Committed to NuclearExe DAEC EMERGENCY PLANNING DEPARTMENT PROCEDURE TRANSMITTAL ACKNOWLEDGEMENT MEMO (TAM-53)

To: NRC-NRR Document Control Desk US NRC Washington DC 20555 Re: Entire EAL Basis Document (Table of Contents Rev) (Copy 91)

PSM

Title:

n/a Distribution Date: 07/31 /2003 Effective Date of Change: 08 / 05 / 2003 Return by: 08121 / 2003 Please perform the following to your assigned manual. If you have any questions regarding this TAM please contact Don A. Johnson at 319-851-7872.

REMOVE INSERT EAL EBD-E (PWR: 21716) _T4C:v.-O Rev. 0 New Section EAL Table of Contents Revision Rev. 12 Rev. 13 EAL EBD-DEF (PWR: 19683) Rev. 1 Rev. 2 EAL EBD-H (PWR: 21677) Rev. 4 Rev. 5 EAL EBD-ORG (PWR: 19684) Rev. 2 Rev. 3 PERFORMED BY:

Print Name Sign Name Date Please return to: K. Dunlap PSC/Emergency Planning 3313 DAEC Rd.

Palo, IA 52324 To be completed by DAEC EP personnel only: A45 Date TAM retumed:

EPTools updated:

LEAL =ASES

_ OCUMENT ~ *r] Rev. 13 INDEX l Page 1of I PROCEDURE TITLE REV # REV. DATE Introduction 1 2/01/2000 Definitions 2 8/5/2003 Organization of Basis Information 3 8/5/2003 EBD-A Abnormal Rad Levels/Radiological Effluent 5 12113/2002 Category EBD-F Fission Product Barrier Degradation 3 11/20,2000 EBD-F Category 3 1/020 EBD-H Hazards and Other Conditions Affecting 5 8/5/2003 Plant Safety Category I EBD-S System Malfunction Category 4 9/30/2002 EBD-E ISFSI Abnormal Events Category 0 8/5/2003 I

-MS~S -D6-OCUMENT Rev. 2 DEFINITIONS Page of 10 Effective Date: 8/I-4l AC - Alternating Current Affecting (in regard to events such as fire, flood, or missiles) - Causing degraded equipment performance as determined by physical observation or by indications in the Control Room or at local control stations.

Alett - Events are in process or have occurred which involve an actual or potential substantial degradation of the level of safety of the plant. Any releases are expected to be limited to small fractions of the EPA Protective Action Guide (PAG) exposure levels.

AM - Initiating Condition applies to all Technical Specification operating modes as well as defueled operation.

AOP- Abnormal Operating Procedure APRM - Average Power Range Monitor ARM- Area Radiation Monitor ATWS - Anticipated Transient Without Scram Barier- Same as 'Fission Product Barrier', below.

Barrier Monitoring Ability - This is a judgment factor in determining whether a fission product barrier is lost or potentially lost Decreased ability to monitor a barrier results from a loss oflack of reliable indicators, including instrumentation operability concerns, readings from portable instrumentation, and consideration for offske monitoring results.

Becquerel - A measurement of radioactive decay rate equal to one disintegration per second.

BOP - Balance of Plant BWR - Boiling Water Reactor CAM - Continuous Air Monitor

EAL BASES DOCUMEN T Rev. 2 DEFINITIONS Page 2 of 10 CDE - Committed Dose Equivalent as defined in 1,0 QFR 20.1003 CEDE - Committed Effective Dose Equivalent as defined in 10 CFR 20.1003 CFM - Cubic Feet per Minute CFS - Cubic Feet per Second Cold condition - This refers to the condition where the reactor coolant temperature is less than or equal to 2120F.

Cold shutdown - As defined in Technical Specification Table 1.1-1, the reactor is in the shutdown mode, the reactor coolant temperature is less than or equal to 212 0F, and all reactor vessel head closure bolts fully tensioned.

Compensatory non-alaming indications - Information displayed in the main control room including analog and digital parameter displays, trend recorders,'the Safety Parameter Display System (SPDS), and the plant process computer.

Confinement Boundary - the barrier (Dry Shielded Canister (DSC)) that separates areas containing radioactive substances, spent nuclear fuel or high-level waste, and the environment Control - As applied to remote shutdown capability, this is the ability to manipulate plant parameters without reliance on control room devices or instrumentation using components and methods specified by Abnormal 0 perating Procedure-9 15, Shutdown Outside Control Room.

Contiguous - Being in actual contact: touching along a boundary or at a point CPS - Counts Per Second CRD - Control Rod Drive CSCS - Core Standby Cooling System CST- Condensate Storage System Cure (Ci) - A measurement of radioactive decay rate equal to 3.70E+10 disintegration's per second (becquerels).

CW- Circulating Water a

EAL BASS M - Rev. 2 DEFINITIONS Page 3 of 10 DAEC - Duane Arnold Energy Center DC - Direct Current DEQ - Dose Equivalent Dominant accident sequences - These will lead to degradation of all fission product barriers. Dominant accident sequences leading to core damage at DAEC include complete-loss of"425'VDC,;loss of decay heat remnoval, ATWS with failure of Standby Liquid Control, prolonged station blackout, and loss of offste power with early HPCI/RCIC failure.

DSC- Dry ShieldedCanister, DW- Drywell EAL Threshold Value - A predetermined, site-specific, observable condition indicating the criteria necessary for declaration of an Emergency Action Level (EAL).

EC- Emergency iCoordinator -

ECCS - Emergency Core Cooling System EDE - Effective Dose Equivalerit as defined In 10 CFR 20.1003 Emergency Action Level (EAL) -,A pre-deternined, site-specific, observable threshold for a plant Initiating Condition that places the plant in a given Emergency Class.' An EAL can be: an instrument reading, an equipment status indicator, a measurable'parameter (on-site or offsite),- a discrete observable- 'event, results of analyses, entry into specific emergency operating procedures, or another phenomenon which, if it occurs, indicates entry into a particular Emergency Class. -

Emergency Class - Same as "Emergency Classification Lever below.

Emergency Classification Level - These are taken from 10 CFR 50, Appendix E. They are, in escalating order (Notification of) Unusual Event (UE), Alert, Site Area Emergency (SAE), and General Emergency (GE).

EOP - Emergency Operating Procedure EPA - Environmental Protection Agency

EAL BASES 0OCU M TRev.

2 DEFINITIONS Page 4 of 10 EPIP - Emergency Plan Implementing Procedure ESF - Engineered Safety Features ESS - Engineered Safety Systems Establish - Make arrangements for a stated condition, e.g., establish communications with control room.

ESW- Emergency Service Water Fission Product Banier - One of the three principal barriers to uncontrolled release of radionuclides: Fuel Clad, Reactor Coolant System (RCS), and the Primary Containment.

FP- Fuel Pool Fuel Clad (Baruler) - The zirconium alloy tubes that contain the fuel pellets.

GeneralEmergency (GE) - Events are in process or have occurred which involve actual or imminent substantial core degradation or melting with potential for loss of containment integrity. Releases can reasonably be expected to exceed EPA Protective Action Guide (PAG) exposure levels offsite for more than the immediate site area.

GPM - Gallons Per Minute GSW- General Service Water Hot shutdown - As defined inTechnical Specification Table 1.1-1, the reactor mode switch is in the shutdown position and the reactor coolant temperature is greater than 212 0F and all reactor vessel head closure bolts fully tensioned.

HPCI - High Pressure Coolant Injection (system).

HSM- Horizontal Storage Module

Rev. 2 DEFINITIONS Page 5 of 10 Identified Leakage - Identified Leakage shall be:

a. Leakage into the drywell such as that from pump seals or valve packing that is captured and conducted to a sump or collecting tank, or
b. -Leakage into the drywell atmosphere from sources that are both specifically located and known not to interfere with the operation of the leakage detection systems.

IDLH - Immediately Dangerous to Life and Health Inadvertent - Accidental or unintentional, e.g., the event occurred because procedures were not strictly adhered to.

Independent Spent Fuel Storage Installatfon (ISFSI) - The on site facility where the loaded Dry Shielde& Canisters (DSCs) will lbe stored in Horizontal Storage Modules (HSMs). The installation is intended for interim storage until the spent fuel is removed from the plant site.i<i ' -

Imminent - No turnaround in safety system performance is expected and escalation to a higher emergency classification level is expected to occur within two hours.

Implement - Commence a required program or series of procedures.

In service - A component or system in the appropriate configuration for normal operation and is considered operable as defined in the Technical Specifications.

Indicator - The name for the row on the fission barrier table that is used for convenient grouping of similar symptoms.

Initiate - Take action to begin a process Initiating Condition (IC)- One of a predetermined subset of nuclear power plant conditions where either the potential exists for a radiological emergency or such an emergency has occurred.

IPE - Individual Plant Examination IPOI - Integrated Plant Operating Instruction IRM - Intermediate Range Monitor

EAL BASES DOCUME-;t ^ l 2 Rev.

DEFINITIONS Page 6 of 10 Isolate - Remove from service by closing off the flow path ISFSI - Independent Spent Fuel Storage Installation kV - Kilovolt(s)

LCO - Limiting Condition for Operation LLRPSF - Low Level Radwaste Processing and Storage Facility LOCA - Loss of Coolant Accident LOOP - Loss of Offsite Power Loss (of a fission product barrier) - A severe challenge to a fission product barrier exists such that the barrier is considered incapable of performing its safety function.

LPCI - Low Pressure Coolant Injection MCC - Motor Control Center MCUTL - Maximum Core Uncovery Time Limit Microcunie (Ci - One millionth of a curie, i.e., 3.7E+4- disintegration's per second (becquerels).

