1@nrc.gov BMJ@nrc.gov

Enclosures:

As Stated