Letter Sequence Supplement |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: L-2021-063, Subsequent License Renewal Application Notification, L-2021-192, Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report, L-2022-108, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response, L-2023-026, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4, ML21215A316, ML21285A107, ML21351A238, ML21351A239, ML21351A241, ML21351A248, ML21354A837, ML21356A011, ML22010A094, ML22010A096, ML22010A097, ML22010A100, ML22012A263, ML22012A282, ML22012A391, ML22013A277, ML22013A282, ML22013A284, ML22013A288, ML22013A292, ML22013A293, ML22013A294, ML22013A295, ML22013A296, ML22013A297, ML22013A301, ML22013A302, ML22013A303, ML22013A304, ML22013A305, ML22013A307, ML22013A316, ML22013A317, ML22013A334, ML22188A086, ML23200A123
|
MONTHYEARL-2021-064, Request for Exemption from the Schedular Requirements of 10 CFR 54.17 (C)2021-03-17017 March 2021 Request for Exemption from the Schedular Requirements of 10 CFR 54.17 (C) Project stage: Request L-2021-063, Subsequent License Renewal Application Notification2021-03-17017 March 2021 Subsequent License Renewal Application Notification Project stage: Other ML21215A3192021-08-0303 August 2021 Appendix E - Applicant'S Environmental Report for St. Lucie Project stage: Request ML21215A3152021-08-0303 August 2021 Application for Subsequent Renewed Facility Operating Licenses Project stage: Request ML21215A3162021-08-0303 August 2021 Enclosure 1: Subsequent License Renewal Application Enclosures Summary Project stage: Other ML21215A3172021-08-0303 August 2021 Enclosure 2: Affidavits Supporting Withholding Proprietary Information from Public Disclosure Project stage: Request L-2021-192, Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report2021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report Project stage: Other ML21285A1072021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1 Project stage: Other L-2021-209, Refueling Outage SL1-30 Steam Generator Tube Inspection Report2021-11-0101 November 2021 Refueling Outage SL1-30 Steam Generator Tube Inspection Report Project stage: Request ML22013A2772021-11-21021 November 2021 2.4 Structural Scoping and Screening Breakout Questions Project stage: Other ML21356A0112021-12-17017 December 2021 Trp 148.3 and 148.4 St Lucie SLRA Breakout Questions Project stage: Other ML21351A2482021-12-17017 December 2021 Trp 26 St. Lucie SLRA - Fire Protection Breakout Questions Project stage: Other ML21351A2412021-12-17017 December 2021 Trp 15 St. Lucie SLRA - Internal Coatings Breakout Questions - Allik Project stage: Other ML21351A2392021-12-17017 December 2021 Trp 14 St. Lucie SLRA - Buried Pipe Breakout Questions - Allik.Docx Project stage: Other ML21351A2382021-12-17017 December 2021 Trp 148.1 St. Lucie SLRA - Breakout Questions for TLAA Section 4.7.1 Rev. 1 Project stage: Other ML21354A8372021-12-20020 December 2021 Trp 11 St. Lucie SLRA Breakout Questions Project stage: Other ML22013A2922021-12-21021 December 2021 Trp 41 St. Lucie SLRA - Breakout Questions Project stage: Other ML22013A2822021-12-21021 December 2021 SLRA - Breakoutt Questions Corrosion OE Project stage: Other ML22013A2842021-12-21021 December 2021 Trp 18 St. Lucie SLRA - Breakout Questions Bolting Integrity Project stage: Other ML22013A2882021-12-21021 December 2021 Trp 23 & 147.8 St. Lucie SLRA - Breakout Questions Cranes AMP-TLAA Project stage: Other ML22013A2932021-12-21021 December 2021 Trp 45 St. Lucie SLRA - Breakout Questions Masonry Walls Project stage: Other ML22013A2942021-12-21021 December 2021 Trp 46 St. Lucie SLRA - Breakout Questions Structures Monitoring Project stage: Other ML22013A2952021-12-21021 December 2021 Trp 47 St. Lucie SLRA - Breakout Questions Project stage: Other ML22013A2962021-12-21021 December 2021 Trp 74 St. Lucie SLRA - Breakout Questions Project stage: Other ML22013A2972021-12-21021 December 2021 Trp 77 St. Lucie SLRA - Breakout Questions Corrosion Structural Project stage: Other ML22013A3012021-12-21021 December 2021 TRP60 St. Lucie SLRA - Breakout Questions Fatigue Monitoring Project stage: Other ML22013A3022021-12-21021 December 2021 Trp 143.1 St Lucie SLRA - Breakout Questions Class 1 Fatigue Project stage: Other ML22013A3032021-12-21021 December 2021 Trp 143.2 St Lucie SLRA - Breakout Questions Non-Class 1 Fatigue Project stage: Other ML22013A3042021-12-21021 December 2021 Trp 143.3 St Lucie SLRA - Breakout Questions EAF Project stage: Other ML22013A3052021-12-21021 December 2021 Trp 143.4 St Lucie SLRA - Breakout Questions HELB Project stage: Other ML21356A5772021-12-22022 December 2021 Slar Breakout Questions - Fire Protection Scoping and Screening Project stage: Approval ML22010A0942022-01-0404 January 2022 Trp 29 St. Lucie SLRA - Tank Breakout Project stage: Other ML22010A0962022-01-0505 January 2022 Trp 010 St Lucie SLRA - Boricacidcorrbreakoutq - Makar Project stage: Other ML22010A0972022-01-0707 January 2022 Trp 038 Psl Internal Surfaces Breakout Questions - Allik Project stage: Other ML22010A1002022-01-0707 January 2022 Trp 033 Psl Selective Leaching Breakout Questions - Allik Project stage: Other ML22012A2632022-01-10010 January 2022 Trp 3 - St. Lucie Psl SLRA Breakout Question Reactor Head Closure Stud Bolting Project stage: Other ML22012A2822022-01-10010 January 2022 TRP142- St. Lucie SLRA Section 4.2 - Breakout Questions Project stage: Other ML22013A3342022-01-11011 January 2022 TRP16 - St. Lucie SLRA Breakout Questions_Pwr Internals Project stage: Other ML22130A6542022-01-11011 January 2022, 21 January 2022 SLRA - Audit Report - Audit Questions Transmitted to Florida Power & Light (FPL) Project stage: Request ML22013A3072022-01-11011 January 2022 Trp 084 St Lucie SLRA - Ssnial Scclombreakoutq Project stage: Other ML22012A3912022-01-11011 January 2022 Scoping and Screening 2.3.3.2 & 2.3.3.4 St. Lucie SLRA - Breakout Questions Project stage: Other ML22013A3162022-01-12012 January 2022 Trp 020 - St. Lucie SLRA Breakout Questions_Occw Project stage: Other ML22013A3172022-01-12012 January 2022 Trp 030 - St. Lucie SLRA Breakout Questions_Fuel Oil Project stage: Other L-2022-044, Subsequent License Renewal Application Revision 1, Supplement 22022-04-13013 April 2022 Subsequent License Renewal Application Revision 1, Supplement 2 Project stage: Supplement L-2022-071, Subsequent License Renewal Application Revision 1 - Supplement 32022-05-19019 May 2022 Subsequent License Renewal Application Revision 1 - Supplement 3 Project stage: Supplement L-2022-075, Subsequent License Renewal Application-Aging Management Requests for Additional Information (RAI) Set 1A Response and Request for Confirmation of Information (RCI) Set 1 Response2022-06-13013 June 2022 Subsequent License Renewal Application-Aging Management Requests for Additional Information (RAI) Set 1A Response and Request for Confirmation of Information (RCI) Set 1 Response Project stage: Request ML22188A0862022-07-0707 July 2022 SLRA - Audit Report Project stage: Other L-2022-108, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response2022-07-11011 July 2022 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response Project stage: Other L-2022-154, Subsequent License Renewal Application Revision 1, Supplement 42022-09-22022 September 2022 Subsequent License Renewal Application Revision 1, Supplement 4 Project stage: Supplement L-2022-165, Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response2022-10-26026 October 2022 Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response Project stage: Request 2022-01-11