MIDAS - Meteorological Information and Dose Assessment System, primary method for detecting and quantifying gaseous releases at the DAEC.

Millicurie (mCi) - One thousandth of a curie, i.e., 3.7E+7 disintegration's per second (becquerels).

Millirem (mrem) - One thousandth of a rem MPH - Miles Per Hour mR - milliroentgen, i.e., one thousandth of a roentgen (R)

MSIV - Main Steam Isolation Valve MSL - Main Steam Line NEI - Nuclear Energy Institute (formerly NUMARC)

-AL E Rev. 2 DEFINITIONS Page 7 of 10 Notification of Unusual Event (NOUE) - Same as "Unusual Event', below.

NPSH - Net Positive Suction Head NUMARC - Nuclear Utility Management and Resources Council (now NEI)

OBE - Operating Basis Earthquake ODAM - Offsite Dose Assessment Manual Operable - A system is considered capable of performing its function In accordance with the applicable Technical Specification requirements. Implicit in this definition is the assumption that all auxiliary equipment required for the system is also operable.

Operating Modes- The applicable operating modes for each Initiating Condition/Emergency Action Level is then listed based on NUMARC/NESP-007 mode descriptions. The ]DAEC EALs use the operating modes defined in Technical Specifications Table 1.1-1. These are:

I - Run/Power Operation 4 - Cold Shutdowna) 2- Startup 5 - Refueling° 3 - Hot Shutdown(a)

(a)AII reactor vessel head closure bolts fully tensioned.

"One or more reactor vessel head closure bolts less than fully tensioned.

OSS - Operations Shift Supervisor PAG - Protective Action Guide Planned - toss of a component or system due to expected events such as scheduled maintenance and testing activities.

Potential Loss (of a fission product barrier) - A challenge to a fission product barrier exists such that the barrier is considered degraded in its ability to perform s safety function.

Primary Containment (Barier) - The drywell, the torus, their respective interconnecting paths, and other connections up to and Including the outermost* containment isolation valves.

Protected Area - Any area encompassed by physical barriers and to which access is controlled.

PSIG - Pounds per Square Inch Gauge

EAL BASES DOCUMENT ' Rev. 2 DEFINITIONS Page 8 of 10 RB - Reactor Building RBCCW- Reactor Building Closed Cooling Water (system)

RCIC - Reactor Core Isolation Cooling (system)

RCS - Reactor Coolant System RCS Baier - The reactor coolant system pressure boundary including the reactor pressure vessel and all reactor coolant system piping up to and including the outermost isolation valves.

Recognition Category - A logical grouping of Initiating Conditions, e.g., System Malfunctions.

Rem - Unit of radiation dose as defined in 10 CFR 20.1004 Required - Action taken (such as entry into emergency operating procedure) is neither optional nor merely suggested; rather, it is imperative based on existing conditions.

RHR - Residual Heat Removal (system)

RHRSW- Residual Heat Removal Service Water (system)

Roentgen (R) - Unit of ionizing radiation energy absorbed in a cubic centimeter of air RPV - Reactor Pressure Vessel RWCU - Reactor Water Clean-Up (system)

SBDG - Standby Diesel Generator SBGT- Standby Gas Treatment (system)

SBLC - Standby Liquid Control (system)

SBO - Station Blackout SID - Shutdown SDC - Shutdown Cooling

- ~l.. -AS~S DOUMENT

; 0  ;^ 0 0 [ Rev. 2 DEFINITIONS Page 9 of 10 SDV- Scram Discharge Volume Significant transient- -(See also, TransientV, below.) Includes response to automatic or manually initiated functions such as scrams, runbacks involving greater than 25% thermal power change, ECCS injections, or undampened thermal power oscillations greater than normal.

Site Area Emergency (SAE) - Events are in process or have occurred which involve actual or likely major failures of plant functions needed for protection of the public. Any releases are not expected to result in exposure levels which exceed EPA Protective Action Guide (PAG) exposure levels except near the site boundary.

SPDS - Safety Parameter Display System SRM - Startup Range Monitor SRO - Senior Reactor Operator SRV - Safety-Relief Valve Sustained wind speed - Baseline wind speed measured by meteorological tower that does not include gusts TAF - Top of Active Fuel (344.5 inches above bottom of RPV)

TEDE - Total Effective Dose Equivalent as defined in 10 CFR 20.1003 Total Leakage - Sum of Identified Leakage and Unidentified Leakage.

Transient - A condition that: (1) is beyond the expected steady-state fluctuations in temperature, pressure, power level, or water level, and (2) is beyond the normal manipulations of the Control Room operating crew, and (3) is expected to require actuation of fast-acting automatic control or protection systems to bring-the reactor to a new safe, steady-state condition.

TSC - Technical Support Center Uncontrolled - Condition is not the result of planned actions by the plant staff in accordance with procedures.

Unisolable - Actions taken from the Main Control Board or locally are not successful in eliminating the leakage path.

EAL BASES DOCUMENT Rev.2 DEFINITIONS Page 10 of 10 Unidentified Leakage - All leakage into the drywell that is not identified leakage.

Unplanned - Used to preclude the declaration of an emergency where a component or system has been removed intentionally from service (e.g., for maintenance and/or testing activities). As used in the context of radioactive releases, "unplanned' includes any release for which a radioactive discharge permit was not prepared, or a release that exceeds the conditions (e.g., minimum dilution flow, maximum discharge flow, alarm setpoints, etc.) on the applicable permit.

Unusual Event (UE) - Events are in process or have occurred which indicate a potential degradation of the level of safety of the plant. No releases of radioactive material requiring offsite response or monitoring are expected unless further degradation of safety systems occurs.

VAC - Volt(s) Altemating Current Vital Area - any area which contains vital equipment.

Vital Equipment - Any equipment, system, device or material, the failure, destruction, or release of which could directly or indirectly endanger the public health and safety by exposure to radiation.

VDC - Volt(s) Direct Current Valid - Indication is from instrumentation determined to be operable in accordance with the Technical Specifications or has been verified by other independent methods such as indications displayed on the control panels, reports from plant personnel, or radiological survey results.

WEC - Water Effluent Concentration

EAL BASES DOCUMENT j Rev. 3 ORGANIZATION OF BASIS INFORMATION Page 1 of 3 L

Effective Date:  ?/S/.2OQ3 The format of the EAL Basis information was developed to address training needs, to facilitate NRC approval, and to facilitate future revisions and -10 CFR 50.54(q) evaluations. Each EAL Basis is organized in the following manner-

1. Emergency Action Level (EAL) Basis Information Organized by Initiating Condition (IC)

Initiating Condition Identifier For consistency, DAEC has chosen to make its Initiating Condition (IC) identifiers identical to those used in NEI 99-01. The EAL Technical Basis information is organized by generic IC identifier number and name. DAEC uses five Recognition Categories identified in NEI 99-01. These are:

A - Abnormal Rad Levels/Radiological Effluent F - Fission Product Barrier Degradation Y> H - Hazards and Other Conditions ct ystm Mafuntio S - -osAffecting Plant Safety S - System Malfunctions E - Independent Spent Fuel Storage Installation (ISFSI)

For the A, H, and S recognition categories, all EAL basis information is organized by IC identifier in escalating emergency class order from Unusual Event through General Emergency. For the E recognition category, all EAL basis information is organized by IC identifier but-do not exceed an Unusual Event. For-the F recognition category the initiating conditions are the combinations of fission product barrier losses and potential losses that correspond to each emergency classification level. The individual indicators used on the fission barrier table are separately discussed below.

The generic IC identifiers use two letters followed by one number. The first letter corresponds to the event category as shown above. The second letter corresponds to the emergency classification level for the IC:

U - (Notification of Unusual Event A - Alert S - Site Area Emergency G - General Emergency The number designates whether the IC is the first, second, third, etc., IC for that recognition category under that emergency classification. For example, SU2 is the designator for the second System Malfunction recognition category IC in the Unusual Event classification, etc. Generic iformation is used from NEIINESP-007, Revision 4, dated May, 1999.

EA4,; BASES DOmENTi Rev. 3 ORGANIZATION OF BASIS INFORMATION Page 2 of 3 II Event Type This is the label of the applicable row for the EAL Tables shown in EPIP Appendix 1. The event type lists the general area of concern and includes Offsite Rad Conditions, Onsite Rad Conditions, Natural Disasters, Fire, Other Hazards and Failures, Security, Control Room Evacuation, EC/OSM Judgment, Loss of Power, RPS Failure, Inability to Maintain Shutdown Conditions, Instrumentation/Communication, Coolant Activity, and Coolant Leak. This structure was chosen to be consistent with the previous EAL presentation which is already familiar to the Emergency Coordinators and Operations Shift Managers. I Applicable Operating Modes The applicable operating modes for each Initiating Condition/Emergency Action Level is then listed based on NUMARCINESP-007 mode descriptions. The DAEC EALs use the operating modes defined in Technical Specifications Table 1.1-1. These are:

I - Run/Power Operation 4 - Cold Shutdown(a) 2 - Startup 5 - Refueling~b) 3 - Hot Shutdown(a) I I

- V (a)All reactor vessel head closure bolts fully tensioned.

(bOne or more reactor vessel head closure bolts less than fully tensioned.

Operating mode applicability of EALs is based on the operating mode that the plant was in immediately before the event sequence leading to entry into the emergency classification. For example, events/conditions addressed by EALs applicable to Run mode are expected to lead to reactor trip which should bring the plant to Hot Shutdown (Mode 3). However, the appropriate emergency classification would still be based on the applicable EALs for Run/Power Operation (Mode 1) for these events/conditions. If "ALL" operating modes are specified for the EAL, then the E4L applies to all modes identified above plus defueled conditions.

