MONTHYEARML22147A1492022-06-0202 June 2022 Relief Request RP-3 Regarding Fuel Oil Transfer Pump Testing ML22136A1092022-05-24024 May 2022 Proposed Alternative Request RP-2 Regarding the Inservice Testing of Certain Pumps ML22118B0382022-05-0505 May 2022 Proposed Alternative Request RP-4 Regarding the Inservice Testing of High-Pressure Injection Pumps ML22082A2532022-03-29029 March 2022 Correction Letter - Issuance of Authorization of Proposed Alternative to Use ASME OM Code Case OMN-27 ML22012A2972022-01-21021 January 2022 Proposed Alternative to Use ASME OM Code Case OMN-27 L-20-256, Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2020-09-28028 September 2020 Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ML18004A1222018-01-22022 January 2018 FENOC-Beaver Valley, Davis-Besse, and Perry - Alternative for the Use of ASME Code Case N-513-4 (CAC Nos. MG0120, MG0121, MG0122, and MG0123; EPID L-2017-LLR-0088) ML16328A1252017-01-23023 January 2017 Relief from the Requirements of the American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants (OM Code) (TAC No. MF7780 - MF7783) ML14175B5532014-08-28028 August 2014 Correction Letter for Relief Requests RR-A1, RR-B1, RP-1, PR-1A, RP3, RR-A36 ML13210A4672013-08-0101 August 2013 Safety Evaluation for Relief Requests RP-6 and RV-1 ML1113105612011-05-19019 May 2011 Acceptance of Requested Licensing Action Relief Request, Proposed Alternative to System Leakage Test Requirements ML1025715692010-09-20020 September 2010 Nozzle RR ML1002715312010-01-29029 January 2010 Relief Request RR-A32 for the Application of Full Structural Weld Overlays on Dissimilar Metal Welds of Reactor Coolant Piping ML1000805732010-01-21021 January 2010 Unit, Relief Request RR-A33 for the Application of Full Structural Weld Overlays on Dissimilar Metal Welds of Reactor Coolant Piping ML0731905112007-12-20020 December 2007 Request for Alternative RR-A30, Revision 2 to Use Proposed Alternative to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Requirements for Structural Weld Overlays (Tac No. MD4452) ML0732301832007-12-14014 December 2007 Request for Alternative RR-A31 for Pressurizer J-Groove Nozzle Weld Repairs (Tac No. MD5956) ML0624404782006-10-19019 October 2006 Evaluation of Request for Relief from the Requirements of the ASME Code, Full Structural Weld Overlay ML0404201062004-02-26026 February 2004 Relief Request, Inservice Testing for Pressurizer Relief Valve ML0227002792002-09-30030 September 2002 Relief, Third 10-Year Interval Inservice Inspection Program Plan ML0227402332002-09-26026 September 2002 Revision to 10 CFR 50.55a Request RR-B4 Regarding American Society of Mechanical Engineers Boiler and Pressure Vessel Code Inservice Inspection Requirement ML0221906062002-08-0101 August 2002 Firstenergy Nuclear Operating Company 10 CFR 50.55a Requests for Alternatives Pursuant to American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) Requirements at the Davis-Besse Nuclear Power Station - Third Ten ML0135301162002-02-20020 February 2002 Inservice Inspection Relief Request No. RR-A22 for the Second 10-Year Inspection Interval 2022-06-02
[Table view] Category:Letter
MONTHYEARIR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000346/20234012023-09-13013 September 2023 Security Baseline Inspection Report 05000346/2023401 (Public) L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000346/20230112023-08-30030 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000346/2023011 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000346/20230052023-08-24024 August 2023 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2023005) L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000346/20230502023-08-0303 August 2023 Special Inspection Report 05000346/2023050 IR 05000346/20230902023-08-0101 August 2023 EA-23-002 Davis-Besse Nuclear Power Station - NRC Inspection Report No. 05000346/2023090 (Public) ML23178A2742023-08-0101 August 2023 Letter to the Honorable Marcy Kaptur from Chair Hanson Responds to Letter Regarding the License Transfer Application for the Davis-Besse Nuclear Power Station L-23-175, Submittal of Fifth Ten Year Inservice Testing Program2023-08-0101 August 2023 Submittal of Fifth Ten Year Inservice Testing Program IR 05000346/20230022023-07-27027 July 2023 Integrated Inspection Report 05000346/2023002 ML23193A7842023-07-13013 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000346/2023402 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML23160A2342023-06-13013 June 2023 Confirmation of Initial License Examination L-23-034, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-13013 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models IR 05000346/20235012023-06-13013 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000346/2023501 L-23-135, Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-31031 May 2023 Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) ML23131A2732023-05-15015 May 2023 Notification of NRC Supplemental Inspection 95001 and Request for Information L-23-101, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 20222023-05-12012 May 2023 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 2022 L-23-131, Readiness for Resumption of NRC Supplemental Inspection2023-05-12012 May 2023 Readiness for Resumption of NRC Supplemental Inspection IR 05000346/20230102023-05-0909 May 2023 Commercial Grade Dedication Inspection Report 05000346/2023010 ML23123A1272023-05-0303 May 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Davis-Besse Nuclear Power Station IR 05000346/20230012023-05-0101 May 2023 Integrated Inspection Report 05000346/2023001 and 07200014/2022001 L-23-092, Occupational Radiation Exposure Report for Year 20222023-04-27027 April 2023 Occupational Radiation Exposure Report for Year 2022 ML23111A1972023-04-26026 April 2023 Information Meeting with Question and Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Plant Station ML23114A1062023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-20020 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments CP-202300157, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-14014 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML23096A1382023-04-11011 April 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage ML23066A2892023-03-14014 March 2023 Request for Threshold Determination Under 10 CFR 50.80 and 10 CFR 72.50 for an Amendment to the Voting Agreement ML23066A2592023-03-14014 March 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2, Davis Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 2024-02-02
[Table view] |
Text
FENOC 5501 North State Route 2 FirstEnergy Nuclear OperatingCompany Oak Harbor,Ohio 43449 Lew W. yers 419-321-7599 Chief Operating Officer Fax 419-321-7582 Docket Number 50-346 License Number NPF-3 Serial Number 2808 September 26, 2002 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001
Subject:
Revision to 10 CFR 50.55a Request RR-B4 Regarding American Society of Mechanical Engineers Boiler and Pressure Vessel Code Inservice Inspection Requirement at the Davis-B esse Nuclear Power Station (TAC No. MB 1607)
Ladies and Gentlemen:
The FirstEnergy Nuclear Operating Company letter Serial Number 2672, dated September 19, 2000, submitted the revised Davis-Besse Nuclear Power Station, Unit 1 (DBNPS)
Inservice Inspection Program for the third ten-year interval based on Section XI of the 1995 Edition and Addenda through the 1996 Addenda of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code. Included with the program revision were several 10 CFR 50.55a requests related to specific conformance with certain Code requirements. This letter provides a revision to the 10 CFR 50.55a request RR-B4 consistent with discussions with members of the Nuclear Regulatory Commission (NRC) Nuclear Reactor Regulation (NRR) staff on September 5, 2002.
Specifically, the 10 CFR 50.55a request for RR-B4 has been revised to delete the references to NRC Regulatory Guide 1.147 and Code Case N-522. The revision to RR-B4 is attached for NRC review and approval.
- 1 - 1ý Docket Number 50-346 License Number NPF-3 Serial Number 2808 Page 2 Should you have any questions or require additional information, please contact Mr.
Patrick J. McCloskey, Manager-Regulatory Affairs, at (419) 321-8450.
Very truly yours, DRW/RMC/s Attachments cc: J. E. Dyer, Regional Administrator, Region III J. B. Hopkins, NRC/NRR Senior Project Manager C. S. Thomas, DB-1 Senior Resident Inspector Utility Radiological Safety Board
Docket Number 50-346 License Number NPF-3 Serial Number 2808 Page 1 of 3 FIRST ENERGY NUCLEAR OPERATING COMPANY DAVIS-BESSE UNIT 1 THIRD 10-YEAR INTERVAL RELIEF REQUEST RR-B4 System/Component(s) for Which Relief is Requested:
ASME Code Section XI, Class 2 Piping
- 1. Containment Purge System Piping from Valve CV5005 to Valve CV5006 (Line HBB-17) at Containment Penetration 33.
- 2. Containment Purge System Piping from Valve CV5007 to Valve CV5008 (Line H-BB-18) at Containment Penetration 34.
Code Requirement:
Table IWC-2500-1, Examination Category C-H, Code Item No. C7.30 of the 1995 Edition, 1996 Addenda of ASME Code Section XI requires a system leakage test of piping once each inspection period using a VT-2 visual inspection.
Code Requirement from Which Relief is Requested:
Portions of the piping segments between the containment isolation valves for Containment Purge System Penetrations 33 and 34 are inaccessible. Relief is requested to the above referenced ASME Code Section requirement regarding the use of a VT-2 visual examination of the complete piping segment between the containment isolation valves.
Basis for Relief:
Containment Purge System Penetrations 33 and 34 piping are tested in accordance with 10 CFR Appendix J, Option B, Type C testing requirements. If leakage is identified during the test, the test boundary is VT-2 visually examined with the soap bubble technique to verify the source of leakage is not through-wall leakage.
Rubber foam barriers and rubber boots installed around the piping at the containment penetrations prohibit access to a portion of the pipe segment. The containment penetration sleeve also extends to within 3 inches of the containment
Docket Number 50-346 License Number NPF-3 Serial Number 2808 Page 2 of 3 isolation valve prohibiting access to a portion of the piping within the sleeve.
Due to this configuration, it is not practical to use a soap bubble technique VT-2 visual examination along the entire length of the pipe. Even the removal of the fire penetration barriers and rubber boots would not allow for a complete soap bubble technique VT-2 visual examination due to the length of the pipe and lack of clearance between the pipe and penetration sleeve.
During normal operations, the containment purge valves are normally closed and the piping is subjected to atmospheric conditions. The inaccessible area contains only longitudinal welds. As these longitudinal welds area were made during the pipe manufacturing process under controlled conditions, it is highly unlikely that inservice flaws would develop under the piping's normal service conditions.
Accordingly, relief is requested pursuant to 10 CFR 50.55a(g)(5)(iii) as the VT-2 examination of the inaccessible portions of the Containment Purge System piping is impractical to perform. A 10 CFR 50.55a request for this piping was previously approved by the NRC for the Second 10-Year Interval Inservice Inspection Program as Relief Request RR-B5 (TAC Nos. M79034 and M77942).
Alternative Examination:
Containment Purge System Penetrations 33 and 34 piping will be tested in accordance with 10 CFR Appendix J, Option B, Type C testing requirements. If leakage is noted during the test, the containment isolation valves and the accessible portions of the piping segment between the containment isolation valves will be VT-2 visually examined with the soap bubble technique to verify the source of leakage is not through-wall leakage.
Justification for the Granting of Relief:
The examination of portions of the piping segment between the Containment Purge Valves is impractical due to inaccessibility of the piping within the penetration sleeve and the penetration rubber foam barriers and rubber boots surrounding the piping. In order to perform the VT-2 visual examination to the entire piping segment between the containment isolation valves, the subject piping would require extensive design modifications. Due to the service conditions of this piping it is highly unlikely that service induced flaws would occur in the inaccessible piping portions.
Docket Number 50-346 License Number NPF-3 Serial Number 2808 Page 3 of 3 Implementation Schedule:
The Containment Purge System piping at Containment Purge System Penetrations 33 and 34 will be pressure tested in accordance with 10 CFR 50 Appendix J, Option B, Type C testing requirements each inspection period under the Third Ten-Year Interval Inservice Inspection Program.
Docket Number 50-346 License Number NPF-3 Serial Number 2808 Page 1 COMMITMENT LIST The following list identifies those actions committed to by the Davis-Besse Nuclear Power Station (DBNPS) in this document. Any other actions discussed in the submittal represent intended or planned actions the DBNPS. They are described only for information and are not regulatory commitments. Please notify the Manager - Regulatory Affairs (419-321-8450) at the DBNPS of any questions regarding this document or associated regulatory commitments.
COMMITMENTS DUE DATE None