Letter Sequence RAI |
---|
|
Results
Other: ML032020526, ML032060316, ML033040017, ML040420040, ML040760831, ML040830646, ML040840483, ML040890917, ML040970488, ML040980602, ML041000245, ML041000258, ML041140337, ML042230368, ML042300171, ML043560170, ML050420463, ML050600059, ML050610153, ML050660027
|
MONTHYEARML0319606822003-07-14014 July 2003 Request for Additional Information - Mixed Oxide Lead Fuel Assemblies Project stage: RAI ML0320205262003-07-21021 July 2003 Notice of Consideration for Mixed Oxide Fuel Lead Assemblies Project stage: Other ML0320303472003-07-22022 July 2003 Memo - Transmittal of Draft Requests for Information on MOX to Licensee Project stage: Draft Other ML0320603162003-07-25025 July 2003 Ltr, Mixed Oxide Lead Fuel Assemblies Project stage: Other ML0322504222003-08-13013 August 2003 Request for Additional Information Mixed Oxide Lead Fuel Assemblies Project stage: RAI ML0327500332003-09-23023 September 2003 Mixed Oxide Fuel Land Assembly License Amendment Request Project stage: Request ML0328803702003-10-0101 October 2003 Stations - Response to RAI Regarding Mixed Oxide Fuel Lead Assemblies Project stage: Response to RAI ML0328904052003-10-0101 October 2003 Response to Request for Additional Information Regarding the Use of Mixed Oxide Fuel Lead Assemblies Project stage: Response to RAI ML0328100902003-10-0303 October 2003 Stations, Partial Response to Request for Additional Information Regarding Use of Mixed Oxide Lead Fuel Assemblies Project stage: Response to RAI ML0329705332003-10-28028 October 2003 Draft Letter to Duke Power Requesting Additional Information on Materials Engineering and Environmental Review for MOX Program Project stage: Draft Other ML0330400172003-10-31031 October 2003 Re. MOX Fuel Assemblies and Associated Amendment Requests Project stage: Other ML0332103452003-11-0404 November 2003 Response to Request for Additional Information Regarding the Use of Mixed Oxide Lead Fuel Assemblies Project stage: Response to RAI ML0332505302003-11-21021 November 2003 Request for Additional Information (RAI) Re.: Mixed Oxide Lead Fuel Assemblies Project stage: RAI ML0333603852003-12-0202 December 2003 Ltr, Withdrawal of Application for Amendment (Tac Nos. MB7865, MB7866, MB7869, MB7870, MB7873, and MB7874) Project stage: Withdrawal ML0335105632003-12-10010 December 2003 Response to Request for Additional Information Regarding Mixed Oxide Fuel Lead Assemblies Project stage: Response to RAI ML0334503932003-12-11011 December 2003 Draft Letter Requesting Additional Information on MOX LTA Fuel at Catawba Project stage: Draft Other ML0335004082003-12-16016 December 2003 Request for Additional Information Mixed Oxide Lead Fuel Assemblies Project stage: RAI ML0335800082003-12-24024 December 2003 Request for Additional Information Regarding Mixed Oxide Lead Fuel Assemblies Project stage: RAI ML0402203962004-01-22022 January 2004 Draft Letter Requesting Additional Information on MOX Radiological Consequences Analyses Project stage: Draft Other ML0405100642004-02-0202 February 2004 Response to Request for Additional Information on the Mixed Oxide Fuel Lead Assemblies (Environmental, Radiological, and Materials) Project stage: Response to RAI ML0404200402004-02-0202 February 2004 Additional Information Regarding Mixed Oxide Fuel Lead Assemblies MOX Fuel Rod Free Volume Project stage: Other ML0403500052004-02-0404 February 2004 Request for Additional Information, Mixed Oxide Lead Fuel Assemblies Project stage: RAI ML0404906832004-02-20020 February 2004 RAI, Mixed Oxide Lead Fuel Assemblies Project stage: RAI ML0407105072004-03-0101 March 2004 Response to Request for Additional Information, Mixed Oxide Fuel Lead Assemblies (Radiological) Project stage: Response to RAI ML0407104972004-03-0101 March 2004 Response to Request for Additional Information, Mixed Oxide Fuel Lead Assemblies (Security) Project stage: Response to RAI ML0407104922004-03-0101 March 2004 Response to Request for Additional Information Mixied Oxide Fuel Lead Assemblies Project stage: Response to RAI ML0409302002004-03-0909 March 2004 Response to Request for Additional Information (RAI) Mixed Oxide Fuel Lead Assemblies (Security) Project stage: Response to RAI ML0409704702004-03-0909 March 2004 Response to Request for Additional Information