EAL Threshold Value The EAL Threshold Value is then listed. This list contains the values, parameters and/or conditions needed for Classification decision making. EAL determination is made from the EAL Threshold Value criteria. When more than one criteria is provided, logic phrasing is used to describe whether several conditions need to be met or only one is necessary.

EAL _~s~s t~OCLJM~NT Rev. 3 ORGANIZATION OF BASIS INFORMATION Page 3 of 3 DAEC EAL Information This contains the plant-specific information used to implement the generic EALs. This section will also include the basis, as appropriate, for deviation from generic EALs. As appropriate, description of any supporting calculations, their underlying bases and assumptions, and their results are included in this section.

References The references used to develop the DAEC EAL Information are listed here, as appropriate.

2. FissIon Product Baffier Table Indicators The basis Information for the fission barrier table indicators is organized similarly to the other basis information described above. - For each barrier - fuel clad, RCS, and primary containment - basis information is organized by "Indicator." The indicator is the name for the row on the fission barrier table and is used for convenient grouping of similar symptoms, similar to the Event Type" used for the A, H, and S EALs described above. Indicators include Radiation/Core Damage, RPV Level, Leakage, Primary Containment Atmosphere, and EC/OSM Judgment.

~After the DAEC Indicator, the applicable generic BWR fission product barrier indicators are then displayed, showing both the generic loss and potential loss conditions, as applicable. Next displayed is the appropriate DAEC information and references. These are displayed in the same manner as the A, H, and S recognition category basis Information described above.

.. ~~~~~~

S~~~~A BAE7- :UMN EBD-E

  • 1 Rev. 0 ISFSI ABNORMAL EVENTS CATEGORY PAGE 1 of 6 I1 Usage Level REFERENCE I;

I IEffective Date: V/0 "0.

Prepared and T.ECHNIC-AL E IEW' Prepared and Verified by: Date: e/6 /6 3

-I /

Validated by: Date:

Emer ncy Panning Staff

/ E

-I -:i ;.0-:. - ::- - .. PROCEDURE APPROVAL :J i

.-;;-i I am responsible for the technical content of this procedure and for obtaining-the necessary approval from the State and County Emergency Management officials prior to implementation.

Documentation of State and County Emergency Management approval is via NEP-2003-0006.

Approved by: Date: />/,;

I Manager, Emergency Planning f

EAL BASES DOCUMENT EBD-E Rev. 0 ISFSI ABNORMAL EVENTS CATEGORY PAGE 2 of 6 Table of Contents EU - Damage To A Loaded Cask Confinement Boundary .................................... E-3 EU2 - Confirmed Security Event With Potential Loss Of Level Of Safety Of The ISFSI

.. E-5

.1'

- EAL 0ASES DMtIAMEST EBD-E

____________i_____;-_:-_-_-X;_-_;________________-_-_ -Rev. 0 ISFSI ABNORMAL EVENTS CATEGORY PAGE 3 of 6 EUI Damage To A Loaded Cask Conlihement Boundary EVENT TYPE: Independent Spent Fuel Storage Installation (ISFSL)

OPERATING MODE APPLICABILITY: Not Applicable EAL THRESHOLD VALUE: (1 or 2 or 3)

1. Any one of the following natural phenomena events with resultant visible damage to or loss of a loaded cask confinement boundary:
  • Report by plant personnel of a tornado strike.
  • Report by plant personnel of a seismic event.
2. The following accident condition with resultant visible damage to or loss of a loaded cask confinement boundary:
  • A loaded transfer cask is dropped as a result of normal handling or transporting.
3. Any condition in the opinion of the EC/OSM that indicates loss of loaded fuel storage cask K> confinement boundary.

DAEC EAL INFORMATION:

The CONFINEMENT BOUNDARY is the barrier (Dry Shielded Canister (DSC)) that separates areas containing radioactive substances, spent nuclear fuel or high-level waste, and the environment.

During all packaging, transfer, and storage activities, the DSC is completely enclosed in one oftwo additional containers, the DSC transfer cask or the horizontal storage module, and is never exposed to the environment. Both of these devices provide physical missile protection and radiation shielding for the DSC.

Because the CONFINMIENT BOUNDARY is not directly accessible for visible inspection, the DAEC EAL definition of VISIBLE DAMAGE to the CONFINEMENT BOUNDARY is defined as: damage to the DSC transfer cask or horizontal storage module that is readily observable without measurements, testing, or analysis. Damage is sufficient to cause concern regarding the continued operability or reliability of the dry shielded canister inside the transfer cask or horizontal storage module. Example damage includes:

deformation due to heat, impact, or unplanned movement, denting, penetration, rupture, cracking, or spalling of concrete to expose concrete reinforcing bar, or reduction in depth or configuration of radiation shielding materials. Surface blemishes (e.g., paint fading, paint chipping, concrete cracks or scratches) are not included in visible damage.

EVI

eAL BASES DOCUMENT EBD-E Rev. 0 1SFS1 ABNORMAL EVENTS CATEGORY PAGE 4 of 6 For the events of concern here, the key issue is whether the i esultant damage to or loss of the loaded fuel cask CONFINEMENT BOUNDARY leads to the degradation of the fuel during transfer or storage, or poses an operational safety problem with respect to its removal from storage. The wind speed, earthquake intensity, height of loaded transfer cask drop as a result of normal handling or transporting etc., in and of themselves, are not the key issue.

EAL Threshold Values for earthquakes are addressed in accordance with AOP 901, "Earthquake."

EAL Threshold Values for Tornadoes are addressed in accordance with AOP 903, "Tornado."

For EAL 1 and EAL 2, the results of the ISFSI Safety Analysis Report (SAR) per NUREG-1536 or SAR referenced in the cask's Certificate of Compliance and the related NRC Safety Evaluation Report were used to develop the DAEC list of natural phenomena events and accident conditions. These EALs address responses to a dropped cask, a tipped over cask, or natural phenomena affecting a cask (e.g.,

seismic event, tornado, etc.) or a dropped cask. (Reference Action Request OTH026062 for credible and non-credible event analysis.)

For EAL 3, any condition not explicitly detailed as an EAL threshold value, which, in the judgment of the EC/OSM, is a potential degradation in the level of safety of the ISFSI. EC/OSM judgment is to be based on known conditions and the expected response to mitigating activities within a short time period.

REFERENCES:

1. 'Methodology for Development of Emergency Action Levels," NEI 99-01 Revision 4, January 2003 (DAEC EU1 is renamed from NEI E-HU1)
2. Abnormal Operating Procedure (AOP) 901, "Earthquake"
3. Abnormal Operating Procedure (AOP) 903, "Tornado"
4. NUREG- 1536, "Standard Review Plan for Dry Cask Storage Systems"
5. SAR referenced in the cask's Certificate of Compliance and the related NRC Safety Evaluation Report
6. Action Request 0TH026062 EU

EAL 8ASS t MENG - .  ; v<EBD-E

._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _

  • _ _ _ _ _ _ _ _ - _ _; _ R ev . 0 ISFSI ABNORMAL EVENTS CATEGORY PAGE 5 of 6 EU2 Confirmed Security Event With-Potential Loss Of Level Of Safety Of The ISFSI EVENT TYPE: Independent Spent Fuel Storage Installation (ISFSI)

OPERATING MODE APPLICABILITY: Not Applicable EAL THRESHOLD VALUE^,  ;

t~~~~~~~~~~~~~~ .:

1. Suspected sabotage devise affecting a horizontal storage module, dry shielded canister or transfer cask, or found inside ISFSI protected area.
2. Confirmed tampering with4 horizontal storage module, dry shielded canister or transfer cask.
3. A hostage situation that disrupts normal ISFSI operations.
4. Civil disturbance or strike that disrupts normal ISFSI operations.
5. Internal disturbance that is not short lived or is not a harmless outburst involving one or more individuals within the ISFSI protected area.
6. Intrusion into the ISFSI protected area by a hostile force.
7. Any security event of increasing severity that persists for 2 30 minutes:
  • Credible bomb threats
  • Extortion
  • Suspicious fire or Explosion
  • Significant Security System Hardware Failure
  • Loss of Guard Post Contact DAEC EAL INFORMATION:

Consultationwith Security is requiredto determine these threshold values.

Security events which do not represent a potential degradation in the level of safety of the ISFSI are reported under 10 CFR 73.71 or in some cases under 10 CFR 50.72.

Reference is made to DAEC security shift supervision because these individuals are the designated personnel qualified and trained to confirm that a security event is occurring or has occurred. Training on security event classification confirmation is closely controlled due to the strict secrecy controls placed on b,_e Security Plan.

EU2

EAL BASES DOCUMENT EBD-E Rev. 0 ISFSI ABNORMAL EVENTS CATEGORY PAGE 6 of 6 EAL 1 describes a suspected sabotage device affecting a Horizontal Storage Module, Dry Shielded Canister or Transfer Cask, or located inside the ISFSI Protected Area. This is considered a potential degradation in the level of safety of the ISFSI.

EAL 2 is for confirmed tampering with a Horizontal Storage Module, Dry Shielded Canister or Transfer Cask located inside the Protected Area at the ISFSI as well as in transport to the ISFSI. This is considered a potential degradation in the level of safety of the ISFSI.

EAL 3 identifies a hostage situation that disrupts normal JSFSI operations. A hostage situation is considered to disrupt normal operations if it results in the inability to perform surveillance activities, or alters other activities at the ISFSI or during transport operations.

EAL 4 describes a civil disturbance or strike which are considered to be spontaneous activities that disrupt normal ISFSI operations. A civil disturbance or strike is considered to disrupt normal ISFSI operations if it initially disrupts normal ingress or egress to the ISFSI Protected Area, or if it requires assistance from the Local Law Enforcement Agencies (LLEA) to control.

