Letter Sequence Other |
---|
|
|
MONTHYEARML0305500962003-03-26026 March 2003 License Amendment No. 256 to License No. DPR-74, Revising TS Values for 4 Kilovolt Degraded-Voltage and Loss-Of-Voltage Relays Project stage: Other ML0309000772003-03-26026 March 2003 DC Cook, Unit 2, Technical Specifications for Amendment 256, Revise TS Values for 4 Kilovolt Degraded-Voltage & Loss-of-Voltage Relays Project stage: Other 2003-03-26
[Table View] |
Similar Documents at Cook |
---|
Category:Letter
MONTHYEARIR 05000315/20240032024-10-31031 October 2024 Integrated Inspection Report 05000315/2024003 05000316/2024003 07200072/2024001 and Exercise of Enforcement Discretion AEP-NRC-2024-77, U2C28 Steam Generator Tube Inspection Report2024-10-21021 October 2024 U2C28 Steam Generator Tube Inspection Report AEP-NRC-2024-80, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2024-10-15015 October 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-79, Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask2024-09-26026 September 2024 Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask AEP-NRC-2024-78, Reply to a Notice of Violation: EA-24-0472024-09-23023 September 2024 Reply to a Notice of Violation: EA-24-047 05000316/LER-2024-002-01, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-09-12012 September 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak IR 05000315/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000315/2024402 and 05000316/2024402, Independent Spent Fuel Storage Installation Security Inspection Report 07200072/2024401 AEP-NRC-2024-69, Core Operating Limits Report2024-09-0909 September 2024 Core Operating Limits Report IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24225A0022024-09-0303 September 2024 Issuance of Amendment Nos. 363 and 344 Revising Technical Specifications Section 3.8.1, AC Sources-Operating, for a One-Time Extension of a Completion Time IR 05000315/20240112024-08-30030 August 2024 NRC Inspection Report 05000315/2024011 and 05000316/2024011 and Notice of Violation AEP-NRC-2024-76, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-08-28028 August 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-51, Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes2024-08-28028 August 2024 Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes 05000316/LER-2024-003, Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage2024-08-22022 August 2024 Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage IR 05000315/20240052024-08-21021 August 2024 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2024005 and 05000316/2024005) AEP-NRC-2024-61, Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request2024-08-15015 August 2024 Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request ML24221A2702024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-62, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-08-0707 August 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report ML24183A0162024-07-25025 July 2024 Review of Reactor Vessel Material Surveillance Program Capsule W Technical Report ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System IR 05000315/20240022024-07-24024 July 2024 Integrated Inspection Report 05000315/2024002 and 05000316/2024002 05000316/LER-2024-002, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-07-15015 July 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak ML24197A1262024-07-15015 July 2024 Unit 2 - Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24176A1012024-06-21021 June 2024 57143-EN 57143 - Paragon Energy Solutions - Update 1 (Final) - 10CFR Part 21 Final Notification: P21-05242024-FN, Rev. 0 AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring ML24163A0132024-06-12012 June 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000315/2024012 and 05000316/2024012 ML24159A2522024-05-30030 May 2024 10 CFR 50.71(e) Update and Related Site Change Reports AEP-NRC-2024-23, Core Operating Limits Report2024-05-23023 May 2024 Core Operating Limits Report ML24141A2162024-05-20020 May 2024 —Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection 05000316/LER-2024-001, Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip2024-05-20020 May 2024 Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip AEP-NRC-2024-40, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-05-16016 May 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-41, Annual Radiological Environmental Operating Report2024-05-15015 May 2024 Annual Radiological Environmental Operating Report AEP-NRC-2024-26, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 492024-05-14014 May 2024 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 49 IR 05000315/20244012024-05-14014 May 2024 – Security Baseline Inspection Report 05000315/2024401 and 05000316/2024401 AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2024-05-14014 May 2024 Unit 2 - Transmittal of Report of Changes to the Emergency Plan IR 05000315/20240012024-05-14014 May 2024 Integrated Inspection Report 05000315/2024001 and 05000316/2024001 ML24115A2152024-05-0707 May 2024 LTR: CNP Non-Acceptance with Opportunity TS 3-8-1 AEP-NRC-2024-24, Form