L-02-010, Independent Spent Fuel Storage Installation Submittal of License Application Amendment 1 (TAC L23399)

From kanterella
(Redirected from ML022950211)
Jump to navigation Jump to search

Independent Spent Fuel Storage Installation Submittal of License Application Amendment 1 (TAC L23399)
ML022950211
Person / Time
Site: Diablo Canyon  
(DPR-080, DPR-082)
Issue date: 10/15/2002
From: Womack L
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
+sispmjr200505, -RFPFR, DIL-02-010, TAC L23399
Download: ML022950211 (12)


Text

W Pacific Gas and Electric Company Lawrence F. Womack Vice President Nuclear Services October 15, 2002 Diablo Canyon Power Plant P0 Box 56 Avila Beach, CA 93424 8055454600 Fax 805 545 4234 PG&E Letter DIL-02-01O U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 72-26 Diablo Canyon Independent Spent Fuel Storage Installation Submittal of License Application Amendment I (TAC No. L23399)

Dear Commissioners and Staff:

This letter submits Amendment 1 to the Diablo Canyon Independent Spent Fuel Storage Installation (ISFSI) License Application. The ISFSI license application was submitted to the Nuclear Regulatory Commission (NRC) by Pacific Gas and Electric Company (PG&E) on December 21, 2001, in PG&E Letter DIL-01-002. The application included a Safety Analysis Report (SAR), Environmental Report (ER),

and other required documents in accordance with 10 CFR 72.

By letter dated August 29, 2002, the NRC staff requested additional information needed to continue their review of the Diablo Canyon ISFSI License Application.

PG&E responded to this request for additional information (RAI) in PG&E Letter DIL-02-009, dated October 15, 2002. Some of the RAI responses required changes to the ISFSI SAR and ER.

On November 12, 1997, the NRC granted PG&E an exemption from the requirements of 10 CFR 70.24 concerning criticality monitors. PG&E requested an exemption from the 10 CFR 72.124(c) criticality monitoring requirements by requesting an extension of the NRC's November 12, 1997, exemption for the FHB/AB to envelop the activities associated with the Diablo Canyon ISFSI SAR, in its letter DCL-02-044, "License Amendment Request 02-03, Spent Fuel Cask Handling," dated April 15, 2002. DCL-02-044 is PG&E's 10 CFR 50 LAR in support of ISFSI licensing, and included the exemption extension request.

In PG&E letter DCL-02-117, "Change in Licensing Basis Compliance from 10 CFR 70.24 to 10 CFR 50.68(b)," dated October 2, 2002, PG&E informed the NRC that PG&E will revise the DCPP licensing basis to reflect compliance with 10 CFR 50.68(b) in lieu of 10 CFR 70.24 and that the exemption request in DCL-02-044 will be revised to request a similar exemption from 10 CFR 50.68(b) in lieu of 10 CFR 70.24.

Z\\

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance

\\

Catlawav 9 Comanche Peak

  • Diablo Canyon e Palo Verde
  • Woaf Creek

Document Control Desk PG&E Letter October 15, 2002 Page 2 These changes are enclosed as Amendment I to the license application documents.

If you have any questions regarding this amendment, please contact Mr. Terence Grebel at (805) 545-4160.

Sincerely, Lawrence F. Womack Vice President - Nuclear Services gwh Enclosure DIL-02-01 0 cc:

Diablo Distribution Brian Gutherman cclenc:

Diane Curran, Esq.

James R. Hall David A. Repka, Esq.

Robert K. Temple, Esq.

Robert R. Wellington, Esq.

Jacquelyn C. Wheeler A member of the STARS (Strategic Teaming and Resource Sharing) ALliance Callawav e Comanche Peak

  • Diablo Canvon
  • Palo Verde e South Texas Proiect e Wolf Creek

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

) Docket No. 72-26 In the Matter of

)

PACIFIC GAS AND ELECTRIC COMPANY) )

Diablo Canyon

)

Independent Spent Fuel Storage

)

Installation

)

AFFIDAVIT Lawrence F. Womack, of lawful age, first being duly sworn upon oath says that he is Vice President, Nuclear Services of Pacific Gas and Electric Company; that he is familiar with the content thereof; that he has executed Amendment 1 to the Diablo Canyon ISFSI License Application on behalf of said company with full power and authority to do so; and that the facts stated therein are true and correct to the best of his knowledge, information, and belief.

Lawrence F. Womack Vice President, Nuclear Services Subscribed and sworn to before me this 14th day of October 2002.