[Table View] |
|
---|
Category:Letter type:L
MONTHYEARL-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-054, 2023 Annual Environmental Operating Report2024-04-0909 April 2024 2023 Annual Environmental Operating Report L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda L-2024-045, Report of 10 CFR 72.48 Plant Changes2024-03-27027 March 2024 Report of 10 CFR 72.48 Plant Changes L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2024-023, Unusual or Important Environmental Event - Turtle Mortality2024-03-0606 March 2024 Unusual or Important Environmental Event - Turtle Mortality L-2024-015, 2023 Annual Radioactive Effluent Release Report2024-02-29029 February 2024 2023 Annual Radioactive Effluent Release Report L-2024-029, 2023 Annual Operating Report2024-02-28028 February 2024 2023 Annual Operating Report L-2024-026, Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules2024-02-27027 February 2024 Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) 2024-08-07
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML24150A2192024-05-29029 May 2024 (E-Mail) St. Lucie, Unit 2 - License Amendment Request, Updated Spent Fuel Pool Criticality Analysis - Acceptance Review L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-126, Enclosure 1: Contents of Improved Technical Specifications (ITS) Submittal2023-10-0202 October 2023 Enclosure 1: Contents of Improved Technical Specifications (ITS) Submittal ML23275A1252023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 4.0, Design Features, Revision 2 - Volume 15 ML23275A1172023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.2, Power Distribution Limits, Revision 2 - Volume 7 ML23275A1162023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.1, Reactivity Control Systems, Revision 2 - Volume 6 ML23275A1152023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.0, LCO and SR Applicability, Revision 2 - Volume 5 ML23275A1122023-10-0202 October 2023 Improved Technical Specifications Conversion License Amendment Request Self-Identified Administrative Changes - Volume 2 ML23275A1182023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.3, Instrumentation, Revision 2 - Volume 8 ML23275A1262023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 5.0, Administrative Controls, Revision 2 - Volume 16 ML23275A1202023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.5, Emergency Core Cooling Systems, Revision 2 - Volume 10 ML23275A1192023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.4, Reactor Coolant System, Revision 2 - Volume 9 ML23275A1212023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.6, Containment Systems, Revision 2 - Volume 11 ML23275A1222023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.7, Plant Systems, Revision 2 - Volume 12 ML23275A1232023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.8, Electrical Systems, Revision 2 - Volume 13 ML23275A1242023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.9, Refueling Operations, Revision 2 - Volume 14 ML23275A1142023-10-0202 October 2023 Improved Technical Specifications Conversion, Chapter 2.0, Safety Limits, Revision 1 - Volume 4 ML23275A1112023-10-0202 October 2023 Improved Technical Specifications (ITS) Revision 2 Submittal Volumes 1 Through 16 ML23275A1102023-10-0202 October 2023 License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1432, Revision 5 