L-98-051, Requests Extension for Response to NRC Re Violations Noted in Insp Repts 50-334/97-08 & 50-412/97-08, Until 980420,based on 980313 Telcon & Upcoming NRC Site Visit

From kanterella
(Redirected from L-98-051)
Jump to navigation Jump to search
Requests Extension for Response to NRC Re Violations Noted in Insp Repts 50-334/97-08 & 50-412/97-08, Until 980420,based on 980313 Telcon & Upcoming NRC Site Visit
ML20217C941
Person / Time
Site: Beaver Valley
Issue date: 03/19/1998
From: Jain S
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
50-334-97-08, 50-334-97-8, 50-412-97-08, 50-412-97-8, L-98-051, L-98-51, NUDOCS 9803270240
Download: ML20217C941 (2)


Text

ge-

  • eV ey Power Staten SNppingport. PA 15077-0004 ESINaw-a March 19,1998 ruNi$UE 72"UEen L-98-051 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No.1 and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Integrated Inspection Report 50-334/97-08 and 50-412/97-08 Notice of Violation Response By letter dated January 9,1998, Duquesne Light Company (DLC) provided a response to the Notice of Violation (NOV) included with the subject inspection report dated November 26,1997. In this letter, DLC provided a basis for why DLC did not concur with Violation B (50-334/97-08-05), and requested that the violation be withdrawn. By letter dated February 18, 1998, the NRC provided the conclusions of their review of the DLC response to the NOV. In this letter, the NRC disagreed with DLC's rationale for requesting the withdrawal of the violation, and requested that DLC provide an additional response to the violation by March 20,1998.

On March 13, 1998, a telephone conference was held between Mr. J. R. White, Mr. N. S. Perry, Dr. J. C. Jang and Mr. G. T. Dentel of the Region I staff and Mr. R. L. LeGrand, Mr. R. M. Vento and other members of the DLC staff to discuss the violation. As a result of this discussion, it was agreed that an NRC site visit would be appropriate to further review the technical details of the radiation monitor system calibration methods utilized at Beaver Valley Power Station. This visit was tentatively scheduled to occur by April 2,1998.

Based on this telephone conference and the upcoming NRC site visit, DLC requests an extension for the response to the February 18,1998, NRC letter until April 20,1998.

This extension request was also agreed to during the March 13, 1998, telephone conference call.

DELIVEllNG OVAttTy 9803270240 980319 PDR

\ 0 EaEnay ADOCK 05000334 G PDR t h

. Beaver Valley P wer Station, Unit No. I and No. 2 -

Integrated Inspection Report 50-334/97-08 and 50-412/97-08 Noticepf Violation Response Page 2 .

If there are any questions concerning this matter, please contact Mr. J. Arias at (412) 393-5203.

L Sincerely, gm EW Sushil C. Jain c: Mr. D. S. Brinkman, Sr. Project Manager Mr. D. M. Kern, Sr. Resident Inspector Mr. H. J. Miller, NRC Region I Administrator Mr. N. S. Perry, Acting Chief, Reactor Projects Branch No. 7, Region I Mr. J. R. White, Chief, Radiation Safety Branch, Region I

.