OAR-1, Owners Activity Report2024-05-0707 May 2024 Form OAR-1, Owners Activity Report ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML24116A0002024-05-0202 May 2024 – Regulatory Audit in Support of Review of the Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors AEP-NRC-2024-35, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-30030 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report AEP-NRC-2024-31, Annual Report of Individual Monitoring2024-04-24024 April 2024 Annual Report of Individual Monitoring AEP-NRC-2024-29, (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-072024-04-0303 April 2024 (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-07 AEP-NRC-2024-02, Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-04-0303 April 2024 Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating 2024-09-09
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24225A0022024-09-0303 September 2024 Issuance of Amendment Nos. 363 and 344 Revising Technical Specifications Section 3.8.1, AC Sources-Operating, for a One-Time Extension of a Completion Time ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System ML22214A0012022-10-0707 October 2022 Issuance of Amendment Nos. 361 and 343 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22046A2332022-06-21021 June 2022 Issuance of Amendment Nos. 360 and 342 Regarding Change to the Technical Specification Requirement for Containment Water Level Instrumentation ML22126A1922022-05-11011 May 2022 Correction to Pages Issued for Amendment No. 359 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22102A0122022-05-0202 May 2022 Issuance of Amendment Nos. 359 and 340 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21062A1882021-03-23023 March 2021 Issuance of Amendment No. 339 One Cycle Extension of Appendix J, Type a, Integrated Leakage Rate Test Interval (EPID L-2020-LLA-0280 (COVID-19)) ML21041A0862021-03-0303 March 2021 Issuance of Amendment No. 338 Regarding One-Time Deferral of the Steam Generator Tube Inspections ML21006A4582021-02-0202 February 2021 Issuance of Amendments Nos. 358 and 337 Regarding Revision to Technical Specifications to Adopt Technical Specifications Task Force Traveler 541, Revision 2 ML20366A1552021-01-15015 January 2021 Issuance of Amendments Nos. 357 and 336 Regarding Revision to Technical Specifications Bases Control Program ML20329A0012021-01-12012 January 2021 Issuance of Amendment No. 356 Regarding Updating the Reactor Coolant System Pressure-Temperature Limits ML20322A4282021-01-0606 January 2021 Issuance of Amendment Nos. 355 and 335, Revision to Technical Specifications to Adopt Technical Specification Task Force Traveler 567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML20315A4832020-12-30030 December 2020 Issuance of Amendment Nos. 354 and 334 Adopt Technical Specification Task Force Traveler TSTF-412, Revision 3, Provide Actions for One Steam Supply to the Turbine Driven Afw/Efw Pump Inoperable ML20213C7042020-09-0303 September 2020 Issuance of Amendment No. 353 One Cycle Extension of Appendix J, Type a, Integrated Leakage Rate Test Interval ML19347B3762020-01-31031 January 2020 Issuance of Amendment Nos. 350 and 331, Revise Technical Specification 5.5.5, Reactor Coolant Pump Flywheel Inspection Program, in Accordance with Technical Specification Task Force TSTF-421 ML19329A0112020-01-23023 January 2020 Issuance of Amendment Numbers 349 and 330 to Apply Leak Before-Break Methodology to Reactor Coolant System Branch Lines and Deletion of Containment Humidity Monitor ML19304B6722019-12-31031 December 2019 Issuance of Amendment Numbers 348 and 329 to Revise Operating Licenses DPR-58 and DPR-74, to Address Issues Identified in Westinghouse Document NSAL-15-1 ML19259A0542019-10-15015 October 2019 Issuance of Amendment to Revise Operating Licenses DPR-58 and DPR-74, Appendix B, Environmental Technical Specifications, Part II, Non-Radiological Environment Protection Plan ML19170A3622019-08-0101 August 2019 Issuance of Amendment Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping ML19031B9662019-04-10010 April 2019 Issuance of Amendments 344, 326 Regarding Request to Adopt TSTF-529, Revision 4, Clarify Use and Application Rules ML18346A3582019-02-0505 February 2019 Issuance of Amendments 343 and 325 Regarding the Battery Monitoring and Maintenance Program AEP-NRC-2018-66, Request for License Amendment to Technical Specification 3.4.15, RCS Leakage Detection Instrumentation, and Application of Leak-Before-Break Methodology2018-11-20020 November 2018 Request for License Amendment to Technical Specification 3.4.15, RCS Leakage Detection Instrumentation, and Application of Leak-Before-Break Methodology ML18284A2542018-11-16016 November 2018 Issuance of Amendments Request for Deviation from National Fire Protection Association 805 Requirements ML18249A0192018-11-13013 November 2018 Issuance of Amendment Nos. 341 and 323 Technical Support Center Relocation ML18131A2532018-07-0606 July 2018 Issuance of Amendments Request for Deviation from National Fire Protection Association 805 Requirements ML17312B0302017-12-19019 December 2017 Issuance