EAL 5 deals with suspicious internal disturbances that may have been planned by one or more individuals as a diversion to gain entry to the ISFSI Protected Area EAL 6 is an intrusion of a hostile force into the ISFSI Protected Area representing a potential substantial--k degradation of the level of safety of the ISFSI. A civil disturbance which penetrates the Protected Area can be considered a hostile force.

EAL 7 is for security events of increasing severity that persist for > 30 minutes. A security event is considered to be "of increasing severity" if the event is NOT under control of the security force within 30 minutes.

NOTE: Credible threat events for the ISFSI are covered under EALs HU4, "Confirmed Security Event Which Indicates a Potential Degradation in the Level of Safety of the Plant," and HA4, "Security Event in a Plant Protected Area."

REFERENCES:

1. Methodology for Development of Emergency Action Levels," NEI 99-01 Revision 4, January 2003 (DAEC EU2 is renamed from NEI E-HU2)
2. Abnormal Operating Procedure (AOP) 914, "Security Events" EU2

I0 EAL BASES DOUMINt -

r .-,

HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY CATEGORY -

EBD-H I Rev. 5 PAGE 1 of 30 Usage Level -

REFERENCE I,

Effective Date: rs - bLoc- I Prepd TECHNICAL REVIEW: -

Prepared and Verified by: Date: 7cA Validated by: Date: -17/ 3 lme ency P)bnning Staff PROCEDURAPROVAL I am responsible for the technical-cohent of this procedure and for obtaining the necessary approval from the State and County Emergency Management officials prior to implementation.

Documentation of State and County Emergency Management approval is via NEP- oo3 - . 0 I -

/- 4/ o 3 Approved by:  : / Date:

Manager, Emergency Planning .tVP;

EEBD-H

<iiEALBASESDOCLJMENTSE9

<.Xt,' K "

Rev. 5 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY CATEGORY PAGE 2 of 30 Table of Contents HU - Natural and Destructive Phenomena Affecting the Protected Area ....... ............ H-3 HU2 - Fire Within Protected Area Not Extinguished Within 15 Minutes of Detection ... H-6 HU3 - Release of Toxic or Flammable Gases Deemed Detrimental to Safe Operation of the Plant ........................................................ H-7 HU4 - Confirmed Security Event Which Indicates a Potential Degradation in the Level of Safety of the Plant ........................................................ H-8 HU5 - Other Conditions Existing Which in the Judgment of the EC/OSM Warrant Declaration of an. Unusual Event........................................................................................H-10 HA - Natural and Destructive Phenomena Affecting the Plant Vital Area ................H-i 1 HA2 - Fire Affecting the Operability of Plant Safety Systems Required to Establish or Maintain Safe Shutdown ......................................................... H-1 5 HA3 - Release of Toxic or Flammable Gases Within a Facility Structure Which Jeopardizes Operation of Systems Required to Maintain Safe Operations or to Establish or Maintain Cold Shutdown ......................................................... H-1 7 HA4 - Security Event in a Plant Protected Area ..................................... H-19 HA5 - Control Room Evacuation Has Been Initiated ..................................... H-21 HA6 - Other Conditions Existing Which in the Judgment of the EC/OSM Warrant Declaration of an Alert ..................................... H-22 HS1 - Security Event in a Plant Vital Area .....................................H-23 HS - Control Room Evacuation Has Been Initiated and Plant Control Cannot Be Established

........................................................................................................................ H-25 HS3 - Other Conditions Existing Which in the Judgment of the EC/OSM Warrant Declaration of a Site Area Emergency .......................................................... H-27 HG1 - Security Event Resulting in LOSM Of Ability to Reach and Maintain Cold Shutdown

........................................................................................................................ H-28 HG2 - Other Conditions Existing Which in the Judgment of the EC/OSM Warrant Declaration of a General Emergency . H-29

EALDASES DOCUMENT -: EBD-H

__ _ _ _ _ __-_ _ _ __ _ _ __-_ __-_ __-_ __-_ __--_ ___-_ __-_ _ _ _ __ _ _ _ _ Rev. 5 HAADS AND OTHER CONDITIONS AFFECTING PLANT SAFETY CATEGORY PAGE 3 of 30 IIIU1 Natural and Destructive Phenonena Affecting the Protected Area EVENT TYPE: Natural Disasters, Other Hazards and Failures OPERATING MODE APPLICABILITY: All EAL THRESHOLD VALUE:

Ay one of the following phenomena affecting the Pro ected Area:

1. Valid Amber Design Basis Earthquake (DBE) light and the wailing seismic alarm on Panel C35 are both activated indicating an acceleration greater than +/- 0.01 gravity.
2. Report by plant personnel of tomnado striking within protected area boundary..
3. Assessment by the control room that a destructive event has occurred.

.:- . . g -

4. Vehicle crash into plant structures or systems within protected area boundary that are determined to be Safe ShutdownAreas. >.:
5. Report by plant personnel of hAnanticipated -explosion within the protected area boundary resulting in visible damage to permanenttctures or equipment required for Safe Shutdown.
6. Report of turbine failure resulting incasing penetration or damage to turbine or generator seals.
7. River flood water levels above 757.0 ft.
8. The Max Normal operating water level exceeding and EOP 3 limits.
9. River water level below 725 ft. 6 in.

DAEC EAL INFORMATION:-

EAL Threshold Value 1 addresses earthquakes that are detected in accordance with AOP 901. For DAEC, a minimum detectable earthquake that is indicated on panel '1C35is an acceleration greater than 0.01 Gravity.

DAEC EAL Threshold Value 2 addresses report of a tornado striking within the protected area or within the plant switchyard.-

DAEC EAL Threshold Value 3 allows for the control room to determine that and event has occurred and take appropriate action based on personal assessment as opposed to verification. No attempt is made to assess the actual magnitude of the damage. Such damage can be due to collision, tornadoes', issiles, or any other cause. Damage can be indicated by report to the control room, physical observation, or by Control Room/local control station instrumentation. Such items as scorching, cracks, dents, or discoloration of equipment or structures required for safe shutdown are addressed by this EAL.

HUI

EAL BASES DOCUMENT EBD-H Rev. 5 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY CATEGORY PAGE 4 of 30 DAEC EAL Threshold Value 4 addresses a vehicle (automobile, aircraft, forklift, truck or train) crash that may potentially damage plant structures containing functions and systems required for safe shutdown of the plant. This does not include vehicle crashes with each other or damage to office or warehouse structures.

Escalation to Alert under HAl would occur if damage was sufficient to affect the ability to achieve or maintain safe shutdown, e.g., damage made required. equipment inoperable or structural damage was observed such as bent supports or pressure boundary leakage.

Safe Shutdown Areas Category Area Electrical Switchyard, 1G31 DG and Day Tank Rooms, 1G21 DG and Day Tank Power Rooms, Battery Rooms, Essential Switchgear Rooms, Cable Spreading Room Heat Sink/ Torus Room, Intake Structure, Pumphouse Coolant Supply Containment Drywell, Torus Emergency NE, NW, SE Corner Rooms, HPCI Room, RCIC Room, RHR Valve Systems Room, North CRD Area, South CRD Area Other Control Building, Remote Shutdown Panel C388 Area, Panel 1C56 Area, SBGT Room DAEC EAL Threshold Value 5 addresses explosions within the protected area As used here, an explosion is a rapid, violent, unconfined combustion, or a catastrophic failure of pressurized equipment, that potentially imparts significant energy to near-by structures or equipment. Damage can be indicated by report to the control room, physical observation, or by Control Room/local control station instrumentation.

Such items as scorching, cracks, dents, or discoloration of equipment or structures required for safe shutdown are addressed by this EAL. The EC/OSM needs to consider the security aspects of the explosion, if applicable.

DAEC EAL Threshold Value 6 addresses turbine failure causing observable damage to the turbine casing or damage to turbine or generator seals.

DAEC EAL Threshold Value 7 addresses the observed effects of flooding in accordance with AOP 902.

Plant site finished grade is at elevation 757.0 ft. Personnel doors and railroad and truck openings at or near grade would require protection in the event of a flood above elevation 757.0 ft. Therefore, EAL 7 uses a threshold of flood water levels above 757.0 ft.

DAEC EAL Threshold Value 8 addresses internal flooding can be due to system malfunctions, component failures, or repair activity mishaps (such as failed freeze seal) that can threaten safe operation of the plant.

HUI

EAL BASES DOCUMENT - EBD-H Rev. 5 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY CATEGORY PAGE 5 of 30 Therefore, this EAL is based on a valid indication that the water level is higher than the maximum normal operating limits. The Maximum Normal Operating Limits are defined as the highest values of the identified parameter expected to occur during normal plant operating conditions with all directly associated support and control systems functioning properly. Exceeding these limits is an entry condition into EOP '3, Secondary Containment Control and may be an indication that water from a primary system is discharging into secondary containment. Exceeding the maximum normal operating limit is interpreted as a potential degradation in the level of the safety of the plant and is appropriately treated as an Unusual Event emergency classification. The maximum normal operating water level limits are taken from AOP 902 and EOP 3 and are shown in the table below: - -

Maximum 0 perating Limits - Water Levels Affected Location Indicator' Maximum Maximum Safe Normal OL OL HPCI Room Area LI 3768 2 inches - 6 inches RCIC Room Area LI 3769 3 inches 6 inches A RHR Comer Room SE Area LI 3770- 2 inches 10 inches B RHR Corner Room NW Area LI3771 2 inches 10 inches Torus Area LI 3772 2 inches 12 inches

\ GAL Threshold Value 9 addresses the effects of low river water level. The intake structure for the safety-related water 'supply; systems (river water,- RHR service water," and emergency service water) is located on the west bank of the Cedar River. An overflow-type barrier across the river was designed and constructed in accordance with Seismic Category I criteria to intercept the stream bed flow and divert it to the intake structure. This makes the entire flow of the river available to the safety-related water supply systems. A minimum flow of 13 cubic feet per second (cfs) from a minimum 1000-year river flow of 60 cfs must be diverted. The top of the barrier wall is at elevation 725 ft. 6 in. 'River water level below this level represents a potential degradation in the level ofsafety of the plant and is addressed by EAL Threshold Value 9.

