MONTHYEARML0304304242003-01-26026 January 2003 Meeting with Exelon Generation Company, LLC to Discuss the License Power Limit for Byron Station, Unit 1 Project stage: Meeting ML0802801642003-02-26026 February 2003 Summary of Meeting with Exelon Generation Company, Llc., Byron Station, Unit 1 to Discuss the License Power Limit Project stage: Meeting ML0313207692003-07-0101 July 2003 Documentation of a Request for Information Regarding the Licensed Thermal Power Level at Byron Station, Unit 1 Project stage: RAI ML0802801742003-07-0808 July 2003 Licensed Thermal Power, Byron Station, Unit 1 - Request for Additional Information Project stage: RAI ML0312701742003-07-0808 July 2003 Request for Additional Information, RAI Required in Order to Fully Resolve Question of Licensed Power Limit from February 5, 2003 Response to Nrc'S Letter of January 22, 2003 Project stage: RAI ML0402001912004-01-14014 January 2004 Evaluation of Davis Besse Modifications to the High Pressure Injection Pump and Associated Mock-Up Testing Project stage: Acceptance Review ML0401602102004-01-16016 January 2004 Task Interface Agreement (TIA 2003-05); NRC Policy Questions on Technical Specification Adequacy and Related Technical Specification Operability Project stage: Other ML0404902202004-02-0606 February 2004 Response to Task Interface Agreement (TIA) 2003-06 Project stage: Other ML0401503012004-02-0606 February 2004 Response to Task Interface Agreement 2003-06 Project stage: Other ML0402701812004-02-11011 February 2004 Memo, Evaluation of Davis-Besse Modifications to the High Pressure Injection Pump and Associated Mock-Up Testing (TIA No. 2003-04, TAC No. MC0584) Project stage: Acceptance Review ML0417002292004-06-30030 June 2004 May Monthly Report on the Status of Open TIAs Assigned to NRR Project stage: Other ML0822102852004-06-30030 June 2004 Memo to C. Pederson (Riii) from E. Hackett (Nrr), Subject: Request for Technical Assistance (TIA 2003-002) - Review of Licensee'S Response to Concern Regarding Potential for Byron Nuclear Power Station to Exceed Its Licensed Thermal Power L Project stage: Approval 2004-01-14
[Table View] |
Similar Documents at Byron |
---|
Category:Memoranda
MONTHYEARML24152A1852024-06-0404 June 2024 Summary of March 28, 2024, Closed Hybrid Pre-Submittal Meeting Between Constellation Energy Generation, LLC and the U.S. Nuclear Regulatory Commission Regarding a Future Amendment Request for Fuel Transition ML23044A3662023-02-15015 February 2023 Calendar Year 2022 Reactor Oversight Process Baseline Inspection Program Completion - Region III ML21277A2472021-11-0505 November 2021 Notification of Significant Licensing Action - Proposed Issuance of Order Approving the Transfer of Licenses for Which a Hearing Has Been Requested - Exelon Generation Company, LLC; Et. Al ML20155K6802020-11-23023 November 2020 Memo to File: Environmental Assessment and Finding of No Significant Impact and NRC Financial Analysis for Exelon Corporation, LLC, Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(b) and (C) for Byron ISFSI ML17335A0442017-12-0404 December 2017 Tvel Lead Test Assembly 3rd Closed Meeting ML17164A3302017-06-13013 June 2017 Safety Evaluation Regarding the Proposed License Amendment to Revise the Byron Licensing Bases for Protection from Tornado-Generated Missiles (CAC Number MF8446 and 8447) ML17142A2382017-05-25025 May 2017 OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns ML16236A2022016-08-24024 August 2016 Backfit Appeal Review Panel Findings Associated with Byron and Braidwood Compliance ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML16082A5422016-03-25025 March 2016 Backfit Review Panel Recommendation Regarding Exelon Appeal of Backfit Affecting Braidwood and Byron Stations Regarding Compliance with 10 CFR 50.34(b), GDC 15, GDC 21, GDC 29, and the Licensing Basis ML16075A3292016-03-16016 March 2016 OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations ML16070A3622016-03-15015 