of Amendments License Amendment Request to Revise Technical Specifications Section 3.7.2, Steam Generator Stop Valves (CAC Nos. MF9539 and MF9540; EPID L-2017-LLA-0198) ML17214A5502017-09-21021 September 2017 Issuance of Amendments License Amendment Request Regarding Technical Specification 3.9.3, Containment Penetrations ML17131A2772017-06-0707 June 2017 Issuance of Amendments License Amendment Request Regarding Containment Leakage Rate Testing Program ML17103A1062017-05-24024 May 2017 Issuance of Amendments Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML17045A1502017-03-31031 March 2017 Issuance of Amendments Adopting of TSTF0425-A, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B ML16258A3402016-11-0202 November 2016 Issuance of Amendments Cyber Security Implementation Schedule ML16242A1112016-10-20020 October 2016 DC Cook, Units 1 and 2 - Issuance of Amendments Adoption of TSTF-490,REV.0,Deletion of E-Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specification and Implementation of Full-Scope Alternative Source Ter ML16216A1812016-08-19019 August 2016 Issuance of Amendment to Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System Instrumentation ML16195A0042016-08-0404 August 2016 Issuance of Amendments to Revise Technical Specifications to Adopt Technical Specifications Task Force - 523, Generic Letter 2008 01, Managing Gas Accumulation ML15327A2172015-12-11011 December 2015 Issuance of Amendments Technical Specifications Surveillance Requirements 3.8.1.10, 3.8.1.11, and 3.8.1.15 ML14197A0972015-11-30030 November 2015 Issuance of Amendment Regarding Restoration of Normal Reactor Coolant System Pressure and Temperature Consistent with Previously Licensed Conditions ML15187A0022015-07-10010 July 2015 Issuance of Amendment No. 328 (Exigent) Regarding Revision to Technical Specifications for Engineered Safety Feature Actuation System ML15076A2262015-04-0606 April 2015 Issuance of Amendments Adoption of TSTF-427, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability, Revision 2 ML15072A2642015-03-30030 March 2015 Issuance of Amendments Containment Leakage Rate Testing Program (TACs MF3568 and MF3569) ML14317A5512014-12-18018 December 2014 Issuance of Amendments Cyber Security Implementation Schedule (Tac Nos. MF3363 and MF3364) ML14282A1182014-11-20020 November 2014 Issuance of Amendments Regarding Containment Divider Barrier Seal ML13140A3982013-10-24024 October 2013 Issuance of Amendment Nos. 322 and 305 - Transition to NFPA 805 Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) and NFPA 805 ML13282A2142013-10-0909 October 2013 Issuance of Amendment Revision to Technical Specification 3.6.9, Distributed Ignition System (Dis) (Emergency Circumstances) ML12318A2342012-12-13013 December 2012 Issuance of Amendments Revised Cyber Security Plant Implementation Schedule Milestone 6 ML12320A5442012-11-15015 November 2012 DC Cook CDBI Response to Question 2012-CDBI-298 ML12138A3982012-08-23023 August 2012 Issuance of Amendment No. 302 Regarding Optimized Zirlo Clad Fuel Rods ML11251A2272011-11-0303 November 2011 Issuance of Amendment to Relocate Closure Time Requirements for Certain Valves Per TSTF-491 ML11249A0902011-11-0101 November 2011 Issuance of Amendment to Reflect TSTF-513 Regarding Reactor Coolant Leakage Detection Instrumentation ML1116100202011-08-25025 August 2011 Issuance of Amendment No. 316 Use of Optimized Zirlo Fuel Design ML11182A1782011-07-28028 July 2011 License Amendment, Issuance of Amendments Cyber Security Plan 2024-09-03
[Table view] Category:Safety Evaluation
MONTHYEARML24225A0022024-09-0303 September 2024 Issuance of Amendment Nos. 363 and 344 Revising Technical Specifications Section 3.8.1, AC Sources-Operating, for a One-Time Extension of a Completion Time ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System ML24107B1202024-04-18018 April 2024 Authorization and Safety Evaluation for Alternative Request No. ISIR-5-07 ML22363A5622023-01-0404 January 2023 Relief Request ISIR-5-06 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles ML22214A0012022-10-0707 October 2022 Issuance of Amendment Nos. 361 and 343 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22166A3302022-07-26026 July 2022 Review of Quality Assurance Program Changes ML22046A2332022-06-21021 June 2022 Issuance of Amendment Nos. 360 and 342 Regarding Change to the Technical Specification Requirement for Containment Water Level Instrumentation ML22055A0012022-06-0808 June 2022 Issuance of Amendment No. 341 Updating the Reactor Coolant System Pressure Temperature Limits ML22102A0122022-05-0202 May 2022 Issuance of Amendment Nos. 359 and 340 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21295A0092021-11-0303 November 2021 Relief Request ISIR-4-11 Limited Coverage Examinations During the Fourth 10 Year Inservice Inspection Interval ML21141A2612021-06-0202 June 2021 Alternative Request REL-PP2 Related to Fifth 10-Year Inservice Testing Program Interval ML21130A0082021-05-12012 May 2021 Relief Request ISIR-5-05 Related to ASME Code Case N 729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles (EPID L-2021-LLR-0033 (COVID-19)) ML21062A1882021-03-23023 March 2021 Issuance of Amendment No. 339 One Cycle Extension of Appendix J, Type a, Integrated Leakage Rate Test Interval (EPID L-2020-LLA-0280 (COVID-19)) ML21041A0862021-03-0303 March 2021 Issuance of Amendment No. 338 Regarding One-Time Deferral of the Steam Generator Tube Inspections ML21034A1552021-02-12012 February 2021 Relief Request ISIR-5-04 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles ML21006A4582021-02-0202 February 2021 Issuance of Amendments Nos. 358 and 337 Regarding Revision to Technical Specifications to Adopt Technical Specifications Task Force Traveler 541, Revision 2 ML20366A1552021-01-15015 January 2021 Issuance of Amendments Nos. 357 and 336 Regarding Revision to Technical Specifications Bases Control Program ML20366A1342021-01-13013 January 2021 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML20329A0012021-01-12012 January 2021 Issuance of Amendment No. 356 Regarding Updating the Reactor Coolant System Pressure-Temperature Limits ML20322A4282021-01-0606 January 2021 Issuance of Amendment Nos. 355 and 335, Revision to Technical Specifications to Adopt Technical Specification Task Force Traveler 567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML20315A4832020-12-30030 December 2020 Issuance of Amendment Nos. 354 and 334 Adopt Technical Specification Task Force Traveler TSTF-412, Revision 3, Provide Actions for One Steam Supply to the Turbine Driven Afw/Efw Pump Inoperable ML20247J6562020-09-10010 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20213C7042020-09-0303 September 2020 Issuance of Amendment No. 353 One Cycle Extension of Appendix J, Type a, Integrated Leakage Rate Test Interval ML19347B3762020-01-31031 January 2020 Issuance of Amendment Nos. 350 and 331, Revise Technical Specification 5.5.5, Reactor Coolant Pump Flywheel Inspection Program, in Accordance with Technical Specification Task Force TSTF-421 ML19329A0112020-01-23023 January 2020 Issuance of Amendment Numbers 349 and 330 to Apply Leak Before-Break Methodology to Reactor Coolant System Branch Lines and Deletion of Containment Humidity Monitor ML19304B6722019-12-31031 December 2019 Issuance of Amendment Numbers 348 and 329 to Revise Operating Licenses DPR-58 and DPR-74, to Address Issues Identified in Westinghouse Document NSAL-15-1 ML19259A0542019-10-15015 October 2019 Issuance of Amendment to Revise Operating Licenses DPR-58 and DPR-74, Appendix B, Environmental Technical Specifications, Part II, Non-Radiological Environment Protection Plan ML19196A0642019-08-23023 August 2019 Relied Request ISIR-4-10 Regarding Fourth Inservice Inspection Program Interval ML19170A3622019-08-0101 August 2019 Issuance of Amendment Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping ML19134A3552019-07-11011 July 2019 Issuance of Amendments Technical Specification Task Force (TSTF) Traveler 563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML19031B9662019-04-10010 April 2019 Issuance of Amendments 344, 326 Regarding Request to Adopt TSTF-529, Revision 4, Clarify Use and Application Rules ML18346A3582019-02-0505 February 2019 Issuance of Amendments 343 and 325 Regarding the Battery Monitoring and Maintenance Program ML18348A4182019-01-0909 January 2019 Units and 2 Approval of Request for Alternative from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N 729-4 ML18337A3942018-12-11011 December 2018 Proposed Alternative Request for Elimination of the Reactor Pressure Vessel Threads in Flange Examination ML18284A2542018-11-16016 November 2018 Issuance of Amendments Request for Deviation from National Fire Protection Association 805 Requirements ML18249A0192018-11-13013 November 2018 Issuance of Amendment Nos. 341 and 323 Technical Support Center Relocation ML18284A3102018-10-26026 October 2018 Approval of Alternative to the ASME Code Regarding Reactor Vessel Weld Examination - Relief Request ISIR-4-08 ML18131A2532018-07-0606 July 2018 Issuance of Amendments Request for Deviation from National Fire Protection Association 805 Requirements ML18103A0592018-04-19019 April 2018 Request for Use of Alternative Isir 04-05, Revision 1, Associated with Reactor Vessel Closure Head Volumetric/Surface Examination Frequency Requirements for the Inservice Inspection Program ML17312B0302017-12-19019 December 2017 Issuance of Amendments License Amendment Request to Revise Technical Specifications Section 3.7.2, Steam Generator Stop Valves (CAC Nos. MF9539 and MF9540; EPID L-2017-LLA-0198) ML17214A5502017-09-21021 September 2017 Issuance of Amendments License Amendment Request Regarding Technical Specification 3.9.3, Containment Penetrations ML17131A2772017-06-0707 June 2017 Issuance of Amendments License Amendment Request Regarding Containment Leakage Rate Testing Program ML17103A1062017-05-24024 May 2017 Issuance of Amendments Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML17096A6272017-04-12012 April 2017 Proposed Alternative to Use ASME OM Code Case OMN-20 ML17045A1502017-03-31031 March 2017 Issuance of Amendments Adopting of TSTF0425-A, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B ML16327A1102016-12-28028 December 