In this EAL, Area" is efinedas aVital plant structures or areas containing equipment necessary for a safe shutdown.

REFERENCES:

1. Abnormal Operating Procedure (AOP) 901, Earthquake
2. Abnormal Operating Procedure (AOP) 902, Flood
3. Abnormal Operating Procedure (AOP) 903, Tomado
4. Emergency Operating Procedure (EOP)-3, Secondary Containment Control
5. EOP Basis Document, EOP-3, Secondary Containment Control
6. UFSAR Chapter 3, Design of Structures, Components, Equipment, and Systems
7. Bechtel Drawing BECH-M017, Equipment Location - Intake Structure Plans at Elevations, Rev. 6 HU2 Fire Within Protected Area Not Extinguished Within 15 Minutes of Detection iVENT TYPE: Fire HUI

EAL BASES DOCUMENT EBD-H Rev. 5 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY CATEGORY PAGE 6 of 30 OPERATING MODE APPLICABILLITY: All EAL THRESHOLD VALUE:

1. Fire in buildings or areas contiguous to any of the following areas not extinguished within 15 minutes of control room notification or verification of a control room alarm:
  • Reactor, turbine, control, admin/security
  • Intake structure

The purpose of this EAL is to address the magnitude and extent of fires that may be potentially significant precursors to damage to safety systems. This includes such items as fires within the administration building, and security building (buildings contiguous to the reactor building, turbine building and control building),

yet, excludes fires in the warehouse or construction support center, waste-basket fires, and other small fires of no safety consequence. A s u sed h ere, D etection i s v isual o bservation and r eport b y p lant p ersonnel o r sensor alarm indication. The 15 minute time p eriod begins with a credible notification that a FIRE is occurring, or notification of a VALID fire detection system alarm. Verification of a fire detection system alarm includes actions that can be taken within the control room or other nearby location to ensure that the alarm is not spurious. A verified alarm is assumed to be an indication of a FIRE unless it is disproved within the 15-minute period by personnel dispatched to the scene. In other words, a personnel report from the scene may be used to disprove a sensor alarm if received within 15 minutes of the alarm.

Per AOP 913, the location of a fire can be determined by observing 1C40B alarm messages, Zone Indicating Unit (ZRJ) alarms, or fire annunciators on panels C40 and C40A. The location of a fire can also be determined by verbal report of the person discovering the fire. erification of the alarm in this context means those actions taken to determine that the control room alarm is not spurious.

REFERENCES:

1. Abnormal Operating Procedure (AOP) 913, Fire
2. Abnormal Operating Procedure (AOP) 914, Security HU2

EAL BASES DOCUMENT EBD-H Rev. 5 HAZARDSANDOTHERCONDITIONSAFFECTINGPLANTSAFETYCATEGORY PAGE7of30 HU3 Release of Toxic or Flammable Gases Deemed Detrimental to Safe Operation of the Plant EVENT TYPE: Other Hazards and Failures OPERATING MODE APPLICABILITY: All EAL THRESHOLD VALUE-Safe operation of the plant is jeopardized by one ofthe following:

1. Report or detection of toxic or flammable gases that could enter within the site area boundary in amounts that can affect normal operation of the plant.
2. Report by Local, County or State Officials for potential evacuation of site personnel based on offsite event.

DAEC EAL INFORMATION: -

This Threshold Value is based bii releases in-concentrations within the site boundary that will affect the health of plant personnel of'feting i 'safe -operation of the plant with the plant being within the evacuation area of an offsite event (i.e., tanker trick accident releasing toxic gases, etc.) The evacuation area is as determined from the DOT Evacuation Tables'for'Selected Hazardous Materials, in the DOT Emergency Response Guide for Hazardous Materials.'

For the purposes of this EAL; C0 2 (such as is discharged by the fire suppression system) is-not toxic. CO2 can be lethal if it reduces oxygen to low concentrations that are immediately dangerous to life and health (IDLH.- CO2 discharge into anaea is not basisfor emergency classification under this IC unless: (1)'

Access to the affected area is required azd (2) CO2 concenfration results in conditions that make the area uninhabitableor inaccessible (i.e., IDLH).

REFERENCES:

1. UFSAR Section 2.2, Nearby Industrial, Transportation, and Military Facilities
2. FSAR Section 6.4, Habitability Systems HU3

EAL BASES DOCUMENT EBD-H Rev. 5 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY CATEGORY PAGE 8 of 30 HU4 Confirmed Security Event Which Indicates a Potential Degradation in the Level of Safety of the Plant EVENT TYPE: Security OPERATING MODE APPLICABILITY: All EAL THRESHOLD VALUE:

1. Suspected sabotage device discovered within plant Protected Area.
2. Suspected sabotage device discovered outside the Protected Area in the plant switchyard or ISFSI.
3. Confirmed tampering with safety related equipment.
4. A hostage situation that disrupts normal plant or ISFSI operations.
5. Civil disturbance OR strike which disrupts normal plant or ISFSI operations.
6. Internal disturbance that is not short lived of that is not a harmless outburst involving one or more individuals within the Protected Area or ISFSI.
7. Credible Security Threat of LO" Severity DAEC EAL INFORMATION:

Security events which do not represent at least a potential degradation in the level of safety of the plant are reported under 10 CFR 73.71 or in some cases under 10 CFR 50.72. The term "suspected sabotage device" is used in place of "bomb device" for consistency with the DAEC Safeguards Contingency Plan.

Consultation with Security supervision is required to determine these Threshold Values.

EAL 1 describes a suspected sabotage device discovered within the Protected Area but outside an area that contains safety functions or systems. It is a potential degradation of the level of safety of the plant and is an UNUSUAL EVENT.

EAL 2 describes a suspected sabotage device discovered in the plant switchyard or ISFSI representing a potential degradation of the level of safety of the plant.

EAL 3 is for confirmed tampering and is adapted from the list of security plan contingencies.

EAL 4 identifies a hostage situation that disrupts normal plant or ISFSI operations. A hostage situation is considered to disrupt normal operations if it results in the inability to perform surveillance activities, alters unit operations, or as described in the security plan.

HU4

-T lAL BASES DOCUMENT EBD-H

-- i-. -. .-- -- do: ev. 5 HAZARS AND OTHER CONDITIONS AFFECTING PLANT SAFETY CATEGORY PAGE 9 of 30 EAL 5 describes a civil disturbance or skrikeis nsidered to be a spontaneous activity that disrupts normal plant or ISFSI operations. A civil disturbance or strike is considered to disrupt normal plant operations if it initially disrupts normal ingress or egress to the owner controlled or protected area, or if it requires assistance from the Local Law Enforcement Agencies (LLEA) to control.

EAL 6 deals with suspicious internal disturbances that may have been planned by unauthorized personnel as a diversion to gain entry to the site property.

EAL 7 ensures that appropriate notifications for the security threat are made in a timely manner. The determination of a Credible Security Threat of,'LO": or "HI" Severity is based on information found in NMC SE-0018, "Security Threat Assessment". The emergency response to a Credible Security Threat of "LO" Severity is initiated through AO 914, "Security Events" and EPIP 2.8, "Security Threat". A Credible Security Threat of "HI" Severity would escalate this classification to the ALERT status as an HA4. Only the plant to which the specific threat is made need declare the Notification of Unusual Event.

Suspected sabotage devices discovered within the plant Vital Area would result in escalation via other Security EALs.

.JEFERENCES:

1. Abnormal Operating Procedure (AOP) 914, Security Events
2. NMC SE-0018, "Security Threat Assessment"
3. EPIP 2.8, "Security Threat"
4. NEIMethodologyforDevelopment ofEimergency Action Levels AUMARCINESP-007 NEI 99-01 Revision 4, May 1999/September 2002
5. NE!MethodologyforDevelopment ofEmergencyAction Levels NUMARC/NESP-007NEI 97-03 August 1997 HU4

EAL BASES DOCUMENT EBD-H Rev. 5 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY CATEGORY PAGE 10 of 30 HU5 Other Conditions Existing Which in the Judgment of the EC/OSM Warrant Declaration of an Unusual Event EVENT TYPE: EC/OSM Judgment OPERATING MODE APPLICABILITY: All EAL THRESHOLD VALUE:

1. Other conditions exist which in the judgment of the Emergency Director indicate a potential degradation of the level of safety of the plant.

DAEC EAL INFORMATION:

The EAL addresses conditions that fall under the Notification of Unusual Event emergency classification description contained in NUREG-0654, Appendix 1, that is retained under the generic methodology.

Events are in process or have occurred which indicate a potential degradation of the level of safety of the plant. No releases of radioactive material requiring offsite response or monitoring are expected unless further degradation of safety systems occurs.

Per EPIP 2.5, the Emergency Coordinator/Operations Shift Manager (EC/OSM) is the title for the emergency director function at DAEC.

REFERENCES:

1. Emergency Plan Implementing Procedure (EPIP) 2.5, Control Room Emergency Response Operation
2. NUREG-0654/FEMA-REP-1, Criteriafor Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants, Revision 1, October 1980, Appendix I HU5

f -  ; - EAL BASES DOCUMENT EBD-H Rev. 5 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY CATEGORY PAGE 11 of 30 HAl Natural and Destructive Phenomena Affecting the Plant 'Vital Area EVENT TYPE: Natural Disasters, Other Hazards and Failures OPERATING MODE APPLICABILITY: All EAL TH1RESHOLD VALUE:

Any one of the following phenomena affecting the Protected Area:

1. Valid Amber Operating Basis Earthquake (OBE) light and the wailing seismic alarm on Panel 1C35 are both activated indicating an acceleration greater than + 0.06 gravity
2. Tornado striking plant vital areas.
3. Assessment by the control room that damage has affected Safe Shutdown Areas.
4. Vehicle crash affecting plant vital areas.
5. Sustained high wind speed of 95 iniles per hour or above affecting plant vital areas.

. Missiles affecting safe shutdown areas.

7. River flood water levels above 767.0 :ft .
8. The Max Safe operating water level exceeding and EOP 3 limits in two or more areas AND reactor shutdown is required.
9. River water level below 724 ft. 6in-DAEC EAL INFORMATION:

There are no significant deviations from the generic EALs. For the events. of concern here, the key issue is not the wind speed, earthquake intensit, etc; btwhether there is resultant damage to equipment or structuresrequiredto achieve or.maintain safe shutdown, regardlessof the cause. Determination of damage affecting the ability to achieve or maintain safe shutdown can be indicated by reports to the control room, physical observation or by Control Room/local control station instrumentation.

EAL Threshold Value 1 addresses OBE events that are detected in-accordance with AOP 901. For DAEC, the OBE is associated with a peak horizontal acceleration of+/- 0.06-Gravity.

DAEC EAL Threshold Value 2 addresses report of a tornado striking a plant vital area.

HAI

EAL BASES DOCUMENT EBD-H Rev. 5 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY CATEGORY PAGE 12 of 30 DAEC EAL Threshold Value 3 addresses a report to the control room of damage affecting safe shutdown areas. The reported damage can be from tornadoes, high winds, -flooding, missiles, collisions, or any other cause.

DAEC EAL Threshold Value 4 addresses vehicle (automobile, aircraft, forklift, truck or train) confirmed crashes affecting plant vital areas. This does not include vehicle crashes with each other or damage to office or warehouse structures.

DAEC EAL Threshold Value 5 addresses sustained high wind speeds as measured by the 33-Foot or 156-Foot elevations on the Meteorological Tower. Sustained wind speed means the baseline wind speed measured by meteorological tower that does not include gusts. The design basis wind speed is 105 miles per hour. However, the meteorological instrumentation is only capable of measuring wind speeds up to 100 miles per hour. Thus the alert level for sustained high wind speed, 95 miles per hour, is selected to be on-scale for the meteorological instrumentation and to conservatively account for potential measurement errors.

DAEC EAL Threshold Value 6 addresses missiles affecting safe shutdown areas. Such missiles can be from any cause, e.g., tornado-generated; turbine, pump or other rotating machinery catastrophic failure; or generated from an explosion.

PerAOPs 913 and 914, the following areasare identified as safe shutdown areas and are shown on the EAL tables. This table is displayed as an aid to the Emergency Coordinatorin determining appropriateareas of concern.

Safe Shutdown Areas Category Area Electrical Switchyard, 1G31 DG and Day Tank Rooms, 1G21 DG and Day Power Tank Rooms, Battery Rooms, Essential Switchgear Rooms, Cable Spreading Room Heat Sinkl Torus Room, Intake Structure, Pumphouse Coolant Supply Containment Drywell, Torus Emergency NE, NW, SE Comer Rooms, HPCI Room, RCIC Room, RHR Systems Valve Room, North CRD Area, South CRD Area Other Control Building, Remote Shutdown Panel C388 Area, Panel 1C56 Area, SBGT Room DAEC EAL Threshold Value 7 addresses river water levels exceeding design flood water levels. All Seismic Category I structures and non-seismic structures housing Seismic Category I equipment are designed to withstand the hydraulic head resulting from the "maximum probable flood" to which the site HA1

EAL BA DOCUMENT EBD-H

_ _ __ __ __ _ _ _ _ _ _ _ _ __ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Re v . 5 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY CATEGORY PAGE 13 of 30 could be subjected. The design flood water is'at elevation 767.0 ft. Major equipment penetrations in the exterior walls are located above elevation 767.b ft. Openings below the flood level are either watertight or are provided with means to control the inflow o fwater in order to ensure that a safe shutdown can be achieved and maintained. Consideration has also been given to providing temporary protection for openings in the exterior walls up to flood levels of 769.0 ft. All buildings were also checked for uplift (buoyancy) for a floodlevel at elevation 767.0 ft. and the minimum factor of safety used was 1.2. Therefore, DAEC EAL 7 uses as its threshold flood water levels above 767 feet.

DAEC EAL Threshold Value- & addresses internal flooding consistent with the requirements of EOP 3, Secondary Containment Control: If RPV- pressure reduction will decrease leakage into secondary containment then this is due to leakage from the primary system- which is:addressed by the Fission Barrier Table indicators and -System Malfin6tion EALs, and is not addressed here. Therefore, EAL 8 addresses conditions in which water level in two or more areas is above Maximum Safe Operating-Limits and reactor shutdown is required.Required means that the reactor shutdown-was procedurally mandated by EOP 3 and is not merely performed as a precaution or inadvertently. Maximum Safe OperatingLimits are defined as the highest parameter value at-which neither (1) equipment necessary for safe shutdown of the plant will fail nor (2) personnel access, necessary for the safe shutdown of the plant will be precluded. The internal flooding can be due to system malfunctions, component failures, or repair activity mishaps (such as failed freeze seal) that can threaten safe operation of the plant. This includes water intrusion on equipment that is

\1/4._otdesigned to be submerged (eg., motor.control centers).

The maximum safe operatingwater level limits are takenfrom EOP3 and areshown on the table below:

Maximum Opertng Limits - Water Levels -

Affected Location Indicator -Maximum Maximum Safe

- .-.  :. iNorma OL OL HPCI Room Area LI 3768 2 inches 6 inches RCIC Room Area ' - -; '-"-LI3769 3inches 6inches A RHR Corner Room'SE Area LI 3770 2 inches B RHR Corner Room NW Area LI 3771' 2 inches - 10 inches Torus Area LI 3772 2 inches 12 inches DAEC EAL Threshold Value 9 addresses the effects of low river water level. The intake structure for the safety-related water supply systems (rver water; RHR service water, and emergency service water) is located on the west bank of the Cedar River. The overflow weir is at elevation 724 feet 6 inches. River level at or below this elevation will result in all river flow being diverted to the safety related water supply systems. The top of the intake structure around the pump wells is at elevation 724 feet' If the river water level dropped to this level, the pump suction would have no continuous supply. Therefore, this EAL uses a threshold of water level below 724 feet 6 inches as a potential substantial degradation of the ultimate heat sink capability.

HAI

EAL BASES DOCUMENT EBD-H Rev. 5 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY CATEGORY PAGE 14 of 30 In this EAL, "Vital Area" is defined as plant structures or areas containing equipment necessary for a safe shutdown.

REFERENCES:

1. Abnormal Operating Procedure (AOP) 901, Earthquake
2. Abnormal Operating Procedure (AOP) 902, Flood
3. Abnormal Operating Procedure (AOP) 903, Tornado
4. Abnormal Operating Procedure (AOP) 913, Fire
5. Abnormal Operating Procedure (AOP) 914, Security Events
6. UFSAR Chapter 3, Design of Structures, Components, Equipment, and Systems
7. Bechtel Drawing BECH-M017, Equipment Location - Intake Structure Plans at Elevations, Rev. 6
8. EOP Basis Document, EOP 3 - Secondary Containment Control Emergency Operating Procedure (EOP) 3, Secondary Containment Control HAI

Y EAL- EASES . , DOCUMENT

. EBD-H I Rev. 5 jHAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY CATEGORY PAGE 15 of 30 -

HA2 Fire or Explosion Affecting the Operability of Plant Safety Systems Required to Establish or Maintain Safe Shutdown EVENT TYPE: Fire OPERATING MODE APPLICABILITY: All EAL TIHRESHOLD VALUE:

1. Fire or explosion affecting one of the following systems or areas of concern.

SYSTEMS

  • Reactivity Control
  • Containment (Drywell/Torus)
  • RHR/Core Spray(SRV's
  • HPCI/RCIC
  • RHRSW/RiverWater/ESW
  • Onsite AC Power/EDG's
  • Offsite AC Power
  • Instrument AC
  • Reactor, Turbine, Control, Admin/Security
  • Intake Structure
  • Pump House AND
2. Affected system parameter indications show degraded performance or plant personnel report VISIBLE DAMAGE to permanent structures or equipment within the specified area.

DAEC EAL INFORMATION:

There is no significant deviation from the generic EAL. Of particular concern for this EAL are fires that may be detected in the reactor building, control building, turbine building, pumphouse, and intake structure Is shown in Tabs 1 and 3 of AOP 913. Damage from fire or explosion can be indicated by physical HA2

EAL BASES DOCUMENT EBD-H Rev. 5 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY CATEGORY PAGE 16 of 30 observation, or by Control Room/local control station instrumentation.. No attempt is made in this EAL to assess the actualmagnitude of the damage.

Per AOP 913, the location of a fire can be determined by observing 1C40B alarm messages, Zone Indicating Unit (ZIU) alarms, or fire annunciators on panels 1C40 and C40A.

NOTE:

Scope of Systems and Equipment of concern established by review of Appendix R Safe Shutdown credited systems. Only those systems directly affecting safe shutdown or heat removal are listed for consideration, due to fire damage. Support Systems and equipment such as HVAC and specific instrumentation, while included in Appendix R analysis is not considered an immediate threat to the ability to shutdown the plant and remove decay heat.