Mixed Oxide Fuel Lead Assemblies (Security) Project stage: Response to RAI ML0407608312004-03-0909 March 2004 Additional Information Regarding Mixed Oxide Fuel Lead Assemblies Criticality Project stage: Other ML0404400252004-03-10010 March 2004 MOX and McGuire Nuclear Stations, Units 1 and 2, Framatome Anp, Inc., MB7863 and MB7864, Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0408306462004-03-16016 March 2004 Additional Information Regarding Mixed Oxide Fuel Lead Assemblies Assembly Bow Project stage: Other ML0408404832004-03-16016 March 2004 Amended Information Regarding Radiological Consequences for MOX Fuel Lead Assemblies Project stage: Other ML0408909172004-03-26026 March 2004 Withholding from Public Disclosure, Compact Disc, McGuire and Catawba LOCA Input Decks, Proprietary, Framatome Anp, Dated October 3, 2003 Project stage: Other ML0409704882004-03-26026 March 2004 Additional Information Regarding Mixed Oxide Fuel Lead Assemblies No Significant Hazards Consideration Evaluation & Environmental Review Project stage: Other ML0410002452004-03-30030 March 2004 Catawba FHA for MOX LTA Project stage: Other ML0409806022004-03-31031 March 2004 Fuel Burn-up Limit Commitment Project stage: Other ML0409700462004-04-0505 April 2004 Safety Evaluation for Proposed Amendments to Facility Operating License and Technical Specifications to Allow Insertion of Mixed Oxide Fuel Lead Assemblies Project stage: Approval ML0412701622004-04-13013 April 2004 Response to Request for Additional Information - Mixed Oxide Fuel Lead Assemblies (Security) Project stage: Response to RAI ML0411403372004-04-21021 April 2004 Catawba - 04/21/2004 Letter from Margaret J. Bupp to Mark J. Wetterhahn Informing That, Subject to the Board'S Protective Order, Bredl'S Approved Representatives Possess the Requisite Need to Know Re Duke Energy Corp.'S Response to Request. Project stage: Other ML0412105122004-04-30030 April 2004 Westinghouse, Request for Additional Information, Revising the Technical Specification to Allow the Use of Four Mixed Oxide Lead Test Assemblies Project stage: Request ML0412605442004-05-0505 May 2004 5/5/04, Catawba MOX, Non-Safeguards Version of Supplement 1 to Safety Evaluation Security Plan for MOX Fuel Project stage: Approval ML0414002012004-05-19019 May 2004 RAI, Re, Mixed Oxide Lead Fuel Assemblies Project stage: RAI ML0421200182004-07-29029 July 2004 Board Notification 2004-10, Supplement 2 to Safety Evaluation for Proposed Amendments to the Facility Operating License and Technical Specifications to Allow Use of Mixed Oxide Fuel Lead Assemblies Project stage: Approval ML0422303682004-08-10010 August 2004 Environmental Assessment and Finding of No Significant Impact Related to Mixed Oxide Lead Test Assemblies Project stage: Other ML0426601442004-08-31031 August 2004 Duke Energy Corporation Catawba Nuclear Station Units 1 & 2, Proposed Amendments to the Facility Operating License and Technical Specifications to Allow Insertion of Mixed Oxide (MOX) Fuel Lead Assemblies (Dose Inputs) Project stage: Request ML0428903432004-09-20020 September 2004 Proposed Amendments to the Facility Operating License and Technical Specifications to Allow Insertion of Mixed Oxide Fuel Lead Assemblies (Revised Dose Evaluations) Project stage: Request ML0427901242004-09-29029 September 2004 Request for Additional Information Concerning Mixed Oxide Lead Fuel Assemblies Project stage: RAI ML0410002582004-09-30030 September 2004 Catawba MOX for AST Weir Project stage: Other ML0428600502004-10-0707 October 2004 Request for Additional Information, Mixed Oxide Fuel Lead Test Project stage: RAI ML0435601702004-12-10010 December 2004 Proposed Amendments to the Facility Operating License and Technical Specifications to Allow Insertion of Mixed Oxide Fuel Lead Assemblies (Additional Information on Revised Does Evaluations) Project stage: Other 2004-02-02
