MONTHYEARL-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-175, Submittal of Fifth Ten Year Inservice Testing Program2023-08-0101 August 2023 Submittal of Fifth Ten Year Inservice Testing Program L-23-034, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-13013 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-135, Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-31031 May 2023 Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-131, Readiness for Resumption of NRC Supplemental Inspection2023-05-12012 May 2023 Readiness for Resumption of NRC Supplemental Inspection L-23-101, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 20222023-05-12012 May 2023 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 2022 L-23-092, Occupational Radiation Exposure Report for Year 20222023-04-27027 April 2023 Occupational Radiation Exposure Report for Year 2022 L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage L-23-059, Response to Apparent Violation in NRC Inspection Report 05000346/2022091; EA 23-0022023-03-0909 March 2023 Response to Apparent Violation in NRC Inspection Report 05000346/2022091; EA 23-002 L-22-212, CFR 50.55a Request RP-5 Regarding Inservice Pump Testing2023-03-0606 March 2023 CFR 50.55a Request RP-5 Regarding Inservice Pump Testing L-23-048, Response to Request for Additional Information Regarding Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report2023-03-0101 March 2023 Response to Request for Additional Information Regarding Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report L-23-057, Energy Harbor Nuclear Corp Retrospective Premium Guarantee2023-02-20020 February 2023 Energy Harbor Nuclear Corp Retrospective Premium Guarantee L-22-253, Submittal of Pressure and Temperature Limits Report, Revision 52023-01-10010 January 2023 Submittal of Pressure and Temperature Limits Report, Revision 5 L-22-284, Request for Notice of Enforcement Discretion for Technical Specification 3.7.9, Ultimate Heat Sink (UHS)2022-12-28028 December 2022 Request for Notice of Enforcement Discretion for Technical Specification 3.7.9, Ultimate Heat Sink (UHS) L-22-211, Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report2022-09-29029 September 2022 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report L-22-216, Submittal of Pressure and Temperature Limits Report. Revision 42022-09-27027 September 2022 Submittal of Pressure and Temperature Limits Report. Revision 4 L-22-213, Occupational Radiation Exposure Report for Year 2021 - Correction2022-09-23023 September 2022 Occupational Radiation Exposure Report for Year 2021 - Correction L-22-129, Submittal of the Updated Final Safety Analysis Report, Revision 342022-09-20020 September 2022 Submittal of the Updated Final Safety Analysis Report, Revision 34 L-22-194, Submittal of Supplemental Information for the Reanalysis for Protection Against Low Temperature Reactor Coolant System Overpressure Events2022-09-19019 September 2022 Submittal of Supplemental Information for the Reanalysis for Protection Against Low Temperature Reactor Coolant System Overpressure Events L-22-203, Submittal of Evacuation Time Estimates2022-09-12012 September 2022 Submittal of Evacuation Time Estimates L-22-050, Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual2022-08-0909 August 2022 Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual L-22-152, Response to Request for Additional Information Regarding a License Amendment Request That Revises the Davis-Besse Nuclear Power Station Emergency Plan2022-07-0505 July 2022 Response to Request for Additional Information Regarding a License Amendment Request That Revises the Davis-Besse Nuclear Power Station Emergency Plan L-22-068, Cycle 22 and Refueling Outage 22 Inservice Inspection Summary Report2022-06-30030 June 2022 Cycle 22 and Refueling Outage 22 Inservice Inspection Summary Report L-22-037, 2021 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2022-06-30030 June 2022 2021 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-22-149, Post Accident Monitoring Report2022-06-23023 June 2022 Post Accident Monitoring Report L-22-153, Readiness for NRC Supplemental Inspection Required for a White Finding2022-06-22022 June 2022 Readiness for NRC Supplemental Inspection Required for a White Finding L-22-098, Withdrawal of Proposed Inservice Inspection Alternative RR-A22022-06-22022 June 2022 Withdrawal of Proposed Inservice Inspection Alternative RR-A2 L-22-136, Steam Generator Tube Circumferential Crack Report - Spring 2022 Refueling Outage2022-06-0707 June 2022 Steam Generator Tube Circumferential Crack Report - Spring 2022 Refueling Outage L-22-102, Report of Facility Changes, Tests, and Experiments2022-05-16016 May 2022 Report of Facility Changes, Tests, and Experiments L-22-092, Combined Annual Radiological Environmental Operating Report and Radiological Effluent Release Report for the Davis-Besse Nuclear Power Station - 20212022-05-16016 May 2022 Combined Annual Radiological Environmental Operating Report and Radiological Effluent Release Report for the Davis-Besse Nuclear Power Station - 2021 L-22-124, Response to Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building2022-05-12012 May 2022 Response to Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building L-22-047, Unit No.1 - Core Operating Limits Report, Cycle 23, Revision O and Revision 12022-05-10010 May 2022 Unit No.1 - Core Operating Limits Report, Cycle 23, Revision O and Revision 1 L-22-127, Readiness for NRC Supplemental Inspection Required for a Greater than Green Finding2022-05-0606 May 2022 Readiness for NRC Supplemental Inspection Required for a Greater than Green Finding L-22-089, Occupational