This EAL addresses a FIRE / EXPLOSION and not the degradation in performance of affected systems.

System degradation is addressed in the System Malfunction EALs. The reference to damage of systems is used to identify the magnitude of the FIRE I EXPLOSION and to discriminate against minor FIREs I EXPLOSIONs. The reference to safety systems is included to discriminate against FIREs / EXPLOSIONs in areas having a low probability of affecting safe operation. The significance here is not that a safety system was degraded but the fact that the FIRE / EXPLOSION was large enough to cause damage to these systems. Thus, the designation of a single train was intentional and is appropriate when the FIRE /

EXPLOSION is large enough to affect more than one component. Lagging fires, fires in waste containers or any miscellaneous fires that may be in the vicinity of safety systems, but do not cause damage to these systems, should NOT be considered for this EAL.

With regard to EXPLOSIONS, only those EXPLOSIONS of sufficientforce to damagepermanent structures or identified equipment requiredforsafe operation, should be considered. As used here, an EXPLOSION is a rapid, violent, unconfined combustion, or a catastrophic failure of pressurized equipment, that potentially imparts significant energy to near-by structures and materials. The occurrence of the EXPLOSION with reports of evidence of damage (e.g., deformation, scorching) is sufficient for the declaration. The EC/OSM also needs to consider any security aspects of the EXPLOSIONS, if applicable.

REFERENCES:

1. Abnormal Operating Procedure (AOP) 913, Fire
2. Abnormal Operating Procedure (AOP) 914, Security Events
3. Abnormal Operating Procedure (AOP) 915, Shutdown Outside Control Room
4. UFSAR Section 6.4, Habitability Systems HA2

EAL CASE$ DOCUMENT EBD-H Rev.-5 (HAARDS AND OTHER CoNDmOai AFFECTING PLANT SAFETY CATEGORY PAGE 17 of 30 HA3 Release of Toxic or Flammable Gases Within a Facility Structure Which Jeopardizes Operation of Systems Required to Maintain Safe Operations or to Establish or Maintain Cold Shutdown EVENT TYPE: Other Hazards and Failures OPERATING MODE APPLICABILITY: All EAL THRESHOLD VALUE..

One of the following: .

1. Report or detection of toxic gases within a Safe Shutdown Area in concentrations that will be life threatening to plant personneL .,.:;.

OR J. Report or detection of flammable gases within a Safe Shutdown Area in concentrations that will affect the safe operation of the plant DAEC EAL INFORMOATON: -I This EAL, in addition to EAL HA5, also addresses entry of toxic gases that -may result in control room evacuation in accordance with AOP 915.

For the purposes of this EAL, C° 2 (such as is diharged by the.fire suppression system) is not toxic. CO2 can be lethal if it reduces oxygen to, low, concentrations that. are immediately dangerous to life and health (IDLH). C 2 discharge into an area is.not basis for' emergency classiflcation under.this IC unless: (1)

Access to the-affected area is required, and (2) C02,concentrationresults. in conditions that make the area uninhabitableor inaccessible(i.e., IDIJO.

TOXIC - Exposure to the worker in excess of the limits specified in 29 CFR 1910.1000. In practice,. this should be considered for concentrations which are capable of producing incapacitation of the worker.

The source of the release is NOT of immediate concern for these threshold values. The concern is for the health and safety of plant personnel and their ability to maintain the plant in a safe operating condition.

This EAL is based on gases that have entered plant structures that will affect the safe operation of the plant. These structures include buildings and areas contiguous to plant vital areas and other significant HA3

EAL BASES DOCUMENT EBD-H Rev. 5 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY CATEGORY PAGE 18 of 30 buildings or areas. The intent of this EAL is NOT to includb buildings or other areas that are NOT contiguous or immediately adjacent to plant vital areas.

Per AOPs 913 and 914, the following areas are identified as safe shutdown areas. This table is displayed as an aid to the Emergency Coordinatorin determiningappropriateareas of concern.

Safe Shutdown Areas Category Area Electrical Power Switchyard, G31 DG and Day Tank Rooms, G21 DG and Day Tank Rooms, Battery Rooms, Essential Switchgear Rooms, Cable Spreading Room Heat Sink/Coolant Supply Torus Room, Intake Structure, Pumphouse Containment Drywell, Torus Emergency Systems NE, NW, SE Comer Rooms, HPCI Room, RCIC Room, RHR Valve Room, North CRD Area, South CRD Area Other Control Building, Remote Shutdown Panel 1C388 Area, Panel 1C56 Area, SBGT Room

REFERENCES:

1. Abnormal Operating Procedure (AOP) 913, Fire
2. Abnormal Operating Procedure (AOP) 914, Security Events
3. Abnormal Operating Procedure (AOP) 915, Shutdown Outside Control Room
4. UFSAR Section 6.4, Habitability Systems HA3

--EALI 1S DO UMENT EBD-H Rev.

HAZARDS AND OTHER CONDITnoNs AFFECTING PLANT SAFETY CATEGORY PAGE 19 of 30

- 1A4 Security Event in a Plant Protected Area EVENT TYPE: Security OPERATING MODE APPLICABILITY: All EAL THRESHOLD VALUE

1. Intrusion into plant Protected Area or ISFSI by a hostile force.
2. Sabotage device discovered in the plant Protected Area or ISFSL
3. Any security event of increasingse-verity that persists for > 30 minutes:
a. Credible bomb threats
b. Extortion
c. Suspicious Fire or Explosion
d. Significant Security System Hardware Failure
e. Loss of Guard Post Contact
4. Credible SecurityThreat of'I' Severity DAEC EAL INFORMATION:

EAL 1 is an intrusion of a hostile force into the Protected Area or ISFSI representing a potential for a substantial degradation of the level of safety of the plant. A civil disturbance, which penetrates the Protected Area, can be considered a hostile force.

EAL 2 is the discovery of a sabotage device in the Plant Protected area or ISFSI.

EAL 3 security events represent an escalated threat to plant safety above that contained in the Unusual Event.

Under this EAL, adversaries within the Protected Area are not yet affecting nuclear safety systems, engineered safety features, or reactor shutdown capability that are located within the vital area. A security event is considered to be "of increasing severity" if events are NOT under control of the security force within 30 minutes. Intrusion into a vital area by a hostile force will escalate this event to a Site Area Emergency.

EAL 4 is the determination of "Credible Security Threat of HI Severity" based on information found in NMC SE-0018, "Security Threat Assessment". The emergency response to a "Credible Security Threat of HI Severity" is initiated through AOP 914, "Security Events" and EPIP 2.8, "Security Threat".

HA4

EAL BASES DOCUMENT EBD-H Rev. 5 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY CATEGORY PAGE 20 of 30

REFERENCES:

1. NMC SE-00 18, "Security Threat Assessment"
2. Abnonnal Operating Procedure (AOP) 914, Security Events
3. NEIMethodologyforDevelopment of Emergency Action Levels NUMARC/NESP-007 NEI 99-01 Revision 4, May 1999/September 2002
4. NEI Methodology for Development of Emergency Action Levels NUMARC/NESP-007 NEI 9 7-03 August 1997 HA4

EAL BASES DOCUMENT EBD-H Rev. 5 (HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY CktE&ORY PAGE 21 Of 30 HA5 Control Room Evacuation Has Been Initiated EVENT TYPE: Control Room Evacuation OPERATING MODE APPLICABILITY: All EAL THRESHOLD VALUE:

1. Entry into AOP 915 and initiation of control room evacuation.

DAEC EAL INFORMATION:

The applicable procedure for control room evacuation at DAEC is AOP 915.

Evacuation of the Control Room represents a potential for substantial degradation of the level of safety of the plant and therefore requires an ALERT declaration. Additional support, monitoring and direction is required and accomplished by activation of the Technical Support Center at the ALERT classification level.

REFERENCES:

1. Abnormal Operating Procedure (AOP) 915, Shutdown Outside Control Room
2. FSAR Section 6.4, Habitability Systems HA5

EAL BASES DOCUMENT EBD-H Rev. 5 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY CATEGORY PAGE 22 of 30 HA6 Other Conditions Existing Which in the Judgment of the EC/OSM Warrant Declaration of an Alert EVENT TYPE: EC/OSM Judgment OPERATING MODE APPLICABILITY: All EAL THRESHOLD VALUE:

1. Other conditions exist which in the Judgment of the Emergency Director indicate that plant safety systems may be degraded and that increased monitoring of plant functions is warranted.

DAEC EAL INFORMATION:

Events are in process or have occurred which involve an actual or potential substantial degradation of the level of safety of the plant Any releases are expected to be limited to a small fraction of the EPA Protective Action Guideline exposure levels.

Per EPIP 2.5, the Emergency Coordinator/Operations Shift Manager (EC/OSM) is the title for the emergency director function at DAEC. The EAL addresses conditions that fall under the Alert emergency classification description contained in NUREG-0654, Appendix 1.

REFERENCES:

1. Emergency Plan Implementing Procedure (EPIP) 2.5, Control Room Emergency Response Operations
2. NUREG-0654/FEMA-REP-1, Criteriafor Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants, Revision 1, October 1980, Appendix I HA6

- , 4 J EAL BASES DOCUMENT EBD-H Rev.5 HAZADS AND OTHER CONDITIONS AFFECTING PLANT SAFETY CATEGORY PAGE 23 of 30 HS1 Security Event in a Plant Vital Aea EVENT TYPE: Security OPERATING MODE APPLICABILITY: All EAL THRESHOLD VALUE:

One of the following:

1. Intrusion into plant Vital Area by a hostile force.
2. A security event which results in the loss of control of any Vital Area (other than the Control Room).
3. IMMINENT loss of physical control of the facility (remote shutdown capability) due to a security event.
4. A confirmed sabotage device discovered in a vital area.

kAAEC EAL INFORMATION:,

IMMINENT - Mitigation actions have been ineffective and trended information indicates that the event or condition will occur within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

This threshold value escalates from the ALERT Protected Area intrusion to a Vital Area intrusion of a hostile force. '

A security event is as defined in the Safeguards Contingency Plan.