March 2016 03/07/2016 Summary of Public Meeting Between U.S. Nuclear Regulatory Commission Staff and Exelon Generation Company, LLC to Discuss an Appeal of a Compliance Backfit ML15355A0812016-01-12012 January 2016 Backfit Review Panel Charter Regarding December 8, 2015, Exelon Appeal of Imposed Backfit Affecting Braidwood and Byron Stations ML15267A7342015-11-10010 November 2015 Renewal of Full-Power Operating Licenses for Byron, Units 1 and 2 ML15253A9132015-09-11011 September 2015 ACRS Full Committee - Corrections to the Aging Management Programs Table ML15187A3272015-07-13013 July 2015 Request for ACRS Review of Byron Braidwood SER ML15051A3612015-03-0303 March 2015 02/05/2015 Summary of Telephone Conference Call No 2 Held Between the NRC and Exelon Generation Co., LLC Concerning Request for Additional Information, Set 45, Pertaining to the Byron, and Braidwood, License Renewal Application ML15016A4732015-01-15015 January 2015 Ltr 2014 Byron EP Annual Closeout (Rdj) ML14317A5432014-11-17017 November 2014 Federal Register Notice Regarding the ACRS Plant License Renewal Subcommittee Meeting (Braidwood/Byron), December 3, 2014 ML14205A5752014-08-11011 August 2014 Summary of Telephone Conference Call Held on June 10, 2014, Between U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Fire Water System Request for Additional Information Responses Pertaining to Byron Station. ML14227A1092014-07-0909 July 2014 Bryron, Units 1 & 2 - Imposition of Facility-Specific Baskfit Compliance with Licensing Basis Plant Design Requirements ML14177A4302014-07-0202 July 2014 06/23/2014 Summary of Telephone Conference Call Between NRC and Exelon Generation Co., LLC, Concerning the Byron and Braidwood, License Renewal Application (TAC Nos. MF1879, MF1880, MF1881 and MF1882) ML14148A3882014-06-0505 June 2014 Summary of Telephone Conference Call Held on May 19, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Draft Request for Additional Information, Set 28, Pertaining to the Byron Station and Br ML14126A5432014-05-19019 May 2014 Summary of Telephone Conference Call Held on April 22, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Draft Request for Additional Information, Set 24, Pertaining to the Byron Station and ML14092A4402014-05-14014 May 2014 Summary of Telephone Conference Call Held on March 19, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Draft Request for Additional Information, Set 18, Pertaining to the Byron Station and ML14107A2262014-05-14014 May 2014 Summary of Telephone Conference Call Held on March 26, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Draft Request for Additional Information, Set 21, Pertaining to the Byron Station and ML12194A5002014-03-31031 March 2014 Final TIA Response Byron Braidwood Single Spurious Assumption ML14064A4032014-03-11011 March 2014 Summary of Telephone Conference Call on February 27, 2014, Between U.S. Nuclear Regulatory Commission & Exelon Generation Company, LLC Concerning Draft Request for Additional Information Re Byron Station & Braidwood Station License Renewal ML14058B1802014-03-11011 March 2014 Summary of Telephone Conference Call on February 18, 2014, Between U.S. Nuclear Regulatory Commission & Exelon Generation Company, LLC Concerning Draft Request for Additional Information Regarding Byron & Braidwood Stations, License Renewal ML14036A3102014-03-0404 March 2014 Summary of Telephone Conference Call Held on January 28, 2014, Between NRC and Exelon, Concerning RAI Set 10, for the Byron and Braidwood Station, LRA ML14063A1742014-01-28028 January 2014 Making Non-Concurrence NCP-2013-014 Public Available ML13267A0802013-12-0909 December 2013 Reactor Systems Branch Safety Evaluation Input to Byron Station Units 1 and 2 and Braidwood Station Units 1 and 2 Measurement Uncertainty Recapture Power Update ML13303B4632013-11-25025 November 2013 Summary of Telephone Conference Call Held on October 22, 2013, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC, Concerning RAI Set 3 for the Byron-Braidwood LRA ML13240A2342013-10-0404 October 2013 8/10/2013 - Summary of Public Scoping Meetings Conducted Related to the Review of the Byron Nuclear Station, License Renewal Application(Tac Nos. MF1790 and MF1791) ML13205A0452013-08-0707 August 2013 08/20/2013 Forthcoming Meeting to Discuss the License Renewal Process and Environmental Scoping for Exelon Generation Company, Llc(Exelon), Byron Nuclear Station, Units 1 and 2 ML13190A3522013-07-10010 July 2013 Notice of Forthcoming Teleconference with Exelon Generation Company, LLC ML13094A0922013-04-0404 April 2013 Notice of Forthcoming Meeting with Exelon Generation Company, LLC to Discuss Future Submittal of a License Amendment Request to Modify Technical Specifications for the Main Steam Isolation Valves & Their Actuators ML13014A7652013-02-0404 February 2013 03/20/2013 Notice of Forthcoming Meeting with Exelon Corporation Regarding License Renewal Application for the Byron and Braidwood Nuclear Power Stations ML12335A2162012-12-20020 December 2012 Review of the Spring 2011 Steam Generator Tube Inservice Inspections During Refueling Outage 17 ML12348A6962012-12-17017 December 2012 1/3/2013 - Notice of Forthcoming Meeting with Exelon Generation Company, LLC, to Discuss Requests for Additional Information Regarding Exelon Physical Security Plans ML1208602902012-03-26026 March 2012 Notice of Forthcoming Public Meeting with Exelon Generation to Discuss Future Fleet Submittal Regarding Licensed Operator Eligibility Requirements ML1206700932012-03-0707 March 2012 Notice of Forthcoming Meeting with Exelon Generation Company, LLC (Exelon) Regarding Byron Station Single Phase Failure Event of February 28, 2012 ML1204817082012-02-17017 February 2012 Summary of Meeting with Exelon, LLC to Discuss Approach to Unrestrained Stack-Up Operations at the Upcoming Loading Campaign at Byron Nuclear Station (Byron), Enclosure 1 - Meeting Attendees, Enc 2- Agenda ML1110202372011-05-0606 May 2011 Verbal Authorization of Relief Request I3R-19 - Relief for Repair of Seal Welds Associated with Reactor Vessel Head Penetrations 31 and 64 ML1110906502011-05-0505 May 2011 Notice of Forthcoming Meeting with Exelon Generation Company, LLC Pre-Application Meeting to Discuss Proposed Amendment Uncertainty Recapture (Mur) Power Uprate License Amendment Request for Braidwood Station, Units 1 & 2 and Byron, Units 1 ML1109103802011-04-13013 April 2011 Verbal Authorization of Relief Request I3R-19 - Alternative Requirements for Repair of Reactors Vessel Head Penetrations Nos. 31 and 43 ML1108405122011-03-29029 March 2011 Verbal Authorization of Relief Request I3R-9 - Alternative Requirements for Repair of Reactor Vessel Head Penetrations 64. and 76 ML11132A1292011-03-17017 March 2011 Transmittal of Ihpb Safety Evaluation, Byron, Units 1 and 2, Braidwood, Units 1 and 2, License Amendment Request Regarding Low Temperature Overpressure Protection and Loss of Decay Heat Removal ML1104505662011-02-15015 February 2011 3/01/2011 Notice of Forthcoming Meeting with Exelon to Discuss Nrc'S Staff'S Review of the Ultimate Head Sink License Amendment Request for the Byron Station, Units 1 and 2 2024-06-04
[Table view] |
Text
July 1, 2003 MEMORANDUM TO: Anthony J. Mendiola, Chief, Section 2 Project Directorate III Division of Licensing Project Management, NRR FROM: George F. Dick, Jr., Senior Project Manager Project Directorate III /RA/
Division of Licensing Project Management, NRR
SUBJECT:
DOCUMENTATION OF A REQUEST FOR INFORMATION REGARDING THE LICENSED THERMAL POWER LEVEL AT BYRON STATION, UNIT 1 (TAC NOS. MB7319 AND MB7378)
By letter dated January 22, 2003, the NRC informed Exelon Generation Company, LLC, the licensee for Byron Station, it was concerned that Byron, Unit 1 may be operating above its licensed thermal power level. The licensee responded to the NRC letter with a submittal dated February 5, 2003.