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000413/20230042024-02-0202 February 2024 Integrated Inspection Report 05000413-2023004 and 05000414-2023004 IR 05000369/20230042024-01-31031 January 2024 Integrated Inspection Report 05000369/2023004 and 05000370/2023004 ML24005A2512024-01-26026 January 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24019A1392024-01-25025 January 2024 TSTF 505 and 50.69 Audit Summary ML24019A2002024-01-24024 January 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000369/20234022023-12-14014 December 2023 Material Control and Accounting Program Inspection Report 05000369/2023402 and 05000370/2023402 ML23317A2272023-11-17017 November 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Transmittal of Dam Inspection Report - Non-Proprietary ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230032023-10-24024 October 2023 Integrated Inspection Report 05000369/2023003 and 05000370/2023003; and Inspection Report 07200038/2023001 IR 05000369/20230102023-10-13013 October 2023 Age Related Degradation Inspection Report 05000369/2023010 and 05000370/2023010 IR 05000369/20240102023-10-13013 October 2023 Notification of McGuire Nuclear Station Comprehensive Engineering Team Inspection U.S. Nuclear Regulatory Commission Inspection Report 05000369, 370/2024010 IR 05000413/20230102023-10-11011 October 2023 NRC Inspection Report 05000413/2023010 and 05000414/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds IR 05000369/20233012023-09-20020 September 2023 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2023301 and 05000370/2023301 ML23230A0652023-08-31031 August 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Relief Request Use of Later Edition of ASME Code ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230052023-08-25025 August 2023 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 (Report 05000369/2023005 and 05000370/2023005) IR 05000413/20230052023-08-25025 August 2023 Updated Inspection Plan for Catawba Nuclear Station Units 1 and 2 (Report 05000413/2023005 and 05000414/2023005) ML23233A1692023-08-17017 August 2023 EN 56683 - Curtiss Wright, Interim Notification Report for PotentialPurt2l IR 05000369/20230022023-07-28028 July 2023 Integrated Inspection Report 05000369/2023002 and 05000370/2023002 IR 05000413/20230022023-07-25025 July 2023 Integrated Inspection Report 05000413/2023002 and 05000414/2023002 IR 05000369/20234202023-07-24024 July 2023 Security Baseline Inspection Report 050003692023420 and 050003702023420 ML23206A0092023-07-24024 July 2023 William B. McGuire Nuclear Station Operator Licensing Written Examination Approval 05000369/2023301 and 05000370/2023301 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23159A2712023-06-20020 June 2023 William B. McGuire Nuclear Station, Unit 1 - Relief Request Impractical Reactor System Welds ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined IR 05000413/20230012023-05-0505 May 2023 Integrated Inspection Report 05000413/2023001 and 05000414/2023001 ML23115A2122023-05-0101 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000369/20230012023-05-0101 May 2023 Integrated Inspection Report 05000369/2023001 and 05000370/2023001 IR 05000413/20230112023-04-25025 April 2023 Focused Engineering Inspection Report 05000413/2023011 and 05000414/2023011 ML23094A1832023-04-18018 April 2023 Audit Plan TSTF-505, Rev. 2, RITSTF Initiative 4B & 10 CFR 50.69, Risk-Informed Categorization & Treatment of Structures, Systems & Components for Nuclear Power Reactors (EPIDs L-2023-LLA-0021 & L-2023-LLA-0022) ML23107A2542023-04-14014 April 2023 301 Examination Report Letter and Report (Merged) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000369/20220062023-03-0101 March 2023 Annual Assessment Letter for McGuire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2022006 and 05000370 2022006) IR 05000413/20220062023-03-0101 March 2023 Annual Assessment Letter for Catawba Nuclear Station, Units 1 and 2 (NRC Inspection Report 05000413/2022006 and 05000414/2022006) IR 05000413/20234012023-03-0101 March 2023 Security Baseline Inspection Report 05000413 2023401 and 05000414 2023401 IR 05000413/20233012023-02-17017 February 2023 Operator Licensing Examination Approval 05000413/2023301 and 05000414/2023301 IR 05000413/20220042023-01-31031 January 2023 Integrated Inspection Report 05000413/2022004 and 05000414/2022004 IR 05000369/20220042023-01-30030 January 2023 Mcguire Nuclear Station - Integrated Inspection Report 05000369/2022004 and 05000370/2022004 IR 05000369/20224202023-01-11011 January 2023 Security Baseline Inspection Report 05000369/2022420 and 05000370/2022420 IR 05000413/20220112022-12-15015 December 2022 Biennial Problem