L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2022-175, Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-0202 December 2022 Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-154, Subsequent License Renewal Application Revision 1, Supplement 42022-09-22022 September 2022 Subsequent License Renewal Application Revision 1, Supplement 4 L-2022-046, Subsequent License Renewal Application Revision - Documents WCAP-18623-P/NP Revision 1 Submittal2022-04-13013 April 2022 Subsequent License Renewal Application Revision - Documents WCAP-18623-P/NP Revision 1 Submittal L-2022-043, Subsequent License Renewal Application Revision 1 - Supplement 12022-04-0707 April 2022 Subsequent License Renewal Application Revision 1 - Supplement 1 ML22010A0962022-01-0505 January 2022 Trp 010 St Lucie SLRA - Boricacidcorrbreakoutq - Makar ML21285A1072021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1 ML21285A1082021-10-12012 October 2021 Enclosure 1: St. Lucie Nuclear Plant, Units 1 and 2, Subsequent Licensee Renewal Application, Revision 1 ML21285A1112021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report L-2021-192, Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report2021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report ML21215A3192021-08-0303 August 2021 Appendix E - Applicant'S Environmental Report for St. Lucie L-2021-142, Westinghouse Report LTR-REA-21-1-NP, Revision 1, St. Lucie Nuclear Plant, Units 1 and 2, Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 20212021-08-0303 August 2021 Westinghouse Report LTR-REA-21-1-NP, Revision 1, St. Lucie Nuclear Plant, Units 1 and 2, Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 2021 ML21215A3152021-08-0303 August 2021 Application for Subsequent Renewed Facility Operating Licenses ML21215A3162021-08-0303 August 2021 Enclosure 1: Subsequent License Renewal Application Enclosures Summary L-2021-192, Westinghouse, Report LTR-REA-21-1-NP, Revision 1, St. Lucie Units 1 & 2 Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 20212021-05-26026 May 2021 Westinghouse, Report LTR-REA-21-1-NP, Revision 1, St. Lucie Units 1 & 2 Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 2021 L-2020-164, License Amendment to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements2020-12-21021 December 2020 License Amendment to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements L-2020-020, License Amendment Request for RCS Pressure/ Temperature Limits and LTOP Applicable for 55 Effective Full Power Years2020-02-18018 February 2020 License Amendment Request for RCS Pressure/ Temperature Limits and LTOP Applicable for 55 Effective Full Power Years L-2019-091, License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements2019-10-0909 October 2019 License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements L-2019-147, Exigent Technical Specification Amendment Request One-Time Allowed Outage Time Extension for Inoperable EDG2019-07-19019 July 2019 Exigent Technical Specification Amendment Request One-Time Allowed Outage Time Extension for Inoperable EDG L-2018-161, License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation2018-12-20020 December 2018 License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation L-2018-182, License Amendment Request Iodine Removal System Elimination2018-11-0909 November 2018 License Amendment Request Iodine Removal System Elimination L-2018-201, Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2018-11-0909 November 2018 Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-2018-147, Submittal of License Amendment Request to Remove the Site Area Map from Technical Specifications2018-08-0202 August 2018 Submittal of License