2016 Cover Letter for Revised Safety Evaluation for Amendment Nos. 332 and 314 Adoption of TSTF-490, Rev. 0, and Implementation of Full-Scope Alternative Source Term ML16242A1112016-10-20020 October 2016 DC Cook, Units 1 and 2 - Issuance of Amendments Adoption of TSTF-490,REV.0,Deletion of E-Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specification and Implementation of Full-Scope Alternative Source Ter ML16216A1812016-08-19019 August 2016 Issuance of Amendment to Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System Instrumentation ML16195A0042016-08-0404 August 2016 Issuance of Amendments to Revise Technical Specifications to Adopt Technical Specifications Task Force - 523, Generic Letter 2008 01, Managing Gas Accumulation ML16032A0312016-02-0404 February 2016 Request for Use of Alternative REL-PP1 Associated with Pump Inservice Testing (CAC Nos. MF6548 and MF6549) 2024-09-03
[Table view] |
Text
March 26, 2003 Mr. A. Christopher Bakken III, Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group 500 Circle Drive Buchanan, MI 49107
SUBJECT:
DONALD C. COOK NUCLEAR PLANT, UNIT 2 - ISSUANCE OF AMENDMENT (TAC NO. MB6580)
Dear Mr. Bakken:
The U.S. Nuclear Regulatory Commission has issued the enclosed Amendment No. 256 to Facility Operating License No. DPR-74 for the Donald C. Cook Nuclear Plant, Unit 2. The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated October 16, 2002, as supplemented January 28, 2003.
The amendment would revise the TS values for the 4 kilovolt degraded-voltage and loss-of-voltage relays.
A copy of our related safety evaluation is also enclosed. A Notice of Issuance will be included in the Commissions next biweekly Federal Register notice.
Sincerely,
/RA/
John F. Stang, Senior Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-316
Enclosures:
- 1. Amendment No. 256 to DPR-74
- 2. Safety Evaluation cc w/encls: See next page
ML030550096 OFFICE PM:PD3-1 LA:PD3-1 SC:EEIB OGC SC:PD3-1 NAME JStang THarris CHolden RWeisman LRaghavan DATE 03/04/03 03/04/03 02/21/03 03/17/03 03/26/03 Donald C. Cook Nuclear Plant, Units 1 and 2 cc:
Regional Administrator, Region III Drinking Water and Radiological U.S. Nuclear Regulatory Commission Project Division 801 Warrenville Road Michigan Department of Lisle, IL 60532-4351 Environmental Quality 3423 N. Martin Luther King Jr. Blvd.
Attorney General P. O. Box 30630, CPH Mailroom Department of Attorney General Lansing, MI 48909-8130 525 West Ottawa Street Lansing, MI 48913 Scot A. Greenlee Director, Nuclear Technical Services Township Supervisor Indiana Michigan Power Company Lake Township Hall Nuclear Generation Group P.O. Box 818 500 Circle Drive Bridgman, MI 49106 Buchanan, MI 49107 U.S. Nuclear Regulatory Commission David A. Lochbaum Resident Inspectors Office Union of Concerned Scientists 7700 Red Arrow Highway 1616 P Street NW, Suite 310 Stevensville, MI 49127 Washington, DC 20036-1495 David W. Jenkins, Esquire Michael J. Finissi Indiana Michigan Power Company Plant Manager One Cook Place Indiana Michigan Power Company Bridgman, MI 49106 Nuclear Generation Group One Cook Place Mayor, City of Bridgman Bridgman, MI 49106 P.O. Box 366 Bridgman, MI 49106 Joseph E. Pollock Site Vice President Special Assistant to the Governor Indiana Michigan Power Company Room 1 - State Capitol Nuclear Generation Group Lansing, MI 48909 One Cook Place Bridgman, MI 49106
INDIANA MICHIGAN POWER COMPANY DOCKET NO. 50-316 DONALD C. COOK NUCLEAR PLANT, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 256 License No. DPR-74
- 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Indiana Michigan Power Company (the licensee) dated October 16, 2002, as supplemented January 28, 2003, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-74 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 256, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of its date of issuance and shall be implemented prior to startup from Unit 2 refueling outage 14.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
L. Raghavan, Chief, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: March 26, 2003
ATTACHMENT TO LICENSE AMENDMENT NO. 256 FACILITY OPERATING LICENSE NO. DPR-74 DOCKET NO. 50-316 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
REMOVE INSERT 3/4 3-25a 3/4 3-25a B 3/4 3-1 B 3/4 3-1
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 256 TO FACILITY OPERATING LICENSE NO. DPR-74 INDIANA MICHIGAN POWER COMPANY DONALD C. COOK NUCLEAR PLANT, UNIT 2 DOCKET NO. 50-316
1.0 INTRODUCTION
By application dated October 16, 2002 as supplemented January 28, 2003, the Indiana Michigan Power Company (the licensee) requested an amendment to the Technical Specifications (TSs) for the Donald C. Cook (D. C. Cook) Nuclear Plant, Unit 2. The proposed amendment would revise the TS values for the 4 kilovolt (kV) degraded-voltage and loss-of-voltage relays. The proposed changes are part of a planned design change to replace the existing 4kV offsite power transformers, loss of voltage relays, and degraded voltage relays with components of an improved design to increase the reliability of offsite power for safety-related equipment.
The supplemental letter contained clarifying information and did not change the initial no significant hazards consideration determination and did not expand the scope of the original Federal Register notice.
2.0 REGULATORY EVALUATION
Title 10 of the Code of Federal Regulations (10 CFR) Part 50 Appendix A, General Design Criteria (GDC) 17 requires that an offsite electric power system shall be provided to permit functioning of structures, systems, and components important to safety. The safety function for each system shall be to provide sufficient capacity and capability to assure that (1) specified acceptable fuel design limits and design conditions of the reactor coolant pressure boundary are not exceeded as a result of anticipated operational occurrences and (2) the core is cooled and containment integrity and other vital functions are maintained in the event of postulated accidents. The degraded voltage and loss of voltage relay trip set points and associated time delays assure proper operation of safety-related loads as required by GDC 17 of 10 CFR Part 50, Appendix A.
The licensee initiated the planned design change following the discovery that the terminal voltage at some safety-related electrical equipment may not be adequate during a postulated design-basis accident coincident with a degraded voltage condition. This finding was reported to the Nuclear Regulatory Commission (NRC) in Licensee Event Report 315/1999-022-01 dated March 23, 2000, and actions were taken to assure that safety-related loads would have adequate voltage. Subsequently, on May 4, 2000, the licensee committed to a planned design change to replace the existing 4kV offsite power transformers (reserve auxiliary transformers
[RATs]) and degraded voltage relays with components of an improved design. These changes are needed to increase the reliability of offsite power for safety-related equipment. The licensees post-restart commitment was to re-evaluate the electrical distribution systems design and licensing basis during the development of the modifications to install the auto-load tap change transformers.
The existing RATs do not have auto load tap changers. The planned design change will replace the existing RATs with load tap changing transformers. When the new RATs are used to provide auxiliary power, they will sense changes in grid voltage and will automatically change taps to maintain the appropriate voltage at the 4kV buses.
The proposed TS revision is needed to allow degraded voltage and loss of voltage relay setpoints to be changed to fully benefit from the improved protection provided by the planned design change. Due to inaccuracies inherent in the existing degraded voltage relays and their associated potential transformer circuits, the relays have wide tolerance. Consequently, spurious trips could occur if the existing relays were set any higher. The design change will replace the degraded voltage relays with relays of an improved design, allowing the degraded voltage trip setting to be increased to maintain voltage above the analytical limit; that is, the value at which all safety-related loads have sufficient voltage to perform their intended safety function.
The design change will also replace the loss of voltage relays with an improved relay design.
This allows the loss of voltage relay setpoints to be low enough to prevent spurious tripping, while still maintaining voltage high enough to ensure all safety-related loads have sufficient voltage to perform their intended safety function.
The proposed changes are requested in accordance with Section 50.90 of 10 CFR to assure continued compliance with 10 CFR Part 50, Appendix A, GDC-17, Electric Power Systems, and GDC-18, Inspection and Testing of Electric Power Systems.
3.0 TECHNICAL EVALUATION
The proposed TSs changes are as follows:
- a. Revise TS Table 3.3-4, Engineered Safety Feature Actuation System Instrumentation Trip Setpoints, to lower the 4kV bus loss of voltage trip setpoint and allowable values for both the motor driven auxiliary feed water pumps and the loss of power functional units. The proposed trip setpoint is 3241 volts with allowable values of greater than or equal to 3195 and less than or equal to 3280 volts.