'Notary Public State of California County of San Luis Obispo SNDRA L.RECTO Commnssion # 13393801 z

Notary Public-Calffomrin 7

Le San Luis Obispo County My om mnExpre an1,20

NOTICE OF CONTROLLED DOCUMENT TRANSMITTAL Date:

October 15, 2002 To:

Document Control Desk From:

Nuclear Quality, Analysis, and Licensing

Subject:

Transmittal of Amendment 1 to the Diablo Canyon ISFSI License Application (License Application, Safety Analysis Report, and Environmental Report)

Please insert the enclosed replacement sections, tables, and figures in Copy No.

1 of the Diablo Canyon ISFSI License Application currently in your possession.

Kindly acknowledge receipt of the Amendment 1 package and compliance with the document revision instructions by signing and returning the controlled document transmittal notice to:

Gregory W. Heggli Diablo Canyon Power Plant Mail Stop 104/5/16C N P.O. Box 56 Avila Beach, CA 93424 I have received the Amendment I package and have complied with the Amendment Instructions for the Diablo Canyon ISFSI License Application.

Signature of Document Holder Date

DIABLO CANYON ISFSI LICENSE APPLICATION AMENDMENT 1 AMENDMENT INSTRUCTIONS These amendment instructions provide a guide for incorporation of amended pages into the Diablo Canyon ISFSI License Application (License Application, Safety Analysis Report, and Environmental Report). The enclosed pages are intended as replacement sheets for materials that currently exist in your controlled copy, and include pages in various sections of text, tables, and figures. The replacement sheets have been designated as "Amendment 1 October 2002" at the bottom right comer of each page.

The replacement pages include primarily information that has been revised substantively in developing Amendment 1. The vertical revision bars on the sides of these pages (with the exception of figures, which show no revision bars) reflect the location of the Amendment 1 changes.

To facilitate the replacement of the affected pages, entire sections are provided as replacement pages even though only a few of the pages may have been altered. It should be noted that some contents have increased in length while others have shortened. Therefore, there may not be an exact correspondence between the replacement pages and the current pages.

The following pages provide detailed instructions for replacement of affected pages, including text, tables, figures, and appendices.

The amendment instructions and removed sheets may be discarded once all replacements have been completed.

Diablo Canyon ISFSI License Application Filing Instructions Remove Current Sheets Insert New Sheets List of Current Pages (4 pages)

Contents (1 page)

Attachment B Emergency Plan Section 7 (65 pages)

Attachment C Technical Specifications TS Comparision Table (16 pages)

Entire Technical Specifications (29 pages)

TS Bases Technical Specification Bases (21 pages)

List of Current Pages (5 pages)

Contents (1 page)

Section 7 (65 pages)

TS Comparison Table (18 pages)

Entire Technical Specifications (47 pages)

TS Bases (31 pages)

DIABLO CANYON ISFSI LICENSE APPLICATION CONTENTS License Application License Application Tables License Application Figures Attachment A - PG&E YEAR IN REVIEW & FINANCIAL STATISTICAL REPORT PG&E Corporation - 2000 Annual Report Attachment B - EMERGENCY PLAN Attachment C - PROPOSED TECHNICAL SPECIFICATIONS Comparison Between Holtec Technical Specifications and Diablo Canyon ISFSI Technical Specifications Proposed Technical Specifications for Diablo Canyon Independent Spent Fuel Storage Installation (ISFSI)

Technical Specification Bases for Diablo Canyon Independent Spent Fuel Storage Installation (ISFSI)

Attachment D - TRAINING PROGRAM Attachment E - QUALITY ASSURANCE PROGRAM Quality Assurance Program Table Quality Assurance Program Figures Attachment F - PRELIMINARY DECOMMISSIONING PLAN Amendment 1 October 2002

DIABLO CANYON ISFSI LICENSE APPLICATION LIST OF CURRENT PAGES Amendment Page No.

Amendment Page No.

Amendment CONTENTS License Application 1

2 3

4 5

6 7

8 9

10 11 12 Attachment A PG&E Year In Review

& Financial Statistical Report PG&E Corporation 2000 Annual Report Cover Page Corporate Overview 1

2 3

4 5

6 7

8 9

10 11 Amendment 1 October 2002 Page No.

I 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 I

DIABLO CANYON ISFSI LICENSE APPLICATION LIST OF CURRENT PAGES Amendment Page No.

Amendment Page No.

Amendment 94 95 96 97 98 99 Attachment B Emergency Plan Cover Page Change Synopsis Table of Contents 1

Section 1 1

3 4

5 6

7 8

Section 2 1

2 Section 3 1

Section 4 1

2 4

5 6

7 8

9 10 11 12 Amendment 1 October 2002 Pa2e No.

13 14 15 16 17 18 19 20 21 Section 5 1

2 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 23 24 25 26 27 28 29 30 31 32 Section 6 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 Section 7 1

2 4

5 6

1 1

1 1

1 1

2

DIABLO CANYON ISFSI "LICENSE APPLICATION LIST OF CURRENT PAGES Amendment Page No.

Amendment Page No.

Amendment 1

1 1

1 1

1 1

1 1

1' 1

1 1

Attachment C Proposed Technical Specifications TS Comparison Matrix 1

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 Amendment 1 October 2002 Page No.

48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 Section 8 1

2 3

4 5

6 7

8 9

Section 9 1

2 Section 10 I

Appendix A 1

2 3

Appendix B I

Appendix C I

1 1 of18 1

1 2 of 18 1

1 3 of 18 1

1 4 of 18 1

1 5 of 18 1

6 of 18 1

7 of 18 1

1 8 of 18

-1 1

9 of 18 1

1 10 of 18 1

11 of18 1

12 of 18 1

13 of 18 1

14 of 18 1

15 of 18 1

16 of 18 1

17 of 18 1

18 of 18 1

Technical Specifications Table of Contents 1

1.1-1 41 1.1-2 1

1.1-3 1

1.1-4 1

1.2-1 1

1.2-2 1

1.3-1 1

1.3-2 1

1.3-3 1

1.3-4 1

1.4-1 1.4-2 1

1.4-3 1

I

3

DIABLO CANYON ISFSI LICENSE APPLICATION LIST OF CURRENT PAGES Amendment Page No.

Amendment Page No.

Amendment 2.0-1 2.0-2 2.0-3 2.0-4 2.0-5 2.0-6 2.0-7 2.0-8 2.0-9 2.0-10 2.0-11 2.0-12 2.0-13 2.0-14 2.0-15 2.0-16 3.0-1 3.0-2 3.1-1 3.1-2 3.1-3 3.1-4 3.1-5 3.2-1 3.2-2 4.0-1 4.0-2 4.0-3 4.0-4 5.0-1 5.0-2 5.0-3 TS Bases Table of Contents B3.0-1 B3.0-2 B3.0-3 B3.0-4 133.0-5 133.0-6 B3.0-7 B3.1 -1 B3.1-2 B3.1-3 B3.1-4 B3.1-5 B3.1-6 B3.1-7 B3.1-8 B3.1-9 B3.1-10 B3.1-11 B3.1-12 B3.1-13 B3.1-14 B3.1-15 B3.1-16 B3.1-17 B3.2-1 B3.2-2 B3.2-3 B3.2-4 B3.2-5 Attachment D Training Program 1

2 Attachment E Qualitv Assurance Program Cover Page Change Synopses i

111 iv 17.1-1 17.1-2 Amendment 1 October 2002 Page No.

17.1-3 17.1-4 17.1-5 17.1-6 17.1-7 17.1-8 17.2-1 17.2-2 17.2-3 17.2-4 17.2-5 17.2-6 17.2-7 17.2-8 17.3-1 17.3-2 17.3-3 17.4-1 17.5-1 17.5-2 17.5-3 17.6-1 17.7-1 17.7-2 17.8-1 17.9-1 17.10-1 17.10-2 17.11-1 17.12-1 17.13-1 17.14-1 17.15-1 17.16-1 17.17-1 17.17-2 17.17-3 17.17-4 17.17-5 17.18-1 17.18-2 4

DIABLO CANYON ISFSI LICENSE APPLICATION LIST OF CURRENT PAGES Page No.

Amendment Page No.

Amendment Page No.

Amendment 17.18-3 Table 17.1-1, Sheet 1 Table 17.1-1, Sheet 2 Table 17.1-1, Sheet 3 Table 17.1-1, Sheet 4 Table 17.1-1, Sheet 5 Table 17.1-1, Sheet 6 Table 17.1-1, Sheet 7 Table 17.1-1, Sheet 8 Table 17.1-1, Sheet 9 Table 17.1-1, Sheet 10 Table 17.1-1, Sheet 11 Figure 17.1-1 Figure 17.1-2 Attachment F Proposed Decommissioning Plan i

1-1 2-1 2-2 2-3 3-1 4-1 5-1 6-1 6-2 7-1 Amendment 1 October 2002 5