Amendment Request to Remove the Site Area Map from Technical Specifications L-2018-121, License Amendment Request to Reduce the Number of Control Element Assemblies2018-06-29029 June 2018 License Amendment Request to Reduce the Number of Control Element Assemblies L-2018-120, License Amendment Request to Remove the Site Area Map from the Technical Specifications2018-06-25025 June 2018 License Amendment Request to Remove the Site Area Map from the Technical Specifications L-2018-111, Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2018-06-0707 June 2018 Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-2018-049, Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications2018-05-29029 May 2018 Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications L-2018-031, License Amendment Request Focused Adoption of NEI 99-01. Revision 6 Unusual Event Fire-Related Emergency Action Level Scheme2018-01-31031 January 2018 License Amendment Request Focused Adoption of NEI 99-01. Revision 6 Unusual Event Fire-Related Emergency Action Level Scheme L-2017-155, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2017-12-19019 December 2017 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors 2024-05-29
[Table view] |
Text
6HSWHPEHU
/
&)5
861XFOHDU5HJXODWRU\&RPPLVVLRQ
$WWQ'RFXPHQW&RQWURO'HVN
5RFNYLOOH3LNH
2QH:KLWH)OLQW1RUWK
5RFNYLOOH0'
6W/XFLH1XFOHDU3ODQW8QLWVDQG
'RFNHWVDQG
5HQHZHG)DFLOLW\2SHUDWLQJ/LFHQVHV'35DQG13)
6XEMHFW6XEVHTXHQW/LFHQVH5HQHZDO$SSOLFDWLRQ5HYLVLRQ6XSSOHPHQW
5HIHUHQFHV
)3//HWWHU/GDWHG2FWREHU+/-6XEVHTXHQW/LFHQVH5HQHZDO
$SSOLFDWLRQ+/-5HYLVLRQ $'$06$FFHVVLRQ1R0/$
)3//HWWHU/GDWHG$SULO+/-6XEVHTXHQW/LFHQVH5HQHZDO$SSOLFDWLRQ
5HYLVLRQ+/-6XSSOHPHQW $'$06$FFHVVLRQ1R0/$
)3//HWWHU/GDWHG$SULO+/-6XEVHTXHQW/LFHQVH5HQHZDO$SSOLFDWLRQ
5HYLVLRQ+/-6XSSOHPHQW $'$06$FFHVVLRQ1R0/$
)3//HWWHU/GDWHG0D\+/-6XEVHTXHQW/LFHQVH5HQHZDO$SSOLFDWLRQ
5HYLVLRQ+/-6XSSOHPHQW $'$06$FFHVVLRQ1R0/$
)3//HWWHU/GDWHG-XQH+/-6XEVHTXHQW/LFHQVH5HQHZDO$SSOLFDWLRQ
+/-$JLQJ0DQDJHPHQW5HTXHVWVIRU$GGLWLRQDO,QIRUPDWLRQ 5$, 6HW$5HVSRQVHDQG
5HTXHVWIRU&RQILUPDWLRQRI,QIRUPDWLRQ 5&, 6HW5HVSRQVH $'$06$FFHVVLRQ1R
0/$
)3//HWWHU/GDWHG-XQH+/-6XEVHTXHQW/LFHQVH5HQHZDO$SSOLFDWLRQ
+/-$JLQJ0DQDJHPHQW5HTXHVWVIRU$GGLWLRQDO,QIRUPDWLRQ 5$, 6HW%5HVSRQVH
$'$06$FFHVVLRQ1R0/$
)3//HWWHU/GDWHG-XO\+/-6XEVHTXHQW/LFHQVH5HQHZDO$SSOLFDWLRQ+/-
$JLQJ0DQDJHPHQW5HTXHVWVIRU$GGLWLRQDO,QIRUPDWLRQ 5$, 6HW5HVSRQVH $'$06
$FFHVVLRQ1R0/$
)3//HWWHU/GDWHG$XJXVW+/-6XEVHTXHQW/LFHQVH5HQHZDO$SSOLFDWLRQ
+/-$JLQJ0DQDJHPHQW5HTXHVWVIRU$GGLWLRQDO,QIRUPDWLRQ 5$, 6HW5HVSRQVHDQG
6XEPLWWDORI6XSHUVHGHG5HVSRQVHIRU2QH6HW5$,DQG2QH6XSSOHPHQW
$WWDFKPHQW $'$06$FFHVVLRQ1R0/$
)3//HWWHU/GDWHG6HSWHPEHU+/-6XEVHTXHQW/LFHQVH5HQHZDO
$SSOLFDWLRQ+/-$JLQJ0DQDJHPHQW5HTXHVWVIRU$GGLWLRQDO,QIRUPDWLRQ 5$, 6HW$
5HVSRQVH $'$06$FFHVVLRQ1R0/$
Florida Power & Light Company
15430 Endeavor Drive, Jupiter, FL 33478
6W/XFLH1XFOHDU3ODQW8QLWVDQG
'RFNHWVDQG
/_3DJHRI
)ORULGD3RZHU /LJKW&RPSDQ\ )3/ RZQHUDQGOLFHQVHHIRU6W/XFLH1XFOHDU3ODQW 36/
8QLWVDQGKDVVXEPLWWHGDUHYLVHGDQGVXSSOHPHQWHGVXEVHTXHQWOLFHQVHUHQHZDO
DSSOLFDWLRQ 6/5$ IRUWKH)DFLOLW\2SHUDWLQJ/LFHQVHVIRU36/8QLWVDQG 5HIHUHQFHV
7KHDWWDFKPHQWWRWKLVOHWWHUSURYLGHVDIRXUWKVXSSOHPHQWWRWKH6/5$WRFRUUHFWRPLVVLRQV
IURP7DEOH $SSHQGL[$ DQG6HFWLRQ%
7KHDWWDFKPHQWLQFOXGHVDVVRFLDWHGUHYLVLRQVWRWKH6/5$ (QFORVXUH$WWDFKPHQWRI
5HIHUHQFHDVVXSSOHPHQWHGDQGUHYLVHGE\5HIHUHQFHV GHQRWHGE\VWULNHWKURXJK
GHOHWLRQ DQGRUEROGUHGXQGHUOLQH LQVHUWLRQ WH[W3UHYLRXV6/5$UHYLVLRQVDUHGHQRWHGE\
EROGEODFNWH[W6/5$WDEOHUHYLVLRQVDUHLQFOXGHGDVH[FHUSWVIURPHDFKDIIHFWHGWDEOH
6KRXOG\RXKDYHDQ\TXHVWLRQVUHJDUGLQJWKLVVXEPLWWDOSOHDVHFRQWDFWPHDW
RU:LOOLDP0DKHU#ISOFRP
,GHFODUHXQGHUSHQDOW\RISHUMXU\WKDWWKHIRUHJRLQJLVWUXHDQGFRUUHFW
([HFXWHGRQWKHQGGD\RI6HSWHPEHU