Loss of physical control of the Control Room OR loss of physical control of the remote shutdown capability due to a security event, is to be classified as a GENERAL EMERGENCY per Initiating Condition HG1.

A "confirmed sabotage device" is a determination made by the security force through the Security Plan, Contingency procedures and other guidance documentation.

This class of security events represents an escalated threat to plant safety above that contained in HA4, Security Event in a Plant Protected Area, in that a hostile force has progressed from the Protected Area to the Vital Area. U nder the condition of concern here, the adversariesare consideredto be in a position to directly and negatively affect nuclear safety systems, engineered safety features, or reactor shutdown capability.

HSI

EAL BASES DOCUMENT EBD-H Rev. 5 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY CATEGORY PAGE 24 of 30

REFERENCES:

1. Abnormal Operating Procedure (AOP) 914, Security Events
2. NEI Methodology for Development of Emergency Action Levels NUMARC/NESP-007 Revision 4, May 1999 HS1

- I . - I- ' . 7.- il

--AL BASES DOCUMENT EBD-H

_XX_

_.:_ _:__ _-.__ _ _ _ _ _ _ _ _:_.__ _ _ _ _ -_ Rev . 5 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY CATEGORY PAGE 25 of 30 HS2 Control Room Evacuation Has Been Initiated and Plant Control Cannot Be Established EVENT TYPE: Control Room Evacuation OPERATING MODE APPLICABILITY: All EAL THRESHOLD VALUE:

The following conditions exist:

1) Control room evacuation has been initiated.

AND

2) Control of the plant cannot be established per AOP 915 within 20 minutes.

DAEC EAL INFORMATION:

K,-Ahere is no significant deviation from the generic EAL. The applicable procedure for control room evacuation at DAEC is AOP 915. Based on the results of the analysis described below, DAEC uses 20 minutes as the site-specific time limit for establishing control of the plant. DAEC has satellite panels associated with the remote shutdown panel at various locations through out the plant. Control of the plant from outside the control room is assumed when the controls are transferred to remote shutdown panel IC388 in accordance with AOP 915.

The EC/OSM is expected to make a reasonable, informedjudgrrment within the 20 minute time limit that control of the plantfrom the remote shutdown panel has been established. The intent of the EAL is that control of important plant equipment and knowledge of important plant parameters has been achieved in a timely manner. Primary emphasis should be placed on those components and instruments that provide protection of and information about safety functions. At a minimum, consistent with the Appendix R safe shutdown analysis descnlbed above, these safety functions include reactivity control, maintaining reactor water level, and decay heat removal.

General Electric performed analyses to demonstrate compliance with the requirements of 10 CFR 50 Appendix R for DAEC. The evaluation of Reactor Coolant Inventory was performed using the GE evaluation model (SAFE). The SAFE code determines if the reactor coolant inventory is above the TAF during the safe shutdown operation. If core uncovery occurs, the fuel clad integrity evaluation is performed by determining the duration of the core uncovery and the resulting peak cladding temperature (PCT). The PCT calculations were performed by incorporating the SAFE output into the Core Heatup Analysis code

'CHASTE). The details of these calculations are provided in Section 4 of the final report for DAEC HS2

EAL BASES DOCUMENT EBD-H Rev. 5 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY CATEGORY PAGE 26 of 30 Appendix R analyses ("Safe Shutdown Appendix R Analyses for Duane Arnold Energy Center", MDE 036).

The required analyses include evaluation of the safe shutdown capability of the remote shutdown system for various control room fire events assuming: (1) no spurious operation of equipment, (2) spurious operation of a safety-relief valve (SRV) for 20 minutes, (3) spurious operation of a SRV for 10 minutes, and (4) spurious leakage from a one-inch line. The analyses show that the worst case spurious operation of SRV or isolation valves on a one-inch liquid line (high-low pressure interface) will not affect the safe shutdown ability of the remote shutdown system for DAEC in case of a fire requiring control room evacuation before the identified time limit for the necessary operator actions at the auxiliary shutdown panels. For the limiting cases of worst case spurious leakage from a one-inch line and spurious operation of a SRV, operator control within 20 minutes would not impact the integrity of the fuel clad, the reactor pressure vessel, and the primary containment.

REFERENCES:

1. Abnormal Operating Procedure (AOP) 915, Shutdown Outside Control Room
2. General Electric Report MDE-44-0386, Safe Shutdown Appendix R Analysis for DAEC, March 1986
3. UFSAR Section 6.4, Habitability Systems
4. NEI Methodologyfor Development of Emergency Action Levels NUMARC/NESP-OO'/ Revision 4, May 1999 HS2

- - - . 1 17;1 I L EAL BASES DOCUMENT EBD-H

_ _ -__ -___ __ _._ _-__ __ _ _._ _;__._._ _-:_ _.__.:-__ _=;_ _-_ _ _._- R ev . 5 jHAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY CATEGORY PAGE 27 of 30 HS3 Other Conditions Existing Which' in the Judgment of the <EC/OSM> Warrant Declaration of Site Area Emergency EVENT TYPE: EC/OSM Judgment .

OPERATING MODE APPLICABILITY: All EAL THRESHOLD VALUE:

1. Other conditions exist whch in the Judgment of the Emergency Director indicate actual or likely major failures of plant functionsneeded for protection of the public.

DAEC EAL INFORMATION:

There is no significant deviation from the generic EAL.

Per EPIP 2.5, the Emergency Coordinator/Operations Shift Manager (EC/OSM) is the title for the emergency director function at DAEC. The EAL addresses conditions that fall under the Site Area Emergency

'lassification description contained in NUREG-0654, Appendix 1.

Events are in process or have occurred which involve actual or likely major failures of plant functions needed for protection of the public. Any releases are -not expected to exceed EPA Protective Action Guidelines beyond the site boundary but could be exceeded onsite.

REFERENCES:

1. Emergency Plan Implementing Procedure (EPIP) 2.5, Control Room Emergency Response Operation
2. NUREG-0654/FEMA-REP-1, Criteriafor Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants, Revision 1, October 1980, Appendix 1 HS3

EAL BASES DOCUMENT EBD-H Rev. 5 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY CATEGORY PAGE 28 of 30 HG1 Security Event Resulting in Loss Of Ability to Reach and Maintain Cold Shutdown EVENT TYPE: Security OPERATING MODE APPLICABILITY: All EAL THRESHOLD VALUE:

One of the following:

1. Loss of physical control of the control room due to security event.

OR

2. Loss of physical control of the remote shutdown capability due to security event.

DAEC EAL INFORMATION:

This EAL is an escalation of the SITE AREA EMERGENCY, HSI declaration for a hostile force intrusion of a Vital Area taking physical control of either the Control Room OR taking over the remote shutdown capabilities which results in the loss of physical control of the facility. This also includes areas where any switches that transfer control of safe shutdown equipment to outside the control room are located.

REFERENCES:

1. Abnormal Operating Procedure (AOP) 914, Security Events
2. FSAR Section 6.4, Habitability Systems HG1
  • .- 4-EAL BA$ES DOCUMENT EBD-H

-:_V

_:-_. _- ___.__; _. _::_____-_. _.:_. _.: _._____._- _i: _--.-:- _-_____. Rev. 5

' (HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY CATEGORY PAGE 29 of 30 HG2 Other Conditions Existing Which in the Judgment of the EC/OSM Warrant Declaration of General Emergency EVENT TYPE: EC/OSM Judgment OPERATING MODE APPLICABILITY: All EAL THRESHOLD VALUE:

Other conditions exist which in the Judgment of the Emergency Director indicate:

1)Actual or imminent substantial core degradation with potential for loss of containment OR

2) There is a potential for uncontrolled radionuclide releases. These releases can reasonably be expected to exceed EPA PAG plume exposure levels outside the site boundary.

DAEC EAL INFORMATION:

Per EPIP 2.5, the Emergency Coordinator/Operations Shift Manager (EC/OSM) is the title for the emergency director fimction at DAEC GENERAL EMERGENCY - Events are in process or have occurred which involve actual or IMMIENT substantial core degradation or melting with potential for loss of containment integrity. Releases can be reasonably expected to exceed EPA Protective Action Guideline exposure levels offsite for more than the immediate site area.

IMMINENT - Mitigation actions have been ineffective and trended information indicates that the event or condition will occur within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

POTENTIAL - Mitigation actions are not effective and trended information indicates that the parameters are outside desirable bands and not stable or improving.

This Emergency Action Level allows for classification of events which in the judgment of the Emergency Director warrant the GENERAL EMERGENCY classification but do not fit into any other GENERAL EMERGENCY criteria. Emergency Director judgment is to be based on known conditions and the expected response to mitigating activities within a short time period arbitrarily set at 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

Classification of a GENERAL EMERGENCY is not to be delayed pending an extended evaluation of possibilities and probabilities. If time allows and the offsite response organizations are active, consultation with the effected state and the NRC is prudent prior to classification.

HG2

EAL BASES DOCUMENT EBD-H Rev. 5 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY CATEGORY PAGE 30 of 30

REFERENCES:

1. Emergency Plan Implementing Procedure (EPIP) 2.5, Control Room Emergency Response Operation
2. NUREG-0654/FEMA-REP-1, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants, Revision 1, October 1980, Appendix 1
3. NEI Methodology for Development of Emergency Action Levels NUMARC/NESP-007 Revision 4, May 1999 HG2