- b. Revise TS Table 3.3-4 to raise the 4kV bus degraded voltage trip setpoint and allowable values, and to decrease the time delay for the loss of power functional units. The proposed trip setpoint is 3959 volts with allowable values of greater than or equal to 3910 volts and less than or equal to 4000 volts. The proposed time delay for the degraded voltage trip is 9 seconds +/-0.25 seconds. The proposed time delay will apply only when a steam generator level low-low or a safety injection signal is present.
- c. Revise the TSs 3/4.3.1 and 3/4.3.2 bases to explain the applicability of the time delay associated with the 4kV bus degraded voltage trip setpoint.
The licensee stated that the proposed loss of voltage (LOV) relay setpoint and the range of allowable values are based on ensuring the setting is low enough to prevent spurious actuation during a voltage transient caused by motor starting conditions, yet high enough to ensure safety-related equipment will perform as required by the safety analysis. The criteria used to determine the setpoint included:
- a. Preventing running Class 1E motors from stalling.
- b. Ensuring any load can be started without damaging any loads that are already running.
- c. Preventing load shedding due to thermal overloads/relaying.
The proposed setpoint value, 3241 volts, is equal to 78 percent of 4160 volts with an allowable range of 3195 volts to 3280 volts (76.80 to 78.85 percent of 4160 volts). This is based on a plant-specific calculation. On January 28, 2003, the licensee provided details on how the above criteria are met. The licensee stated that the minimum required voltage to prevent Class 1E motor stalling is 76.68 percent of the rated bus voltage. The lowest anticipated transient voltage on the 4.16 kV bus is 79.88 percent of the rated bus voltage and is the result of starting a reactor coolant pump. The proposed setpoint value of 3241 volts with an allowable range of 3195 volts to 3280 volts is sufficient to prevent spurious actuation during transients (i.e., the relay should not actuate during voltage transients experienced during starting of plant motors). The range is sufficient to preclude the stalling, damage, or spurious tripping of Class 1E motors due to low voltage. The voltage analysis demonstrated that (1) the voltage of the Class 1E buses remains above the upper allowable setpoint value of the LOV relay during the start of the largest plant motor; (2) the minimum allowable voltage is sufficient to preclude stalling of Class 1E motors; and (3) the increased current resulting from a voltage just above the lower allowable setpoint value of the LOV relay is within the allowable current versus time range for Class 1E motor overcurrent protection. This ensures that the motor will not be thermally damaged or trip prior to degraded voltage relay actuation.
The time delay for the LOV relay is maintained at 2 seconds with a tolerance of +/- 0.2 seconds.
The 2-second time delay was chosen to bypass short duration system voltage drops and to function in sufficient time to allow the protective actions initiated by the loss of voltage to meet the accident analysis equipment start times.
The proposed degraded voltage setpoint is based on a voltage response analysis. It was selected to ensure all safety-related loads have sufficient voltage to perform their intended safety function. The criteria used to determine the setpoint included:
C Providing degraded voltage and time delay setpoints that support the voltage requirements of the Class 1E loads at all onsite system distribution levels (i.e., 4kV, 600 V, and 120/208V).
C Providing minimum continuous running voltage (nominally 90 percent of nameplate) to Class 1E motors on the emergency buses.
The analytical limit, that is, the voltage at which all safety-related loads have sufficient voltage to perform their intended safety function, was determined to be 3902 volts, but a higher value of 3910 volts was used to bound the low end of the allowable value range and to provide margin for future load changes.
The proposed time delay for the degraded voltage relay is based on setting the delay short enough to allow safety-related equipment to operate within the assumptions of the safety analysis, but long enough to avoid spurious operation of the relay. The proposed 9 +/- 0.25 second time delay only applies when a safety injection signal or a steam generator low-low level signal is present. This time delay supports the safety analysis assumptions for safety-related equipment operation. The time delay associated with the voltage changes by the new automatic load tap-changing transformer has been considered in the proposed 9 +/- 0.25 second time delay determination.
The longer degraded voltage time delay remains the present value of 2 minutes and is applicable during non-accident conditions. It will continue to prevent unnecessary disconnecting of the offsite power source due to short, inconsequential grid disturbances and prevent unnecessary challenges to safety systems of the unit.
The proposed setpoint and time delay values were determined by a plant-specific calculation using the methodology provided in Institute of Electrical and Electronics Engineers Standard 741-1997, Standard Criteria for the Protection of Class 1E Power Systems and Equipment in Nuclear Power Generating Stations. The calculation considers the errors associated with the circuit that monitors the voltage at the 4kV safety-related switchgear. It also reflects factors associated with the design change, which includes replacing the existing voltage relays with new relays furnished with internal harmonic filters. The accuracy of the relays and associated components, as well as the tolerances associated with setting the relays, have been considered.