Identification and Resolution Inspection Report 05000413/2022011 and 05000414/2022011 ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22347A1512022-12-13013 December 2022 William B. Mcguire Nuclear Station Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 ML22340A6662022-12-0808 December 2022 Summary of November 30, 2022, Public Meeting with Duke Energy Carolinas, LLC for McGuire Nuclear Station, Units 1 & 2 Proposed LAR to Adopt TSTF-505, Rev. 2 and 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems ML22290A1012022-11-29029 November 2022 Issuance of Amendment Nos. 326 and 305, Regarding Changes to Technical Specification 3.4.3, Reactor Coolant System Pressure Temperature Limits ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations IR 05000413/20224032022-11-17017 November 2022 Cyber Security Inspection Report 05000413/2022403 and 05000414/2022403 (Public) ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 2024-02-02
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23271A1792023-09-28028 September 2023 Request for Confirmation License Amendment Application to Revise Control Room Cooling TS 3.7.11 ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23030B9032023-01-30030 January 2023 Formal Release of RAIs for McGuire Unit 1, Relief Request Impractical RPV Rx Coolant System Welds, Due March 1, 2023 (Email) ML23017A2232023-01-13013 January 2023 Request for Additional Information (RAI) Issuance for McGuire Unit 1 Steam Generator Tube Inspection Report (Email) ML22336A0692022-11-28028 November 2022 Final 2023 Catawba Nuclear Station (CNS) Commercial Grade Dedication (CGD) Inspection Information Request ML22175A0162022-06-24024 June 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22154A1312022-06-0303 June 2022 NRR E-mail Capture - Catawba Nuclear Station, Units 1 and 2 - Request for Additional Information Environmentally-Assisted Fatigue License Renewal Commitment ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22102A2962022-04-13013 April 2022 Request for Withholding Information from Public Disclosure Response to Request for Additional Information ML22063B1782022-03-0909 March 2022 Request for Additional Information Regarding LAR for Revision to the Conditional Exemption of the End of Cycle Moderator Temperature Coefficient Measurement Methodology (EPID L-2021-LLA-0198) NON-PROPRIETARY ML22024A1122022-01-24024 January 2022 2022 CNS POV Inspection Information Request ML22010A0732022-01-0606 January 2022 50.59 Inspection Information Request ML21354A8612021-12-15015 December 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156) ML21335A2252021-12-0101 December 2021 NRR E-mail Capture - Catawba Nuclear Station, Unit 2 - Request for Additional Information Spring 2021 Steam Generator Tube Inspection Report (L-2021-LRO-0043) ML21267A2782021-09-23023 September 2021 50.59 Inspection Information Request ML21252A0532021-09-0808 September 2021 NRR E-mail Capture - Formal Release of Rais, 30 Day Response, Mcguire Relief Request, Ref: Later Edition Addenda ASME Code, Section XI, 50.55a(g)(4)(iv) ML21117A1232021-04-23023 April 2021 NRR E-mail Capture - Catawba Verbal Relief Request Request for Additional Information ML21103A0542021-04-13013 April 2021 NRR E-mail Capture - Extension to Request for Additional Information AMS Topical Report AMS-TR-0720R1 ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21067A6742021-03-0505 March 2021 NRR E-mail Capture - Final Request for Additional Information AMS Topical Report AMS-TR-0720R1 ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML21020A0682021-01-20020 January 2021 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000369/2021011 and 05000370/2021011) and Request for Information (RFI) ML20346A0212020-12-10010 December 2020 NRR E-mail Capture - Formal Release of RAIs - License Amendment to Change TS 3.8.1 Due Jan. 29, 2021 ML20338A3932020-12-0303 December 2020 Notification of Inspection and Request for Information ML20323A4072020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) ML20244A0462020-08-31031 August 2020 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML20216A3512020-08-0303 August 2020 Mcquire U-1 ISI RFI ML20101L3132020-04-10010 April 2020 Notification of Inspection and Request for Information ML20073F3832020-03-13013 March 