During the course of its review, the NRC staff determined that it needed further information and prepared questions to be sent to the licensee. On June 10, 2003, the attached questions were FAXed to the licensee. A discussion of the questions with the licensee was held via a telephone conference call on June 20, 2003. A formal Request for Information is in preparation.
Attachment:
As stated
July 1, 2003 MEMORANDUM TO: Anthony J. Mendiola, Chief, Section 2 Project Directorate III Division of Licensing Project Management, NRR FROM: George F. Dick, Jr., Senior Project Manager Project Directorate III /RA/
Division of Licensing Project Management, NRR
SUBJECT:
DOCUMENTATION OF A REQUEST FOR INFORMATION REGARDING THE LICENSED THERMAL POWER LEVEL AT BYRON STATION, UNIT 1 (TAC NOS. MB7319 AND MB7378)
By letter dated January 22, 2003, the NRC informed Exelon Generation Company, LLC, the licensee for Byron Station, it was concerned that Byron, Unit 1 may be operating above its licensed thermal power level. The licensee responded to the NRC letter with a submittal dated February 5, 2003.
During the course of its review, the NRC staff determined that it needed further information and prepared questions to be sent to the licensee. On June 10, 2003, the attached questions were FAXed to the licensee. A discussion of the questions with the licensee was held via a telephone conference call on June 20, 2003. A formal Request for Information is in preparation.
Attachment:
As stated DISTRIBUTION:
PUBLIC MChawla PD3-2 r/f GDick WRuland PCoates AMendiola ADAMS Accession Number: ML031320769 OFFICE LA:PD3-2 PM:PD3-2 SC:PD3-2 NAME PCoates GDick AMendiola DATE 06/24/03 06/30/03 07/01/03 OFFICIAL RECORD COPY
Questions Regarding Byron, Unit 1 Thermal Power The NRC staff is reviewing the licensees response of February 5, 2003, to the NRCs letter of January 22, 2003. During the review, the staff has determined that it requires additional information in order to fully resolve the question of the licensed power limit for Byron Station, Unit 1. The staffs questions or information needs are as follows:
- 1. Questions specific to the licensees February 5, 2003, submittal 1.1 On Page 2 and on Page 5, the licensee identified participation by other than on-site personnel in such activities as detailed review of the installation and re-evaluation of the installation uncertainty calculations of the ultrasonic flow meters (UFMs). Please provide an elaboration of the statement, that the equipment was performing within specification.
1.2 On Page 9, the licensee identified a MWe evaluation and toward the end of the letter, discussed other parameters associated with the plant secondary side. Please provide a description of observations and conclusions obtained during those or any other evaluations, including any items that may be consistent with a thermal power level being greater than 100 percent. Include any observations relative to the turbine/alternator performance, including but not limited to the overall conversion efficiency of the turbine generator with the assumption that the plant is operating at 100 percent thermal power.