In addition to the protection provided by the LOV relays and the degraded voltage relays, the licensee has established provisions to monitor and maintain adequate switchyard voltages and to respond in the event that the switchyard voltages drop below the minimum acceptable levels.
For added assurance that all essential loads can adequately perform their design functions, an interface agreement between the American Electric Power (AEP) Energy Delivery and Customer Relations Group and the AEP Nuclear Generating Group has been developed, a real-time switchyard voltage monitoring computer program has been developed, and response procedures have been developed.
The interface agreement provides guidance to ensure that the organizations responsible for operation, maintenance, and engineering consider the impact of their activities on facilities located at D. C. Cook and on the AEP transmission system. Specifically, the interface agreement contains a provision that system control center personnel monitor system conditions to ensure that adequate voltage levels to support the D. C. Cook facility in the event of an accident are maintained.
Switchyard voltages are monitored on the D. C. Cook Online Load Flow (CKOLF) computer program, which is a real-time state-estimator/load-flow computer program. CKOLF determines the expected voltage levels at the switchyard assuming a D. C. Cook Unit 1 trip (if only one unit is operating) or both Units 1 and 2 trip (if both units are operating). The program provides an alarm to the AEP Transmission Coordinator (AEPTC) if the expected switchyard voltage is not within the acceptable limits. A special operating procedure, Cook Nuclear Plant Transmission/Auxiliary Voltage Operating Guide, is followed by the AEPTC. This procedure provides directions for the AEPTC to respond to switchyard voltage conditions outside of the limits acceptable to D. C. Cook as indicated by an alarm. The AEPTCs required actions include notifying D. C. Cook Unit Supervisors of the switchyard voltage conditions and also taking immediate compensatory actions to restore voltage levels to within acceptable limits.
Additionally, D. C. Cook has an operating procedure Degraded Offsite AC Voltage Response, that provides directions for responding to degraded switchyard voltage conditions.
The proposed bases change explains that the proposed time delay for the 4kV bus degraded voltage setpoint presented in the TS is to protect the plant during situations addressed in the safety analysis in Chapter 14 of the Updated Final Safety Analysis Report. A longer time delay that is not included in the TS will apply when neither a steam generator low-low level nor a safety injection signal is present. The longer time delay will be included in an owner-controlled document instead of the TS. This is consistent with NUREG-1431, Revision 2, and its bases.
The proposed changes allow the LOV relays and degraded voltage relays to act in concert to assure that electrical equipment powered by the 4 kV bus will perform its safety function if a loss of offsite power or a degraded voltage condition were to occur. The changes to the setpoints and time delays together with the interface agreement assure the electrical equipment is capable of performing its function to meet the requirements of the accident analyses.
The proposed format changes are for improved readability, consistency with NUREG-1431, Revision 2, and improved appearance. The format changes are not intended to introduce other changes.
In response to the NRC staffs request for additional information (RAI) regarding auxiliary bus voltage analysis, the licensee stated that Electrical Transient Analyzer Program (ETAP) was used to perform the power system analysis and the system model is developed from approved design drawings and procedures. The system model reflects the configuration of D. C. Cook and the expected configurations under design-basis accident conditions. Connected loads and their operating conditions used in the model ( i.e., percent loading, duration, etc.) are based on available design information for meeting their most demanding design requirements. The results of the analysis confirm that all essential loads in the system will have adequate voltage to perform their design function as long as the voltages remain at or above the analytical limit of 3902 volts or 93.8 percent of 4160 volts at the 4kV safety-related buses.
The NRC staff evaluated the assumptions, loading and summary of results provided by the licensee on January 28, 2003 and finds them acceptable. The licensee stated that ETAP is widely accepted and used in the industry as the power system analysis tool. This program meets 10 CFR Part 50, Appendix B requirements and has been verified and validated. The system modeled in ETAP was developed in accordance with approved design drawings and procedures.
4.0
SUMMARY
The NRC staff has reviewed the information in the license amendment request and the response to the NRC staff RAI and for the reasons set forth above concluded that the requirements of GDC 17 will be fulfilled via implementation of this amendment, which is therefore acceptable. The proposed amendment continues to assure compliance with DGC 18.
5.0 STATE CONSULTATION
In accordance with the Commissions regulations, the Michigan State official was notified of the proposed issuance of the amendment. The State official had no comments.
6.0 ENVIRONMENTAL CONSIDERATION
The amendment changes the requirements with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 or change the surveillance requirements. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding (67 FR 68739). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b),
no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
7.0 CONCLUSION
The NRC staff has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: Amar Pal Date: March 26, 2003