2020 NRR E-mail Capture - Request for Additional Information - Catawba Nuclear Station - SG Report (RA-19-0391) - C2R23 ML20071D0962020-03-0505 March 2020 NRR E-mail Capture - Request for Additional Information - McGuire Nuclear Station Unit 1 Delay in Update of the Code of Record for in Service Inspections ML20050D3382020-02-21021 February 2020 Letter RAI 1 MAGNASTOR-Catawba and McGuire Exemptions with Enclosure ML20052E4282020-02-21021 February 2020 Notification of NRC Fire Protection Team Inspection (Fpti) (NRC Inspection Report 05000412/2020013 and 05000414/2020013) and Request for Information ML19354B6372020-01-0707 January 2020 Exemption Request for NAC Magnastor Cask Loaded to Incorrect Helium Backfill Density Request for Additional Information ML20003E5372020-01-0303 January 2020 NRR E-mail Capture - Catawba PT Limits LAR - RAIs ML19032A5842019-01-31031 January 2019 Emergency Preparedness Program Inspection Request for Information ML19011A1372019-01-10010 January 2019 NRR E-mail Capture - Duke Energy Fleet RAIs - Relief Request 18-GO-001 - Proposed Alternative for Depth Sizing Qualification Examination of Welds (L-2018-LLR-0117) ML19009A5412019-01-0909 January 2019 NRR E-mail Capture - Request for Additional Information - Catawba Nuclear Station, Units 1 and 2 - Esps LAR ML19007A3422018-12-21021 December 2018 NRR E-mail Capture - Duke Energy Fleet Draft RAIs - Relief Request 18-GO-001 - Proposed Alternative for Depth Sizing Qualification Examination of Welds (L-2018-LLR-0117) ML18352A8052018-12-18018 December 2018 NRR E-mail Capture - Request for Additional Information - McGuire Nuclear Station, Units 1 and 2 - MRP-227 Review ML18306A9372018-11-0202 November 2018 NRR E-mail Capture - Request for Additional Information - McGuire Nuclear Station, Units 1 and 2 - Esps LAR ML18285A0812018-10-11011 October 2018 NRR E-mail Capture - Request for Additional Information - McGuire Nuclear Station, Units 1 and 2 - TORMIS LAR RA-18-0011, Response to Request for Supplemental Information Regarding Duke Energy'S Response to GL 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools2018-05-30030 May 2018 Response to Request for Supplemental Information Regarding Duke Energy'S Response to GL 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools ML18138A4662018-05-18018 May 2018 NRR E-mail Capture - Request for Additional Information - McGuire Nuclear Station, Units 1 and 2 - TORMIS LAR ML18088B2822018-03-29029 March 2018 Requalification Program Inspection - McGuire Nuclear Station ML18068A5052018-03-0909 March 2018 NRR E-mail Capture - Request for Additional Information - Catawba Nuclear Station, Units 1 and 2 - Nsws Return Pond Header LAR (CACs MG0245 and MG0246, EPID L-2017-LLA-0297) ML18058B2062018-02-27027 February 2018 Notification of Inspection and Request for Information ML18057A2182018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to A. Zaremba Request for Additional Information for Review of Duke Energy'S Decommissioning Funding Plan Update) ML17335A0972017-11-29029 November 2017 NRR E-mail Capture - Request for Additional Information - Catawba Nuclear Station, Units 1 and 2 - Relief Request 17-CN-001 (CACs MF9807 and MF9808, EPID L-2017-LLR-0032) ML17331B1492017-11-21021 November 2017 NRR E-mail Capture - Request for Additional Information - McGuire Nuclear Station, Units 1 and 2 - Nsws One-Time LAR (CACs MG0242 and MG0243, EPID L-2017-LLA-0299) 2023-09-28
[Table view] |
Text
August 13, 2003 Mr. Michael S. Tuckman Executive Vice President Duke Energy Corporation 526 South Church St Charlotte, NC 28201-1006
SUBJECT:
WILLIAM B. MCGUIRE NUCLEAR STATION, UNITS 1 AND 2 AND CATAWBA NUCLEAR STATION, UNITS 1 AND 2 RE: MIXED OXIDE LEAD FUEL ASSEMBLIES (TAC NOS. MB7863, MB7864, MB7865, AND MB7866)
Dear Mr. Tuckman:
By letter dated February 27, 2003, you submitted applications for amendment to the operating licenses for McGuire Nuclear Station, Units 1 and 2 and Catawba Nuclear Station, Units 1 and 2. The proposed amendments would revise the Technical Specifications to allow the use of four mixed oxide fuel assemblies at either the Catawba or McGuire station. The Nuclear Regulatory Commission staff has reviewed the information provided and has determined that additional information is required as identified in the Enclosure.
We discussed these questions with your staff on August 13, 2003. Your staff indicated that a response to these issues could be provided by September 30, 2003. Please contact me at (301) 415-1493, if you have any other questions on these issues.
Sincerely,
/RA/
Robert E. Martin, Senior Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-369, 50-370, 50-413, and 50-414
Enclosure:
Request for Additional Information cc w/encl: See next page
August 13, 2003 Mr. Michael S. Tuckman Executive Vice President Duke Energy Corporation 526 South Church St Charlotte, NC 28201-1006
SUBJECT:
WILLIAM B. MCGUIRE NUCLEAR STATION, UNITS 1 AND 2 AND CATAWBA NUCLEAR STATION, UNITS 1 AND 2 RE: MIXED OXIDE LEAD FUEL ASSEMBLIES (TAC NOS. MB7863, MB7864, MB7865, AND MB7866)
Dear Mr. Tuckman:
By letter dated February 27, 2003, you submitted applications for amendment to the operating licenses for McGuire Nuclear Station, Units 1 and 2 and Catawba Nuclear Station, Units 1 and 2. The proposed amendments would revise the Technical Specifications to allow the use of four mixed oxide fuel assemblies at either the Catawba or McGuire station. The Nuclear Regulatory Commission staff has reviewed the information provided and has determined that additional information is required as identified in the Enclosure.
We discussed these questions with your staff on August 13, 2003. Your staff indicated that a response to these issues could be provided by September 30, 2003. Please contact me at (301) 415-1493, if you have any other questions on these issues.
Sincerely,
/RA/
Robert E. Martin, Senior Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-369, 50-370, 50-413, and 50-414
Enclosure:
Request for Additional Information cc w/encl: See next page DISTRIBUTION:
PUBLIC OGC CHawes GGalletti LPlisco, RII RHaag, RII PDII-1 R/F ACRS JNakoski DThatcher RMartin Adams No. ML032250422 OFFICE PDII-1/PM PDII-1/LA PDII-1/SC NAME RMartin:as CHawes JNakoski DATE 08/13/03 08/13/03 08/13/03 OFFICIAL RECORD COPY
REQUEST FOR ADDITIONAL INFORMATION ON APPLICATION FOR MOX LEAD TEST ASSEMBLIES DUKE POWER COMPANY WILLIAM B. MCGUIRE NUCLEAR STATION, UNITS 1 AND 2 DOCKET NOS. 50-369 AND 50-370 CATAWBA NUCLEAR STATION, UNITS 1 AND 2 DOCKET NOS. 50-413 AND 50-414
- 1. Section 3.5.4, Quality Assurance, states, in part, that Framatome ANP has the responsibility for the overall Quality Assurance (QA) oversight of the entire fuel assembly fabrication process and that Framatome ANP ultimately has the responsibility for certification of the finished fuel assemblies to Duke Power, thru DCS.
A. Given this oversight role of Framatome ANP, please describe the complete QA oversight process to be employed for the fuel fabrication process. Also, provide a copy of the relevant QA program and process plan to be implemented for that purpose.
B. Is a QA plan for assembly and certification of the fuel rods and assemblies being developed specifically for those activities?
- 2. Section 3.5.4, Quality Assurance, states, in part, that every sub-vendor who operates under the technical requirements by Framatome ANP will be qualified by Framatome ANP as an approved supplier.
A. Please identify the sub-vendors to be used for this effort. Will all sub-vendors operate under the technical requirements of Framatome ANP? If not, what alternate technical requirements will they use and how will they be qualified?