6LQFHUHO\
William
Digitally signed by William Maher DN: cn=William Maher, o=Nuclear, ou=Nuclear Licensing Projects,
email=william.maher@fpl.com, Maher
c=US Date: 2022.09.22 11:36:32 -04'00'
- LOOLDP'0DKHU
/LFHQVLQJ'LUHFWRU1XFOHDU/LFHQVLQJ3URMHFWV
)ORULGD3RZHU /LJKW&RPSDQ\
$WWDFKPHQW 6XSSOHPHQW(QYLURQPHQWDOO\$VVLVWHG)DWLJXH
&F 5HJLRQDO$GPLQLVWUDWRU8615&5HJLRQ,,
6HQLRU5HVLGHQW,QVSHFWRU8615&6W/XFLH3ODQW
&KLHI8615&'LYLVLRQRI1HZDQG5HQHZHG/LFHQVHV
6HQLRU3URMHFW0DQDJHU8615&'LYLVLRQRI1HZDQG5HQHZHG/LFHQVHV
&KLHI%XUHDXRI5DGLDWLRQ&RQWURO)ORULGD'HSDUWPHQWRI+HDOWK
St. Lucie Units 1 and 2 Dockets 50-335 and 50-389 L-2022-154 Attachment 1 Page 1 of 5 Environmentally-Assisted Fatigue Affected SLRA Sections: Table 19-3 (Appendix A2), B.2.2.1 SLRA Page Numbers: A2-65, B-25 Description of Change:
As indicated in the response to RAI 4.3.3-2 (ADAMS Accession No. ML22181A147), the PSL Unit 2 spray nozzle transient (also called the spray nozzle transient 17A/B/C) was intended to be included in the St. Lucie Units 1 and 2 Fatigue Monitoring Program and counted during the SPEO. However, this requirement was inadvertently omitted from the revision to SLRA Table 19-3, Item No. 1 of Appendix A2 and Section B.2.2.1. This supplemental response revises SLRA Table 19.3 of Appendix A2 and Enhancement 2 of SLRA Section B.2.2.1 to reflect this SPEO cycle counting requirement.
In addition to the SLRA revisions discussed above, the revised SLRA Table 19.3 of Appendix A2 and enhancement table of SLRA Section B.2.2.1 below include the revisions associated with 1 of Reference 1, Attachment 10 of Reference 2, Attachments 3 and 4 of Reference 3, and Attachment 5 of Reference 4.
References:
- 1. FPL Letter L-2022-043 dated April 7, 2022 - Subsequent License Renewal Application Revision 1 - Supplement 1 (ADAMS Accession No. ML22097A202)
- 2. FPL Letter L-2022-075 dated June 13, 2022 - Subsequent License Renewal Application
- Aging Management Requests for Additional Information (RAI) Set 1A Response (ADAMS Accession No. ML22164A802)
- 3. FPL Letter L-2022-081 dated June 30, 2022 - Subsequent License Renewal Application
- Aging Management Requests for Additional Information (RAI) Set 1B Response (ADAMS Accession No. ML22181A147)
- 4. FPL Letter L-2022-108 dated July 11, 2022 - Subsequent License Renewal Application
- Aging Management Requests for Additional Information (RAI) Set 2 Response (ADAMS Accession No. ML22192A078)
St. Lucie Units 1 and 2 Dockets 50-335 and 50-389 L-2022-154 Attachment 1 Page 2 of 5 Associated SLRA Revisions:
SLRA Appendix A2, Section 19.4, commitment No. 1 of Table 19-3 on page A2-65, as updated by Attachment 11 to ADAMS Accession No. ML22097A202, Attachments 3 and 4 to ADAMS Accession No. ML22181A147, and Attachment 5 to ADAMS Accession No. ML22192A078, is revised as follows:
19.4 Subsequent License Renewal (SLR) Commitments List Table 19-3 List of Unit 2 SLR Commitments and Implementation Schedule No. Aging Management NUREG-2191 Commitment Implementation Schedule Program or Activity Section (Section) 1 Fatigue Monitoring (19.2.1.1) X.M1 Continue the existing PSL Fatigue Monitoring AMP, including No later than 6 months prior to enhancement to: the SPEO, i.e.:
a) Update the AMP governing procedure to take action to revise the PSL2: 10/06/2042 affected St. Lucie Unit 2 Class 1 piping fatigue analyses before 80-year plant design cycle limits are exceeded, and identify any new break locations (CUF > 0.1) requiring evaluation for impact on essential SSCs, including evaluation for associated dynamic affects (jet impingement, reactive forces and pipe whip, compartment pressure and environmental conditions), as required.
b) Update the plant procedure to monitor chemistry parameters that provide inputs to Fen factors used in CUFen calculations.
c) Update the plant procedure to identify and require monitoring of the 80-year projected plant transients that are utilized as inputs to CUFen calculations. These transients include:
x The plant loading/unloading transient, the 10 percent step load increase/decrease transient, and the cold feedwater following hot standby transient.
x The primary coolant pump starting/stopping transient.
x The auxiliary spray at power 1, auxiliary spray at power 2, and main spray term in cooldown transients.
x The pressurizer spray nozzle transient (also called the spray nozzle transient 17A/B/C).
St. Lucie Units 1 and 2 Dockets 50-335 and 50-389 L-2022-154 Attachment 1 Page 3 of 5 Table 19-3 List of Unit 2 SLR Commitments and Implementation Schedule No. Aging Management NUREG-2191 Commitment Implementation Schedule Program or Activity Section (Section) d) Update the plant procedure to monitor and track the following transients during the SPEO:
x Loss of charging x Loss of letdown x Loss of regenerative heat exchanger (short-term) x Loss of regenerative heat exchanger (long-term) e) Update the plant procedure to identify the corrective action options to take if component specific fatigue limits are approached.
St. Lucie Units 1 and 2 Dockets 50-335 and 50-389 L-2022-154 Attachment 1 Page 4 of 5 SLRA Section B.2.2.1, page B-25, as updated by Attachment 11 to ADAMS Accession No. ML22097A202, Attachment 10 to ADAMS Accession No. ML22164A802, and Attachments 3 and 4 to ADAMS Accession No. ML22181A147, is revised as follows:
Enhancements The PSL Fatigue Monitoring AMP will be enhanced as follows, for alignment with NUREG-2191. The enhancements are to be implemented no later than 6 months prior to entering the SPEO.
Element Affected Enhancement
- 1. Scope of Program Update the AMP governing procedure to take action to revise the affected St. Lucie Unit 2 Class 1 piping fatigue analyses before 80-year plant design cycle limits are exceeded, and identify any new break locations (CUF > 0.1) requiring evaluation for impact on essential SSCs, including evaluation for associated dynamic affects (jet impingement, reactive forces and pipe whip, compartment pressure and environmental conditions), as required.
- 3. Parameters Monitored or Update the AMP governing procedure to monitor the chemistry Inspected parameters that provide inputs to Fen factors used in CUFen calculations. This chemistry parameter includes reactor coolant dissolved oxygen which is controlled and tracked in accordance with the PSL Water Chemistry (Section B.2.3.2) AMP.
- 3. Parameters Monitored or Update the AMP governing procedure to identify and require Inspected monitoring of the 80-year plant design cycles, or projected cycles that are utilized as inputs to component CUFen calculations, as applicable. These transients include:
x The plant loading/unloading transient, the 10 percent step load increase/decrease transient, and the cold feedwater following hot standby transient.
x The primary coolant pump starting/stopping transient.
x The auxiliary spray at power 1, auxiliary spray at power 2, and main spray term in cooldown transients.
x The pressurizer spray nozzle transient (also called the spray nozzle transient 17A/B/C).
- 3. Parameters Monitored or Update the plant procedure to monitor and track the following Inspected transients during the SPEO:
x Loss of charging x Loss of letdown x Loss of regenerative heat exchanger (short-term) x Loss of regenerative heat exchanger (long-term)
St. Lucie Units 1 and 2 Dockets 50-335 and 50-389 L-2022-154 Attachment 1 Page 5 of 5 Element Affected Enhancement
- 5. Monitoring and Trending Update the AMP governing procedure to identify the corrective action options if the values assumed for fatigue parameters are approached, transient severities exceed the design or assumed severities, transient counts exceed the design or Associated
Enclosures:
None.