- 2. Questions related to the feedwater flow meters 2.1 Included in topical reports Westinghouse has submitted affirming the accuracy of the AMAG CrossFlow ultrasonic flowmeter at a number of nuclear power plants are comparisons of feedwater flow readings from the UFM with simultaneous readings from the installed venturi-based FW flow meters. Westinghouse notes that the FW venturis tend to defoul upon return to power following an outage, and that the UFM accuracy can, therefore, be confirmed immediately following start-up.
Please provide all available data showing simultaneous readings or correction factor computations for the venturis and the UFMs upon return to power or at other times when the venturis were known to be clean. Please provide the data, showing the degree of correlation between the two types of flowmeters. If such data do not exist, the staff requests that the licensee obtain these data after the next startup. The venturi delta-P instruments should be calibrated before taking data, or supplemented with laboratory-grade devices. Please include uncertainty evaluations for the data measurement and acquisition equipment for both the existing data and new data.
2.2 Please provide a complete description of the methodology used to calculate the correction factors. Include the behavior as a function of power.
2.3 Fluctuations in the CF for Byron appear to be greater than at other plants. It was recommended by Westinghouse to run continuous UFM monitoring for a period of 6 months to possibly identify the root cause of the fluctuations. Please describe how the CF fluctuations at Byron compared with the CF fluctuations at Braidwood, and how indicated power is affected by the level of CF fluctuation. Describe actions that have been taken in response to the Westinghouse recommendation and what was found to
be the root cause of this condition. Discuss the status of corrective actions to resolve this condition, and how the CF fluctuations currently compare between the Byron and Braidwood units.
- 3. Questions related to the quality of the calorimetric calculations When comparing comparable units multiple parameters other than the UFM feedwater flowrate instrumentation are biased in a manner that suggests that Byron is operating a thermal power that is greater than Braidwood. The licensee has concluded that this is acceptable for Byron Unit 1 because each of the indications is within the respective uncertainty ranges. More information is needed to support this conclusion. One would not expect that random deviations for multiple parameters, even though individually within expected bounds, would all be in the same direction. Consequently, please provide the following information for Byron Unit 1, Byron Unit 2, Braidwood Unit 1, and Braidwood Unit 2:
3.1 For the time between January 1, 1998, and the present, identify every parameter that was measured that could be used as an input to the calculation or estimation of thermal power or changes in thermal power. For each parameter, (1) identify each instrument or group of instruments that provides the value of the parameter and, (2) identify any dependencies or indicate that the parameter values are statistically independent.
3.2 For conditions corresponding to the predicted characteristics for 100 percent power, provide the results of a statistical analysis that would allow a conclusion to be drawn regarding whether there is, in fact, a statistically significant difference in the power levels between the comparable units. In addition, please provide a discussion of the methodology that was used to do the comparison. Include assumptions and identify any cases where values were adjusted and justify such changes.
3.3 Provide the results of the same type of above analysis for lower power conditions where the information may provide additional insights into operational behavior.
3.4 Based upon the above, provide for Byron 1, estimates of the probability that thermal power does not exceed 100 percent for a minimum of the following four cases: (1) prior to implementation of the UFM instrumentation; (2) prior to implementation of the power uprate with feedwater flowrate determined using the UFM instrumentation; (3) following the power uprate using feedwater flow venturi characteristics that have not been recalibrated by the UFM instrumentation (without the UFM instrumentation); and (4) following the power uprate with feedwater flowrate determined using the UFM instrumentation. Please provide a representative example of the calculations used to determine the estimates.
- 4. Questions related to other secondary side equipment 4.1 Describe and explain any changes in the turbine efficiencies at Byron prior to and following UFM implementation. Provide the same type of information for Braidwood.
Also describe and explain any differences in turbine efficiencies between the Byron and Braidwood Units prior to and following UFM implementation.
4.2 Describe and explain any differences in the turbine governor and throttle valves between the Byron and Braidwood Units. Were these valves originally purchased as identical valves for Byron and Braidwood?
4.3 Were any modifications made to the turbine governor or throttle valves (or to the turbines) prior to, in conjunction with, or subsequent to power uprate?