B. Please identify the manufacturer(s) of the fuel rods and assemblies, and the locations of manufacture of these components. Provide a detailed schedule for the manufacture of the fuel rods and assemblies. Is the manufacturer(s) required to perform its fabrication activities in accordance with the Framatome ANP QA program or is an alternate QA program(s) going to be used?
- 3. Section 3.5.4, Quality Assurance, states, in part, that Framatome ANP will verify that each of these vendors/facilities meets the requirements of 10 CFR 50 Appendix B. This verification may include quality system audits by Framatome ANP, review of audits performed by other Framatome ANP facilities from other regions, and/or surveillance audits by other approved Framatome ANP quality auditors.
A. Please describe to what extent these three applicable review processes will be implemented to support the entire fuel rod and assembly fabrication process and the ultimate certification of the finished fuel.
B. Please describe the method(s) to be use to identify, document, and resolve any discrepancies identified with the vendors/facilities as a result of the various verification processes described.
C. Please describe how the results of these verification activities will be documented and retained in an auditable and retrievable manner.
D. Will the reporting requirements of 10 CFR Part 21 be imposed on each of the vendors/facilities?
McGuire Nuclear Station Catawba Nuclear Station cc:
Ms. Lisa F. Vaughn Mr. Richard M. Fry, Director Legal Department (ECIIX) Division of Radiation Protection Duke Energy Corporation North Carolina Department of 422 South Church Street Environment, Health, and Charlotte, North Carolina 28201-1006 Natural Resources 3825 Barrett Drive County Manager of Mecklenburg County Raleigh, North Carolina 27609-7721 720 East Fourth Street Charlotte, North Carolina 28202 Ms. Karen E. Long Assistant Attorney General Mr. Michael T. Cash North Carolina Department of Regulatory Compliance Manager Justice Duke Energy Corporation P. O. Box 629 McGuire Nuclear Site Raleigh, North Carolina 27602 12700 Hagers Ferry Road Huntersville, North Carolina 28078 Mr. C. Jeffrey Thomas Manager - Nuclear Regulatory Anne Cottingham, Esquire Licensing Winston and Strawn Duke Energy Corporation 1400 L Street, NW. 526 South Church Street Washington, DC 20005 Charlotte, North Carolina 28201-1006 Senior Resident Inspector NCEM REP Program Manager c/o U. S. Nuclear Regulatory 4713 Mail Service Center Commission Raleigh, NC 27699-4713 12700 Hagers Ferry Road Huntersville, North Carolina 28078 Mr. T. Richard Puryear Owners Group (NCEMC)
Mr. Peter R. Harden, IV Duke Energy Corporation VP-Customer Relations and Sales 4800 Concord Road Westinghouse Electric Company York, South Carolina 29745 6000 Fairview Road 12th Floor Charlotte, North Carolina 28210 Dr. John M. Barry Mecklenburg County Department of Environmental Protection 700 N. Tryon Street Charlotte, North Carolina 28202
McGuire Nuclear Station Catawba Nuclear Station cc:
Mr. Gary Gilbert North Carolina Electric Membership Regulatory Compliance Manager Corporation Duke Energy Corporation P. O. Box 27306 4800 Concord Road Raleigh, North Carolina 27611 York, South Carolina 29745 Senior Resident Inspector North Carolina Municipal Power 4830 Concord Road Agency Number 1 York, South Carolina 29745 1427 Meadowwood Boulevard P. O. Box 29513 Mr. Dhiaa Jamil Raleigh, North Carolina 27626-0513 Vice President Catawba Nuclear Station County Manager of York County Duke Energy Corporation York County Courthouse 4800 Concord Road York, South Carolina 29745 York, South Carolina 29745 Piedmont Municipal Power Agency Mr. G. R. Peterson 121 Village Drive Vice President Greer, South Carolina 29651 McGuire Nuclear Station Duke Energy Corporation Saluda River Electric 2700 Hagers Ferry Road P. O. Box 929 Huntersville, North Carolina 28078 Laurens, South Carolina 29360 Henry Porter, Assistant Director Division of Waste Management Bureau of Solid and Hazardous Waste Department of Health and Environmental Control 2600 Bull Street Columbia, South Carolina 29201-1708