L-2018-024, Submittal of Summary of Changes to Radiological Emergency Plan Revision 63

From kanterella
Jump to navigation Jump to search
Submittal of Summary of Changes to Radiological Emergency Plan Revision 63
ML18032A750
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/31/2018
From: Stamp B
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML18032A750 List:
References
L-2018-024
Download: ML18032A750 (1)


Text

  • F=PL.

JAN 3 1 2018 L-2018-024 10 CFR 50.4 10 CFR 50 Appendix E U.S. Nuclear Regulatory Commission Attn : Document Control Desk Washington, D. C. 20555-0001 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Radiological Emergency Plan Revision 63 The Turkey Point Plant Radiological Emergency Plan, Revision 63 was implemented on January 5, 2018.

A summary of the changes to the revised document is attached. FPL has determined that the changes described do not result in a decrease in the effectiveness of the Emergency Plan.

Sincerely,

~

Brian Stamp Plant General Manager Turkey Point Nuclear Plant Attachment cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Florida Power & Light Company 9760 SW 344 St Homestead, FL 33035