Radiation Exposure Report for Year 20212022-04-12012 April 2022 Occupational Radiation Exposure Report for Year 2021 L-22-056, Energy Harbor Nuclear Corp., Annual Notification of Property Insurance Coverage2022-03-22022 March 2022 Energy Harbor Nuclear Corp., Annual Notification of Property Insurance Coverage L-22-059, Response to Request for Additional Information on Proposed Inservice Test Alternative RP-32022-03-21021 March 2022 Response to Request for Additional Information on Proposed Inservice Test Alternative RP-3 L-22-074, Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-15015 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations L-22-061, Ile Post Exam Letter L-22-0612022-02-24024 February 2022 Ile Post Exam Letter L-22-061 L-22-023, Retrospective Premium Guarantee2022-02-17017 February 2022 Retrospective Premium Guarantee L-21-266, Response to Request for Additional Information on Proposed Inservice Inspection Alternative RR-A22022-01-27027 January 2022 Response to Request for Additional Information on Proposed Inservice Inspection Alternative RR-A2 L-20-289, Emergency Plan Amendment Request2022-01-19019 January 2022 Emergency Plan Amendment Request L-21-290, Response to NRC Inspection Report 05000346/2021091, EA-21-1762021-12-21021 December 2021 Response to NRC Inspection Report 05000346/2021091, EA-21-176 2023-09-12
[Table view] Category:Schedule and Calendars
MONTHYEARL-23-135, Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-31031 May 2023 Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML15113A1072015-04-30030 April 2015 Schedule Revision for the Review of the Davis-Besse Nuclear Power Station License Renewal Application ML14329A4792014-11-28028 November 2014 Schedule Revision for the Review of the Davis-Besse Nuclear Power Station License Renewal Application (TAC No. ME613) ML12032A1312012-01-31031 January 2012 Schedule Revision for the Environmental Review of the Davis-Besse Nuclear Power Station, Unit No. 1, LRA ML12025A1092012-01-31031 January 2012 Schedule Revision for the Environmental Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application ML11353A0152011-12-27027 December 2011 Schedule Revision for the Safety Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application ML12213A3572011-12-0202 December 2011 E-mail from S. Sakai to A. Erickson, Subject: FW: Licensee Projected Timeline ML1101901132011-02-28028 February 2011 Environmental Site Audit Regarding Davis-Besse Nuclear Power Station, Unit Number 1, License Renewal Application ML1034305802010-12-28028 December 2010 Schedule for the Conduct of Review of the Davis-Besse Nuclear Power Station, Unit 1, License Renewal Application L-09-335, Request for Extension of Enforcement Discretion for Noncompliances Related to Fire Protection Programs2010-01-14014 January 2010 Request for Extension of Enforcement Discretion for Noncompliances Related to Fire Protection Programs L-09-219, Response to Regulatory Issue Summary 2009-11, Preparation and Scheduling of Operator Licensing Examinations.2009-08-14014 August 2009 Response to Regulatory Issue Summary 2009-11, Preparation and Scheduling of Operator Licensing Examinations. 2023-05-31
[Table view] |
Text
IFENOC "E%% 5501 North State Route 2 FirstEnergyNuclear Operating Company Oak Harbor,Ohio 43449 Barry S. Allen 419-321-7676 Vice President- Nuclear Fax: 419-321-7582 August 14, 2009 L-09-219 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001
Subject:
Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Response to Regulatory Issue Summary 2009-11, "Preparation and Scheduling of Operator Licensing Examinations" The Davis-Besse Nuclear Power Station (DBNPS) is providing information in response to NRC Regulatory Issue Summary (RIS) 2009-11, "Preparation and Scheduling of Operator Licensing Examinations," as requested. The attached NRC Form 536, "Operator Licensing Examination Data," provides information through calendar year 2017 for Initial Operator License Examinations and through calendar year 2012 for Generic Fundamentals Examinations.
Note that the requested primary date for the 2011 Initial Operator License Examination is different than previously submitted. This operator license class was originally scheduled to start immediately following the DBNPS sixteenth refueling outage.
However, this refueling outage has been rescheduled, and the examination dates submitted under RIS 2008-16 for 2011 and 2013 are affected.
There are no regulatory commitments included in this letter. If there are any questions or if additional information is required, please contact Mr. Robert C. Hovland, Site Training Manager, at (419) 321-8406.
Sincerely, Barry S. Allen LJS MUU5
Enclosure A NRC Form 536 - Operator Licensing Examination Data cc: Regional Administrator, NRC Region III DB-1 NRC/NRR Project Manager DB-1 NRC Senior Resident Inspector Chief, Operations Branch, NRC Region III Utility Radiological Safety Board
Enclosure A L-09-219 Form NRC - 536 Operator Licensing Examination Data (one page follows)
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to intocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Davis-Besse Nuclear Power Station, Unit 1 NRC Region III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 11 CY 13 Cy 15 Cy 17 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 11 Cy 13 Cy 15 CY 17 NUMBER OF REACTOR 6 6 6 6 OPERATORS NUMBER OF SENIOR REACTOR 8 8 8 8 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 2 2 2 2 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 12/05/2011 12/02/2013 12/07/2015 12/04/2017 ALTERNATE DATE 01/09/2012 01/06/2014 01/11/2016 01/08/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER